Hampton · Zoning Ordinance
Hampton Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 4 of 4. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
work is conducted using best management practices to ensure that flow and circulation patterns and chemical and biological characteristics of the wetland are not impaired and that any adverse effect on the aquatic environment will be minimized.
ii. Temporary water level stabilization measures associated with ongoing silvicultural operations.
iii. Limited ditching, tilling, dredging, excavating or filling done solely for
the purpose of maintaining or repairing existing drainage systems necessary for the cultivation of agricultural crops, provided that the
maintenance or repair activity does not result in the impairment, alteration or loss of wetlands not previously subject to agricultural and silvicultural use under the terms
and provisions of subsection (G)(4) above.
iv. Limited excavating and filling necessary for the repair and maintenance of piers, walkways, nature trails,
observation decks, wildlife management shelters, boathouses or other similar water-related structures,
provided that they are built on pilings to allow unobstructed flow of water and preserve the natural
contour of the wetland.
v. Temporary permits.
vi. National Army Corps permits.
H. Prohibited uses.
1. Receiving areas for toxic or hazardous waste or other contaminants.
2. Hazardous or sanitary waste landfills.
3. Any other use not specifically allowed by the existing zoning district.
(Ord. No. 457, § 1, 8-14-18) Sec. 1-3. Groundwater recharge protection standards.
A. Findings of fact. To provide for the health, safety and welfare of the public and a healthy economic climate within Hampton, Georgia and surrounding communities, it is essential that the quality of public drinking water be ensured. For this reason, it is necessary to protect the subsurface water resources that Hampton, Georgia, and surrounding communities rely on as sources of public water. Groundwater resources are contained within aquifers, which are permeable, rock strata occupying vast regions of the subsurface. These aquifers are replenished by infiltration of surface water runoff in zones of the surface known as groundwater recharge areas. Groundwater is susceptible to contamination when unrestricted development occurs within significant groundwater recharge areas. It is, therefore, necessary to manage land use within groundwater recharge areas to ensure that pollution threats are minimized.
B. Purpose. The purpose of this Ordinance is to:
1. Protect groundwater quality by restricting land uses that generate, use or store dangerous pollutants in recharge areas;
2. Protect groundwater quality by limiting density of development; and
3. Protect groundwater quality by ensuring that any development that occurs within
the recharge area shall have no adverse effect on groundwater quality and shall meet the more stringent of 1) the requirements stated in this Ordinance or 2) current requirements established by the
State of Georgia.
C. Applicability. The standards of this section shall apply to all lands within the jurisdiction of Hampton, Georgia, that are mapped as significant recharge areas by the Georgia Department of Natural Resources in Hydrologic Atlas 18, 1989 edition.
D. Definitions. The following words and phrases shall have the meaning given in this section:
Aquifer. Any stratum or zone of rock beneath the surface of the earth capable of containing or producing water from a well.
DRASTIC. The standardized system for evaluating groundwater pollution potential using the hydrogeologic settings described in U.S.
Environmental Protection Agency document EPA600/2-87-035.
Pollution susceptibility. The relative vulnerability of an aquifer to being polluted from spills, discharges, leaks, impoundments, applications of chemicals, injections and other human activities in the recharge area.
Recharge area. Any portion of the earth's surface, where water infiltrates into the ground to replenish an aquifer.
Significant recharge areas. The most significant ground-water recharge areas mapped by the Georgia Department of Natural Resources in Hydrologic Atlas 18, 1989 edition.
E. Use limitations. The following criteria pursuant shall apply in significant recharge areas:
1. New above ground chemical or petroleum storage tanks having a minimum volume
of 670 gallons shall have secondary containment for 110 percent of the volume of such tanks or 110 percent of the
volume of the largest tank in a cluster of tanks. Such tanks used for agricultural
purposes are exempt, provided they comply with all federal requirements.
2. New agricultural waste impoundment sites shall be lined if they exceed 50 acre-feet.
3. New wastewater treatment basins shall have an impermeable liner approved by
the Georgia Environmental Protection Division.
4. No new stormwater infiltration basins may be constructed.
5. Wastewater spray irrigation systems or the land spreading of wastewater sludge
shall be practiced in accordance with Georgia Department of Natural Resources criteria for slow rate land treatment. An application for a development permit for activities involving wastewater spray
irrigation or land spreading of wastewater sludge must be accompanied by proof
that the applicant has received a land application system permit from the Georgia Environmental Protection Division.
6. New homes served by septic tank/drain field systems shall be on lots having one hundred ten percent of the minimum size
limitations as identified on Table MT-1 of the Department of Human Resources'
Manual for On-Site Sewage Management Systems.
7. New manufactured home parks served by septic tank/drain field systems shall have lots or spaces with at least one
hundred ten percent of the minimum size limitation as identified on Table MT-2 of the Department of Human Resources'
Manual for On-Site Sewage Management Systems.
8. If the Hampton Zoning Ordinance requires a larger lot size than that required by
subsection (E)(6) above for homes or by subsection (E)(7) above for manufactured homes, the larger lot size shall be used.
9. Any lot of record, as of the effective date of this section shall be exempt from the requirements of subsection (E)(6) or (E)(7) lot size standards.
(Ord. No. 457, § 1, 8-14-18) Sec. 1-4. Stream Buffer Protection.
A. This section shall be known as the ;City of Hampton Stream Buffer Protection Ordinance.;
B. Findings. Whereas, the City Council of the City of Hampton finds that buffers adjacent to streams provide numerous benefits including:
10. Protecting, restoring and maintaining the chemical, physical and biological integrity of streams and their water resources;
11. Removing pollutants delivered in urban stormwater;
12. Reducing erosion and controlling sedimentation;
13. Protecting and stabilizing stream banks;
14. Providing for infiltration of stormwater runoff;
15. Maintaining base flow of streams;
16. Contributing organic matter that is a source of food and energy for the aquatic ecosystem;
17. Providing tree canopy to shade streams and promote desirable aquatic habitat;
18. Providing riparian wildlife habitat;
19. Furnishing scenic value and recreational opportunity; and
20. Providing opportunities for the protection and restoration of greenspace.
C. Purposes. The purpose of this article is to protect the public health, safety, environment and general welfare; to minimize public and private losses due to erosion, siltation and water pollution; and to maintain stream water quality by provisions designed to:
1. Create buffer zones along the streams of the City of Hampton for the protection of water resources; and
2. Minimize land development within such buffers by establishing buffer zone requirements and by requiring authorization for any such activities.
