A. Procedures for Submittal of Plans and Plat Recordation

1. General Procedure. When any subdivision of land is proposed, before any permit for the subdivision may be granted, the subdividing owner, or his authorized agent, must apply for and secure approval

of the proposed subdivision in accordance with the following procedures of this UDC.

2. Subdivision Defined. See Sec.

12.2.

3. Plat Approval Required. No person may sell or transfer any land by reference to or exhibition of or other use of a plat of a subdivision before such plat has been approved by the Director of Planning and Zoning and recorded in the office of the Clerk of Superior Court of the county. The description of any land by metes and bounds in the instrument of transfer or other documents used in the process of selling or

transfer does not exempt the transaction from this Sec. 11.2.5.

4. Submittal of required plats. Any subdivider of land within unincorporated Hall County must submit to the Director of Planning and Zoning the required plats of the subdivision, which shall conform to the requirements of this UDC.

5. Preliminary Plat Approval Required. No subdivider may proceed with any construction work on the proposed subdivision, including clearing of land, before obtaining a preliminary plat approval from the county.

6. Approved Street Access Required for All Lots. No building permit may be issued for and no building or other structure may be

erected on any lot within the subdivision unless the street giving access to the lot upon which said building

is proposed to be placed has been accepted or opened as, or has otherwise received the legal status of, a public street prior to that time, or unless such street and lot corresponds in its location and lines with a street shown on a subdivision plat approved by the county, or on a street plat made and adopted

by the Board of Commissioners, or a street located and accepted by the governing authority of the county.

Any building erected in violation of this section will be deemed an unlawful structure, and the Building Official, county attorney, or other

official designated by the governing authority of the county may bring appropriate action to enjoin such erection or cause it to be vacated or removed.

7. Exemptions from Preliminary Plat Requirements. The following types of subdivision may be exempted from the requirements of a preliminary plat and are not required to obtain a certificate of preliminary plat approval. The subdivision must be required to obtain a recording and approval certificate as a final plat:

a. A subdivision which has lots fronting on a road or street shown on the official road map of the county; provided no new street, no community water system and no community sewer system is required.

b. The subdivision of land in a designated planned development meeting the requirements of this UDC and having been

approved by the county.

c. A subdivision in which all lots having frontage on a proposed street exceed 1.25 acres per lot may be exempt from curb and gutter and the related storm drainage. Those lots which front on the proposed street may not thereafter be subdivided into lots smaller than 1.25 acres. A statement to this effect must be placed on the final plat to be recorded.

Additionally, those lots shall have a minimum lot width of 100 feet at the building line as defined in Sec. 2.1. Any lot which has at least 50 percent of its frontage on the radius section of a turnaround at the end of a street may measure the building line at a point beyond the minimum required setback line but in no case may the building line be less than 50 feet from the minimum required rear setback line.

8. Preapplication Review. The owner, or their authorized design representative, must review the subdivision plans with the Director of Planning and Zoning prior to submittal of a preliminary plat when the proposed subdivision involves a tract greater than 20 acres, any tract with a community water or sewer system, or any tract in a planned development district with a proposed new street. The informal review is intended to:

a. Review of the requirements of these regulations; and

b. Review of the owner's plans and the development's impact on soil erosion control, subdivision design, water supply and waste treatment.

9. Boundary Survey Required. The subdivider must present a boundary survey of the tract and a rough sketch of the proposal.

10. Submittal of Plans to Affected Agencies. The Director of Planning and Zoning may require the developer to present the plans to any other affected agency.

11. Preliminary Plat Action Required. The owner or their authorized agent must make an application for preliminary plat approval to the Director of Planning and Zoning by filing in the office of the Director the following items, if applicable, in subsection 12 and 13 below.

12. Preliminary Plat Application.

The preliminary plat must contain an application signed by the owner, setting out:

a. Total acreage.

b. Number of lots.

c. Average lot size.

d. Minimum lot size.

e. Proposed use of each lot.

f. Water supply system.

g. Sewer system.

h. Length of proposed roads.

i. Phasing of the subdivision.

j. Estimated time for completion.

k. An outline of any proposed organizations to control a portion or all of the tract, such as a homeowners association or

equivalent body.

l. Notice of intent to dedicate any portion of the property to the public.

