Gray · Zoning Ordinance
Appendix A - ZONING AND SUBDIVISION REGULATIONS / Article XIV - REQUIRED SUBDIVISION IMPROVEMENTS
Section 149. Storm drainage and stormwater management.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Prior to commencement of construction, subdivider shall provide a storm drainage plan to the commission for approval. Said plan shall include accurate existing and proposed watercourses and the system of open channels, pipes, culverts, drains, inlet, catch basins, and similar facilities designed to handle stormwater in times of rainstorms. The calculations used in the design of such systems and plans shall clearly indicate the easements required in the construction and maintenance of the drainage system and said easements shall be shown on the final plat. Further, the subdivider shall comply with all stormwater ordinance requirements of the City of Gray. No development will be approved to proceed that does not address runoff and drainage issues.
History
(Ord. No. 05-O-004, 4-4-2005; Ord. No. 07-O-002, 3-5-2007)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.