Skip to content
Georgia Commons
Menu

Hampton · Zoning Ordinance

Hampton Zoning Ordinance

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 3 of 4. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

of a property appropriately zoned under this article. The flag shall count against the percentage of window signage permitted for the zoned property as delineated in Section 11-9.

J. Handheld signs. All handheld signs shall meet the following regulations:

1. Hand held signs are permitted only in conjunction with the City's ordinances

and regulations of mass gatherings.

2. No handheld signs shall be placed or carried which extend beyond the width of the carrier's body or that extend more

than 24 inches above the carrier's head.

3. All persons carrying any such signs, shields or sandwich boards shall remain at least ten feet apart, shall not stand or loiter in front of any doorway, driveway or public street intersection and shall not interfere with the general flow of traffic, whether pedestrian or vehicular.

4. All handheld signs are exempt from the permitting requirements of Section 11-3.

5. Changeable copy signs and LED signs.

Only monument signs can be changeable copy or LED signs and cannot constitute more than 50 percent of the area of the monument sign.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-6. Special Requirements.

A. City property. All lots, buildings, structures or property owned by the City of Hampton shall be exempt from all requirements of this article.

Further, city-sponsored or operated events shall be exempt from sign regulations. Only official City of Hampton signs or official traffic control and safety signs shall be placed within any city right-of-way.

B. All signs must be placed upon a lot. No sign may be placed on any lot, which lot does not meet the minimum requirements of the Zoning Ordinance and Subdivision Regulations of the Code of Hampton, Georgia.

C. Obstruction to doors, windows or fire escapes. No sign shall be erected, relocated, or maintained so as to prevent free ingress to, or egress from, any door, window or fire escape; nor shall any sign be attached to any stand pipe or fire escape.

D. Seasonal lighting: Allowed only for 45 consecutive days and not to be extended, strands or strings of lights may be erected on each lot in addition to the signage otherwise allowed by this article, but only pursuant to the following conditions:

1. Lighting shall be UL approved outdoor lighting;

2. Lighting shall not exceed one linear foot per foot of public road frontage, per lot.

E. Sign not to constitute traffic hazard. No sign or other structure regulated by this article shall be erected at the intersection of any public streets in such a manner as to obstruct free and clear vision from vehicles thereupon; or be placed at any location where, by reason of the position, shape or color, it may interfere with, obstruct the view of, or be confused with, any authorized traffic sign, signal, or device; or make use of the words &STOP&, &DANGER&, or any other word, phrase, symbol or character in such manner as to interfere with, mislead or confuse motorists.

F. Posting on trees, poles, etc. No sign shall be allowed to be tacked, painted, posted, marked, or otherwise affixed on trees, utility poles, or other similar structures, or on rocks, the ground itself, or other natural features.

G. No posting on supports. No message or advertisement may be displayed on any portion of the structural supports of any sign.

H. Maintenance. All signs regulated by this article shall be kept clean, neatly painted, and free from all electrical and mechanical hazards, including, but not limited to, faulty wiring and loose connections, and the premises surrounding the signs shall be maintained by the owner in a sanitary and inoffensive condition, free and clear of all weeds, rubbish and debris.

I. Special situations. Those developments which include at least one building of three stories or more may be permitted wall or roof signs in sizes not exceeding 100 square feet per primary and secondary facade. The sign allowance provided under this subsection shall be exempt from the aggregate signage allowed per lot.

J. No simulation of public signal. No sign shall be erected which simulates an official traffic control, warning sign or public service signal.

K. Compliance of premises with City Code.

No permit shall be issued as to any lot where such lot is in noncompliance with any provision of the City Code.

L. Entrance signs, subdivision signs, and signs on properties with a conditional use permit may be externally illuminated from dusk until dawn, but may not be internally illuminated or include an LED sign or changeable copy sign.

M. LED strip lighting, rope lighting, or string lights are to be prohibited for the border or perimeter of windows, signs, or doors to attract the attention of customers.

N. Neon signs shall be allowed only in historic districts.

O. Awnings: Awnings shall be made of rustproof metal or high quality, colorfast and sunfade-resistant canvas. Colors shall be limited to a single field color with a single contrasting color for lettering and shall comply with all other requirements of this article.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-7. Variances.

This section shall provide the exclusive procedures for granting variances to the requirements of this article.

A. Upon application by the property owner of a lot zoned OI, C-2, C-3, M-1, M-2, or MU covering more than ten contiguous

acres, the City Council may grant a variance to allow the aggregate signable area to exceed 500 square feet where the applicant has shown that:

1. All signs and structures within the business development are in conformance with this article; and

2. The variance, if granted, would not cause substantial detriment to other property owners or tenants, or to the public good, nor would it impair the purpose and intent of this article;

and

3. The City Council shall consider at least one of the following factors:

i. The size of buildings constructed on the subject lot;

ii. The potential to subdivide the lot; or iii. The number of different tenants occupying the buildings;

and

4. Financial loss to the applicant.

However, such loss is not sufficient grounds, by itself, to justify a variance.

Furthermore, peculiar conditions or circumstances which are the result of actions of the current or former owner(s) of the property covered by the application cannot be considered as grounds to justify a variance. The authority to erect and maintain additional signs as may be

permitted under any such variance shall terminate upon the subdivision of the lot upon which such variance was granted.

1. Upon application by the property owner of a lot zoned MR-1 or MR-2, covering more than ten contiguous acres, the City Council may grant a variance to allow a ground sign where the applicant has shown that:

2. All signs and structures within the business development are in conformance with this article; and

3. The variance, if granted, would not cause substantial detriment to other property owners or tenants, or to the public good, nor would it impair the purpose and intent of this article;

and

4. The City Council shall consider at least one of the following factors:

i. The size of buildings constructed on the subject lot;

ii. The potential to subdivide the lot; or iii. The number of different tenants occupying the buildings;

and

5. Financial loss to the applicant.

However, such loss is not sufficient grounds, by itself, to justify a variance.

Furthermore, peculiar conditions or circumstances which are the result of actions of the current or former owner(s) of the property covered by the application cannot be considered as grounds to justify a variance. The authority to erect and maintain additional signs as may be

permitted under any such variance shall terminate upon the subdivision of the lot upon which such variance was granted.

B. Upon application by the property owner of a lot, the City Council may grant a

height variance where the applicant has shown that:

1. All signs and structures within the business development are in conformance with this article; and

2. The variance, if granted, would not cause substantial detriment to other property owners or tenants, or to the public good, nor would it impair the purpose and intent of this article;

and

3. The City Council shall consider at least one of the following factors:

i. The size of buildings constructed on the subject lot;

ii. The potential to subdivide the lot; or iii. The number of different tenants occupying the buildings;

and

4. Financial loss to the applicant.

However, such loss is not sufficient grounds, by itself, to justify a variance.

Furthermore, peculiar conditions or circumstances which are the result of actions of the current or former owner(s) of the property covered by the application cannot be considered as grounds to justify a variance. The authority to erect and maintain additional signs as may be

permitted under any such variance shall terminate upon the subdivision of the lot upon which such variance was granted.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-8. Sign Setbacks and Restrictions.

A. All signs shall be required to be located within the required front yard of a principal structure and shall not be permitted to extend beyond the front property line into the public street. The location of signs shall not interfere with the view of a traffic signal or traffic vision.

B. When the requirements in Section 11-9 make reference to this subsection, in order to erect a second sign a use must have frontage on two publicly dedicated public streets with each public street including a legal curb cut. In addition, there must be a minimum lot area of one acre to permit a second such sign to be erected. In those instances where one of the public street frontages is on a public street serving a residential subdivision, a second sign shall be prohibited.

C. Except in the DT-MU district, all signs shall be required to be set back a minimum of 1 foot from all property lines.

D. All signs shall be required to be set back a minimum of 10 feet from all electrical transmission lines.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-9. Requirements by District.

A. In addition to all other regulations in this article, all signs must conform with the requirements contained in this section.

B. The following types of signs shall be permitted on lots zoned RA, R-1, R-2, R-3, R-4, R-D, PD, and:

1. One flag of not more than 15 square feet.

Where flags are flown from flagpoles, flag poles shall not exceed 35 feet in height. Official flags of a government entity shall not be subject to these limitations.

2. For subdivisions, one subdivision sign at each entrance from an exterior street,

designed as a monument sign, not to exceed 32 square feet in area or 8 feet in height.

3. For uses with a conditional use permit, one entrance sign designed as a monument sign, not to exceed 32 square feet in area or 8 feet in height.

C. The following types of signs shall be permitted on lots zoned MR-1, and MR-2:

1. One flag of not more than 15 square feet.

Where flags are flown from flagpoles, flag poles shall not exceed 35 feet in height. Official flags of a government entity shall not be subject to these limitations.

2. One entrance sign designed as a monument sign, not to exceed 32 square feet in area or 8 feet in height.

3. One projecting sign, not to exceed 15 feet in area and not to project more than 6

feet beyond the facade.

4. One temporary sign, not to exceed 100 square feet.

D. The following types of signs shall be permitted on lots zoned OI and C-1:

1. One flag of not more than 40 square feet.

Where flags are flown from flagpoles, flag poles shall not exceed 60 feet in height. Official flags of a government entity shall not be subject to these limitations.

2. Monument signs not to exceed 32 square feet in area or 8 feet in height.

3. Projecting signs, not to exceed 15 feet in area and not to project more than 6 feet beyond the facade.

4. Roof signs, not to exceed 3 feet in height above the eave or 75 square feet in area.

5. Wall signs, sandwich board signs, awning signs, and window signs.

6. The total area of all signs, excluding temporary signs, shall not exceed 150

square feet.

7. Temporary signs, not to exceed 8 feet in height or width, and not to exceed 32

total square feet.

E. The following types of signs shall be permitted on lots zoned C-2, C-3, MU, M-1, and M-2 for individual establishments that are not a part of a business subdivision:

1. One flag per establishment of not more than 40 square feet. Where flags are

flown from flagpoles, flag poles shall not exceed 60 feet in height. Official flags of a government entity shall not be subject to these limitations.

2. One pole sign per establishment not to exceed 20 feet in height or 100 square

feet in area.

3. One monument sign per establishment not to exceed 20 feet in height or 50 square feet in area.

4. Projecting signs, not to exceed 20 feet in area and not to project more than 6 feet beyond the facade.

5. Roof signs, not to exceed 5 feet in height above the eave or 100 square feet in area.

6. Wall signs, sandwich board signs, awning signs, and window signs.

7. The total area of all signs, excluding temporary signs, shall not exceed 300

square feet.

8. Temporary signs, not to exceed 8 feet in height or width, and not to exceed 32

total square feet.

F. The following types of signs shall be permitted on lots zoned C-2, C-3, MU, M-1, and M-2 that are part of a business subdivision:

1. One flag per establishment of not more than 40 square feet. Where flags are

flown from flagpoles, flag poles shall not exceed 60 feet in height. Official flags of a government entity shall not be subject to these limitations.

2. One pole sign for the first 50,000 square feet of total gross leasable area in the business subdivision, plus one additional pole sign for each additional 100,000

square feet. No pole sign shall exceed 20 feet in height or 150 square feet in area.

3. One monument sign for the first 50,000 square feet of total gross leasable area in the business subdivision, plus one

additional monument sign for each additional 100,000 square feet. No monument sign shall exceed 20 feet in height or 100 square feet in area.

4. One projecting sign per establishment, not to exceed 20 feet in area and not to project more than 6 feet beyond the

facade.

5. One roof sign per establishment, not to exceed 5 feet in height above the eave or 100 square feet in area.

6. One wall sign per establishment, not to exceed 100 square feet in area.

7. Sandwich board signs, awning signs, and window signs.

8. The total area of all signs, excluding temporary signs, shall not exceed 400

square feet.

9. Temporary signs, not to exceed 8 feet in height or width, and not to exceed 32

total square feet.

G. The following types of signs shall be permitted on lots zoned DT-MU:

1. One flag of not more than 25 square feet.

Where flags are flown from flagpoles, flag poles shall not exceed 35 feet in height. Official flags of a government entity shall not be subject to these limitations.

2. Projecting signs, not to exceed 25 feet in area and not to project more than 5 feet beyond the facade.

3. Roof signs, not to exceed 3 feet in height above the eave or 32 square feet in area.

4. Wall signs and window signs, not to exceed 32 square feet in area for each facade.

5. Awning signs, not to exceed 1 foot in height.

6. One sandwich board sign.

7. The total area of all signs, excluding temporary signs, shall not exceed a total of 100 square feet.

8. Temporary signs, not to exceed 8 feet in height or width, and not to exceed 32

total square feet.

H. The following types of signs shall be permitted on lots zoned DT-RC:

1. One flag of not more than 25 square feet.

Where flags are flown from flagpoles, flag poles shall not exceed 25 feet in height. Official flags of a government entity shall not be subject to these limitations.

2. Projecting signs, not to exceed 25 feet in area and not to project more than 5 feet beyond the facade.

3. Wall signs and window signs, not to exceed 25 square feet in area.

4. One sandwich board sign.

5. The total area of all signs, excluding temporary signs, shall not exceed a total of 100 square feet.

6. Temporary signs, not to exceed 8 feet in height or width, and not to exceed 32

total square feet.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-10. Unsafe and Unlawful Signs.

A. If the City Council or its designated representative shall find that any sign regulated herein is unsafe or unstable, or is a menace to the public health or safety, or is abandoned, or is maintained in a dilapidated condition, or has been constructed or erected or is being maintained in violation of the provisions of this article, the City Council or its designated representative shall notify the permittee, owner, or occupant of the property on which the sign is located by certified mail of such violation. Said notice shall include a brief and complete statement of the violations to be remedied. If the permittee, owner, or occupant of the property where the sign is located cannot be located, notice shall be affected by the City Council or its designated representative affixing the notice to the sign or to the building on which the sign is erected.

B. If the permittee or property owner fails to remove or alter the structure so as to comply with the standards herein set forth within ten days after such notice, the permit for such sign shall be revoked and the permittee or property owner shall be subject to the penalties set forth in Section 11-14 of this article.

C. In any case in which a sign is an immediate threat to the physical safety of persons or adjoining property, the City Council or its designated representative may cause such structure to be removed summarily and without notice and cause the cost of same to be placed as a lien on the property upon which the sign sits.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-11. Nonconforming Signs.

A. The following provisions shall apply to signs which, on the effective date of this article, were approved and legally erected under previous sign restrictions and which became nonconforming with respect to the requirements of this article's restrictions:

1. The owner of the sign shall secure a permit for the continuation of the sign subject to the restrictions of this section.

Application for such permit must be filed within ten days of the notice of

nonconformance. There shall be no charge for this permit. Failure to apply for such permit within ten days shall result in

waiver of the protections afforded nonconforming signs by this section and the display of such sign shall be thereafter unlawful.

2. No change shall be made in the size of any nonconforming sign, nor shall any

structural changes be made in such a sign unless the sign is brought into compliance with the provisions of this article.

3. Any nonconforming sign declared to be unsafe by the City Council or its

designated representative shall be removed or rendered safe and brought into compliance with the provisions of this article.

4. Except as provided in this article, any sign erected on any public property or

public street in violation of this article may be removed therefrom by duly

authorized employees of the City or Henry County, and the responsible party may

be cited for such violation.

B. Except when destroyed by fire or other Act of God, a nonconforming sign shall not be replaced by another nonconforming sign, except that the substitution or interchange of poster panels, painted boards or dismountable material on nonconforming signs shall be permitted.

C. Minor repairs and maintenance of nonconforming signs shall be permitted. However, no structural repairs or changes in the size or shape of the sign shall be permitted except to make the sign comply with the requirements of this article.

D. No change in shape, size or design shall be permitted on a nonconforming sign except to make the sign comply with all requirements of this article.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-12. Prohibited Signs.

It shall be unlawful for any person to erect flashing signs, billboards, or aerial view signs in the City. Vehicle mounted signs shall also be prohibited in the City.

(Ord. No. 457, § 1, 8-14-18) Sec. 11-13. Exemptions.

A. The following signs are exempt from the permitting requirements of this article; provided, however, that such signs shall be subject to all other provisions of this article:

1. Wall signs one square foot and smaller.

2. Projecting signs five square feet and smaller.

3. Memorial signs or tablets, names of buildings, and dates of erection when cut into any masonry surface or when constructed

of bronze or other incombustible materials.

4. Stake signs with an area of 4 square feet or less.

5. Any ground sign or stake sign that has an area of 6 sq. ft. or less placed during a permit exempt season which is period of

time that starts the first day of the qualifying period preceding a federal, state, county, or City of Hampton election, including primary election, special election and runoff election, and that

ends three (3) days after said election.

Signs under this paragraph may be placed in the Right-of-Way provided that:

i. Such sign be placed at least 5 ft.

from the edge of pavement for streets with no curb, OR 5 ft. from the outer edge of the curb for streets with curbs, OR 1 ft. from the outer edge of the sidewalk for streets with sidewalk;

ii. Approval of property owner(s) is obtained prior to placing signs on private property(ies);

iii. Approval of property owner is obtained if the placement of sign in the Right-of-Way is directly in front of a residential or commercial property;

iv. Signs are not placed on parcels or lots owned or operated by the City.

Where any such sign creates a public safety risk or an imminent danger to public safety, the Code Enforcement Officer immediately may move the sign to the nearest location in the right-ofway where it will not create a public safety risk. S/He then shall notify the

person or entity, if known, that placed the sign of its new location and the reason prompting the move. That person or entity may maintain the sign on the new site, relocate the sign to an alternate safe area or remove the sign entirely.

The person or entity that places a sign in any right-of-way shall be responsible for its removal immediately after the

expiration of the period stated in this subsection. Where that person or entity fails to undertake such action, the City may remove the sign from the right-ofway. The actions authorized under this paragraph are in addition to any other

lawful remedies available to the City.

B. The following signs are exempt from all provisions of this article:

1. Signs that are not visible from any public street or any adjacent property.

2. Temporary signs required to be posted by federal law, state law, Henry County, or by the Code of Ordinances of Hampton,

Georgia.

3. Decals affixed to or signs painted on equipment, fuel pumps or other types of

vending equipment used for dispensing retail products, provided that such decals or signs have a signable area not exceeding four square feet on any single piece of equipment.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 487, § 1, 10-8-19)

Sec. 11-14. Penalties.

Any person found in violation of any of the provisions of this article shall be subject to a fine not to exceed $500.00 per day. A separate offense shall be deemed committed each day during or upon which a violation occurs or is permitted to continue. Any sign erected or maintained in violation of this Ordinance for more than 30 days shall also be subject to removal by the City at the owner's or permittee's expense.

(Ord. No. 457, § 1, 8-14-18)

ARTICLE 12. ADMINISTRATION

Sec. 12-1. Administration, Interpretation, and Application.

A. The provisions of this Appendix shall be administered by the Zoning Administrator. The Zoning Administrator shall be responsible for interpretation of the provisions of the Zoning Ordinance, the Official Zoning Map, Subdivision Ordinance, and all other ordinances that are applicable to the development and growth of the City.

