Hall County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE / 9.4 - Street Construction Requirements
9.4.3. Culverts and Storm Sewers
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Materials All culverts and storm sewers must be constructed of the following materials and meet Georgia Department of Transportation (GDOT) specifications.
These specifications are also required of those culvert and storm sewer installations that are connected to the county storm sewer system:
1. Reinforced concrete pipe (RCP), GDOT approved Class III or better.
RCP is required in dams;
2. Corrugated metal pipe is prohibited in applications under streets, within the county right-of-way, and in all live stream applications;
3. High density polyethylene (HDPE) pipe, GDOT approved, class II;
4. Other alternative culvert and storm sewer materials, such as PVC, aluminum, and bottomless designs.
with approval from the County Engineer; and
5. Storm sewer manhole covers must be locking and be engraved with the phrase "Hall County Storm Sewer."
Manhole cover designs must meet County Engineer's approval.
6. Hall County will only be responsible for the maintenance of pipes installed in accordance with numbers 1, 2, and 3 above when such materials are located inside county owned right-of-way.
B. Pipe Sizes All pipe sizes must be approved by the County Engineer to meet the drainage requirements of the watershed and area of the potential runoff. The minimum cross drain diameter is 18 inches.
Minimum cover must be 12 inches below the bottom of pavement base section or 12 inches below the finished grade outside of pavement. The flow velocity must be
no less than 2.5 feet per second for the 25-year, 24-hour design storm. The pipe
slope must be no less than 0.5 percent.
There must be a minimum horizontal separation of 10 feet from water and sanitary sewer pipes and a vertical separation of 18 inches from all utilities.
C. Pipe Construction The gauge or class of pipe used must be determined by acceptable methods using H-20 highway loading and must meet GDOT specifications. The Engineering Department may inspect the pipe before installation to ensure that it is free of cracks or damage. All damaged or used
pipe will be refused.
D. Endwalls All culverts 24 inches in diameter or larger must have endwalls or flared end sections constructed in accordance with GDOT specifications.
E. Catch Basins All catch basins must be designed and constructed in accordance with GDOT specifications and must be GDOT Standard 1033D, 1034D, or 1019. The use of a Standard 1019 is excluded from turnarounds and the low point of sag vertical curves draining more than 300 feet of gutter. The use of Standards 1033D and 1034D may only apply along curbed streets. Drainage calculations and design data are required.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.