Ir al contenido
Georgia Commons
Menú

Grantville · Ordenanza de zonificación

Appendix A - ZONING / Article 12 - SITING OF WIRELESS TELECOMMUNICATIONS FACILITIES

Sec. 12.16. Lot Size and Setbacks.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All proposed Towers and any other proposed Wireless Telecommunications Facility structures shall be set back from abutting parcels, recorded rightsAPPENDIX A—ZONING § 12.16 of-way and road and street lines by the greater of

the following distances: A distance equal to the height of the proposed Tower or Wireless Telecommunications Facility structure plus ten percent (10%) of the height of the Tower or structure, or the existing

setback requirement of the underlying Zoning District, whichever is greater. Any Accessory structure shall be located so as to comply with the applicable

minimum setback requirements for the property on which it is situated.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 02-2012, § 4, 4-9-2012)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:grantville/zoning/12.16@2026-11-11-08e20a2c31

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Grantville Zoning Ordinance, Sec. 12.16. Lot Size and Setbacks | Georgia Commons