B. The City of Hampton Community Development Department shall accept all applications for rezoning, conditional use/exceptions, variances, modifications, and any and all other zoning or land use map amendments to ensure the application is complete. Applications shall be made on forms provided by the Community

Development Department. The City of Hampton Director of Community Development and/or designee shall review, analyze, and make recommendations to the Hampton City Council for their review and vote for either approval, approval with conditions, or denial.

C. In interpreting and applying the provisions of this Appendix, the same shall be held to the minimum requirements for the promotion of health, safety, aesthetics, and convenience of the general welfare. The lot or yard area required by these regulations for a particular building shall not be diminished and shall not be included as part of the lot or yard areas of any other building. The lot or yard areas of buildings existing at the time this Appendix became effective shall not be diminished below the requirements herein provided for buildings hereafter erected, and such required areas shall not be included as a part of the required areas of any building hereafter erected.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 503, § 2, 2-11-20)

Sec. 12-2. Enforcement.

A. The City of Hampton Building Administrator shall be responsible for the issuance of permits for construction according to the regulations of the Zoning Ordinance, and Community Development Department shall be responsible for enforcement against any violations of the Zoning Ordinance.

B. No permit or license shall be issued for any use, building, or other purpose if the same shall be in conflict with the regulations of this Appendix.

C. If it is found that any of the regulations of this Appendix are being violated, the City of Hampton Building Administrator shall notify the person responsible for such violations in writing, indicating the nature of the violation, and order the action necessary to correct it. Such written notice shall not be a necessary condition precedent to enforcement of the Appendix. The city shall order discontinuance of illegal use of land, buildings, or structures; discontinuance of illegal additions, alterations, or structural changes;

discontinuance of any illegal work being done; or shall take any other action authorized by this Appendix to ensure compliance with or to prevent violation of its provisions.

(Ord. No. 457, § 1, 8-14-18) Sec. 12-3. Variances.

A. For all variances, including those in conjunction with use permits and rezonings but excluding administrative variances in Section 12-4 of this Article, upon application made to the Zoning Administrator, the City Council, following a public hearing, is authorized to consider such variances from the terms of this Appendix as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of the Appendix will, in an individual case, result in practical difficulty or unnecessary hardship, so that the spirit of the Appendix shall be observed, public safety and welfare secured, and substantial justice done. The existence of a nonconforming use of neighboring land, buildings or structures in the same or in other districts shall not constitute a reason for a variance. A variance may be granted in an individual case of unnecessary hardship upon a finding by the City Council that all the following conditions exist:

1. There are extraordinary and exceptional conditions pertaining to the particular

piece of property in question because of its size, shape or topography that are not applicable to other lands or structures in the same district.

2. A literal interpretation of the provisions of this Appendix would deprive the

applicant of rights commonly enjoyed by other properties of the district in which the property is located.

3. Granting the variance requested will not confer upon the property of the applicant any special privileges that are denied to other properties of the district in which the applicant's property is located.

4. The requested variance will be in harmony with the purpose and intent of this

Appendix, the specific zoning of the property and the land use plan and will not be injurious to the general welfare of the community.

5. The special circumstances or justifications for the variance are not the result of self-imposed actions or misfortunes of the applicant.

6. The variance requested is the minimum variance that will make possible the

legal use of the land, building or structure.

7. The variance is not a request to permit a use of land, buildings or structures which is not permitted by right in the district involved.

B. The City Council shall hold a public hearing in accordance with Section 12-9 - Public Hearing and Notice Procedures.

C. Variances approved in accordance with this section shall be done so by ordinance.

D. Should the City Council deny a variance request on a parcel(s) of land, then the same request may not be considered until the expiration of at least 12 months from the date of denial.

E. All requests by private groups, individuals, businesses and other nonpublic organizations for variances shall be accompanied by a filing fee which is maintained in the office of the Zoning Administrator.

F. Any person or persons, jointly or severally, aggrieved by a variance decision may appeal said decision in accordance with O.C.G.A. § 36-66-5.1.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 2023-07, § 1(Exh. A), 6-13-23)

Sec. 12-4. Administrative Variances.

A. The Zoning Administrator may modify the following standards during development review without a public hearing or City Council approval.

Any other modification beyond those listed below must be considered by the Hampton City Council as a variance under the provisions of Section 12-3.

1. Front setback or setback adjacent to public street: Variance not to exceed five feet.

2. Side setback: Variance not to exceed two feet.

3. Rear setback: Variance not to exceed four feet.

4. Height of building: Variance not to exceed five feet.

5. Converted garages or carports meeting the requirements of Section 3-26.

6. Residential and commercial design standards.

7. Other requirements within this Ordinance specifically stating that an administrative variance is allowed.

B. The applicant shall demonstrate, and the Zoning Administrator shall find, that all of the following criteria are present when approving a request for an administrative variance:

1. There are clear and compelling reasons that are not purely financial demonstrating that the required standard cannot be met.

2. The modification is the minimum amount necessary to meet the clear and compelling reasons identified above.

3. The requested adjustment will not contravene the public interest or negatively impact adjoining properties.

C. All requests by private groups, individuals, businesses and other nonpublic organizations for administrative variances shall be accompanied by a filing fee which is maintained in the office of the Zoning Administrator.

D. Appeals of the decision of the Zoning Administrator may be made to Hampton City Council within 30 days of notification of the administrative decision.

1. When it is alleged that an error has been made by the administrative staff when

exercising its authority under this section or when an administrative decision aggrieves any person, an appeal to the

City Council may be made within 30 days of receipt of notification of the decision.

2. An appeal may be submitted to the Zoning Administrator in writing for the City

Council's review. The City Council shall establish a reasonable time for the hearing of the appeal no more than 45 days from the date of receipt of the appeal.

Due notice shall also be provided to the parties in interest. The City Council

shall decide the appeal within 15 days after the hearing. Any party may appear in person or by agent or by attorney and offer testimony or present opinions by

expert witnesses qualified in the subject to which they are testifying.

3. Any person or persons, jointly or severally, aggrieved by the City Council's decision may appeal said decision in accordance with O.C.G.A. § 36-66-5.1.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 2023-07, § 1(Exh. A), 6-13-23)

Sec. 12-5. Conditional Uses.

A. The following standards and guidelines shall apply to all conditional use requests as permitted in the applicable zoning districts.

B. An application shall be submitted to the Zoning Administrator for technical review. A site plan reflecting compliance with all appropriate provisions of this Appendix shall accompany the application. The Zoning Administrator and/or the City Council may require additional information necessary to evaluate the application. An application is not considered accepted until all required information has been provided.

C. Following a public hearing, the City Council shall consider all of the following prior to making a decision on any conditional use:

1. The report and recommendation submitted by the City of Hampton's Community Development Department.

2. Whether all specific requirements of this Appendix relative to consideration of a

conditional use have been met.

3. The impact the proposed use may have on traffic and/or the adverse effect it may cause to neighboring properties.

4. The physical characteristics of the site and its suitability for the proposed request.

The elements of topography, drainage, size and shape of the land(s) should be part of the City Council's decisionmaking process.

5. The adequacy and availability of public infrastructure (water, sewer, roads, etc.)

to serve the request.

6. Whether the applicant has agreed to any specific conditions that will enhance his/ her request, protect the public interest, and assure the continued beneficial use

of nearby properties.

7. Whether the request will further or support the goals and objectives of the City of Hampton's Comprehensive plan, protect the public interest, and assure the

continued beneficial use of nearby properties.

D. The City Council shall hold a public hearing in accordance with Section 12-9 - Public Hearing and Notice Procedures.

E. Conditional Uses approved in accordance with this section shall be done so by ordinance.

F. All requests by private groups, individuals, businesses and other nonpublic organizations for variances shall be accompanied by a filing fee which is maintained in the office of the Zoning Administrator.

G. Should the City Council deny a request for conditional use on a parcel(s) of land, then the same request may not be considered until the expiration of at least 12 months from the date of denial.

H. Upon discovery that the operation of the conditional use has or had ceased for a period of 365 days or more and the owner of the property has not requested voluntary termination of the conditional use, the Zoning Administrator shall forward a report to City Council which may recommend that action be taken to remove the conditional use permit from the property through a City initiated zoning action.

I. Any person or persons, jointly or severally, aggrieved by the City Council's decision may appeal said decision in accordance with O.C.G.A.

§ 36-66-5.1.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 504, § 2, 2-11-20; Ord. No. 2023-07, § 1(Exh. A), 6-13-23) Sec. 12-6. Seasonal Activities and/or

Temporary Events.

A. Seasonal activities are only allowed in zoning districts where they are permitted and with a valid temporary event permit.

B. The Zoning Administrator shall have the authority to grant temporary event permits for seasonal activities and/or temporary events upon a determination that the activity or event, if permitted, would not cause substantial detriment to the public good, would not interfere with another event for which a permit has been issued, would not negatively affect the safety and welfare of pedestrian and vehicular traffic, nor would it impair the purposes or intent of this Appendix.

C. If no building permit is required for the seasonal activity and/or temporary event, the Zoning Administrator shall have up to one week following the date of receipt of a written request for the temporary event permit to make a decision on the issuance of the temporary event permit. If the Zoning Administrator fails to act on the issuance before the expiration of the one-week period, the Zoning Administrator shall be deemed to have approved the temporary event permit request.

D. If a building permit is required for the seasonal activity and/or temporary event, the Zoning Administrator shall have up to two weeks following the date of receipt of a written request for the temporary event permit to make a decision on the issuance of the temporary event permit. If the Zoning Administrator fails to act on the issuance before the expiration of the two-week period, the Zoning Administration shall be deemed to have approved the temporary event permit request.

E. Application requirements.

1. Any applicant for a temporary event permit for a seasonal activity and/or temporary event shall have the written authorization of the property owner;

2. Applicants for farmers or other regularly scheduled markets shall submit a schedule for approval and receive an annual permit for the months specified within that

schedule;

3. No single temporary outdoor sales permit for regularly scheduled markets shall be approved for the same lot or any portion thereof for a total of more than 90 days in a calendar year; no special event other

than regularly schedules markets and film production shall be allowed to exceed six days in any 30-day consecutive period of time;

4. These uses shall be permitted only on lots that have access to paved parking

with a curb cut;

5. No operator, employee or representative shall solicit directly to the motoring public;

6. As a part of the application for a temporary outdoor sales permit, a scaled drawing indicating boundary of the site, parking and location of associated activities and/or structures shall be provided;

and

7. Vendors shall be responsible for refuse and debris clean up. Property sanitation and maintenance requirements shall be

strictly adhered and enforced by City code enforcement.

(Ord. No. 457, § 1, 8-14-18) Sec. 12-7. Rezoning Requests and Text Amendments.

A. An application for a rezoning of property shall be considered a simultaneous request for an amendment to the Official City Zoning Map.

B. A request for rezoning, amendment to the zoning map, or amendment to the text of the Zoning Ordinance may be proposed to the City Council by any public agency or department of the City of Hampton, Georgia.

C. Applications for rezoning or change of zoning conditions may also be submitted by an individual with 51 or more percent ownership in fee simple of the subject property being petitioned for rezoning, or their legal agent authorized in writing over the owner's signature.

D. All requests by private groups, individuals, businesses and other nonpublic organizations for rezoning or change of zoning conditions shall be accompanied by a filing fee which is maintained in the office of the Zoning Administrator.

E. Applications for rezonings, except those initiated by Hampton City Council, must contain the following:

1. A completed and signed copy of the application.

2. A copy of any proposed restrictive covenants to be placed upon the property which is subject to the application.

3. A site plan representing information on the location, extent and type of proposed development, which may include, depending upon the type of development, the following minimum types of information:

i. Correct scale and north arrow.

ii. The present zoning classification of all adjacent parcels.

iii. The location of the parcel relative to existing or proposed public streets.

iv. Required setbacks for the zoning district requested.

v. Topographic information sufficient to show elevation and drainage conditions of the land.

vi. Existing conditions or improvements on the property.

vii. The location and extent of required buffer areas, including the extent of

natural vegetation or fences as required.

viii. Proposed lot layout of the property if it is to be a subdivision for

residential, commercial or industrial development, with required setbacks and buffer areas shown.

ix. Commercial or industrial development shall also indicate the location and dimensions of proposed buildings, parking and loading areas, driveways and storage areas.

x. Report from the Henry County Health Department and the Henry County Water and Sewerage Authority and/or (as applicable) the City utility department.

xi. The Zoning Administrator may require additional information, or information different from the above, depending upon the type of development, to properly evaluate the application.

F. All proposed amendments to this Appendix, rezonings or changes of zoning conditions shall be transmitted by the City of Hampton Community Development Director to the City of Hampton City Council for review. The City of Hampton City Council shall study the need and justification of the following facts:

1. The possible effects of the proposed amendment on the character of a zoning district, a particular piece of property, neighborhood, a particular area, or the

community.

2. The relation that the proposed amendment bears to the purpose of the overall zoning scheme with due consideration

given to whether or not the proposed amendment will help carry out the purposes of this Appendix.

3. Consistency with the Comprehensive Plan.

4. Potential impact on infrastructure including water and sewerage systems.

5. Impact on adjacent thoroughfares and pedestrian and vehicular circulation and traffic volumes.

6. Impact upon adjacent property owners.

7. Ability of the subject land to be developed as it is presently zoned.

8. Physical conditions of the site relative to its capability to be developed as requested, including topography, drainage, access,

and size and shape of the property.

9. Merits of the requested amendment relative to any other guidelines and policies for development which the City Council

may use in furthering the objectives of the land use plan.

10. An approval of rezoning does not incorporate plan approval. For plan submittal, review, and approval process see City of Hampton Code of Ordinances.

Appendix B - Subdivisions. Article 3.

Procedure.

G. After completing a study of the proposed amendment, the City of Hampton Community Development Department shall submit their recommendations and report to the City Council.

These recommendations shall be of an advisory nature and shall not be binding on the City Council.

H. In making a decision, following a public hearing, the City of Hampton City Council may approve, approve with conditions, or deny.

I. Conditional zoning. In deciding upon any application for zoning map amendment or special use permit, the Hampton City Council may, on their own motion or upon the suggestion of the applicant, grant the application subject to any of the following conditions. The applicant or any successor in title may construct only those uses agreed upon as conditions and only in such a manner as approved by the Hampton City Council.

The applicant or any successor in title is not vested by right to a depicted concept design or layout but rather the uses agreed upon as conditions approved by the Hampton City Council.

Any zoning map amendment which is adopted with conditions shall be indicated on the Official Zoning Map. The property shall be indicated on the Official Zoning Map with the suffix "C" to indicate that the property has been rezoned with conditions. Such conditions shall remain imposed upon the property until removed or modified by the City Council.

1. Such conditions deemed necessary to promote and protect the health, safety, and general welfare.

2. Such conditions deemed necessary to protect neighboring properties and to lessen any potentially adverse effects of the zoning change.

3. Such conditions set forth, but not limited to, the following:

i. Setback requirements from any lot line;

ii. Street network design and street block layout;

iii. Provisions contained within the Master Plan for Greenways and Trails in Hampton;

iv. Requirement of additional professional certified studies including but not limited to traffic analysis,

environmental analysis, economic and market analysis, etc.

v. Specified or prohibited locations for buildings, parking, loading or storage areas;

vi. Restrictions on land use activities to be permitted;

vii. Maximum building dimensions and height;

viii. Landscaping or planted area which may include the location, type and maintenance of plant materials within a designated buffer area;

ix. Fences, walls, earth berms, or other landscape buffer provisions or protective measures;

x. Preservation of existing trees and vegetation;

xi. Special conditions to eliminate or reduce undesirable views, light, glare, dust or odor;

xii. Hours of operation;

xiii. Architectural details to be compatible with existing buildings in the area;

xiv. Adherence to specific concept plans as adopted;

xv. Any other requirements that the City Council may deem appropriate and necessary for the protection of public health and welfare.

J. Prior to a final vote being taken on any application for which conditions shall be imposed, such conditions shall be made a part of the motion to approve. If the applicant finds such conditions to be unacceptable, they may, at the time before the final vote, withdraw the application. Such withdrawal shall not enable the applicant to refile the same request for the same property until at least 12 months have elapsed from the date of withdrawal.

K. If the decision of the City Council is to deny the request for rezoning or change of zoning conditions, then the same property may not again be considered for rezoning or change of zoning conditions, until the expiration of at least 12 months immediately following the defeat of the request by the City Council.

L. Requirements for amendments to the City of Hampton Code of Ordinances. This City of Hampton Code of Ordinances may be amended by the City of Hampton City Council on its own motion or by the initiation of the Community Development Department. Otherwise, a complete application packet shall be required as described below:

1. An application to amend the text of the City of Hampton Code of Ordinances

shall be submitted on forms provided by the City of Hampton Community Development Department.

2. The application shall include the following information:

i. Identification of the specific provision proposed for amendment;

ii. The proposed modifications in a strikethrough and underline format;

iii. A detailed explanation of the rationale and justification for the requested amendment;

iv. A detailed explanation of the potential impacts of the modification on the development of the City of Hampton;

3. The Community Development Department shall prepare a staff report analyzing the proposed amendment and recommend approval, denial, or approval

with modifications. The staff report shall address the following issues:

i. Consistency of the amendment with the comprehensive plan.

ii. Potential impacts on the character and quality of development in the City of Hampton and any affected zoning districts.

iii. Potential impacts on the provision of infrastructure and improvements.

iv. The merits of the proposed amendments relative to any guidelines, policies, or programs adopted in

furtherance of the comprehensive plan.

4. The City of Hampton City Council shall consider the proposed amendment to the

City of Hampton Code of Ordinances at a public hearing, according to the procedures.

The City of Hampton City Council shall evaluate the proposed amendment, considering the issues and recommendations contained in the City of Hampton Community Development Department staff report.

The City of Hampton City Council shall make a decision to approve, approve with further modifications, or deny.

M. Requirements for amendment to the comprehensive plan. The comprehensive plan may be amended by the City of Hampton City Council on its own motion. Otherwise, a complete application packet shall be required as described below.

1. An application to amend the text or maps of the City of Hampton Comprehensive

Plan shall be submitted on forms provided by the City of Hampton Community

Development Department.

2. The application shall include the following information:

i. Identification of the specific provision proposed for amendment.

ii. The proposed modifications in a strikethrough and underline format.

iii. A detailed explanation of the rationale and justification for the requested amendment.

iv. A detailed explanation of the potential impacts of the modification on the development of the City of Hampton.

3. The Director of Community Development shall prepare a staff report analyzing the proposed amendment and recommend approval, denial, or approval

with modifications.