D. Definitions.
Buffer means, with respect to a stream, a natural or enhanced vegetated area (established by subsection (F)(1) below), lying adjacent to the stream.
Floodplain means any land area susceptible to flooding, which would have at least a one percent probability of flooding occurrence in any calendar year based on the basin being fully developed as shown on the current land use plan; i.e., the regulatory flood.
Impervious cover means any manmade paved, hardened or structural surface regardless of material. Impervious cover includes, but is not limited to, rooftops, buildings, streets, roads, decks, swimming pools and any concrete or asphalt.
Land development means any land change, including but not limited to, clearing, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving and any other installation of impervious cover.
Land development activity means those actions or activities which comprise, facilitate or result in land development.
Land disturbance means any land or vegetation change, including, but not limited to, clearing, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, that do not involve construction, paving or any other installation of impervious cover.
Land disturbance activity means those actions or activities which comprise, facilitate or result in land disturbance.
Parcel means any plot, lot or acreage shown as a unit on the latest county tax assessment records.
Permit means the permit issued by the planning department required for undertaking any land development activity.
Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
Protection area or stream protection area means, with respect to a stream, the combined areas of all required buffers and setbacks applicable to such stream.
Riparian means belonging or related to the bank of a river, stream, lake, pond or impoundment.
Setback means, with respect to a stream, the area established by subsection (F)(2) extending beyond any buffer applicable to the stream.
Stream means all <blue-line< streams as shown on the most current USGS 7.5 Minute Quadrangle Map for the Hampton planning area. Stream also includes all <dotted blue-line streams< as shown on the most current USGS 7.5 Minute Quadrangle Map for the Hampton planning area.
In addition, stream will include any stream not defined above, but which is designated within the City's comprehensive plan as a stream as meeting the following criteria:
1. The location of a spring, seep, or groundwater outflow that sustains streamflow; or
2. A point in the stream channel with a drainage area of 25 acres or more; or
3. Where evidence indicates the presence of a stream in a drainage area of other than 25 acres; the planning department may
require field studies to verify the existence of a stream.
Stream bank means the sloping land that contains the stream channel and the normal flows of the stream.
Stream channel means the portion of a watercourse that contains the base flow of the stream.
Watershed means the land area that drains into a particular stream.
E. Applicability. This article shall apply to all land development activity on property containing a stream protection area as defined by this Appendix. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under state law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under state law or from other applicable local, state or federal regulations.
1. Grandfather provisions. This article shall not apply to the following activities:
i. Work consisting of the repair or maintenance of any lawful use of land that is zoned and approved for such use on or before the effective date of this article.
ii. Existing development and ongoing land disturbance activities including, but not limited to, existing agriculture, silviculture, landscaping, gardening and lawn maintenance, except that new
development or land disturbance activities on such properties will be subject to all applicable buffer requirements.
iii. Any land development activity that is under construction, fully approved for development, scheduled for permit approval or has been submitted for approval as of the effective date of this article.
iv. Land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as for an office park or other phased development that has been previously approved within two years of the
effective date of this article.
2. Exemptions. The following specific activities are exempt from this article. Exemption of these activities does not constitute an exemption for any other activity
proposed on a property:
i. Activities for the purpose of building one of the following:
• A stream crossing by a driveway, transportation route or utility line;
• Public water supply intake or public wastewater outfall structures;
• Intrusions necessary to provide access to a property;
• Public access facilities that must be on the water including, boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks;
• Unpaved foot trails and paths; or
• Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used.
ii. Public sewer line easements paralleling the creek, except that all easements (permanent and construction) and land disturbance should be at
least 25 feet from the top of the bank. This includes such impervious cover as is necessary for the operation and maintenance of the
utility, including but not limited to, manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in subsection (2)(i), above.
iii. Land development activities within a right-of-way existing at the time this article takes effect or approved under the terms of this article.
iv. Within an easement of any utility existing at the time this article takes effect or approved under the terms of this article, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to, manholes, vents and valve structures.
v. Emergency work necessary to preserve life or property. However, when emergency work is performed under this section, the person performing it shall report such work to the planning director on the next business day after commencement of the work. Within ten days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by the planning director to be reasonably necessary to correct any impairment such
emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area.
vi. Forestry and silviculture activities on land that is zoned for forestry,
silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be
prohibited, then no other land disturbing activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the buffer.
3. After the effective date of this section, it shall apply to new subdividing and platting activities.
4. Any land development activity within a buffer established hereunder or any
impervious cover within a setback established hereunder is prohibited unless a variance is granted pursuant to subsection (G) below.
F. Buffer and setback requirements. All land development activity subject to this article shall meet the following requirements:
1. An undisturbed natural vegetative buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top
of the stream bank.
2. An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover shall be
prohibited. Grading, filling and earthmoving shall be minimized within the setback.
3. No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback.
G. Variance procedures. Variances from the above buffer and setback requirements may be granted in accordance with the following provisions:
1. Where a parcel was platted prior to the effective date of this article, and its
shape, topography or other existing physical condition prevents land development consistent with this article, and the planning director finds and determines that the requirements of this article prohibit the otherwise lawful use of the property by the owner, the Planning Commission
of the City of Hampton may grant a variance from the buffer and setback requirements hereunder, provided such variance require mitigation measures to offset the effects of any proposed land development on the parcel.
2. Except as provided above, the Planning Commission of the City of Hampton shall
grant no variance from any provision of this article without first conducting a public hearing on the application for variance and authorizing the granting of the variance by an affirmative vote of the planning commission. The City of HampAPPENDIX C:
ton shall give public notice of each such public hearing in a newspaper of general circulation within the City of Hampton.
The City of Hampton shall require that the applicant post a sign giving notice of the proposed variance and the public
hearing. The sign shall be of a size and posted in such a location on the property as to be clearly visible from the primary adjacent road right-of-way.