13. Preliminary plat; agency approvals and engineering certificate.

The preliminary plat must contain copies of the preliminary plat, drawn according to this section, having affixed to them the stamps or signatures of the following applicable agencies or firms. A letter from an applicable agency may be submitted in lieu of a plat stamp:

a. Approval of the Director of Utilities if to be served by a public water system;

b. Approval of the Department of Natural Resources and Director of Engineering if to be served by a community water

system;

c. Approval of the Director of Utilities if to be served by a public sewer system;

d. Approval of the Department of Natural Resources and Director of Engineering if to be served by a community sewer

system;

e. Approval of the county health department;

f. Preliminary engineering certificate, signed and sealed by an engineer, surveyor or landscape architect registered in Georgia;

g. Approval for construction by the Director of Engineering.

14. Preliminary plat; review by Planning and Zoning Director. The Director of Planning and Zoning

must review the application and, if determined to be complete, submit it to the Planning Commission. The Director may recommend changes that are necessary to meet the standards and intent of this UDC to serve the best interests of the county.

15. Preliminary plat; action by Planning Commission. The Planning Commission, or their designee as

detailed in Sec. 11.1.1.D.3., may:

a. Grant preliminary plat approval; or

b. Grant preliminary plat approval conditional upon any changes, which must be noted on the preliminary plat or attached thereto; or

c. Deny preliminary plat approval, if the plat does not meet the standards and intent of this Sec. 11.2 or any other regulations of this UDC.

16. Preliminary plat; notation of action. Action of the Department of Planning and Zoning must be noted on three copies of the preliminary plat. One copy of the plat must be returned to the applicant.

17. Preliminary Plat, expiration of approval. A certificate of preliminary plat approval will expire 12 months following the date of approval. The applicant must have received, at a minimum, an approved grading inspection within the 12 months following preliminary plat approval to continue work on the subdivision without an extension.

18. Preliminary Plat; appeals. Should an applicant disagree with the comments of the Director of Planning and Zoning, concluding that factual

or interpretive errors have been made, the following appeal procedure is designed to resolve the issues:

a. Submit to the Director a written statement clearly defining the nature of the disagreement, the specific reference to the section of these regulations at issue, and the applicant's own opinion.

b. Should the Director, after review of the applicant's statement, conclude that neither these regulations nor other

applicable regulations or conditions of zoning would be violated, the Director may

modify their comments accordingly. However, should the Director conclude that these or

other applicable regulations would be violated, the case must be referred to the Planning Commission at the earliest regularly scheduled meeting.

c. The Planning Commission must, after receiving a report from the Director, decide the issue.

d. Should the applicant disagree with the decision of the Planning Commission, an application may be filed to appeal the decision to the Board of Commissioners in accordance with Sec. 11.2.7.

19. Soil Erosion and Sedimentation Control Permit; issuance. Following the approval of a preliminary plat, and review and approval by

the Department of Planning and Zoning, a soil erosion and sedimentation control permit may be issued by the Engineering Department.

20. Soil Erosion and Sedimentation Control Permit; implementation of measures. Upon the issuance of a soil erosion and sedimentation control permit:

a. Erosion control measures must be installed by the subdivider and inspected and approved by the Engineering Department prior to any grubbing or grading; and

b. Sediment retention facilities must be installed and operational prior to major grading operations.

21. Extension on Time Limit of Development. Before a certificate of preliminary plat approval has expired, the subdivider may request an extension of the certificate. An application must be made in writing to the Planning Commission.

The Planning Commission must take action on the application in the same manner as an original application. However, if modifications are made to regulations, the plat must

meet these changes.

22. Construction Inspection Schedule. Each phase of the subdivision must be constructed according to the schedule in Table

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/zoning/11.2.5@2026-05-28-39b8ab3138

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Zoning Ordinance, 11.2.5. Subdivision Review Process and | Georgia Commons