4. The City of Hampton City Council shall consider the proposed amendment to the

City of Hampton Comprehensive Plan at a public hearing.

i. The City of Hampton City Council shall evaluate the proposed amendment, considering the issues and recommendations contained in the

staff report.

ii. The City of Hampton City Council shall approve, approve with further modifications, or deny.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 505, § 2, 2-11-20; Ord. No. 2023-07, § 1(Exh. A), 6-13-23) Sec. 12-8. Reversion.

After an approval has been granted for a map amendment to create or extend any zoning district (except for amendments initiated by Hampton City Council), the applicant, agent or property owner has 12 months in which to make substantial progress in developing the property. Substantial progress shall mean the point of construction at which time the first inspection is carried out. If no substantial construction or alteration of the property or other affirmative action to develop the property has occurred within 12 months of the granting of an application for rezoning, the Zoning Administrator may review the situation and report its findings with recommendations to the City Council who can, at a public hearing, change the zoning category to its prior or other appropriate zoning district classification. The Zoning Administrator shall track the dates of rezoning and status of substantial progress and report to the City Council for their review of any development not meeting this standard.

(Ord. No. 457, § 1, 8-14-18) Sec. 12-9. Public Hearings and Notice Procedures.

A. Public hearings. If the City Council is taking action resulting in a zoning decision, it shall provide for a hearing on the proposed amendment for the purpose of receiving and considering public comment on the merits of the proposed amendment.

B. The following rules of procedure shall govern the public hearing before the City Council:

1. Each applicant or applicant's agent shall appear before the Council, identify

themselves by name, address, and whether they are the owner or an agent for the

owner.

2. Each applicant or other interested party who provides the Council with documents shall have each document numbered and shall identify each document and each such document submitted shall be made a part of the official record of the hearing.

3. Each applicant shall have 15 minutes to present facts pertinent to the application. An applicant may have additional time to address the Council if the applicant notifies the City Clerk prior to the start of the public hearing that applicant needs additional time. The additional time shall be limited to 15 minutes for the applicant.

4. Each person in support of or opposition to rezoning of property and amendment

to the Zoning Ordinance shall have 5 minutes to address the Council and shall provide the City Clerk with name and

address; however, the total time for all interested parties in support or opposition shall not exceed 30 minutes unless further time is granted by City Council.

5. At the conclusion of the hearing, the City Council shall announce its decision and

direct the Zoning Administrator to notify the applicant in writing of the Council's decision. The Council's decision shall

immediately be entered on the minutes and made a part of the record.

C. Notification of hearing. At least 15, but not more than 45 days prior to the date of the hearing, the Zoning Administrator shall cause to be published within a newspaper of general circulation within the City and Henry County a notice of the hearing. The notice shall state the time, place and purpose of the hearing.

D. If a zoning decision is for the rezoning of property and the rezoning is initiated by a party other than city officials or a city department then:

1. The notice, in addition to the foregoing requirements, shall include the location of the property, the present zoning classification of the property, and the proposed zoning classification of the property; and

2. A sign containing information required by this Appendix shall be placed in a

conspicuous location on the property not less than 15 days prior or more than 45

days prior to the date of the hearing.

3. If the property proposed for rezoning does not have frontage on a public street, then the sign may be posted on the

right-of-way of the nearest public street which provides access to the site. No

public hearing may be held by the City Council until said sign(s) have been posted for at least 15 days. Said signs shall

remain posted until final action has been taken by the City Council.

(Ord. No. 2023-07, § 1(Exh. A), 6-13-23) Sec. 12-10. Appeals.

Any person or persons, jointly or severally, aggrieved by a City Council's decision may appeal said decision in accordance with O.C.G.A. § 36- 66-5.1.

(Ord. No. 2023-07, § 1(Exh. A), 6-13-23)

APPENDIX B

SUBDIVISIONS

ARTICLE 1. PURPOSE, AUTHORITY AND

JURISDICTION

Sec. 1-1. Purpose and Scope.

These regulations are to provide for the orderly growth and development of the City of Hampton, Georgia, in accordance with the City's zoning ordinance, Comprehensive Plan, Future Land Use map, stormwater management plan, sediment control ordinance, watershed ordinance(s), construction standards and all other applicable city ordinances that govern the development of and division of lands in the City limits. The primary purposes of this Appendix are:

A. To provide for safe and efficient traffic circulation by development of a

coordinated street network in relation to existing and planned streets, adjoining

residential and nonresidential developments and public facilities.

B. To achieve the most efficient development and livability of the division of properties throughout the City limits.

C. To provide for the acceptance of land for public rights-of-way.

D. To provide for the installation and construction of utilities, infrastructure, public facilities and other public improvements essential to service land being divided for use by the general public.

E. To assure that public improvements will be constructed according to safe and

enduring standards.

F. To enable the dedication or preservation of lands for public schools, parks and

other public facilities/amenities.

G. To assure that developments that occur within an environmentally sensitive

atmosphere are consciences and protective of the area's natural elements and that the potential for natural or manmade hazards or disasters is lessened.

H. To provide for the division and development of tracts of land that comply with the goals, standards and policies of the Comprehensive Plan.

I. To establish the procedures for submittal and approval of preliminary and final

plat/plans for both residential, nonresidential and mixed use developments.

(Ord. No. 457, § 1, 8-14-18) Sec. 1-2. Authority.

This appendix is adopted by the Hampton City Council pursuant to authority granted by the constitution and laws of the State of Georgia.

(Ord. No. 457, § 1, 8-14-18) Sec. 1-3. Jurisdiction.

These regulations shall govern the development of lands within the City limits of Hampton. The city Zoning Administrator shall review and approve all required materials and documents relevant to the development and division of lands within the City. Furthermore, the Zoning Administrator shall coordinate with other city departments and when necessary, with state, county and regional agencies in assuring the proper implementation of all necessary rules and regulations pertinent to the development of lands within the City limits.

(Ord. No. 457, § 1, 8-14-18)

ARTICLE 2. INTERPRETATION

Sec. 2-1. Minimum Requirements.

The provision contained in this Appendix shall be considered as minimum requirements. When the City Council or Zoning Administrator imposes greater restrictions on a development that protect the health, safety and welfare of the general public and that do not impose a hardship upon a developer/development or community, than those restrictions shall prevail.

(Ord. No. 457, § 1, 8-14-18) Sec. 2-2. Definitions.

Certain terms and words are defined for the purpose of this Appendix. Words used in the present tense shall also include the use of the word(s) in the future tense, unless otherwise indicated. The word (shall( is mandatory, and the word (may( is permissive.

As-built plans. Detailed construction plans showing completed improvements as constructed.

Boulevard. A street developed with a minimum of two one-way paved lanes, separated by a landscaped median.

City. City of Hampton, Georgia.

City council. The City Council of Hampton, Georgia. The term (city council( shall be synonymous with the term (council.(

City manager. The City Manager of the City of Hampton, the City manager shall be chief administrator for the City.

Commercial/office subdivision. A division of land developed and intended to serve the needs of office, retail, and professional business uses.

Construction plans. Detailed plans (prepared by a professional licensed engineer, surveyor or landscape architect), indicating the location of streets, cross sections, grading profiles and elevations and all other public improvements to a parcel of land. This shall include, water and sewer, drainage, stormwater and soil erosion control improvements.

Construction standards. The city's adopted Construction and Development Standards

Manual. The standards and specifications related to the design and drawing of public improvement.

Covenant. An agreement or detailed restrictions which runs with the land placed on lots and recorded of record with the clerk of Superior Court.

Dedicated plat. A plat required for the dedication to the City or other public authority of right-ofway for streets, public easements, sewer or water facilities, or other public improvement.

Development permit. Permit issued by the planning and zoning department for construction of residential or nonresidential land improvements, including soil erosion and sedimentation control, clearing and grading, street and drainage construction and stormwater management.

Easement. A right granted by a property owner to the general public, a public utility, the City or a private individual or corporation for the use or access to a portion of an owners land(s). The use of the easement must be specific and designated as (public or private(, depending on the nature of its use.

Engineer. A professional engineer licensed in the State of Georgia and registered through the state board of professional engineers, who is competent in the field of civil design.

Flood hazard area. The area threatened by periodic flooding as determined by data and maps provided by the Federal Emergency Management Administration (FEMA). U.S. Department of Housing and Urban Development (HUD), U.S.

Soil Conservation Service, U.S. Army Corps of Engineers or hydrological studies utilizing generally accepted engineering practices. All lands within the limits of a flood having a 100-year return frequency or greater. The floodplain area consisting of the floodway and the flood fringe areas.

Health department. The City of Hampton Health Department shall be responsible for enforcement of city/county health regulations including the issuance of permits for on-site sewage disposal and water wells.

Improvements. The physical changes to land(s) which are necessary to make properties useable, this includes without limitation, the installation of water and sewer facilities, grading, paving of streets, hydrants, sidewalks, trails, utilities, drainage and detention systems and other public facilities/amenities.

Industrial subdivision. A division of land developed and intended to serve the needs of industrial or manufacturing uses.

Landscape architect. A licensed professional in the State of Georgia who is competent in the field of civil as well as landscape and streetscape design.

Lot. Recorded parcel(s) or tract(s) of land(s) held in common or single ownership. In order to meet this definition of )lot), a parcel must meet all applicable requirements of this Appendix and the City's zoning ordinance.

Lot, corner. A lot having frontage at the intersection of at least two public streets.

Lot, coverage. The portion of a lot, parcel or/tract of land that is covered with buildings or other impervious surfaces. The ratio of the horizontal area of a lot covered with buildings or structures.

Lot, depth. The distance measured from the front lot line to the rear lot line.

Lot, division. The division of land, into multiple pieces. To be valid under this Appendix, each piece of land divided must meet the definition of )lot) as provided in this Appendix.

Lot, flag. A large lot whose maximum width does not front along a public street, but is served by a narrow strip of frontage along a public street.

Lot, frontage. The length of the front lot line measured along the street right-of-way.

Lot, minimum area. The smallest lot area, without regard to setbacks and easements, established by a zoning district on which a use or structure may be located.

Lot of record. A lot that exists as shown or described on a plat/plan or deed in the records of the Henry County Clerk of Superior Court and described by metes and bounds.

Lot, through. A lot, other than a corner lot, having frontage on more than one street; corner lot having front on three or more streets.

Lot, width. The horizontal distance between side lot lines, measured along the front yard building setback line as established by the City Zoning Ordinance.

Marginal access-street. A residential or nonresidential street paralleling a major or minor arterial public street, which provides access to abutting properties and is intended to protect those properties from through traffic.

Nonresidential. Any development, site, zoning or project that is unrelated to the use, zoning and/or proposal of residential land uses (single and/or multifamily).

Pavement width. The cross section width of a paved public street measured from the edges of pavement.

Perennial stream. Any stream which flows throughout the year and is shown as a solid blue line on a United States Geological Survey, 7-Minute Topographic Series Map.

Plan, concept/conceptual. A draft drawing of a development showing proposed improvements to a parcel or tract of land. Such a plan does not require all the standards required in this Appendix for a preliminary or final plat, nor does it constitute a submitted preliminary plan unless all requirements of this Appendix are complied with.

Planning and zoning department. The City of Hampton Planning and Zoning Department shall administer all land use planning and zoning projects as directed by the City Council, as well as develop and enforce policies, programs and ordinances that govern the development of lands, the proposal of zonings, the preparation of current and long-range plans and the coordination of capital improvement (infrastructures) projects.

Plat. A map or plan representing a subdivided parcel of land or combination of lands prepared for the purpose of installing and/or finalizing existing and proposed elements of a site to be developed; this would include preliminary and final plat/plans.

A. Preliminary plat/plan: A plan showing the detailed design and layout of a subdivision of land, prepared for the purpose of development and which includes all

improvements and meets all requirements specified in this Appendix.

B. Final plat/plan: A plat of a subdivision unit, or phase of development with legal description of all lots, easements, open space and right-of-way sufficient to

reproduce the plat in the field, and which meets the requirements of the Georgia

Plat Act of 1978. The final plat is intended for legal recording of lots, right-of-way, easements, and restrictive covenants.

Public hearing. Meetings announced and advertised in advance in accordance with the Georgia Planning Act of 1989 and open to the public, where the public is given an opportunity to participate in the discussions of the meeting.

Public street. A public street includes the land between dedicated or prescriptive right-of-way lines whether improved or unimproved, paved or unpaved, and may be comprised of easement, shoulders, curb and gutter, drainage ditches and other structures and areas within the public right-of-way lines. Where applicable, public street is synonymous with *court*, *road*, *trace*, *trail*, and other such words which commonly refer to public thoroughfares. Public streets are classified as follows:

A. Expressway. The expressway system includes high volume limited access thoroughfares through the City. These include U.S. 19/41 and U.S. 42.

B. Major arterial road. Major arterial roads are defined as Old Georgia 3, Woolsey

Road, Georgia Highway 20, Hampton and Locust Grove Road, Oak Street (portions of Oak Street are not up to arterial standards and the property owner and/or

developer for any properties developed off of Oak Street will be required to deposit sufficient amount of money to bring that portion of Oak Street that fronts the property to be developed up to a major arterial standard is defined as a road of a minimum of 24 feet in width,

curb, gutter, and storm drainage), and any other roads subsequently developed or brought to arterial standards as identified by the City Council.

C. Minor arterial. An arterial public street similar in function to a major arterial but which is intended to provide moderate

levels of traffic flow and greater access to abutting properties. Minor arterials serve as traffic feeders to major arterials and for regional travel.

D. Collector public street. A public street which carries traffic from local public

streets to minor and major arterial public streets, and may include the principal

entrance of a development.

E. Local public street. A public street designed to provide access to adjoining properties within a subdivision or other development.

F. Cul-de-sac. A local public street with only one outlet, closed and terminated by a vehicular turnaround.

G. Marginal access public street. A public street which is parallel to, and adjacent to an arterial public street or highway

and which provides access to abutting properties and protection from through traffic.

Public street, cul-de-sac. A public street that does not terminate into an intersection with another public street, but rather ends in a turnaround.

Public street, dead-end street. A public street that does not terminate into an intersection with another public street and does not end in a turnaround.

Public utilities. Gas, water, sewer, electrical, communication and similar services that are provided to the public through the City, Henry County Water and Sewerage Authority, and/or a corporate entity, that is regulated and is a service provided for the benefit of public's health, safety and welfare.

Public utility facilities. Buildings and structures including generating and switching stations, poles, lines, pipes, pumping stations, antennas, transmitters, valves, and all other structures related to the furnishing of utility services in the City.

Settling tank. A tank or basin (in a wastewater treatment facility) in which settleable solids are removed by gravity.

Sewer. Collection lines, pipes or conduit that transports effluent, sewage or stormwater runoff from a generating source to a treatment facility or receiving body of water.

Sewer system and treatment. Devices for collection, treatment and disposal of sewage.

Sewerage/sewage. The total of organic or inorganic waste and wastewater generated by residential and nonresidential sources; effluents which may or may not be sanitary, such as industrial, stormwater runoff, etc.

Sight distance, intersection. The distance measured from a vehicles eye-height, measured from ground level to the eye-height of a motorist to a specific object to a specific distance based on the speed of oncoming vehicles.

Sight distance, stopping. The unobstructed vision of a motorist on a horizontal plane along a street centerline as measured from the motorist's eyeheight.

Soil erosion and sediment control plan. A plan for temporary and permanent facilities to control soil erosion and sedimentation on a construction site (see: City of Hampton Soil Erosion and Sedimentation Control Ordinance).

Stub out service. Sanitary sewer or public water connection lines/facilities within the street rightof-way or on public or private properties that are intended to extend and serve adjacent properties in the future.

Subdivision. The division of a parcel or tract of land for the purpose of creating sites for development and/or the rearrangement of existing lot lines. A division of parcels or tracts of land shall be considered a subdivision and shall comply with all subdivision regulations if one of the following elements is proposed for the proper development of such lots:

A. If new streets/public streets are created;

B. If new utility improvements are required;

C. If new sanitary sewer or public water are required;

D. If the division has created two lots from the original parcels [AND] any of the

above is applicable.

E. If the division has created three or more lots from the original parcel.

Surveyor, land. One who is licensed by the State of Georgia as a land surveyor and is qualified to make accurate field measurements and to mark, describe and define land boundaries.

Utility department. The City of Hampton Utilities Department shall be responsible for approving the design, development, maintenance, finance and construction inspection of sewer and water facilities and all public utilities within the City.

Utility director. The City of Hampton Utility Director shall be responsible for approving the design, development, maintenance, finance and construction inspection of sewer and water facilities and all public utilities within the City.

Utility easement. The right-of-way acquired by a utility or governmental agency to locate utilities (pipelines telephone lines, cable, towers, sewer, etc.) on a publicly or privately owned parcel of land.

Utility, private/public. Any agency that, under public franchise, ownership or under certificate of convenience and necessity or by grant of authority, provides the public with electricity, gas, water, sewer, etc., or other similar services.

Utility, services. The generation, transmission and/or distribution of gas, electrical, water or communication oriented facilities that are installed by a public utility company or the City;

including the collection and treatment of sewage and solid waste.

Wetlands. Areas within the City or Henry County that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, or as defined by federal law.

Zoning Administrator. The City Manager or their designee.

Zoning district. The various zoning districts as defined in the City of Hampton Zoning Ordinance.

Zoning ordinance. The City of Hampton Zoning Ordinance.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 490, § 1, 10-8-19)

ARTICLE 3. PROCEDURE

Sec. 3-1. Generally.

A. Within the territorial limits of the City, no person shall subdivide or rearrange a lot line of any lot or parcel of land or grade, install streets, utilities or make any improvements to a parcel(s) of land without complying with the provisions of this Appendix.

B. No residential or nonresidential final plat/ plan of a development shall be recorded by the Henry County Clerk of Superior Court unless the same has been approved as provided herein.

C. No building permits shall be issued or improvements or services authorized or installed in any unapproved development.

D. The review and approval process for residential or nonresidential developments shall include a pre-application conference with the Zoning Administrator and/or city manager.

Nonresidential developments shall submit/present a preliminary/conceptual plan of the layout, architectural and sign designs of the project.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-2. Pre-Application Conference and Preliminary Plat.

A. Purpose of conference.

1. Every subdivider/developer shall consult with the City Zoning Administrator for

advice and assistance prior to preparation of a preliminary plat/plan and submittal of an application for approval, as well as inquire as to the necessary documents and materials needed for a plan submittal.

2. The purpose of the conference is to familiarize applicants with the development process of the City and the applicable ordinances and regulations necessary to

guide a development appropriately.

3. For developments requesting access onto state highways, the applicant should

consult with and get confirmation from the state department of transportation.

All projects affecting state, Henry County, or city infrastructure (public streets, utilities, etc.), projects will need to be coordinated with the affected state, Henry County, or city department, and/or

authorities.

B. Preliminary/conceptual plan.

1. The subdivider/developer shall prepare and present a preliminary plan at the

pre-application conference. The preliminary plan shall be a general design of the proposed subdivision including

boundaries of the proposed subdivision and all lots, topographic contours, layout of lots and streets (including public streets adjacent to the subdivision) size and

dimensions of the property and proposed lots (including lot area), delineation of creeks, streams, and all other bodies of water, open space and other planned

improvements, and such other information as may be deemed necessary by the planning and zoning department.