3. Variances will be considered only in the following cases:
i. When a property's shape, topography or other physical conditions existing at the time of the adoption of this article prevents land development unless a buffer variance is granted.
ii. Unusual circumstances when strict adherence to the minimal buffer requirements in the ordinance would create an extreme hardship.
4. Variances will not be considered when, following adoption of this article, actions of any property owner of a given property have created conditions of a hardship on that property.
5. At a minimum, a variance request shall include the following information:
iii. A site map that includes locations of all streams, wetlands, floodplain
boundaries and other natural features, as determined by field survey;
iv. A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;
v. A detailed site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the buffer and setback. The exact area of the buffer to be affected shall be accurately and clearly indicated;
vi. Documentation of unusual hardship should the buffer be maintained;
vii. At least one alternative plan, which does not include a buffer or setback
intrusion, or an explanation of why such a site plan is not possible;
viii. A calculation of the total area and length of the proposed intrusion;
ix. A stormwater management site plan, if applicable; and
x. Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed.
6. The following factors will be considered in determining whether to issue a variance:
xi. The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;
xii. The locations of all streams on the property, including along property
boundaries;
xiii. The location and extent of the proposed buffer or setback intrusion;
xiv. Whether alternative designs are possible which require less intrusion or no intrusion;
xv. The long-term and construction water-quality impacts of the proposed variance; and xvi. Whether issuance of the variance is at least as protective of natural
resources and the environment.
H. Compatibility with other buffer regulations and requirements. This article is not intended to interfere with, abrogate or annul any other ordinance, rule or regulation, statute or other provision of law. The requirements of this article should be considered minimum requirements, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment shall be considered to take precedence.
I. While the requirements of this article are intended to apply to all streams in the City of Hampton, special conditions may exist that require greater protection. Nothing in this article should be construed as preventing the establishment of wider and/or more restrictive buffers and setbacks as required under any other existing or future legislation. In addition, nothing in this article should be construed as preventing the establishment of wider buffers for purposes of protecting greenspace, preserving habitat or other goals that may not be specifically mandated by legislation.
J. Additional information requirements for development on buffer zone properties. Any permit applications for property requiring buffers and setbacks hereunder must include the following:
1. A site plan showing:
i. The location of all streams on the property;
ii. Limits of required stream buffers and setbacks on the property;
iii. Buffer zone topography with contour lines at no greater than five-foot
contour intervals;
iv. Delineation of forested and open areas in the buffer zone; and
v. Detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback.
2. A description of all proposed land development within the buffer and setback; and
3. Any other documentation that the planning director may reasonably deem necessary for review of the application and to ensure that the buffer zone ordinance is addressed in the approval process.
K. All buffer and setback areas must be recorded on the final plat of the property following plan approval.
L. Responsibility. Neither the issuance of a development permit, nor compliance with the conditions thereof, nor with the provisions of this article shall relieve any person from any responsibility otherwise imposed by law for damage to persons or property; nor shall the issuance of any permit hereunder serve to impose any liability upon the City of Hampton, its officers or employees, for injury or damage to persons or property.
M. Inspection. The City of Hampton may cause inspections of the work in the buffer or setback to be made periodically during the course thereof and shall make a final inspection following completion of the work. The permittee shall assist the City in making such inspections. The City of Hampton shall have the authority to conduct such investigations as it may reasonably deem necessary to carry out its duties as prescribed in this article, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the protection area. No person shall refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out official duties.
N. Violations, enforcement and penalties. Any action or inaction which violates the provisions of this article or the requirements of an approved site plan or permit may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
1. Notice of violation. If the planning director determines that an applicant or other responsible person has failed to comply
with the terms and conditions of a permit, an approved site plan or the provisions of this article, it shall issue a written notice of violation to such applicant or other
responsible person. Where a person is engaged in activity covered by this article without having first secured the appropriate permit therefor, the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site. The notice of violation shall contain:
i. The name and address of the owner or the applicant or the responsible person;
ii. The address or other description of the site upon which the violation is occurring;
iii. A statement specifying the nature of the violation;
iv. A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the approved site plan or this article and the date for the completion of such remedial action;
v. A statement of the penalty or penalties that may be assessed against the person to whom the notice of
violation is directed; and vi. A statement that the determination of violation may be appealed to the planning director by filing a written notice of appeal within 30 days after the notice of violation (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient).
2. Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the
following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed.
Before taking any of the following actions or imposing any of the following penalties, the planning director shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable
opportunity, of not less than ten days (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) to cure such violation.
In the event the applicant or other responsible person fails to cure such violation after such notice and cure period, the planning director may take any one
or more of the following actions or impose any one or more of the following penalties:
i. Stop work order. The planning director may issue a stop work order which shall be served on the
applicant or other responsible person.
The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take necessary remedial measures to cure such violation or violations.
ii. Withhold certificate of occupancy.
The planning director may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.
iii. Suspension, revocation or modification of permit. The planning director may suspend, revoke or modify the permit authorizing the land
development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days (or such greater period as the planning director shall deem appropriate) (except that in the event the violation
constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) after the planning director has taken one
or more of the actions described above, the planning director may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after
receipt of the notice of violation.
v. Criminal penalties. For intentional and flagrant violations of this article, the planning director may issue a
citation to the applicant or other responsible person, requiring such person to appear in Hampton Municipal Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days, or both.
Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
O. Administrative appeal and judicial review.
Administrative appeal. Any person aggrieved by a decision or order of the planning director, may appeal in writing within ten days after the issuance of such decision or order to the Planning Commission of the City of Hampton and shall be entitled to a hearing before the Planning Commission of the City of Hampton within 45 days of receipt of the written appeal.
P. Judicial review. Any person aggrieved by a decision or order of the planning director, after exhausting all administrative remedies, shall have the right to appeal de novo to the Hampton Municipal Court.
Q. Penalties. Penalties in effect for violations of Chapter 67 of the Code of Ordinances, City of Hampton, Georgia at the time of the effective date of this article shall be and hereby made applicable to this article and shall remain in full force and effect.
(Ord. No. 457, § 1, 8-14-18)
ARTICLE 2. POST-CONSTRUCTION
STORMWATER MANAGEMENT FOR NEW
DEVELOPMENT AND REDEVELOPMENT*
Sec. 2-1. Purpose and Intent.
