Skip to content
Georgia Commons
Menu

Grantville · Zoning Ordinance

Appendix A - ZONING / Article 12 - SITING OF WIRELESS TELECOMMUNICATIONS FACILITIES

Sec. 12.16. Lot Size and Setbacks.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All proposed Towers and any other proposed Wireless Telecommunications Facility structures shall be set back from abutting parcels, recorded rightsAPPENDIX A—ZONING § 12.16 of-way and road and street lines by the greater of

the following distances: A distance equal to the height of the proposed Tower or Wireless Telecommunications Facility structure plus ten percent (10%) of the height of the Tower or structure, or the existing

setback requirement of the underlying Zoning District, whichever is greater. Any Accessory structure shall be located so as to comply with the applicable

minimum setback requirements for the property on which it is situated.

History

The history line the source prints at the end of the section.

(Ord. No. 02-2012, § 4, 4-9-2012)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:grantville/zoning/12.16@2026-11-11-08e20a2c31

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Grantville Zoning Ordinance, Sec. 12.16. Lot Size and Setbacks | Georgia Commons