2. Following the pre-application conference the Zoning Administrator shall review

the preliminary plan and provide the applicant with the following items within seven working days:

i. Verification of either compliance or noncompliance with the City Zoning Ordinance.

ii. Recommendations for improvement of request with current ordinances and policies.

iii. Compliance with the City's Comprehensive Plan.

iv. Recommendations or comments from other city departments, the county health department and fire department.

v. Recommendations for improvements to the proposed development, its design, layout, zoning adjustments, etc.

C. If the property is not in the correct zoning district for the proposed development, in order to continue with the development, the developer/ subdivider will be required to apply for the appropriate zoning that is applicable to his/her request.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-3. Preliminary Plat, Filing and Review Procedures.

A. The subdivider shall file with the planning and zoning department five copies of the preliminary plat/plan and construction improvements (erosion and sediment control plans, public street improvement profiles, structural plans and all civil engineering documents), and two copies of a stormwater management plan. The Zoning Administrator shall review the preliminary plat/plan with the appropriate city departments, or county and state departments, if applicable.

B. The planning and zoning department shall notify the local school district office, the county tax assessor's office, and the county 911 department of all proposed developments.

C. The plan review process shall determine compliance with the regulations of this Appendix and the zoning ordinance and make any changes necessary to improve the development.

D. If the preliminary plat/plan is determined to be deficient of required information by the City, it shall be the responsibility of the developer/ subdivider to make all necessary changes and corrections and resubmit all changes to the planning and zoning department for further review.

E. The approval of all preliminary plat/plans shall include on the plat/plan, applicable zoning standards of development, rezoning conditions and any other modifications or recommendations from the City.

F. Following the review and approval of a preliminary plat/plan by the City's departments, a meeting with a representative of each department or appropriate agencies shall be held to verify compliance of the plat/plan with all necessary regulations and in order to issue all appropriate and permissible permits.

G. All plat/plans which meet the (ARC) Atlanta Regional Commission's standards for a (DRI) development of regional impact or other regional or federal impact requirements/standards shall be submitted to ARC and/or other appropriate state agencies, all plans for review, comment and recommendation prior to approval of said plat/ plans or issuance of any permits for the site.

This may take place during or prior to the rezoning processes if deemed necessary by the Zoning Administrator or as part of the preliminary plan review.

H. If required to submit a plan to the ARC for a DRI review or other state or federal analysis;

those recommendations or reasonable changes to a plan or rezoning shall be incorporated into the design or study of the plan(s).

(Ord. No. 457, § 1, 8-14-18) Sec. 3-4. Preliminary Plat, Required Information.

The preliminary plat/plan shall meet the minimum standards of design and requirements for the construction of public improvements as provided in Article IV, Improvements Standards of this Appendix, and shall have the following information:

A. Description:

1. Proposed name of development, its units and/or phases of development.

All phases or units of a development must be delineated on the submitted plan.

2. A plan layout of the proposed development and potential phases/ units of development must be submitted for a development that has or may have more than two phases/units to it.

3. Names, addresses and telephone numbers, pagers, cell phones of subdivider, engineer, landscape architect, surveyor and project manager, as well as each person's e-mail address.

4. Graphic scale, north arrow (which shall be identified as magnetic, true or grid north).

5. Date and revision schedule.

6. Location map showing the relationship of the development to the surrounding area, including identification of landmarks or

distances to landmarks within the area of the project.

7. Acreage to be divided and the total number of lots/parcels.

8. Proposed net and gross density for residential projects and the total square footage of buildings of nonresidential projects. The total approved density shall reflect the total net density of the entire project, including a running tally of all

phases/units of the entire project unless otherwise approved, which may include approval of a net density per individually zoned properties within the development.

9. Lineal feet of proposed public streets (per phase and total in project).

10. Zoning of property and all of that districts space standards, any special conditions of zoning, minimum house size and lot sizes.

11. Impervious surface calculations.

B. Existing conditions:

1. Topographic contours and vertical intervals of not more than two feet when new streets are involved.

2. Location and delineation of wooded/ tree areas, vegetation, lakes, streams, creeks or other natural elements of the land.

3. Topographic data shall be based on field surveys or aerial photos.

4. Soil conditions according to the U.S.

Soil Conservation Service Classifications Manual.

5. Current name and address of adjacent property owners, names of subdivisions, businesses, and/or nonresidential projects: including zoning of adjacent properties.

6. In the case of a submittal of a replatted development, a copy of the existing plat shall be submitted also.

The words: +Replat or Revised Plat+ shall be included on such document.

7. Location/delineation and calculations of the acreage of wetlands, floodplains, reservoirs, recharge

areas, other bodies/sources of water and land subject to a 100-year flood hazard, including contour elevations. The plat shall state if elevations are taken from a surveyed stream on a FEMA map or if the

elevations are from an independent study (HEC-2, QUICK-2, etc.).

Wetland areas shall be field located.

8. Delineation of such natural resources shall be indicated in a report from a

registered soil scientist in the State of Georgia.

9. State whether or not a project lays within the Towaliga Watershed district.

10. Location of existing and proposed property lines, location, width and names of all platted public streets, rail public streets, utility rights-ofway, public areas, existing planning and zonings, structures and/or

landmarks.

11. Existing utility, sewer, water mains and lines, easements, drains,

culverts, and/or other underground or above ground facilities adjacent to or within the boundaries and rights-of-way of the proposed project.

Included shall be the sizes, grades and invert elevations from field surveys or other sources. All sizes and data on all utilities shall be provided.

12. Existing drainage patterns. The boundaries of the pre-developed drainage basins shall be shown on a map. The map shall include the number of acres in each basin, the pre-developed runoff coefficient and the time of concentration.

C. Proposed conditions:

1. Layout and names of proposed public streets, alleys, public walkways (bike trails, sidewalks, paths, etc.) with width of pavement and right-of-way.

2. Layout of all lots, including building setback lines, lot dimensions and area/square footage of lots.

Showing all existing and proposed easements (drainage, water, sewer, storm pipes, etc.) and the location of them on all lots. Also include the proximity (distance and location) of all adjacent easements and utilities.

3. Lots with detention ponds on them must meet the minimum zoning area requirements outside the area of the pond. Lots with detention ponds must meet the setback requirements of the applied zoning district to be declared a buildable lot. Homes or buildings may not be set closer than 20 feet to a detention retention pond, regardless if the home/building(s) comply with the setback requirements.

4. Flood elevations on any lots within a 100-year flood hazard area. In addition, the foundation elevation that is a minimum of one foot above the established 100-year flood elevation shall be shown. This data may be shown either on the lot layout or

in tabular form. The flood hazard area shall include both studied and unstudied streams, including drainage ways as designated on the preliminary plat.

5. Construction plans of street including typical cross section and grade profiles shall show the percent of

each grade and length of each vertical curve. The minimum centerline stopping sight distance for interior

streets is 200 feet. Construction plans of sanitary sewers with grades, service, pipe size and points of discharge and connection to other trunk or lateral sewers.

6. Show the centerline stopping distance for all points of access onto state and county public streets. Show posted speed limits of such public streets.

7. As-built construction plans of storm drainage systems with grade, pipe sizes, lengths, location of outlets, runoff and velocity calculations, and other drainage structures. All storm drainage systems carrying off-site runoff shall be designed for the 100-year storm event. All storm pipes within the public street rightof-way shall be asphalt coated corrugated metal pipe.

8. Improvement construction plans of water supply systems with pipe sizes and location of hydrants, valves and all other appurtenances.

9. Draft of proposed deed restrictions/ covenants to be imposed on any or all parcels within the development.

10. Easements for drainage and proposed and existing water and sewer lines and utilities along the side, rear lot lines or wherever else they may be placed and watercourses as required in Section 4-32.

11. Proposed soil erosion and sedimentation control.

12. Final contours: In some cases, the street profiles will suffice in showing the amount of cut and fill;

however, in all cases, final contours need to be shown on the plans.

13. Stormwater management: A hydrologic study should be included and the necessary outlet control structures shown on the plan. No increase in runoff or velocity will be permitted. A professional engineer's certification that the improvements will not adversely impact downstream property (see: Hampton Stormwater Management Ordinance).

14. Proposed drainage patterns: The boundaries of the post-developed drainage basins shall be shown on a map. The map shall include the number of acres in each basin, the post-developed runoff coefficient and the time of concentration (see: Hampton Stormwater Management Ordinance).

15. Show a five-foot high fence on all detention ponds with a 100-year pond elevation over four feet. A ten-foot wide gate to be located as to provide the best vehicular access.

Vegetation shall be planted around all fences in order to minimize the visual impact the fencing has on a development, except at the designated gate area.

16. Detail drawings: Any structural practice used should be explained and illustrated with detail drawings and must meet minimum city standards.

17. Tree save areas shall be field located, staked, marked with flagging tape,

and submitted to the City for approval prior to any land disturbance.

D. Show the following notes on all plans:

1. That all storm sewer, sanitary sewer, water, etc., easements exist where

such utilities are placed. If placed on or along property lines, such utilities or infrastructure shall be centered on lot lines. All easements shall include an indication of their width.

2. All storm drains shall be extended a minimum of 30 feet behind any home(s) or building(s).

3. Grade stakes shall be set on all streets prior to any street grading.

An as-built subgrade centerline profile shall be submitted and approved by the City prior to the installation of curb and gutter or other infrastructure and utility improvements.

4. An as-built detention pond detail and revised hydro study shall be submitted to the City prior to the final approval of by the City.

5. All undisturbed buffers shall be field located, staked and flagged or

marked with tenzar and shall be submitted to the City for approval prior to grading.

6. Total amount of impervious surface of the entire site. No site shall exceed 25 percent impervious surface.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-5. Invalidation of Preliminary Subdivision Plat.

If no substantial construction or alteration of the property or other affirmative action to develop the property occurs within 12 months of the effective date of granting approval of a preliminary plat, said plat approval may become void. Unless there are circumstances that clearly justify an extension of time, City Council may nullify the preliminary plat approval and instruct the Zoning Administrator to inform the applicant by letter of the nullification and that land alteration shall terminate until another preliminary plat is approved.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-6. Filing Procedures for Final Plat.

A. Once the proposed improvements are substantially in place and the developer/subdivider is seeking final approval from the City, the developer/subdivider shall submit to the City planning and zoning department five copies of the final plat for review and comment. The final plat shall conform substantially to the preliminary plat as approved by the City. The plat shall include those portions of the preliminary plat, which have been developed and/or approved, provided that it complies with all requirements of this Appendix.

B. The developer/subdivider shall submit with all final plat submittals, soil data, which shall have been prepared by a qualified soil scientist that is approved by the board of health. The soil data should include test results for all proposed (septic tank) lots for which final plat approval is requested. Soil study test results shall be reviewed and certified by the Henry County Health Department. A report from the county health department indicating the status of each lot's capability to be developed.

C. When the final plat has been reviewed and approved by the planning and zoning department, the developer/subdivider shall supply one original drawing of the final plat on mylar or sepia in black ink, as well as 17 copies of the plat in blue line format. A licensed professional engineer or landscape architect shall prepare the plat. The minimum size of the plat(s) shall be 8, inches x 11 inches and a maximum size of 17 inches x 22 inches. In addition, all other necessary documentation for recording must be submitted at this time. Both Zoning Administrator and mayor shall sign the final plat. The final plat shall than be presented to the City Council as an update to them of development activities occurring in the City.

D. The developer shall be responsible for properly recording the final plat with the Clerk of Superior Court of Henry County. The developer shall then submit to the City, confirmation (letter, receipt, signed plat, etc.) from the Superior Court, that the plat has been recorded. The mylar and three copies of the plat will be returned to the developer, with one copy going to the following city/county departments:

1. Two copies to the City planning and zoning department;

2. One copy to the county planning and zoning department;

3. One copy to the County Engineer;

4. Two copies to the City utility department;

5. One copy to the county health department;

6. One copy to the county D.O.T.;

7. One copy to the county tax assessor's department;

8. One copy to the county board of education;

9. One copy to the county 911 office;

10. One copy to the City police department;

11. One copy to the county G.I.S. department;

12. One copy to the county voters registration; and

13. One copy to the postmaster general.

E. The planning and zoning department shall retain remaining copies of the final plat.

F. Other important items necessary for consideration of final plat approval by the planning and zoning department shall consist of:

1. Completion of public improvements. The developer shall contact the planning and zoning department for a checklist specifying the procedure in obtaining the various approvals from the City, which will release the subdivision or final plat

consideration.

2. Bonds and/or letters of credit required.

The developer/subdivider may be required, in the discretion of the Zoning Administrator, the following bonds and/or letters of credit:

i. Bond defined. For the purposes of this section, the term -bond- shall mean a performance guaranty given in form satisfactory to the Zoning Administrator and obtained from a surety licensed to do business in the State of Georgia and named in the current list of -Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring

Companies,- as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch. U.S. Department of the Treasury. All bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act.

ii. Letter of credit defined. For the purposes of this section, the term .letter of credit. shall mean an irrevocable letter of credit given in form satisfactory to the Zoning Administrator and drawn upon a banking or other financial institution licensed to do business in the State of Georgia. At a minimum,

the letter of credit shall provide for the immediate and unconditional drawing of any or all of the amount of the letter upon presentment and demand for payment.

iii. Maintenance bond/letter of credit.

The developer/subdivider shall be required to post either a bond or, in the sole discretion of the Zoning Administrator, a letter of credit in an amount at least equal to that necessary to cover the cost of infrastructure improvements upon neglect or abandonment of the project.

iv. Residential bond/letter of credit. The amount of the maintenance bond/

letter of credit for a residential development shall not be less than $100.00 per lineal foot of street and $10.00 per lineal foot of sidewalks within the development.

v. Nonresidential bond/letter of credit.

The amount of the maintenance bond/letter of credit for a nonresidential development shall not be less than $100.00 per lineal foot of street within the development.

vi. Landscape bond/letter of credit. The maintenance bond/letter of credit

shall state, in addition to all other amounts listed in this section, sufficient funding available to cover the cost of required landscaping or

vegetating a site of development.

Tree replacement, ground cover replacement, or buffer replacement shall be the responsibility of the developer/subdivider in addition to the required landscape plan provided for in the zoning ordinance. The additional amount of the bond/ letter of credit shall be set by the Zoning Administrator or, in his absence, by the City Manager.

Additional costs to the City outside of the amount of the bond shall be charged to the developer/subdivider and shall constitute a lien upon the property.

vii. Duration of bond/letter of credit.

The maintenance bond/letter of credit required by this section shall have an initial duration of three years and shall be renewed, in the sole discretion of the City Council, for additional terms of three years.

Except as otherwise provided in this section, upon final inspection and certification from the City that all infrastructure work covered under the bond is satisfactorily completed, in good condition and in compliance with all applicable laws, ordinances, rules, regulations, and construction standards, the maintenance bond/ letter of credit shall be released.

3. For developments with multiple phases of construction, separate maintenance

bonds/letters of credit may be accepted by the Zoning Administrator for each phase. However, where improvements in one phase of a development connect or are integrated into another phase, the maintenance bond(s)/letter(s) of credit given on one, multiple, or all phases of development may, when, in the sole discretion of the Zoning Administrator and/or the City Council it is necessary, be

renewed until certification from the City that all infrastructure work within the

development as a whole is satisfactorily completed, in good condition and in

compliance with all applicable laws, ordinances, rules, regulations and construction standards.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-7. Necessary Final Plat Documentation.

The final plat and acceptance of public improvements will be presented to the Zoning Administrator along with the following items at a final review meeting. The purpose of the meeting is to determine completion of all infrastructure improvements, notify the developer of additional requirements necessary to move forward, confirm approval of all city-county agencies/departments and to ensure that all required documentation is accurate and that all fieldwork is in compliance with this Appendix. The following items shall be presented to or in position of the Zoning Administrator during the final plat review meeting:

A. Completed application form.

B. Final plat/plan drawn to the required standard set forth in this Appendix.

C. Copy of all materials test results for base and asphalt paving (core test).

D. Verification from the appropriate city/ county departments that all required

inspections have been made and approved and that improvements to the subdivision include street construction, sidewalks, drainage systems, right-of-way seeding/

sod are in compliance with the approved plans. This would include the installation of all utilities (above or below ground), street and traffic signs and any other

appropriate and necessary improvements as required by the City.

E. Verification from the County Engineering department that the soil erosion and sedimentation control for the development is in compliance with the approved soil erosion and sedimentation control

plan.

F. Verification from the City utility department that all water and sewer requirements have been met, including submission of required documents and

inspections.

G. Three-year maintenance bond/letter of credit.

H. Three-year landscape bond/letter of credit.

I. A bond/letter of credit for water and sewer system improvements submitted

to and approved by the City utility department director.

J. As-built drawings of all water and sewerage facilities as approved by the City utility department. The plans shall

include the grade, pipe sizes and points of discharge.

K. Soil study for developments not using public sewerage, including recommendation or comments provided from the county health department.

L. As-built drawings of streets, sidewalks, storm drainage systems and stormwater

detention. The minimum required asbuilt information to be submitted with the final plat application shall include the following:

1. The existing centerline profile of all newly constructed streets.

2. The size, material, length, slope, invert elevations and accurate location of all storm drain pipes.

3. The top and invert elevations of all drainage structures.

4. An as-built topographical survey of all detention basins and details of existing outlet structures. Calculations showing volumes and outflow rates. A registered professional

engineer, surveyor or licensed landscape architect, shall prepare the as-built drawings at a minimum scale of 100 feet to the inch.

M. Processing fee.

N. Master plan of all phases for developments with more than two phases.

O. Conceptual drawing of all nonresidential developments, including, architectural

colors and facade materials.

P. Results of density tests of all areas of fill and/or compaction.

Q. A set of /as-built/ plans submitted to the planning and zoning department in such

format as the Zoning Administrator may specify from time to time.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-8. Processing Fee.

Prior to the approval of the final plat application in the review meeting, the developer shall pay a fee to the City planning and zoning department.

This fee shall be set by the City Council from time to time. Such fees shall be set forth on the final plat application form.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-9. Final Plat Required Information.

The final plat shall include the following items including the requirements from Section 3-4:

A. Name, address and telephone numbers and e-mails of the owner of record of the proposed development, including the main contact or project manager. Project

management changes shall be given to the Zoning Administrator within 24 hours of such changes.

B. Certification by a surveyor that all monuments exist and their sizes, locations and materials are correctly shown on the

plat.

C. Legal description of the property including reference to land lot(s) and district(s) lines, street right-of-way lines, easements and other right-of-way infrastructure/utility locations. All street right-of-way boundaries, street names,

addresses, tax identification numbers, bearings and angles of intersections.