The purpose of this article is to protect, maintain and enhance the public health, safety, environment, and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater runoff and nonpoint source pollution associated with new development and redevelopment. It has been determined that proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic resources. Additionally, the City of Hampton is required to comply with several State and Federal laws, regulations, and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related to managing the water quantity, velocity, and quality of post-construction stormwater runoff.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-2. Definitions.
For this Article, the terms below shall have the following meanings:
"Administrator" means the person appointed to administer and implement this Article on Post-Constructions Stormwater Management for New Development and Redevelopment in accordance with Section 2-4.
"Applicant" means a person submitting a land development application for approval.
"BMP" or "best management practice" means both structural devices to store or treat stormwater runoff and non-structural programs or practices which are designed to prevent or reduce the pollution of the waters of the State of Georgia.
"BMP landscaping plan" means a design for vegetation and landscaping that is critical to the performance and function of the BMP
including how the BMP will be stabilized and established with vegetation. It shall include a layout of plants and plant names (local and scientific).
"Channel" means a natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water.
"Detention" means the temporary storage of stormwater runoff in a stormwater detention facility for the purpose of controlling the peak discharge.
"Detention facility" means a structure designed for the storage and gradual release of stormwater runoff at controlled rates.
"Development" means a new development or redevelopment.
"Extended detention" means the storage of stormwater runoff for an extended period of time.
"Extreme flood protection" means measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more.
"Flooding" means a volume of surface water that exceeds the banks or walls of a BMP, or channel; and overflows onto adjacent lands.
"GSMM" means the latest edition of the Georgia Stormwater Management Manual, Volume 2:
Technical Handbook, and its Appendices.
"Hotspot" means a land use or activity on a site that has the potential to produce higher than normally found levels of pollutants in the stormwater runoff. As defined by the
administrator, hotspot land use may include gasoline stations, vehicle service and
maintenance areas, industrial facilities (both permitted under Industrial Stormwater General Permit and others), material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity use.
"Impervious surface" means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into the soil.
"Industrial Stormwater General Permit" means the National Pollutant Discharge Elimination System (NPDES) permit issued by Georgia
Environmental Protection Division to an industry for stormwater discharges associated with industrial activity. The permit regulates pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies based on Standard Industrial Classification (SIC) Code.
"Infiltration" means the process of percolating stormwater runoff into the subsoil.
"Inspection and maintenance agreement" means a written agreement providing for the long-term inspection, operation, and
maintenance of stormwater management system and its components on a site.
"Land development application" means the application for a land development permit on a form provided by City of Hampton along with the supporting documentation required in Section 2-10(a).
"Land development permit" means the authorization necessary to begin constructionrelated, land-disturbing activity.
"Land disturbing activity" means any activity which may result in soil erosion from water or wind and the movement of sediments into
state water or onto lands within the state, including but not limited to clearing, dredging, grading, excavating, and filling of land.
Land disturbing activity does not include agricultural practices as described O.C.G.A.
12-7-17(5) or silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities.
"Linear feasibility program" means a feasibility program developed by City of Hampton and submitted to the Georgia Environmental Protection Division, which sets reasonable criteria for determining when implementation of stormwater management standards for linear transportation projects being constructed by City of Hampton is infeasible.
"Linear transportation projects" means construction projects on traveled ways including but not limited to roads, sidewalks, multiuse paths and trails, and airport runways and taxiways.
"MS4 Permit" means the NPDES permit issued by Georgia Environmental Protection Division for discharges from the City of Hampton's municipal separate storm sewer system.
"New development" means land disturbing activities, structural development (construction, installation, or expansion of a building or other structure), and/or creation of impervious surfaces on a previously undeveloped site.
"Nonpoint source pollution" means a form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other
contaminants from land to surface water or groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.
"Overbank flood protection" means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e., flow events that exceed the capacity of the channel and enter the floodplain).
"Owner" means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
"Person" means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
"Post-construction stormwater management" means stormwater best management practices that are used on a permanent basis to control and treat runoff once construction has been completed in accordance with a stormwater management plan.
"Post-development" means the conditions anticipated to exist on site immediately after completion of the proposed development.
"Practicability policy" means the latest edition of the Metropolitan North Georgia Water Planning District's Policy on Practicability Analysis of Runoff Reduction.
"Pre-development" means the conditions that exist on a site immediately before the
implementation of the proposed development.
Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time before the first item being approved or permitted shall establish pre-development conditions.
"Pre-development hydrology" means (a) for the new development, the runoff curve number determined using natural conditions hydrologic analysis based on natural, undisturbed condition of the site immediately before implementation of the proposed development; and (b) for redevelopment, the existing conditions hydrograph may take into account the existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property.
"Previously developed site" means a site that has been altered by paving, construction, and/or land disturbing activity.
"Redevelopment" means structural development (construction, installation, or expansion of a building or other structure), creation or addition of impervious surfaces, replacement of impervious surfaces not as part of routine maintenance, and land disturbing activities associated with structural or impervious development on a previously developed site.
Redevelopment does not include such activities as exterior remodeling.
"Routine maintenance" means activities to keep an impervious surface as near as possible to its constructed condition. This includes ordinary maintenance activities, resurfacing paved areas, and exterior building changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.
"Runoff" means stormwater runoff.
"Site" means an area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of
development, the site includes all areas of land covered under an applicable land development permit.
"Stormwater concept plan" means an initial plan for post-construction stormwater management at the site that provides the groundwork for the stormwater management plan including the natural resources inventory, site layout concept, initial runoff characterization, and first round stormwater management system design.
"Stormwater management plan" means a plan for post-construction stormwater management at the site that meets the requirements of Section 2-8(d) and is included as part of the land development application.
"Stormwater management standards" means those standards set forth in Section 2-7.
"Stormwater management system" means the entire set of non-structural site design features and structural BMPs for collection, conveyance, storage, infiltration, treatment, and disposal of stormwater runoff in a manner designed to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety, and general welfare.
"Subdivision" means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or new utility improvement or new sanitary sewer or public water or new roadway or a change in an
existing street or roadway.
