Hall County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE / 9.4 - Street Construction Requirements
9.4.2. Cuts, Fills, and Subgrade
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Cuts, fills, and subgrades are subject to the approval of the County Engineer. The County Engineer must specify any improvements which he or she feels necessary to protect community assets and to reduce the potential undue deterioration of street improvements. The subdivider will be guided by the following general requirements:
A. Slope maximums must be at a ratio of two feet horizontal distance to one foot rise;
B. All slopes must be adequately planted with approved vegetation. A suitable
mulch of straw, hay, etc., must be used;
C. The subdivider is responsible for any erosion that might occur until the streets are accepted into the county road
maintenance system;
D. Compaction must be 98 percent by Proctor Density Test;
E. Trees that have one foot of fill or less on the critical root zone and are off the
county right-of-way may remain until the 45-day inspection. At the time of the 45-day inspection, trees that show signs of distress will need to be removed at the discretion of Hall County Engineering.
All other organic materials must be removed from cuts, fills, and subgrade.
F. Backfill behind curbs must be free of organic material, stone, broken concrete, etc.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.