D. All lot lines measured to hundredths (0.01) of a foot. The bearings shall be indicated for all lot lines to the nearest second. The error of closure should not

be less than one foot in 10,000 feet.

E. Stipulation of deed restrictions and/or covenants on the property.

F. The lengths of all arcs, including radii, points of curvature, tangent bearings,

and the length and bearing of the long cord of every arc.

G. Detention pond maintenance and access easement to be shown, minimum 20 feet

to a public right-of-way. Location of all storm drains including pipe sizes.

H. Any buffer areas required in the zoning ordinance, including statements whether

or not the buffer areas are to be enhanced with additional landscape materials,

remain undisturbed, fenced, or a combination of all screening and protection techniques.

I. Individual lot sizes measured in square feet; placed either in a table or on the individual lots.

J. The outline of all property to be dedicated or reserved for public use or to be reserved for common use of all property owners in the subdivision with the purpose of the

dedication or reservation indicated.

K. Location of sidewalks, pedestrian or bicycle ways and their length and width.

L. If wetlands do lie within the development or unit/phase, the plat must include the following notation: /Wetlands shown

on this plat are under the jurisdiction of the U.S. Army Corps of Engineers. Lot

owners may be subject to penalty by law for disturbance to these wetland areas without proper authorization/. In addition, the plat shall include the amount of wetlands, in acreage, within the development.

M. The following notation shall be included on all final plats: /This plat is hereby approved for recording by the City of

Hampton, Georgia/ Date:

By: (Mayor, City Manager or Director of Planning and Zoning)

N. Notation that the City assumes no responsibility for the overflow or erosion of natural or artificial drains beyond the extent of the street right-of-way, nor for the extension of culverts beyond the points shown on this plat and as required by

this Appendix.

O. Notation that all storm drains shall be extended a minimum of 30 feet behind

any future residence or building.

P. Proposed net and gross density for residential projects and the total square footage of buildings of nonresidential

projects. The total approved density shall reflect the total net density of the entire project, including all phases/units of the entire project unless otherwise approved, which may include approval of a net

density per individually zoned properties within the development. The plat shall

also include the calculation of impervious surface area.

Q. A statement that street rights-of-way, sidewalks, and designated easements and

properties shown are specifically dedicated for public use and upon recording, are

accepted by the City.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-10. Administrative Changes to a Plat.

The Zoning Administrator, mayor or city manager may approve alterations to a plat which depart from the standards of this Appendix as long as the adjustments do not alter the purpose and intent of these regulations. Such changes shall be less than the ratio changes described in the above as drastic changes.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-11. Individual Lot Divisions.

The process for approving an individual residential plat (only), that is not part of a subdivision. All applicants shall include the following information on all individual plat submittals. The planning and zoning department shall check the plat(s) for accuracy of other city/county mapping and ordinance compliance. The following information shall be included on each plat/survey:

A. Zoning of property; including setback information;

B. Correct land lot(s) and district(s);

C. Scale of measurement (preferably; 10:

100' or 10: 50');

D. Outline of planning and zoning foot prints;

E. Notes which indicate if property(s) is in a 100-year floodplain, wetland and/or

watershed area or if any other bodies of water are on property(s) and indicate on property;

F. Dimensions and acreage of property;

G. Proposed and existing easements and setbacks on-site;

H. Contours at two- or five-foot intervals;

I. Tree save areas;

J. North arrow;

K. Engineer's/surveyor's seal, signature, phone number, address;

L. Iron pins set at all corners unless otherwise noted;

M. A 20-foot drainage easement and sanitary easement shown inside all rear lot lines and all easements shown on side and/or

front lot lines;

N. Calculations which demonstrate that the development, as a whole, complies with

the 25 percent impervious cover requirements of this Appendix;

O. Note: City of Hampton, Georgia assumes no responsibility for overflow or erosion of natural or artificial drains beyond the extent of the street right-of-way; nor for the extension of culverts beyond the point shown on this plat;

P. All storm drains shall be extended a minimum of 30 feet behind future residence;

Q. The field data upon which this plat is based has a closure precision of at least one foot in 100,000 feet;

R. This plat has been calculated for closure and is accurate within at least one foot in 100,000 feet;

S. All lot lines measured to hundredths (0.01) of a foot. The bearings shall be indicated for all lot lines to the nearest second. The error of closure should not

be less than one foot in 100,000 feet;

T. Stipulation of deed restrictions and/or covenants on the property;

U. The lengths of all arcs, including radii, points of curvature, tangent bearings,

and the length and bearing of the long cord of every arc;

V. Restrictive covenants and/or conditions of zoning; and

W. These and all other standards as described in Section 3-9 of this Appendix shall

apply to the approval of individual plats.

(Ord. No. 457, § 1, 8-14-18) Sec. 3-12. Dedication Plats for Right-ofWay Acquisition.

A plat is required for dedication to the City of property for acquisition of right-of-way and public improvements such as public streets, water/ sewer, or other utilities that will require public facilities. The review and approval of plats for this purpose shall require the plat/survey to meet the requirements of Section 3-11 of this Appendix. A bond/letter of credit (which shall not expire until three years after completion) shall be required for all public improvements as required for final plats.

(Ord. No. 457, § 1, 8-14-18)

ARTICLE 4. IMPROVEMENTS

STANDARDS

Sec. 4-1. Street Layout and Design.

The location, arrangement, extension width and grade of all streets shall conform to the standards of this Appendix and shall be coordinated with city infrastructure projects, as well as applicable Henry County and State of Georgia projects.

A. Whenever a tract to be subdivided/ developed includes any part of or the entire part of a city planned public street project, such public street or part of said public street shall be installed by the

subdivider according to the specifications of this Appendix and in accordance with the Comprehensive Plan.

B. Proposed streets of a development shall be designed so as to be continuous and in alignment with existing, planned or platted streets with which they are adjacent to.

1. Proposed streets shall be extended to the boundary lines of the tract to be subdivided/developed, unless prevented by topography or other physical conditions (as determined by the planning and zoning department) for the coordination of the layout of the development with existing and future development of adjacent tracts.

2. Where there exist in adjacent tracts half-width streets, alleys or stubbedout streets, the proposed development that adjoins such public streets shall connect to such public streets

and/or alleys in order provide continuity of public street networks.

3. Half streets shall be prohibited unless reviewed and approved by the County Engineer and the City Council as a matter of a variance. If proven not to be necessary to create a half street, the developer of such public street(s) shall construct such public streets to the specification of this Appendix and shall be required to finish any existing half streets or unpaved public streets if such public streets will provide access to the proposed development.

C. All residential subdivisions having less than 75 lots may include a boulevard

entrance(s) when on city or county public streets (this will be determined by the

County Engineer and the speed limit of the public street in which the development has its access from). When fronting off of a state route, boulevard entrances shall be installed. Subdivisions with 76 to 150 lots shall have boulevard entrances and shall provide a secondary entrance

when access to a second public street is feasible. Subdivisions with lots of more than 150 homes shall have an additional

entrance for every 100 additional lots within the development, including a development with multiple phases. The sum of all lots within a multi-phases development shall be regarded as one entire development. Developments unable to meet the required entrance yield shall not submit continuous phases of a development until such requirement can be complied with.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-2. Developments Constructed Off of State Highways, Major and Minor

Arterials.

A. Whenever a proposed development has streets that will enter off of a state highway that is maintained and controlled by the (G.D.O.T.)

Georgia D.O.T., the preliminary plat shall be submitted to G.D.O.T. for review and approval.

B. When a tract of land fronts on a state highway or minor and major city or county arterial public street, the developer of a residential subdivision shall be required to have all lots face within the interior of the development as to provide frontage only off of interior collector or local streets.

C. Access from a state highway, major or minor city/county public street shall be limited based on visibility safety and design to minimize the amount of ingress and egress points. The number of actual access points off of the state highway into any residential or nonresidential development shall be determined by the G.D.O.T.

D. Access off of a major or minor city/county public street and the number of access points shall be approved by the County Engineer and shall be based on the design, safety and best visibility into and out of the development. The County Engineer shall require that access from major or minor city/county public streets also be provided through an interior public street system to all business, office or industrial sites in order to minimize multiple (too many) ingress/egress points.

E. Business or office 1strip1 centers or nonresidential developments that rely on direct access from a major or minor public street, shall be designed as to also limit access to such businesses by allowing for share parking and shared ingress/egress points. Access to such sites shall be determined by visibility, safety and design. Such sites may be required to provide accel/decel lanes or additional right-of-way to create appropriate turning lanes into such developments.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-3. Street Right-of-Way Widths.

A. The minimum width of street rights-ofway subsequently constructed measured from back of sidewalk to back of sidewalk shall not be less than as shown below. These provisions shall not apply to public streets constructed as of the effective date of this Appendix.

1. Major arterials: 100 feet.

2. Minor arterials: 80 feet.

3. Collector public streets: 60 feet.

4. Local public streets: 50 feet.

B. 1T1 and 1Y1 intersections and all other access points not listed here shall follow standard nationally known design standards such as, but not limited to, International Fire Codes, fire apparatus access public streets.

C. The County Engineer may approve of innovative or contemporary public street designs after review of such techniques and examples of such in other communities. The developer, engineer and/or landscape architect shall provide proof of the functionality of any and all innovative designs not permitted in this Appendix.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-4. Pavement Widths.

The minimum pavement for streets to be installed by the subdivider's shall be at the expense of the subdivider. The city's participation in cost for pavement in excess of the minimum width

required, if determined to be necessary by the County Engineer shall be determined on a case by case basis with the City Council. The required widths are shown below:

Functional Class With Curbs* (from back of curbs) Without Curbs

* Major arterial 52 ft. 48 feet Minor arterial 28 ft. 24 feet Collector/Local 26 ft. N/A Local-Industrial 30 ft. N/A Local-Commercial/ Office 28 ft. N/A Alleys 16 ft. N/A

* Four Lane highways should be 52 feet wide;

two lane highways should be 28 feet wide.

* Residential culs-de-sac should have 80-foot diameters.

* Commercial, industrial and/or office park culs-de-sac should have 110-foot diameters.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-5. Speed Limits.

The posted speed limit on all local streets within a subdivision shall be 25 miles per hour. The speed limit for all other city streets shall be determined by the Hampton City Council.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-6. Curbing.

Curbs shall be required in all residential and nonresidential developments. Curbs in all subdivisions shall be L-back curbs 24 inches long, six inches thick, and an 18-inch gutter. All curbs shall be constructed of Portland cement concrete.

Curbs shall be designed to provide handicapped access at street intersections, wherever sidewalks are constructed.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-7. Street Grades and Elevations.

Grades on major and minor arterials shall not exceed five percent and grades on local residential streets shall not exceed 12 percent.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-8. Horizontal Curves.

The radius of horizontal curves on local residential streets within subdivision shall be no less than 150 feet. The horizontal radius for collector and arterial streets or any streets with a design speed of more than 25 miles per hour shall comply with ASHTO standards.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-9. Vertical Curves.

All changes in grade shall be connected by vertical curves, which are as long as conditions permit and under no circumstances should they be shorter than established minimums prescribed by approved highway design methods.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-10. Centerline Sight Distance.

Minimum street centerline sight distances shall be designed relative to the designed speed of the street and should be measured above the street centerline using a driver-eye height of 3.5 feet and an object height of six inches. The minimum stopping sight distance for any street shall not be less than 200 feet.

Minimum centerline site distances relative to design speed posted on streets are:*

Speed (MPH)* Centerline sight 0—30 200 40 275 50 400 55 475 Distance (stopping distance in feet):

* The minimum stopping distance for streets shall not be less than 200 feet.

Sight distance for intersections with minor/ major arterials use intersection sight distance measured from a driver's eye height of 3.5 feet to and object height of 4.25 feet.

Speed (MPH)* 0—30 40 50 55 Centerline sight distance (stopping distance in feet) 375 580 840 990

* Data taken from 1990 AASHTO Guide, A policy on Geometric Design of Highways and Streets.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-11. Intersection Geometry.

Street intersections shall be as nearly at right angles as possible. In residential subdivisions no intersection shall be at an angle of less than 80 degrees or more than 100 degrees.

A. Street intersections in commercial and industrial subdivisions shall be at an

angle of not less than 90 degrees.

B. The minimum curb radius at street intersections shall not be less than 25-foot radius, shall be required at intersections with existing collector and arterial public streets maintained by the City of Hampton.

C. The minimum curb radius of street intersections for industrial and commercial subdivisions shall be 50 feet.

D. Pedestrian ramps shall be designed for all intersections in accordance with

standard drawings for subdivisions and residential developments designed to include sidewalks and shall meet the minimum standards in regards to the Americans with Disabilities Act (ADA).

The curb shall be de-pressed to accommodate future installations at the same time as the street.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-12. Street Intersection Offset.

Street intersections shall have a minimum centerline offset of at least 125 feet.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-13. Tangents on Reverse Curves.

A tangent of at least 100 feet long shall be introduced between reversed curves on major and minor arterial streets, or on any street where the posted speed limit will be 35 miles per hour or greater.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-14. Dead-End Streets.

A. Local streets designed to have one end permanently closed and not connected with any existing street, proposed future street, or not intended to extend to the property line of an adjacent tract, shall be no longer than seven times the lot width provided by the zoning ordinance, unless necessary due to the topographic or other physical conditions of the property.

1. Permanent dead-end streets. Permanent dead-end streets shall be joined by a

cul-de-sac with a paved turnaround having an outside diameter of 80 feet (40-foot

radius) and a right-of-way of at least 110 feet diameter. Dead-end streets designed to be permanent and that exceed more

than 800 feet in length may be required to have a cul-de-sac turn around midway between the entrance intersection and the end of the street to provide maneuvering for emergency vehicles, when the dead-end street is the only street in a

subdivision.

2. Temporary dead-end streets. Stub streets which are intended to provide access for which are intended to provide access for future development within a tract of land or adjacent tracts shall be required to

have a temporary turnaround area having a diameter of at least 80 feet, consisting of six inches of graded aggregate base.

B. For developments with a temporary turnaround, it shall be required of the subdivider to provide a bond or letter of credit equal to the cost of permanent cul-de-sac construction, in accordance with the standards of Section 4-4, for a period of two years. Failure of the subdivider to extend the street or to construct a permanent cul-de-sac shall result in the City using the bond or letter of credit funds to complete the cul-desac construction.

C. In his sole discretion, the Zoning Administrator may require streets within a development to connect. In such a case, the developer may appeal this administrative decision to the City Council.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-15. Private Streets.

With the exception of alleys, there shall be no private streets platted in any subdivision. Every lot in subdivided property shall be served from and shall have frontage onto a street dedicated to either the county or to the City of Hampton.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-16. Alleys.

Private alleys may be provided at the rear of lots in residential, commercial, and industrial developments when approved by the Zoning Administrator.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-17. General Construction Requirements.

A. Every subdivision developer shall be required to follow the requirements of the Soil Erosion and Sedimentation Control Ordinance of the City of Hampton, to grade and improve streets, alleys and rights-of-way, to install curbs or ditches when required and to install street name signs in accordance with city's specifications. Every subdivider shall be required to comply with the inspection procedures of this Appendix.

B. All street design and construction and related material shall be in strict accordance with Georgia Department of Transportation 2Standard Specifications, Construction of Public Streets and Bridges2, 1993 Edition, and all revisions thereto and the requirements of Sections 4-18 and 4-19. Where circumstances dictate variations from the standard specifications, the governing body may vary the requirements, provided the design of materials accepted are in all ways commensurate with good practice.

C. All materials, equipment, labor and other matters related to street construction shall be provided by the developer. The following is a summary of the improvements required:

1. Grading. All streets, public streets, and alleys shall be graded to their full width right-of-way by the subdivider so that

the pavements and sidewalks, when installed in the future, can be constructed on the same level plane. The preparation of the right-of-way before grading is

started and the construction of cuts and fills shall be accomplished according to the specifications of the City (see Sections 4-18 and 4-19).

2. Three copies of an as-built subgrade centerline profile shall be submitted to the Hampton Planning and Zoning Department. The profile shall include both proposed and as-built centerline elevations at every even station. No curb and gutter or waterlines shall be installed

prior to subgrade approval.

3. Storm drainage. An adequate drainage system, including necessary curb, pipes, culverts, headwalls, intersectional drains, drop inlets, bridges, swale ditches, and detention areas, shall be provided for the proper drainage of all surface water and prepared by a registered professional

engineer or landscape architect.

4. Public streetway surfacing. After preparation of the subgrade the public streetbed shall have base material and paving

applied according to county specifications (see Sections 4-18 and 4-19).

(Ord. No. 457, § 1, 8-14-18) Sec. 4-18. Construction Requirements for Residential Subdivision Streets.

A. The design and construction requirements for residential subdivisions shall comply with the minimum standards shown in Table 3-1.

B. The grading, base and pavement for residential street construction shall be as follows:

1. Grading. All streets shall be graded to the elevations shown on the approved

construction plans.

C. Clearing and grubbing. After the development permit has been issued by the Hampton Planning and Zoning Department, and a preconstruction conference has been held, the development inspector duly notified, and all required silt and erosion control measures installed and approved, the contractor may only clear and grub those lots that have received approval for construction of homes or buildings.

All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed in the areas where utilities, principle buildings, and necessary infrastructure have been permitted to go. All other vegetation, especially trees, shall be maintained on the lot or lots throughout the extent of the development.

Removal of required vegetation to meet the City tree ordinance and/or landscape plan shall prohibit continuance of any field or construction work on the site. Replacement of vegetation at an equal portion to that removed or damaged shall occur prior to continuation of the project, or within the construction limits of the project. No rubbish or other material resulting from the clearing and grubbing of the public street way may be buried within a lot or future lot of record. If burning is permitted, all burn pits must be located outside of the public streetway construction limits.

D. Excavation. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material in the top 12 inches of the public streetway. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of 12 inches and back-filled with suitable material. All rock and boulders in the public streetbed shall be excavated to a depth of at least 12 inches below the subgrade and the space back-filled to the correct grade with suitable material. Any stones, broken rock, or boulders resulting from the grading of the public streetway may not be placed in any public streetway fill area except when approved by a development inspector and then under his supervision. During the construction of the public streetway on a day to day basis, the public streetbed edges shall be kept lower than the center and the grading shall be done so that the surfaces of the excavated areas and fill will be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditchers or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes.

E. Placement of fill. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density to the surrounding soil before placement of the fill is begun. The entire area upon which fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six inches. Before the placement of fill material is begun, all loosened soil shall be compacted the approximate density of the underlying soil. Where a depth of fill and surfacing is three feet or less, the original ground shall be compacted a minimum 12 inches deep to at least 95 percent of the maximum laboratory dry density as determined from representative samples of the material being compacted. In areas where layers of organic or other unstable materials exists, the existing ground shall be excavated, for the full width of the fill area, to the underlining stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material.

All fill material shall be deposited and spread in uniform horizontal layers, not more than six inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers or other approved equipment. Each layer shall be compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted. Fills shall be compacted to at least 95 percent of the maximum dry density to within the top 12 inches of the fill.