Other terms used but not defined in this Article shall be interpreted based on how such terms are defined and used in the GSMM and the City of Hampton MS4 permit.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-3. Adoption and Implementation of the GSMM; Conflicts and
Inconsistencies.
(a) In implementing this Article, the City of Hampton shall use and require compliance with all relevant design standards, calculations, formulas, methods, and other guidance from the GSMM as well as all related appendices.
(b) The Article is not intended to modify or repeal any other Article, ordinance, rule, regulation, or other provision of law, including but not limited to any applicable stream buffers under state and local laws, and the Georgia Safe Dams Act and Rules for Dam Safety. In the event of any conflict or inconsistency between any provision in the City of Hampton's MS4 permit and this Article, the provision from the MS4 permit shall control. In the event of any conflict or inconsistency between any provision of this Article and the GSMM, the provision from this Article shall control. In the event of any other conflict or inconsistency between any provision of this Article and any other ordinance, rule, regulation, or other provision of law, the provision that is more restrictive or imposes higher protective standards for human health or the environment shall control.
If any provision of this Article is invalidated by a court of competent jurisdiction, such judgement shall not affect or invalidate the remainder of this Article.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-4. Designation of Administrator.
The Zoning Administrator may from time to time appoint someone to administer and implement this Article.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-5. Applicability Criteria for Stormwater Management Standards.
This Article applies to the following activities:
(a) New development that creates or adds 5,000 square feet or greater of new
impervious surface area or that involves land disturbing activity of 1 acre of land or greater;
(b) Redevelopment (excluding routine maintenance and exterior remodeling) that creates, adds, or replaces 5,000 square feet of greater of new impervious surface area of that involves land disturbing
activity of 1 acre or more;
(c) New development and redevelopment if
(i) such new development or redevelopment is part of a subdivision or other common plan of development,
and (ii) the sum of all associated impervious surface area or land disturbing activities that are being developed
as part of such subdivision or other common plan of development meets or exceeds the threshold in (a) and
(b) above;
(d) Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this Article; and
(e) Linear transportation projects that exceed the threshold in (a) or (b) above.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-6. Exemptions from the Stormwater Management Standards.
This Article does not apply to the following activities:
(a) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs;
(b) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement;
(c) Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or
environmental restoration;
(d) Repairs to any stormwater management system deemed necessary by the
administrator;
(e) Agricultural practices as described in O.C.G.A. § 12-7-17(5) within areas zoned for these activities except for buildings or permanent structures that exceed the
threshold in 2-5 (a) or (b);
(f) Silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities except for buildings or permanent structures that
exceed the threshold in 2-5 (a) or (b);
(g) Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or
exits; and Linear transportation project being constructed by City of Hampton to the extent the administrator determines that the stormwater management standards may be infeasibly to apply, all or in part, for any portion of the linear transportation project. For this exemption to apply, an infeasibility report that is compliant with the City of Hampton linear feasibility program shall first be submitted to the administrator that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-7. Stormwater Management Standards.
Subject to the applicability criteria in Section 2-5 and exemptions in Section 2-6, the following stormwater management standards apply.
Additional details for each standard can be found in GSMM Section 2.2.2.2:
(a) Design of Stormwater Management System: The design of the stormwater management system shall be in accordance with the applicable sections of the GSMM as directed by the administrator. Any design which proposes a dam shall comply with the Georgia
Safe Dams Act and Rules for Dam Safety as applicable.
(b) Natural Resources Inventory: Site reconnaissance and surveying techniques shall be used to complete a thorough assessment of existing natural resources, both terrestrial and aquatic, found on the site.
Resources to be identified, mapped, and shown on the Stormwater Management Plan, shall include, at a minimum (as applicable):
(i) Topography (minimum of 2-foot contours) and Steep Slopes (i.e., Areas with Slopes Greater Than 15%), (ii) Natural Drainage Divides and Patterns, (iii) Natural Drainage Features (e.g.,
swales, basins, depressional areas), (iv) Natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, drinking water wellhead protection areas, and river corridors,
(v) Predominant soils (including erodible soils and karst areas), and (vi) Existing predominant vegetation
including trees, high quality habitat and other existing vegetation.
(c) Better Site Design Practices for Stormwater Management Stormwater management plans shall preserve the natural drainage and natural treatment systems
and reduce the generation of additional stormwater runoff and pollutants to the maximum extent practicable. Additional details can be found I the GSMM Section 2.3.
(d) Stormwater Runoff Quality/Reduction:
Stormwater Runoff Quality/Reduction shall be provided by using the following:
(i) For development with a stormwater management plan submitted before January 1, 2021, the applicant may choose either (A) Runoff Reduction or (B) Water Quality.
(ii) For development with a stormwater management plan submitted on or after January 1, 2021, the applicant shall choose (A) Runoff Reduction and additional water quality shall not the required. To the extent (A) Runoff Reduction has been determined to be infeasible for all or a portion of the site using the Practicability Policy, then (B) Water Quality shall apply for the remaining runoff from a 1.2 inch rainfall event and must be treated to remove
at least 80% of the calculated average annual post-development total suspended solids (TSS) load or
equivalent as defined in the GSMM.
(A) Runoff Reduction - The stormwater management system shall be designed to retain the
first 1.0 inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable.
(B) Water Quality - The stormwater management system shall be designed to remove at least
80% of the calculated average annual post-development total suspended solids (TSS) load of equivalent as defined in the GSMM for runoff from a 1.2 inch rainfall event.
(iii) If a site is determined to be a hotspot as detailed in Section 2-5, the City of Hampton may require the
use of specific or additional components for the stormwater management system to address pollutants of concern generated by that site.
(e) Stream Channel Protection: Stream channel protection shall be provided by using all of the following three approaches:
(i) 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event;
(ii) Erosion prevention measures, such as energy dissipation and velocity control; and (iii) Preservation of any applicable stream buffer.
(f) Overbank Flood Protection: Downstream overbank flood protection shall be provided by controlling the post-development peak discharge rate to the pre-development
rate for the 25-year, 24-hour storm event.
(g) Extreme Flood Protection: Extreme flood protection shall be provided by controlling the 100-year, 24-hour storm event such that flooding is not exacerbated.