The top 12 inches of the fill shall be compacted to at least 100 percent of the maximum dry density.

The entire public streetbed shall be scarified and compacted with a sheep's foot or other approved rollers. While the work is in progress, contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface.

F. The contractor shall have available on the job at all times at least one motor patrol grader with adequate power to blade and maintain the public streetbed. Suitable scarifies shall also be available for use wherever necessary.

1. Final finishing of public streetway. After all excavation has been completed and

all fills have been placed, the entire public street bed surface shall be finally shaped with a grading machine

supplemented with hand work whenever required, to secure a smooth surface and uniform crow-section specified. When final shaping is finished, the public street

surface shall conform accurately to the line, grade and cross section shown of plans, and no roots, sod, grass, stones, or other unsuitable material shall remain

in the top 12 inches of the finished public streetbed. All ditches and drains shall be opened to effectively drain the public

streetway.

2. Placement of curb and gutter. After sanitary sewer and water lines have been installed, all storm drainage in place, and the final finishing of the public streetway has been approved by the

development inspector, the installation of the concrete curb and gutter may begin, All concrete curb and gutter shall be in accordance with Hampton Construction Standards. Any curb and gutter, which does not conform to a true section, texture, line and grade shall be removed and replaced as directed by the development inspector.

3. Subgrade. Before placing any pavement base the entire surface of the subgrade

shall be plowed, harrower, and mixed to a depth of at least six inches. If a subgrade stabilization material is required it shall be incorporated into the subgrade at this time. After the material has been thoroughly mixed the subgrade shall be

brought into a proper line and grade and compacted to 100 percent of maximum

dry density just prior to placing the base material. The centerline profile shall

conform to the established elevations with an acceptable tolerance of one-halfinch. The acceptance crown tolerance shall be one-half-inch.

4. Base construction. The Hampton Development Inspector shall be notified 24 hours prior to the placing of any base material.

After the inspector is satisfied all the equipment necessary for the proper

construction of public street base is on the project and the subgrade has been

brought to the proper line, grade and crown, and compacted to the required density he may authorize the placing of the base material. After the base material has been placed and compacted to the required density the inspector will

check the completed base course. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified or the exposed edge of the concrete gutter is less than the minimum depth required,

shall be reshaped and rolled to obtain the required cross section. After the

compacted material has been approved, cores shall be taken as directed by the development inspector to determine the thickness of the constructed base course.

Areas found to be deficient in thickness shall be corrected as directed by the

development inspector. A copy of all delivery tickets for the graded aggregate base material shall be furnished prior to placing any asphaltic concrete paving

material. A shortage in the base material used shall require that the asphaltic concrete surface course thickness be

increased. All work and materials shall be in accordance with the pertinent graded aggregate construction sections of the

Georgia Department of Transportation 3Standard Specifications.....3, latest edition.

In lieu of constructing the previously mentioned paving section, a soil cement base shall be a minimum of five inches in thickness of the surface course shall remain at two inches. All soil cement construction shall be in accordance with the 3soil cement construction3 sections of the Georgia Department of Transportation 3Standard Specifications.....3; latest edition. The preparation of the soil cement base shall be done under the supervision of a professional engineer registered in the State of Georgia. A letter stamped by the engineer attesting to the construction of the soil cement base shall be submitted to the Hampton Planning and Zoning Department for approval.

G. Paving.

1. After the public street base has been accepted by the development inspector

and upon his approval the contractor shall begin the construction of the asphaltic concrete pavement. All asphaltic concrete material and construction shall be in accordance with the 3hot mix

asphaltic concrete construction3 sections of the Georgia Department of Transportation 3Standard Specifications.....3, latest edition. After the material has been placed and rolled to the satisfaction of the inspector, he shall check the cross section of the finished pavement. Any area found to be

deficient shall be marked and a record of deficiencies made by the development

inspector.

2. If, in the opinion of the development inspector, the extent of deficiencies will impair the performance of the pavement,

he shall direct that an overlay of a minimum thickness of one inch be placed before the public streetway is opened to traffic. A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the development inspector at the time of completion of the work.

If the delivery tickets indicate a shortage in the material used from the quantity

estimated the development inspector may require a minimum one-inch overlay of the streets.

3. Upon acceptance of the surface course by the development inspector, the developer shall have core tests made as directed by county engineer to verify the thickness of the street base and asphalt pavement. If these indicate a deficiency in thickness of the street base asphalt pavement an

overlay shall be required when the following deficiencies occur:

i. When the number of cores deficient in thickness within the allowable one-quarter of an inch tolerance exceeds 35 percent of the total cores taken on one street.

ii. When two or more consecutive tests show a deficiency of more than onequarter of an inch allowable tolerance. When a core shows a deficiency in excess of the allowable tolerance

additional cores will be taken to delineate the area of the deficient thickness.

iii. Any required overlay shall extend a minimum of 150 feet beyond the

outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be cut normal to the public streetway for full depth of asphalt pavement, removing the original pavement for a minimum of ten feet at each end of the overlay.

The thickness of the overlay shall be determined by the depth of the deficient area and shall not be less than one inch in compacted thickness. The type of material used in the overlay shall be specified by the

county.

H. Shoulder and drainage improvements. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be back-filled and compacted and the ditches and back slopes properly graded, shaped, seeded and mulched. An 80-percent stand of grass must be obtained. All swales and ditches excavated below required depth shall be back filled and compacted to 95 percent of maximum dry density.

Use StandardsTable 3-1 RESIDENTIAL SUBDIVISION STREET DEVELOPMENT STANDARDS Construction Standards Specifications

1. Surface topping (plant mix) Two-inch 4E4 or 4F4 asphalt topping, 220 pounds per square yard

2. Primer 0.15 gallons primer per square yard 4MC4 or 4RC4

3. Curbs/Shoulder and ditch Construction 24-inch x six-inch concrete 4L4

back curb: 18-inch gutter; six inches high; six-inch curb width

4. Base construction Six-inch base (graded aggregate); 100 percent compaction

5. Street surface width 22 feet pavement width with curb and gutter: 26 feet back of curb to back of curb

6. Street base width 22 feet with curb and gutter

7. Street grade 12 percent maximum on local streets; Eight percent maximum on collector and minor arterial streets; Five percent maximum on major streets; Two percent maximum grade at intersections 100 feet from curb line

8. Turnaround area 40 feet radius cul-de-sac pavement, 80 feet diameter

9. Intersections 20 feet pavement radius at intersection within subdivision 25 feet pavement radius required where intersecting existing county or state public streets

10. Right-of-way 50 feet right-of-way minimum for local streets (additional right-of-way and/or slope easements may be required for cut and fill areas) 110 feet diameter right-of-way for cul-de-sac

11. Fill areas and back slopes 2:1 maximum slope allowed

12. Storm sewers and cross drains GDOT materials specifications:

coated metal pipe required: pipe location and size will be approved by Hampton Planning and Zoning Department Use StandardsTable 3-1 RESIDENTIAL SUBDIVISION STREET DEVELOPMENT STANDARDS Construction Standards Specifications

13. Grassed areas Shall comply with the Hampton Soil Erosion and Sedimentation Control Ordinance

14. Core Testing Core samples will be taken as directed (at developer's expense) to determine thickness of base and pavement

15. Maintenance bond Two-year maintenance bond or letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catch basins, cross drains) and stormwater detention facilities.

On phased developments, certain sections may require a renewed bond if used for construction access on newer phases (see Section 3-6) (Ord. No. 457, § 1, 8-14-18) Sec. 4-19. Construction Requirements for Industrial and Commercial

Subdivision Streets and Arterial Roads.

The design and construction requirements for subdivision developments for industrial, commercial or office use and streets which are to be city arterial public streets shall comply with the minimum standards shown on Table 3-2.

Industrial and commercial subdivision streets and arterial public streets and shall be required to have concrete curb and gutter along each side in accordance with Hampton Construction

Standard.

All grading, subgrade, base and pavement for industrial commercial and arterial street construction shall be in accordance with Section 4-18 and Table 3-2.

Use StandardsTABLE 3-2 Nonresidential Developments and Arterial Roads Construction Standards Industrial Subdivisions Commercial/Office Subdivisions

1. Surface topping plant mix 15-inch 6E6 of 6F6 asphalt topping, 165 pounds per square yard Two-inch 6E6 or 6F6 asphalt topping, 220 pounds per square yard

2. Binder Three-inch binder 330 pounds per square yard None

3. Prime Coat 0.15 gallons primer per square yard

Use StandardsTABLE 3-2 Nonresidential Developments and Arterial Roads Construction Standards Industrial Subdivisions Commercial/Office Subdivisions

4. Curbs/shoulder and ditch construction (curb and gutter required for commercial/industrial subdivision streets) 24-inch x six-inch concrete 7L7 back curb; 18-inch gutter, six inches high; six-inch curb width Ditch and shoulder improvements: five feet wide grassed shoulders with three-fourth-inch per foot slope;

2:1 maximum drainage ditch slope and two-foot minimum depth from other edge of shoulder 24-inch x six-inch concrete 7L7 back curb; 18-inch gutter; six inches high; six-inch curb width.

Ditch and shoulder improvements: five feet wide grassed shoulders with three-fourths-inch per foot slope;

2:1 maximum drainage ditch slope and two-foot minimum depth from outer edge of shoulder

5. Base construction Eight-inch base graded aggregate, 100 percent compaction

Eight-inch base graded aggregate, 100 percent compaction

6. Street surface width 30 feet width with curb and gutter, back of curb

28 feet width with curb and gutter, back of curb

7. Street base width 26 feet 30 feet

8. Street Grade Eight percent maximum on collector and minor arterial streets; two percent maximum grade at intersections; 100 feet from curb line Eight percent maximum on collector and minor arterial streets; five percent maximum on major streets: two percent maximum grade at intersections;

100 feet from curb line

9. Turn around area 55 feet radius cul-de-sac pavement; 110 feet diameter

55 feet radius cul-de-sac pavement; 110 feet diameter

10. Intersections Fifty feet pavement radius at intersections; 50 feet straight section from curved streets required 50 feet turning radius at intersections; 50 feet straight section from curved streets required

11. Drive-way entrances GDOT specifications GDOT specifications

12. Right-of-way 50 feet right-of way minimum;

additional right-of-way or slope easement may be required for cut and fill areas; 140 feet diameter right-of-way for cul-de-sac 50 feet right-of-way minimum;

additional right-of-way slope easement may be required for cut and fill areas

13. Fill areas and back slopes 2:1 maximum slope allowed 2:1 maximum slope allowed

14. Storm sewers and cross drains GDOT materials specifications:

coated metal pipe required, pipe location and size be approved by Hampton GDOT materials specifications:

coated metal pipe required, pipe location and size to be approved by Hampton

15. Greased areas Shall comply with the Hampton Soil Erosion and Sedimentation Control Ordinance Shall comply with the Hampton Soil Erosion and Sedimentation Control Ordinance

16. Core Testing Core samples will be taken as directed to determine thickness of base and pavement (at developer's expense) Core samples will be taken as directed to determine thickness of base and pavement (at developer's expense) Use StandardsTABLE 3-2 Nonresidential Developments and Arterial Roads Construction Standards Industrial Subdivisions Commercial/Office Subdivisions

17. Maintenance bond or letter of credit Two-year maintenance bond or letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catch basins, cross drains) and stormwater detention facilities.

On phased developments, certain sections may require a renewed bond or letter of credit if used for construction access on newer phases (see Section 3-6) Two-year maintenance bond or letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catch basins, cross drains) and storm detention facilities. On phased developments, certain sections may require a renewed bond or letter of credit if used for construction access on newer phases (see Section 3-6) (Ord. No. 457, § 1, 8-14-18) Sec. 4-20. Construction Requirements for Residential Alleys.

The design and construction requirements for residential alleys shall comply with the minimum standards shown in Table 3-3. Curb and gutter is not required for residential alleys. Sidewalks are also not required for residential alleys.

Private alleys shall be maintained pursuant to the rules, regulations, and policies of the City at the expense of the adjoining property owners or homeowners' association. The developer or landowner shall grant the appropriate easement so that the public may use the private alleyway.

Private alleyways shall be constructed so as to provide adequate turning radii onto public streets, driveways, residential parking garages and carports for full-size noncommercial two-axle vehicles. Curbs and gutters may be provided, but are not required. Private alleyways serving more than four lots shall not have dead-ends.

Use StandardsTABLE 3-3 Alley construction standards

Construction Standards

1. Street surface width 12 feet minimum

2. Right-of-way width 20 feet minimum (Ord. No. 457, § 1, 8-14-18) Sec. 4-21. Improvement to Existing Streets and Rights-of-Way.

Every development shall have frontage on a paved city or county public street. The existing public streets upon which a development has frontage and access shall be widened, resurfaced, or paved to city specifications for the full length of the frontage of the development if found necessary due to the existing public street being deficient relative to city specifications.

A. Existing unpaved public street. Any unpaved public street upon which a development has frontage and access shall be paved and widened, according to the

functional class of the public street (Section 4-4) along the frontage of the development to the nearest intersection with a paved city or county public street. The

minimum right-of-way required according to Section 69-59 shall be dedicated along the entire frontage of the subdivision.

B. Existing paved public street. Any existing paved city or county public street upon which a development has frontage

and access and which is deficient relative to city specifications (Sections 4-18 and 4-19) shall be resurfaced and widened as determined by the City's appointed

engineer. The minimum right-of-way required according to Section 4-3 shall be dedicated along the entire frontage of the development.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-22. Development Access Control.

Any development, which has an entrance onto a state highway, major arterial, minor arterial, or collector county public street shall provide lanes for deceleration, ingress, and egress in accordance city and state standards.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-23. Marginal Access Streets.

Where a development abuts or includes a major arterial street, marginal access streets may be required to be parallel to and on each side of the major arterial right-of-way, at a distance suitable for the use of the intervening lands for landscaped buffer areas.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-24. Street Names.

A. Proposed streets, which are obviously in alignment with other already existing and named streets, shall bear the names of the streets in which they align with. The names of proposed streets shall not duplicate existing street names, irrespective of the use of the words; street, avenue, boulevard, drive, place, court, etc., in the naming of the street.

B. All proposed street names within the City for new public streets or public streets within commercial, industrial or residential developments must be approved by the City Zoning Administrator during the preliminary plat review process. Any request to change the name of an existing public street must be submitted to the City Zoning Administrator for review and approval.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-25. Street Signs.

The utility department director shall determine the need and location of street signs within a development. The location of the street signs shall be determined during the review of the preliminary plat. The city's standard steel street posts or wooden four-inch (4 × 4) posts with horizontal reflectorized street name plates with four-inch letters shall be furnished and installed by city at the cost of the developer.

A. The cost of street signs and their installation shall be paid by the developer to the planning and zoning department

during the final plat approval meeting.

B. The request for an invoice and the ordering of signs shall come from the planning and zoning department.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-26. Mailboxes.

A. Definitions. The following definitions shall apply to the interpretation and enforcement of this section:

1. 8Mailbox8 shall mean any freestanding or detached structure, container, or

receptacle for the delivery of the United States Postal Service mail.

2. 8Masonry8 shall mean brick, stone, concrete, and all other substances or materials having like properties of weight or immobility.

B. Exemptions. This section shall not apply to the following:

1. Any pre-existing mailbox; or

2. Any mailbox upon which substantial work has been begun as of the effective date of this Appendix.

C. Location. Mailboxes shall be located so as to comply with the rules and regulations of the United States Postmaster General. On public streets without a curb, mailboxes shall be set back eight feet from the edge of the public street so as to allow the mail carrier to pull a postal delivery vehicle completely off the travel lanes of the public street to deliver the mail. Where shoulder width does not allow for such a distance, the public street shall be set back the maximum distance possible from the roadway. On public streets with a curb, mailboxes shall be set so that they are accessible to a postal carrier without any portion of the mailbox extends over the public street. Under no circumstances may the location of the mailbox interfere with the safe use of a public street by the traveling public.

Any mailbox which fails to conform to the location requirements provided herein shall be unlawful and deemed a public nuisance.

D. Construction and composition of mailboxes.

1. It shall be unlawful to construct and/or maintain a mailbox which fails to meet

the construction specifications enumerated in this subsection (D).

2. In order to safeguard the health and welfare of the traveling public and to ensure uniform standards of function and aesthetics within the City, mailboxes shall be constructed as follows:

i. The support structure or post of the mail box shall not be constructed with masonry material or of any material that will not readily yield upon impact with a vehicle.

ii. The encasement or housing for the mailbox itself shall not be made of a masonry material or of any material that will not readily yield upon impact with a vehicle.

iii. All posts shall have a maximum width of four inches by four inches or, if round, the post shall have a diameter no greater than four inches.

If a metal post is used to support the mailbox, such post shall be hollow.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-27. House Numbers.

Building numbers for individual and multi-use residential and nonresidential buildings shall be assigned by the Zoning Administrator prior to the approval of the final plat.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-28. Traffic Signs.

The planning and zoning department shall determine the need and location of traffic signs within a development and throughout the City and shall approval of all signs styles. Generally, all signs shall follow a uniform, standard concept as approved by the utility department director.

Any innovative designs or styles must be approved by the utility department director and/or the Zoning Administrator prior to installation of such signs.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-29. Street Surface Drainage.

The size, length and location of all surface drainage pipe or structures shall be shown on all preliminary plats. All storm drain pipes or culverts carrying stormwater from the street and adjacent property or through lots in the subdivision shall be extended to at least 30 feet behind the rear of the structure to be located on the lot. Stormwater shall be released into a channel or swale without causing scouring, erosion, or resulting in sedimentation of the receiving channel. The outlet channel shall include structural and vegetative measures to assure non-erosive velocities of stormwater.

A. Installations, backfilling and compaction around drainage pipes shall be in

accordance with GDOT specifications. All pipes shall have a minimum cover of 18

inches from the bottom of the public street base and headwalls or inlet basins constructed at the ends of the pipes.

B. All cross drain pipes within public rightsof-way for the purpose of providing storm drainage shall be coated metal pipe,

concrete, or other material approved by the county. Ninety-five percent compaction shall be required around all pipes.

C. The design of drainage structures shall be based on recognized hydrological

formulae.

D. Piped collection systems for public streets (catch basins, inlets, cross drains,

longitudinal piping), shall be designed for the 50-year storm.

E. Public street culverts, which carry live streams, and off-site drainage, shall be designed for the 100-year storm.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-30. Storm Drainage Detention Structures On-Site.

The city may require on-site storm drainage and detention facilities for any subdivision or commercial or industrial development. The rate of runoff from any development shall not exceed the rate that existed prior to the development.

On-site detention facilities shall be constructed for a 100-year storm, and may include permanent retention basins, underground storage of stormwater, roof system retention, rip-rap around drainage structures parking lot design for controlled release of stormwater, or other structures approved by the City's designated engineer and planning and zoning department.

Plans for stormwater detention facilities shall be accompanied with stormwater runoff calculations based on recognized formulas, and shall conform to the requirements of the Hampton Stormwater Management Ordinance.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-31. Blocks.

A. Layout. Subdivision blocks shall have sufficient width, to provide for two tiers of lots of appropriate depth and length. The length, widths and shapes of block shall be determined with regard to:

1. Zoning requirements for lot sizes and dimensions;

2. Provision of adequate building sites suitable to special needs of the type of use contemplated;

3. Convenient access, circulation, control and safety of street traffic; and

4. Topographic condition.

B. Length. Blocks shall be not less than 500 feet, nor more than 1,200 feet in length, except where topographic or other conditions of the site make such dimensions impractical.

C. Mid-block pedestrian easements. For blocks over 800 feet in length, the planning and zoning and zoning board may require one or more public crosswalks of not less than ten feet wide near the center and entirely across the full width of the block, when necessary for access to schools, playgrounds, shopping centers, transportation and other community facilities.

D. Width. Blocks shall be wide enough to allow two tiers of lots with adequate depth relative to the width of lots, except where fronting on a major or minor arterial public street, or prevented by topographic conditions, or by the size and shape of the property.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-32. Lots.

Generally: The size, shape, width, depth, orientation and minimum building setbacks of lots in residentially or nonresidentially zoned properties shall be in accordance with the applicable zoning districts.

A. Side lot lines. Where practical on a standard lot, side lot lines shall be at right angles to straight lines or radial to curved street right-of-way lines.

B. Frontage on public streets. All lots that are part of a residential or nonresidential subdivision/development shall front upon a public street. All lots must have the

minimum amount of frontage required by the applicable zoning district.

C. Cul-de-sac lots. Any lot, which has frontage on a cul-de-sac, shall have at least 50 percent of the required frontage of said lots, in accordance with the minimum

frontage as determined by the applicable zoning district. Flexibility shall be applied to the actual front setback of residential cul-de-sac lots, as long as the side setbacks of such lots are not less than ten feet

from the side property line. Flexibility shall be applied to the actual front setback of nonresidential cul-de-sac lots, as long as the proximity of buildings does not

interfere with accessibility of emergency vehicles.

D. Corner lots. Corner lots for residential and nonresidential lots shall have side

yard frontage on a public street equal to that of the front yard frontage as specified in the appropriate zoning district.

The Zoning Administrator may require additional property before a lot can be properly developed if the initial lot is too narrow to provide the proper

infrastructure, parking, landscaping or overall development standards for such lot(s).

1. In the case of an individual site that is not part of a planned or unified

development, or that is part of a "strip" development and not having interior lots; the side and front setbacks of nonresidential lots may be equal in distance depending on the design of the overall proposed development and/or the surrounding buildings.

2. All setbacks shall be flexible for lots/buildings within the PD Planned Development zoning district. Such setbacks shall be proposed by the developer and approved by the Zoning Administrator during the preliminary plan meeting and preliminary plan review process.

E. Through lots. Through lots or double frontage lots in residential developments shall be prohibited except where one of

the thoroughfares is an alley is and is used only for the purpose of accessing the homes of such lots.

1. Through lots or alleys that provide separation of residential developments or individual homes from nonresidential uses shall provide at

a minimum a 20-foot buffer along the through public street that will provide shade and screening trees in order to protect the privacy of adjacent residential homes.

2. The ingress and egress of nonresidential parcels adjacent to residential parcels should be designed as to minimize access into such nonresidential lots in order to prevent unwarranted traffic and noise for adjacent residential homes.

F. Flag lots. Flag lots shall be prohibited in subdivisions.

G. Public facilities. Subdividers of any lot shall connect with public sewer and water facilities within a development or as an individually developed parcel. Where

public sewer and water are not available, the developer/subdivider shall provide

all infrastructure needs to the development at his/her own expense. Alternative methods of sewerage treatment may be proposed to the City and approved by

the council upon a recommendation from the utility department and county and/or state health department. All developments must comply with the zoning ordinance regarding utilities.

H. Landscaping. All developments must comply with the zoning ordinance regarding utilities.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-33. Easements and Widths.

A. All lots within a development shall provide easements for stormwater drainage, detention systems, future/potential sanitary sewer installations to adjoining undeveloped lands, as well as, for gas, electric, telephone, cable and other utilities necessary to properly develop a site proposing living or working facilities.

B. Parcels of land containing easements shall so indicate on the preliminary and final plans of the site being developed as to the exact location of each easement and their purpose. Easements and their infrastructure/utilities should be located as to minimize the need for land disturbance as well as the amount of infrastructure (piping, cable, etc.) that must be installed. This does not prevent the developer/subdivider from installing the necessary amount of utilities or infrastructure for proper development of a project. All easement shall be a minimum of 20 feet wide, centered ten feet on center of the easements.

C. Where a development is traversed by a watercourse, drainage way, channel or stream, there shall be provided a stormwater drainage easement, sanitary sewer easement or drainage easement along each side of the watercourse for the purpose of widening deepening, relocating, improving or protecting such easement. A 50-foot undisturbed buffer or if necessary, a buffer of greater size shall be required along any watercourse for protection of such watercourse.

D. Proposed lots for developments that are traversed by easements shall contain the minimum buildable area defined by the zoning district, exclusive or outside of areas occupied by such easements, unless otherwise approved by the Zoning Administrator.

E. All stormwater detention facilities shall be accessible from a public street by way of a 20-foot easement to a designated entrance to the facility and by way of a 20-foot easement around the facility.

F. The city shall have the right to access any property, both public and private for the purpose of repairing public utilities and infrastructure.

The city shall have the right to excavate, dig up or remove any vegetation or obstructions that may be near easements for the purpose of repairing such utilities. The city shall replace any grass or shrubs damaged or removed for this purpose, but not trees or other organic or inorganic items that may have caused damage to such utilities/infrastructure. Utilities damaged by natural causes shall be replaced by the City at the City's expense unless such repairs are still under bond or unless such damage was caused by property owners or other causes not of a natural element nature.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-34. Permanent Reference Monuments.

A. Concrete cylinders or rectangular prisms not less than four inches in diameter or square and 42 inches in length shall be set at the extreme comers of developments.

B. Steel pins not less than one-half-inch in diameter and 30 inches long, with a survey marker cap showing the land surveyors registration number shall be set at the following locations:

1. All points where street lines intersect the boundary lines.

2. All angle points and points of curve on each street.

3. All lot corners.

C. Any monument disturbed by construction or grading shall be reset.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-35. Standards for Water and Sewer Systems.

The "City of Hampton Water and Sewer Department Development Standards for Design and Installation of Water and Sewerage Systems", adopted May 1996, as hereafter amended, is incorporated by reference and made a part of this Appendix.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-36. Sidewalks.

A. Generally. Sidewalks shall be constructed within a single-family, multifamily, commercial, industrial and/or office development/subdivision on both sides of all streets within the public right-of-way and along the frontage of a "strip" commercial/office development.

B. Sidewalks shall be constructed along the entire perimeter of a development where such perimeters/parcel boundaries run or front along a city/county public street(s), or along the entire extent of the parcel boundaries where access to adjacent lots may or are possible as a part of existing or future developments. The community development director may require that sidewalks be extended to the nearest arterial or collector street.

C. Construction specifications. Sidewalks shall be at least 5 feet wide and at least 4 inches thick.

Sidewalks shall be constructed of Portland cement concrete, 3,000 PSI. Sidewalks may also be constructed of brick or stone pavers. Any other materials proposed for sidewalks shall be approved by the community development department and/or public works department upon review of development plans.

D. Sidewalks shall be installed no closer than 5 feet to the back of curb and shall not be constructed over any underground gas, electric, communications, or water and sewer utilities.

Planting of trees, shrubs or ground covers as described in the landscape ordinance of this Appendix shall be required within the area of between the back of curb and sidewalks. The community development director may require a variable sidewalk location, width, and landscape treatment based on site conditions, future road expansions, and the City's comprehensive plan and LCI Study strategies and policies concerning mobility, accessibility, and pedestrian improvements. Where sidewalks currently exist, new sidewalk construction or reconstruction must be continuous with existing sidewalks.

E. Installation. Sidewalks must be installed at the same time as the building construction, unless an alternative method is approved by the community development director. Sidewalks must be completed prior to the issuance of certificate of occupancy for property on which the sidewalk fronts. The sidewalk plan must be recorded on the final plat and all sidewalks completely installed prior to approval of the final plat. The three-year bond on sidewalks shall take effect upon the date that the final plat is approved.

Broken curbing or gutter or sidewalks during the three-year period shall be repaired by the developer/builder before the release of such affective bond. The bond shall indicate the responsible party for repairs to all infrastructure covered by the bond.

F. Sidewalks may not be cut, removed or closed temporarily without a permit from the building department. Such permit may not be issued unless safe, adequate, and convenient provision is made for nonmotorized travel through the area that is disrupted. Damage to sidewalks caused during construction or development activity must be repaired at no cost to the city within 30 days or prior to the issuance of a certificate of occupancy, whichever is earlier.

G. All sidewalk construction and repairs must provide for wheelchair ramps to and from sidewalks at the intersection of each street corner and crosswalk. Access ramps must be constructed pursuant to standards approved by the public works department.

1. All driveways with sidewalks and sidewalk crosswalk installations are required to

be constructed in accordance with the accessible sidewalk standards published by the U.S. Department of Transportation, Federal Highway Administration, in FHWA-SA-03-01 as amended.

H. Sidewalks may not be constructed on any street in the city without first obtaining a permit to do so from the community development department. Any person constructing a sidewalk on a street, without first obtaining a permit, is in violation of this Code, and the community development department may condemn the sidewalk and have it removed and replaced at no cost to the city.

I. No wall, fence, sign or other structure may obstruct passage along a sidewalk.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 522, § 2, 10-13-20)

Sec. 4-37. Gas, Electric, and Communication Utilities.

A. Responsibility. The subdivider shall make the necessary arrangements with the appropriate utility companies for the installation of utilities to assure that all lots have adequate gas, electrical and telephone communications services.

B. Enforcement. No occupancy permit shall be issued for structures in a subdivision or developments unit or phase until all necessary utilities have been installed.

C. Exemptions. The following specific facilities shall be exempt from the requirements of this Appendix:

1. Poles used exclusively for street lighting.

2. Poles, overhead lines, and associated overhead structures owned by a utility

company crossing over any portion of an area from which overhead wires are allowed.

3. Overhead lines attached to the exterior of a building by means of a bracket or

similar device and extending from one location on the building, or to an adjacent building without crossing any street or

right-of-way.

4. Radio antennae and associated structures and equipment used for furnishing communications service.

5. Service terminals and necessary padmounted electric transformer equipment installed above ground, used to distribute communications and electric service in

underground systems.

D. Electrical transformer substations.

Transformer substations shall be allowed within subdivision developments to serve the proposed developments and a larger area. These facilities shall be fenced with a chain link security fence and shall be landscaped with tree plantings and shrubs. The utility company shall obtain an easement (or other necessary property rights) for these installations which shall be clearly indicated on the development's preliminary and final plats.

(Ord. No. 457, § 1, 8-14-18) Sec. 4-38. Cemeteries and Grave Sites.

A. Knowledge of or suspicion of a grave site, burial ground, cemetery and/or other archeological or historical site on a proposed site of development shall require professional and careful identification and delineation of such a site.

Identification of such a site during grading, excavation or development of a site without previous knowledge of such historical significant elements, shall constitute stoppage of land disturbance or construction related activities until release for further activity by the City Council, Zoning Administrator, state agencies specializing in historically significant elements of the state or any combination thereof.

B. Prior to land disturbance, grading or any aspect of development, where a site contains or borders a cemetery or grave site, the developer shall clearly delineate the area on all site plans and construction drawings and install protective fencing. A 50-foot undisturbed buffer shall be maintained around the perimeter of the grave site or cemetery. If a natural buffer does not exist, than a 50-foot wide area shall be delineated around the perimeter of the site and a permanent fence (with an eight-foot wide gate) shall be installed around the perimeter to protect the grave site.

1. Access shall be provided from either a major or minor arterial public street or from a local/collector public street, at least 20 feet in width, to provide vehicular and pedestrian access to the site.

2. The buffer and/or fence shall be maintained by the owner, or adjacent owners of the land closest to or as a part of the adjacent lands to the grave site or cemetery.

3. The grave site or cemetery shall be delineated on the preliminary and final plats.

(Ord. No. 457, § 1, 8-14-18)

ARTICLE 5. PUBLIC DEDICATION AND

RESERVATION

Sec. 5-1. Public Sites—Generally.

When a site or area of land within a development is proposed, requested, needed and/or offered to or by the City for the purpose of public use; such as a park, school, fire station, water/sewer facilities, water reservoir, public works, or other public need, the necessary land shall be reserved for such use as is deemed necessary by the City Council and so indicated on the preliminary and final plat of the development or made a part of the land use plan of the City. The city council shall determine the department or committee responsible for the development and maintenance of such property.

(Ord. No. 457, § 1, 8-14-18) Sec. 5-2. Dedication.

When a site is proposed, requested, needed and/or offered to or by the City for the purpose of public use, the land shall be transferred by a deed and dedicated plat and recorded by the Clerk of Superior Court following acceptance by the council at a public hearing. The public hearing shall follow the same requirements as that of a rezoning, as specified in the City Zoning Ordinance. A separate dedication plat is not required if the proposed property is part of a planned residential/nonresidential development, all other requirements shall apply.

A. Land dedicated to the board of education shall be reviewed by the board prior to

the City Council deciding if such location is appropriate for the needs of the school board. The decision by the board to

accept this site shall be the final decision of the board but such dedications and

overall zoning should be coordinated with the City Council. The school board shall have 60 days to decide if they will accept the property. If the board choices to

accept the property for future school use, than the school board shall notify the

City mayor or manager of its intent.

Coordination of required documentation, deed, plats, etc., shall be coordinated through the Zoning Administrator, as part of the development process.

1. No property shall be declared dedicated to the school board during a rezoning or preliminary plan review phase without first having been reviewed and decided upon by the board of education and the City Council.

2. The city council shall amend the land use plan upon acceptance of such land for school use, within one year of such accepted amendment to the City's capital improvements element of the land use plan.

3. A preliminary plan is required to be reviewed by the school board and city council indicating the general location and layout of the proposed school site.

B. Parks, fire stations, water/sewer facilities, libraries, schools or other lands and/or buildings or funds proposed for dedication to the City for public uses shall be reviewed by the Zoning Administrator

and recommendations made to the City Council for their review and considerations prior to any rezoning or approval of a

preliminary plan proposal. The council shall make a decision in a public hearing meeting that such lands, buildings or

funds are or are not in the best interest of the community. A deed and dedication

plat shall accompany such proposal to the City.

(Ord. No. 457, § 1, 8-14-18) Sec. 5-3. Dedication/Reservation of Lands.

When a site, zoning or funds are determined necessary for public purposes by the City Council, then such lands shall be noted as such as part of city public record. The council on dedications shall make no change in the use of such land(s) or zoning(s) (i.e., rezoning, variances, etc.) or take action without the action/decision taking place at a public hearing. The public hearing shall determine the final use of the land, the estimated budget for the project as well as a resolution from the planning and zoning department as to the impact this change or changes will have on the land use plan and/or surrounding neighborhoods. The city council shall then make the dedicated land, zoning or funds a part of the land use plan with appropriate amendments made within the year that such lands/ buildings or funds are accepted by the council.

The council shall also consider the cost and benefit such dedications will have on or for the general welfare of the public.

(Ord. No. 457, § 1, 8-14-18)

ARTICLE 6. SUBDIVISION

CONSTRUCTION INSPECTION

Sec. 6-1. Pre-Construction Review and Approval.

A. All developments shall construct and install all improvements in accordance with the requirements of article IV. The steps for pre-construction review and approval and required inspections shall be followed as indicated below.

B. Prior to beginning development of the subdivision, the subdivider shall first obtain the following approvals:

1. Preliminary plat approval required. The subdivider must first have a preliminary plat approved by the City.

2. Soil erosion, sedimentation, and pollution control plan. The subdivider must have a soil erosion sedimentation, and

pollution control plan in compliance with the Hampton Soil Erosion, Sedimentation, and Pollution Control Ordinance.

The plan shall be reviewed and coordinated by the City of Hampton Community Development Department. No development permit shall be issued by

the City of Hampton's Community Development Department for any development, which does not meet the standards of this Appendix.

3. Pre-construction conference. Prior to grading, the subdivider shall contact the City of Hampton's Community Development

Department to arrange a pre-construction conference. The pre-construction meeting shall include a review of the soil erosion, sedimentation, and pollution

control plan, street cross sections and profiles, construction specifications, procedures for inspections and testing, stormwater drainage and detention facilities, water/sewer service, and any other matters concerning the development. The

subdivider shall provide a list of names, telephone numbers, addresses and business license numbers of all contractors and subcontractors employed on a job.

4. Development permit required. A development permit shall be issued by the City of Hampton's Community Development

Department only after the approval of the construction improvements plans and soil erosion, sedimentation, and pollution control plan. Site grading shall be limited only to those areas clearly defined on the approved plans. Any site grading

which is done without an approved soil erosion control plan and development permit is a violation of this Appendix and shall result in enforcement penalties as provided by Article VIII. In instances

where grading has exceeded the area approved according to the approved plans and development permit, the permit fee

amount shall be doubled. Any violations of the conditions or limitations imposed by the development permit shall also be

subject to penalties provided by Article VIII of this Appendix.

(Ord. No. 457, § 1, 8-14-18; Ord. No. 506, § 2, 2-11-20)

Sec. 6-2. Inspection Procedures.

The subdivider is responsible for making requests for inspections before beginning any of the stages indicated below. No grading shall commence without approved soil erosion and sedimentation control plan and a development permit. Soil erosion prevention measures shall be installed prior to grading as required by the Hampton Soil Erosion and Sedimentation Control Ordinance.

If the City has an employee available and qualified to perform the inspection, said employee will do so. Otherwise, the City shall request Henry County to perform the inspections in accordance with the City's agreements with the county.

A. Inspection notification. The subdivider shall notify the City planning and zoning department at least 24 hours before any

stage of construction begins. If construction during any phase is stopped or delayed due to inclement weather or

other reasons, the subdivider shall notify the planning and zoning department 24

hours before commencing construction activity again.

B. Clearing and grubbing. After providing the required notice to the Hampton Planning and Zoning Department, clearing of the right-of-way may begin. All work is

to be in accordance with Section 4-18 of this Appendix.

C. Street grading. Following inspection and approval of the street clearing and grubbing by the development inspector, and street grade stakes have been set by the project's engineer, the contractor may

proceed with the grading of the streets.

All work is to be in accordance with Section 4-18 of this Appendix. Compaction tests shall be made as required by the development inspector to determine

that the required 95 percent maximum dry density is being achieved. At least one test shall be made over each storm drain pipe when it has been covered with 18 inches of backfill material.