(h) Downstream Analysis: Due to peak flow timing and runoff volume effects, some
structural components of the stormwater management system fail to reduce discharge peaks to pre-development levels downstream from the site. A downstream
peak flow analysis shall be provided to the point in the watershed downstream of the site or the stormwater management system where the area of the site comprises 10% of the total drainage area in accordance with Section 3.1.9 of the
GSMM. This is to help ensure that there are minimal downstream impacts from development on the site. The downstream analysis may result in the need to resize structural components of the stormwater
management system.
(i) Stormwater Management System Inspection and Maintenance: The components of the stormwater management system
that will not be dedicated to and accepted by the City of Hampton, including all
drainage facilities, best management practices, credited conservation spaces, and conveyance systems, shall have an
inspection and maintenance agreement to ensure that they continue to function as designed. All new development and
redevelopment sites are to prepare a comprehensive inspection and maintenance agreement for the on-site stormwater management system. This plan shall be written in accordance with the requirements in Section 2-16.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-8. Pre-Submittal Meeting, Stormwater Concept Plan, and Stormwater Management Plan Requirements.
(a) Before a land development permit application is submitted, an applicant may request a pre-submittal meeting with the City of Hampton. The pre-submittal meeting should take place based on an early step in the development process such as before site analysis and inventory (GSMM Section 2.4.2.4) or the stormwater concept plan (GSMM Section 2.4.2.5). The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the City of Hampton when applying for a Determination of Infeasibility through the Practicability Policy.
(b) The stormwater concept plan shall be prepared using the minimum following steps:
(i) Develop the site layout using better site design techniques, as applicable (GSMM
Section 2.3).
(ii) Calculate preliminary estimates of the unified stormwater sizing criteria requirements for stormwater runoff quality/ reduction, channel protection, overbank
flooding protection, and extreme flood protection (GSMM Section 2.2).
(iii) Perform screening and preliminary selection of appropriate best management practices and identification of potential siting locations (GSMM Section 4.1).
(c) The stormwater concept plan shall contain:
(i) Common address and legal description of the site,
(ii) Vicinity map, and (iii) Existing conditions and proposed site layout mapping and plans (recommended
scale of 1" = 50'), which illustrate at a minimum:
(A) Existing and proposed topography (minimum of 2-foot contours),
(B) Perennial and intermittent streams,
(C) Mapping of predominant soils from USDA soil surveys
(D) Boundaries of existing predominant vegetation and proposed limits of clearing and grading.
(E) Location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.),
(F) Location of existing and proposed roads, buildings, parking areas, and other impervious surfaces,
(G) Existing and proposed utilities (e.g., water, sewer, gas, electric) and easements,
(H) Preliminary estimates of unified stormwater sizing criteria requirements,
(I) Preliminary selection and location, size, and limits of disturbance of proposed BMPs,
(J) Location of existing and proposed conveyance systems such as grass channels, swales and storm drains,
(K) Flow paths,
(L) Location of the boundaries of the base floodplain, future conditions floodplain, and the floodway (as applicable) and relationship of site to upstream and downstream properties and drainage, and
(M) Preliminary location and dimensions of proposed channel modifications, such as bridge or culvert crossings.
(d) The stormwater management plan shall contain the items listed in this part and be prepared under the direct supervisory control of either a registered Professional Engineer or a registered Landscape Architect licensed in the state of Georgia. Items (iii), (iv), (v), and (vi) shall be sealed and signed by a registered Professional Engineer licensed in the state of Georgia.
The overall site plan must be stamped by a design professional licensed in the State of Georgia for such purpose. (GSMM Section 2.4.2.7)
(i) Natural Resources Inventory (ii) Stormwater Concept Plan (iii) Existing Conditions Hydrologic Analysis (iv) Post-Development Hydrologic Analysis
(v) Stormwater Management System (vi) Downstream Analysis (vii) Erosion and Sedimentation Control Plan (viii) BMP Landscaping Plan
(ix) Inspection and Maintenance Agreement
(x) Evidence of Acquisition of Applicable Local and Non-Local Permits
(xi) Determination of Infeasibility (if applicable)
(e) For redevelopment and to the extent existing stormwater management structures are being used to meet stormwater management standards the following must also be included in the stormwater management plan for existing stormwater management structures
(i) As-built Drawings (ii) Hydrology Reports (iii) Current inspection of existing stormwater management structures with deficiencies noted (iv) BMP Landscaping Plans
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-9. Application Fee.
The fee for review of any land development application shall be based on the fee structure established by the City of Hampton, and payment shall be made before the issuance of any land disturbance permit or building permit for the development.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-10. Application Procedures.
Land development applications are handled as part of the process to obtain the land disturbance permit pursuant to [insert local ordinance reference] or building permit [insert local ordinance reference], as applicable. Before any person begins development on a site, the owner of the site shall first obtain approval in accordance with the following procedure:
(a) File a land development application with the City of Hampton on the City of
Hampton's form of application along the following supporting materials:
(i) The stormwater management plan prepared in accordance with Section 2-8(d), (ii) A certification that the development will be performed in accordance with the stormwater management
plan once approved, (iii) A Preliminary Determination of Infeasibility, as applicable, prepared in accordance with the practicability policy, and (iv) An acknowledgement that applicant
has reviewed the City of Hampton's form of inspection and maintenance agreement, and that applicant agrees to sign and record such inspection and maintenance agreement before the final inspection.
(b) The administrator shall inform the applicant whether the application and supporting materials are approved or disapproved.
(c) If the application or supporting materials are disapproved, the administrator shall notify the applicant of such fact in writing. The applicant may then revise
any item not meeting the requirements hereof and resubmit the same for the administrator to again consider and either approve or disapprove.
(d) If the application and supporting materials are approved, the City of Hampton may issue the associated land disturbance permit or building permit, provided all
other legal requirements for the issuance of such permits have been met. The
stormwater management plan included in such applications becomes the approved stormwater management plan.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-11. Compliance with the Approved Stormwater Management Plan.
All development shall be:
(a) Consistent with the approved stormwater management plan and all applicable land disturbance and building permits,
and
(b) Conducted only within the area specified in the approved stormwater management plan. No changes may be made to an approved stormwater management
plan without review and advanced written approval by the administrator.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-12. Inspections to Ensure Plan Compliance During Construction.