D. Subgrade compaction. Following the completion and approval of the street grading and installation of curb and gutter the contractor may proceed with the

preparation of the subgrade in accordance with Section 4-18 of this Appendix.

Compaction tests shall be made at the direction of the development inspector to determine that the required 100 percent

maximum dry density is being achieved.

E. Curb and gutter. Following the installation of all proposed sanitary sewer and water lines and acceptance of the street grading the contractor may proceed with

the construction of the curb and gutter.

All work and materials shall be in accordance with Section 4-18.

F. Base preparation. After the street subgrade has been inspected and approved, the contractor may proceed with the

construction of the street pavement base.

All work and materials shall be in accordance with Section 4-18 and Table 3-1 or Table 3-2. Compaction tests shall be made as directed by the county to

assure that the required 100 percent maximum dry density has been achieved.

Cores shall be taken as directed by the county to determine the constructed thickness of the base course.

G. Paving. After the public street base has been approved and accepted by the

development inspector, the contractor may proceed with the construction of the

asphaltic concrete binder and/or surface courses. All work and materials shall be in accordance with Section 4-18 and Tables 3-1 and 3-2 of this Appendix. Compaction tests shall be made as directed by the County Engineer to assure that the

required 98 percent maximum has been achieved.

H. Street core tests. Street core test results shall be submitted and approved by the

County Engineer prior to the recording of a final subdivision plat. These cores shall be taken as directed by the development

inspector immediately upon completion of the surface course. Refer to Section 4-18 of this Appendix.

I. Soil erosion and sedimentation control.

During all of the stages of inspection, soil erosion and sedimentation control

measures shall be inspected. The development shall be subject to soil erosion sedimentation control inspection at any

other times determined necessary to assure compliance with the approved plan. The subdivider is responsible for continued maintenance of all soil erosion and sedimentation control measures as

required by the Hampton Soil Erosion and Sedimentation Control Ordinance.

J. Work stoppage. A stop work order may be issued at any time if it is determined to be necessary due to failure of the

subdivider to comply with any of the requirements of this Appendix, the zoning ordinance or, the soil erosion and

sedimentation control ordinance. A stop work notice shall be posted on the site and the subdivider shall be notified in writing concerning the reasons for the stop work order. Any work which proceeds in violation of a stop order shall subject the subdivider to penalties as prescribed in Article VIII of this Appendix.

K. Work delays. If construction during any phase of development is delayed due to

inclement weather or for other reasons, the subdivider shall notify the Hampton Planning and Zoning Department prior to resuming construction activity.

(Ord. No. 457, § 1, 8-14-18) Sec. 6-3. Minimum Inspection Requirements.

The following inspections shall be made and documented by the City. If the City has an employee available and qualified, said employee shall perform the inspection(s). Otherwise, the City shall request Henry County to perform the inspection(s) in accordance with the applicable agreements between the City and county.

A. Street improvement:

1. Check results of subgrade, base and embankment compaction tests and depth.

2. Inspect for compaction around all drainage pipes and drainage structures.

3. Inspect and document the alignment and condition of curb and gutter equipment.

4. Check fill material before authoring use.

5. Inspect and document concrete pours for curbs and headwalls.

6. Inspect and document paving machine adjustments.

7. Inspect and document the placement of asphalt pavement for compliance with material and weight specifications. Check core-testing

results.

8. Obtain from the subdivider all records of asphalt mix and materials quantities.

9. Require at graded street profiles and review for compliance to the approved construction plans prior to installing any curb and gutter or base material.

B. Storm drainage improvements:

1. Inspect cross drain pipes to assure that metal pipe is properly coated and sized according to plans.

2. Reject any defective pipe and assure that it is not used on the job.

3. Observe pipe-laying operations to assure that pipes are true to line and grade, properly located and bedding and backfill is compacted according to specifications. Document the depth and type of bedding, trench conditions, and backfilling

operations.

4. Inspect rip-rap or concrete head walls for proper installation, ensure that

drainage catch basins and manholes are installed properly.

5. Inspect drainage ditches within the street right-of-way and drainage easements within the subdivision to assure proper embankment slope and grade according to specifications.

6. For enclosed storm drainage systems, inspect to ensure that pipes are true to line and grade. Storm drain sewer pipes on steep slopes, greater than 12 percent should be checked to see that they are properly anchored. Inspect pipe materials and document pipe manufacturer, class and size. Pipe materials for storm sewers shall be reinforced concrete, asphalt-coated corrugated steel or other approved materials.

Inspect to ensure that sewers are laid with uniform slope between structures and have straight alignments between structures.

7. Inspect stormwater detention facilities to assure compliance with approved plans capacity volumes

and county construction standards.

C. Sanitary sewer and water main improvements. The city water and sewer department shall inspect the following:

1. Pipe material, manufacturer, class and size for conformance with water and sewerage authority specifications.

2. Reject any defective materials to assure that they will not be used on the job.

3. Observe pipe-laying operation to ensure that all joints are properly made, pipes are true to line and grade, compaction and backfill are done according to specifications.

4. Document the depth and type of bedding, trench conditions, compaction, the location of all service stub outs and connections, backfilling and

location of all utilities.

5. Perform and document all final acceptance testing according to water and sewerage authority specifications.

(Ord. No. 457, § 1, 8-14-18) Sec. 6-4. Developer's Responsibilities.

A. Generally. The subdivider shall be responsible for maintaining documentation of all construction activity. It is recommended that the subdivider retain a professional engineer to supervise, document and inspect all construction of the subdivision.

B. Construction materials records. The subdivider shall maintain all records of all construction materials and quantities used to construct the public streets for the subdivision.

Asphalt tickets and other material records shall be made available to the Hampton inspectors when requested.

(Ord. No. 457, § 1, 8-14-18)

ARTICLE 7. LEGAL STATUS

Sec. 7-1. Conflict with Other Laws.

When the provisions of this Appendix are in conflict with any other ordinance of the City, the most restrictive standards as adopted by the City shall apply until amendments to existing ordinances or new ordinances resolving the conflict(s) are adopted by the council.

(Ord. No. 457, § 1, 8-14-18) Sec. 7-2. Appeal Provisions.

Any appeal of a decision by the Zoning Administrator, mayor, city manager or other department managers regarding this Appendix, shall be presented in writing to the city clerk within 15 days of the decision of such city officials. The city clerk shall review the application and schedule the appeal at the next possible city council meeting. The council shall review the appeal on the basis of the request complying with the intent of the applicable zoning district land use plan and the standards of this Appendix. The council shall consider a deviation from these standards under the procedures of the variance section of the City Zoning Ordinance.

(Ord. No. 457, § 1, 8-14-18)

ARTICLE 8. ADMINISTRATION AND

ENFORCEMENT

Sec. 8-1. Administration.

The Zoning Administrator shall administer the process for residential and nonresidential preliminary and final plans. The Zoning

Administrator shall be responsible for coordination of plans with city and county agencies/ departments and any state agencies. The Zoning Administrator shall present to the planning and zoning commission and city council all final plans as a matter of record that such plans comply with or exceed the standards of this Appendix.

The Zoning Administrator or his/her designee may authorize enforcement action if the developer/ subdivider or any contractor/subcontractor fails to comply with any of the provisions of this Appendix or other applicable ordinances dealing with land development.

(Ord. No. 457, § 1, 8-14-18) Sec. 8-2. Penalties for Violations.

Violation of the provisions of this Appendix or failure to comply with any of its requirements including violation of conditions in connection with granted variances, rezonings, conditional uses or other specially permitted uses, shall be punished by a fine of $1,000.00 per day of violation and/or by imprisonment of not more than 60 days. A violation that goes unattended or fixed by the developer/subdivider within five working days or less shall be grounds for stoppage of any and all work started or permitted to be started until such violations are made. The violator shall also be required to pay any court costs that are lawfully imposed. The imposition of one penalty for any violation shall not excuse the violation or permit it to continue but the City shall require that the violation be fixed, amended or altered to meet the requirements of this Appendix. Each day such violation continues, it shall be considered a separate violation. Nothing herein shall prevent the City Council from taking other legal action as determined necessary to prevent or remedy any violation.

(Ord. No. 457, § 1, 8-14-18) Sec. 8-3. Administrative Variances.

Minor variances may be authorized by the Zoning Administrator, utilities director, city manager, mayor or designated civil engineer of the City concerning the layout of streets, lots and blocks in situations where physical characteristics of the property create practical difficulty or hardship by strict compliance of the regulations of this Appendix. A consultation with at least three of these individuals, the developer and appropriate inspectors shall be required as part of the review process of granting a deviation in street, lot and block standards. A written report shall be followed detailing the reasons why the variance was needed and why it was or was not granted. Such report shall be filed with the preliminary and final plat of the development.

All other variance requests above and beyond those mentioned in this section shall require approval from the City Council at a public hearing.

(Ord. No. 457, § 1, 8-14-18)

APPENDIX C

STORMWATER

ARTICLE 1 STORMWATER

Sec. 1-1. River Corridor Protection Overlay.

A. Findings of fact. The state has determined that its river corridors are of vital importance in that they help preserve those qualities that make a river suitable as a habitat for wildlife, a site for recreation, and a source of clean drinking water. River corridors are fragile natural resources subject to flood, erosion, soil-bearing capacity limitation, and other natural and human induced hazards. In their natural state they serve multiple functions for pollution control, aquifer recharge and discharge, storage and passage of floodwater, and erosion and sedimentation control, as well as wildlife habitat, education, scientific study, open space and recreation, and scenic and aesthetic beauty.

B. Purpose.

1. The Towaliga River corridor protection district is an overlay district shown on the Henry County Unified Land Development Code Sec. 3.04.03. that applies additional standards of specific areas

that may lie within the Towaliga River corridor. In each zoning district located within the boundaries of the river corridor protection district, both the regulations of that district and the regulations of the river corridor protection district shall apply. If required development

standards are specified for the same item in both districts, the more stringent

governs.

2. The purpose of this district is to protect certain river corridors that have been

designated by the State of Georgia as protected river corridors because of their unique environmental importance. This

district is intended to help maintain high water quality of these rivers. Other local governments lying along these river corridors have adopted similar protective measures. In this manner, this state

resource may be protected in a way that would not be possible by the uncoordinated action of an individual jurisdiction.

C. Boundaries of the River Corridor Protection district. The River Corridor Protection district consists of a natural vegetative buffer area extending 150 feet from the top of the riverbank on both sides of the Towaliga River as established by the State of Georgia. The top of the riverbank is defined as the uppermost part of the riverbank, usually marked by a break in the slope. All land that lies within this corridor is part of the River Corridor Protection district. The River Corridor Protection district is delineated on the protected river corridors map, which is made a part of this Ordinance by reference, and is used to show the boundaries of the River Corridor Protection district.

D. Permitted uses.

1. Single-family dwellings, including the usual appurtenances, within the buffer

area, meeting the following conditions:

i. The dwelling shall be located on a tract of land containing at least two acres. For the purposes of these standards, the size of the tract of land shall not include any area that lies within the protected river (that is, for tracts of land that include portions of a protected river, the area between the river banks cannot be counted towards the two-acre minimum size). Only the part of the lot from the riverbank back from the water may be used. A lot of less than two acres existing at the time of enactment of this Ordinance is grandfathered and may be used as long as other provisions of this Ordinance are met.

ii. There shall be only one such dwelling on each two-acre or larger tract of land.

iii. Complies with all other applicable zoning regulations.

iv. No septic tank or septic tank drain field may be located within the protected river corridor.

2. A structure existing at the time of adoption of this Ordinance is grandfathered and may be rebuilt provided minimum

square footage and setback requirements of the primary zoning district in which the structure is located are met.

3. Construction of road crossings and utility crossings meeting the following development standards:

v. All requirements of the Soil Erosion and Sedimentation Control Act of 1975 and the City of Hampton Soil and Sedimentation Control Ordinance must be met.

4. Timber production and harvesting meeting the following development standards:

vi. Activity must be consistent with the best management practices

established by the Georgia Forestry Commission.

vii. Activity must not impair the drinking quality of the river water as defined by the Federal Clean Water

Act, as amended.

5. Any pre-existing industrial and commercial use located within the River Corridor Protection district meeting the following development standards:

viii. Activity does not impair the drinking quality of the river water as defined by the federal Clean Water

Act, as amended.

ix. Activity complies with all applicable state and federal environmental laws

and regulations.

6. Wildlife and fisheries management activities consistent with the purposes of O.C.G.A. § 12-2-8 (as amended) of Article 1, Chapter 2, Title 12 of the Official Code of Georgia, Annotated.

7. Wastewater treatment.

8. Recreational activities consistent with either the maintenance of a natural

vegetative buffer or with river-dependent recreation. For example, a boat ramp

would be consistent with this criterion, but a hard surface tennis court would

not. Paths and walkways within the protected river corridor are consistent with this criterion, but parking lots are not.

9. Natural water quality treatment or purification.

10. Agricultural production and management meeting the following development standards:

x. Activity complies with best management practices established by the Georgia Soil and Water Conservation Commission.

xi. Activity does not impair the drinking quality of the river water as defined by the Federal Clean Water

Act, as amended.

xii. Activity shall be consistent with all state and federal laws and all regulations promulgated by the Georgia Department of Agriculture.

11. Other use permitted in a primary zoning district that ties in the River Corridor Protection district. The list of permitted uses given for each primary zoning district must be adhered to on land to which the

River Corridor Protection district is also applied. However the list of prohibited

uses given in the paragraph below of this section applies to all River Corridor

Protection district land, regardless in which primary zoning district it lies.

12. Other uses permitted by the Georgia Department of Natural Resources or under section 404 of the Clean Water Act.

E. Prohibited uses. The following uses are specifically prohibited within the River Corridor Protection district:

13. Neither septic tanks, nor septic tank drain fields.

14. Handling areas for receiving and storage of hazardous waste, unless located within port facilities that meet the following

development standards:

xiii. All federal and state laws and regulations for the handling and transport of hazardous waste are met.

xiv. Operations are performed on impermeable surfaces having spill and leak protection systems as described by the Georgia Department of Natural Resources.

15. Hazardous waste landfill.

16. Solid waste landfill.

17. Except as noted above, all construction within the buffer area.

F. Buffer restoration. The natural vegetative buffer shall be restored as quickly as possible following any land-disturbing activity or construction within the river corridor related to the acceptable uses above.

(Ord. No. 457, § 1, 8-14-18) Sec. 1-2. Wetland Protection Standards.

A. Findings of fact.

1. The wetlands within the City of Hampton, Georgia, are indispensable and fragile natural resources with significant development constraints due to flooding, erosion and soils limitations. In their natural

state, wetlands serve man and nature.

They provide habitat areas for fish, wildlife and vegetation; water quality maintenance and pollution control; flood control; erosion control; natural resource education; scientific study; and open space and recreational opportunities. In addition, the wise management of forested wetlands is essential to the economic

well-being of many communities within the State of Georgia.

2. Nationally, a considerable number of these important natural resources have been

lost or impaired by draining, dredging, filling, excavating, building, pollution and other acts. Piecemeal or cumulative losses will, over time, destroy additional

wetlands. Damaging or destroying wetlands threatens public safety and the general welfare.

3. It is, therefore, necessary for Hampton, Georgia, to ensure maximum protection

for wetlands by discouraging development activities that may adversely affect wetlands.

B. Purpose. The purpose of this Ordinance is to promote wetland protection, while taking into account varying ecological, economic development, recreational and aesthetic values. Activities that may damage wetlands should be located on upland sites to the greatest degree practicable as determined through a permitting process.

The objective of this Ordinance is to protect wetlands from alterations that will significantly affect or reduce their primary functions for water quality, floodplain and erosion control, groundwater recharge, aesthetic nature and wildlife habitat.

C. Wetland Protection district. This Ordinance shall apply to all lands within wetlands located within the jurisdiction of Hampton, Georgia.

The U.S. Department of the Interior, National Wetland Inventory Maps (NWI Maps) show the general location of wetlands and should be consulted by persons contemplating activities in or near wetlands. The NWI maps, together with all explanatory matter thereon and attached thereto, is hereby adopted by reference and declared to be a part of this Ordinance.

D. Wetland Protection district boundaries. The NWI maps are general reference documents, and wetland boundaries indicated on the map are approximations. The purpose of the NWI maps is to alert developers/landowners if they are within proximity to a wetland, which means that there is a high likelihood of the presence of a jurisdictional wetland and a need for the developer/landowner to seek U.S. Army Corps of Engineers guidance as to whether a section 404 permit will be required prior to any activity. The NWI maps do not represent the boundaries of jurisdictional wetlands within the jurisdiction of Henry County and cannot serve as a substitute for a delineation of wetland boundaries by the U.S. Army Corps of Engineers, as required by section 404 of the Clean Water Act, as amended.

Any local government action under this Ordinance does not relieve the landowner from federal or state permitting requirements.

E. Buffer requirements. A natural or enhanced vegetative buffer shall be maintained for a distance of 25 feet along the wetland as measured from the delineated boundary to provide an area of protection between the wetland and all permissible uses.

F. Issuance of permits. No local permit should be issued on a project that appears to contain wetlands until a determination has been made by the U.S. Army Corps of Engineers on whether jurisdictional wetlands exist on the site. If there are jurisdictional wetlands on the site that will be disturbed by the proposed development, the applicant must first obtain a wetlands alteration section 404 permit from the U.S. Army Corps of Engineers.

G. Permitted uses. The following uses shall be allowed as of right within a wetland to the extent that they are not prohibited by any other ordinance or law, including laws of trespass, and provided they do not require structures, grading, fill, draining or dredging except as provided herein.

1. Conservation or preservation of soil, water, vegetation, fish and other wildlife,

provided they do not affect waters of Georgia or of the United States in such a way that would require an individual 404 permit.

2. Outdoor passive recreational activities, including fishing, bird watching, hiking, boating, horseback riding and canoeing.

3. Forestry practices applied in accordance with best management practices approved

by the Georgia Forestry Commission and as specified in section 404 of the Clean Water Act.

4. The continuation cultivation of agricultural crops. Agricultural activities shall be subject to best management practices approved by the Georgia Department of Agriculture.

5. The pasturing of livestock, provided that riparian wetlands are protected, that soil profiles are not disturbed and that

approved agricultural best management practices are followed.

6. Education, scientific research and nature trails.

7. Temporary emergency permit. A temporary emergency permit can be issued by the City of Hampton, Georgia for the

following reasons:

i. Maintenance or repair of lawfully located roads or structures and of facilities used in the service of the public to provide transportation, electric, gas, water, telephone, telegraph, telecommunication or other services, provided that such roads, structures or facilities are not materially changed or enlarged and written notice prior to the commencement of work has been given to Hampton, and provided that the

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hampton/zoning/whole@2026-11-11-600e25166b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hampton Zoning Ordinance (the whole text) (Part 3 of 4) | Georgia Commons