Periodic inspections of the stormwater management system during construction shall be conducted by the staff of the City of Hampton or conducted and certified by a professional engineer who has been approved by the City of Hampton.
Inspections shall use the approved stormwater management plan for establishing compliance.
All inspections shall be documented with written reports that contain the following information:
(a) The date and location of the inspection;
(b) Whether the stormwater management system is in compliance with the approved stormwater management plan;
(c) Variations from the approved stormwater management plan; and
(d) Any other variations or violations of the conditions of the approved stormwater
management plan.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-13. Final Inspection: As-Built Drawings; Delivery of Inspection and Maintenance Agreement.
Upon completion of the development, the applicant is responsible for:
(a) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the
approved stormwater management plan and associated hydrologic analysis,
(b) Submitting as-built drawings showing the final design specifications for all
components of the stormwater management system as certified by a professional engineer,
(c) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan, and
(d) Delivering to City of Hampton a signed inspection and maintenance agreement
that has been recorded by the owner in the property record for all parcel(s) that make up the site.
The required certification under part (a) shall include a certification of volume, or other performance test applicable to the type of stormwater management system
component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan.
This certification and the required performance tests shall be performed by a qualified person and submitted to the City of Hampton with the request for a final inspection. The City of Hampton shall perform a final inspection with the applicant to confirm applicant has fulfilled these responsibilities.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-14. Violations and Enforcement.
Any violation of the approved stormwater management plan during construction, failure to submit as-built drawings, failure to submit a final BMP landscaping plan, or failure of the final inspection shall constitute and be addressed as violations of, or failures to comply with, the underlying land disturbance permit pursuant to Appendix C
- Stormwater. Article 4-Soil Erosion, Sedimentation, and Pollution Control or the underlying building permit pursuant to Chapter 18. Buildings and Building Regulations. Article I. To address a violation of this Article, the City of Hampton shall have all the powers and remedies that are available to it for other violations of building and land disturbance permits, including without limitation the right to issue notices and orders to ensure compliance, stop work orders, and penalties as set forth in the applicable ordinances for such permits.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-15. Maintenance by Owner of Stormwater Management Systems Predating Current
GSMM.
For any stormwater management systems approved and built based on requirements predating the current GSMM and that is not otherwise subject to an inspection and maintenance agreement, such stormwater management systems shall be maintained by the owner to that the stormwater management systems perform as they were originally designed.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-16. Inspection and Maintenance Agreements.
(a) The owner shall execute an inspection and maintenance agreement with the City of Hampton obligating the owner to inspect, clean, maintain, and repair the stormwater management system; including vegetation in the final BMP landscaping plan. The form of the inspection and maintenance agreement shall be in the form provided by the City of Hampton. After the inspection and maintenance agreement has been signed by the owner and the City of Hampton, the owner shall promptly record such agreement at the owner's cost in the property record for all parcel(s) that make up the site.
(b) The inspection and maintenance agreement shall identify by name or official title the person(s) serving as the point of contact for carrying out the owner's obligations under the inspection and maintenance agreement. The owner shall update the point of contact from time to time as needed and upon request by the City of Hampton. Upon any sale or transfer of the site, the new owner shall notify the City of Hampton in writing within 30 days of the name or official title of new person(s) serving as the point of contact for the new owner. Any failure of an owner to keep the point of contact up to date shall, following 30 days' notice, constitute a failure to maintain the stormwater management system.
(c) The inspection and maintenance agreement shall run with the land and bind all future successors-in-title of the site. If there is a future sale or transfer of only a portion of the site, then:
(i) The parties to such sale or transfer may enter into and record an assignment
agreement designating the owner responsible for each portion of the site and associated obligations under the
inspection and maintenance agreement.
The parties shall record and provide written notice and a copy of such assignment agreement to the City of Hampton.
(ii) In the absence of a recorded assignment agreement, all owners of the site shall be jointly and severally liable for all obligations under the inspection and maintenance agreement regardless of
what portion of the site they own.
(Ord. No. 534, §§ 1, 2, 1-12-21) Sec. 2-17. Right-of-Entry for Maintenance Inspections.
The terms of the inspection and maintenance agreement shall provide for the City of Hampton's right of entry for maintenance inspections and other specified purposes. If a site was developed before the requirement to have an inspection and maintenance agreement or and inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then the City of Hampton shall have the right to enter and make inspections pursuant to the City of Hampton's general provisions for property maintenance inspections pursuant to Sec. 2-18. Owner's Failure to Maintain the Stormwater Management
System.
The terms of the inspection and maintenance agreement shall provide for what constitutes a failure to maintain a stormwater management system and the enforcement options available to City of Hampton. If a site was developed before the requirement to have an inspection and maintenance agreement or an inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then:
(a) An owner's failure to maintain the stormwater management system so that it performs as it was originally designed
shall constitute and be addressed as a violation of, or failure to comply with, owner's property maintenance obligations pursuant to Article 4. Improvements Standards / Section 4-33 and
(b) To address such a failure to maintain the stormwater management system, the City
of Hampton shall have all the powers and remedies that are available to it for other violations of an owner's property
maintenance obligations, including without limitation prosecution, penalties, abatement, and emergency measures.
(Ord. No. 534, §§ 1, 2, 1-12-21)
ARTICLE 3. ILLICIT DISCHARGE AND
ILLEGAL CONNECTION
Sec. 3-1. General Provisions.
A. Purpose and intent. The purpose of this article is to protect the public health, safety, environment and general welfare through the regulation of non-stormwater discharges to the City of Hampton's separate storm sewer system to the maximum extent practicable as required by federal law. This article establishes methods for controlling the introduction of pollutants into the City's separate storm sewer system in order to comply with requirements of the National Pollutant Discharge Elimination System (NPDES) permit process. The objectives of this article are to:
1. Regulate the contribution of pollutants to the City's separate storm sewer system by any person;
2. Prohibit illicit discharges and illegal connections to the City's separate storm sewer system;
3. Prevent non-stormwater discharges, generated as a result of spills, inappropriate dumping or disposal, to the City's separate storm sewer system; and
4. To establish legal authority to carry out all inspection, surveillance, monitoring and enforcement procedures necessary to
ensure compliance with this article.
B. Applicability. The provisions of this article shall apply throughout the municipal boundaries of the City and to all discharges entering the City's storm drain system generated on any developed and undeveloped lands unless explicitly exempted by an authorized enforcement agency.
C. Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation, or other provision of law. The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.
D. Responsibility for administration. The code enforcement officer shall administer, implement and enforce the provisions of this article. Any powers granted or duties imposed upon the authorized enforcement agency may be delegated in writing by the authorized enforcement agency to persons or entities acting in the beneficial interest of or in the employment of the agency.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-2. Definitions.
Accidental discharge means a discharge prohibited by this article which occurs by chance and without planning or thought prior to occurrence.
Authorized enforcement agency means employees or designees of the code enforcement officer designated to enforce this article.
Best management practices (BMPs) means schedules of activities, prohibitions of practices, general good house-keeping practices, pollution prevention and educational practices, maintenance procedures, and other management practices to prevent or reduce the discharge of pollutants directly or indirectly to stormwater, receiving waters, or stormwater conveyance systems. BMPs also include treatment practices, operating procedures, and practices to control site runoff, spillage or leaks, sludge or water disposal, or drainage from raw materials storage.
City's separate storm sewer system means any facility designed or used for collecting and/or conveying stormwater, including but not limited to, any roads with drainage systems, highways, city streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural and manmade or altered drainage channels, reservoirs, and other drainage structures, and which is:
A. Owned or maintained by the City;
B. Not a combined sewer; and
C. Not part of a publicly-owned treatment works.
Clean Water Act means the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent amendments thereto.
Construction activity means activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES general construction permits.
These include construction projects resulting in land disturbance. Such activities include, but are not limited to, clearing and grubbing, grading, excavating and demolition.
Hazardous materials means any material, including any substance, waste, or combination thereof, which because of its quantity, concentration, or physical, chemical, or infectious characteristics may cause, or significantly contribute to, a substantial present or potential hazard to human health, safety, property, or the environment when improperly treated, stored, transported, disposed of, or otherwise managed.
Illegal connection means either of the following:
A. Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit
discharge to enter the storm drain system including, but not limited to, any conveyances which allow any non-stormwater discharge including sewage, process
wastewater, and wash water to enter the storm drain system, regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or
B. Any pipe, open channel, drain or conveyance connected to the City's separate storm sewer system which has not been
documented in plans, maps, or equivalent records and approved by an authorized
enforcement agency.
Illicit discharge means any direct or indirect non-stormwater discharge to the City's separate storm sewer system, except as exempted in Section 3-3 of this Appendix.
Industrial activity means activities subject to NPDES industrial permits as defined in 40 CFR, Section 122.26(b)(14).
National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit means a permit issued by the Georgia EPD under authority delegated pursuant to 33 USC § 1342(b), that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis.
Non-stormwater discharge means any discharge to the storm drain system that is not composed entirely of stormwater.
Person means, except to the extent exempted from this article, any individual, partnership, organization, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other entity recognized by law and acting as either the owner or as the owner's agent.
Pollutant means anything which causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; oil and other automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; nonhazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; hazardous substances and wastes; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from construction of a building or structure; concrete and cement; and noxious or offensive matter of any kind.
Pollution means the contamination or other alteration of any water's physical, chemical or biological properties by the addition of any constituent and includes, but is not limited to, a change in temperature, taste, color, turbidity or odor of such waters, or the discharge of any liquid, gaseous, solid, radioactive, or other substance into any such waters, as will or is likely to, create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life.
Premises means any building, lot, parcel of land, or portion of land whether improved or
unimproved including adjacent sidewalks and parking strips.
State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface and subsurface water, natural or artificial, lying within or forming a part of the boundaries of the State of Georgia which are not entirely confined and retained completely upon the property of a single person.
Storm drainage system means publicly-owned facilities by which stormwater is collected and/or conveyed, including but not limited to, any roads with drainage systems, municipal streets, gutters, curbs, inlets, piped storm drains, pumping facilities, retention and detention basins, natural and human-made or altered drainage channels, reservoirs, and other drainage structures.
Stormwater pollution prevention plan means a document which describes the best management practices and activities to be implemented by a person or business to identify sources of pollution or contamination at a site and the actions to eliminate or reduce pollutant discharges to stormwater, stormwater conveyance systems, and/or receiving waters to the maximum extent
practicable.
Stormwater runoff or stormwater means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation.
Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release, or the velocity of flow.
Wastewater means any water or other liquid, other than uncontaminated stormwater,
discharged from a facility.
Watercourse means a permanent or intermittent stream or other body of water, either natural or manmade, which gathers or carries surface water.
Waters of the United States or waters of the U.S.
means:
A. All waters which are currently used, were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters which
are subject to the ebb and flow of the tide;
B. All interstate waters, including interstate @wetlands@;
C. All other waters such as intrastate lakes, rivers, streams (including intermittent
streams), mudflats, sandflats, @wetlands@, sloughs, prairie potholes, wet meadows,
playa lakes, or natural ponds the use, degradation, or destruction of which would affect or could affect interstate or foreign commerce including any such waters:
1. Which are or could be used by interstate or foreign travelers for recreational or other purposes;
2. From which fish or shellfish are or could be taken and sold in interstate or foreign commerce; or
3. Which are used or could be used for industrial purposes by industries in interstate commerce.
D. All impoundments of waters otherwise defined as waters of the United States under this definition;
E. Tributaries of waters identified in paragraphs (1) through (4) of this definition;
F. The territorial sea; and
G. @Wetlands@ adjacent to waters (other than waters that are themselves wetlands)
identified in paragraphs (1) through (6) of this definition.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-3. Prohibitions.
A. Prohibition of illicit discharges. No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the City's separate storm sewer system any pollutants or waters that cause or contribute to a violation of applicable water quality standards, other than stormwater.
The commencement, conduct or continuance of any illegal discharge to the storm drain system is prohibited except as described as follows:
1. The following discharges are exempt from discharge prohibitions established by this article: water line flushing when
performed by a governmental agency or other potable water sources; landscape irrigation or lawn watering; diverted stream flows; rising groundwater, groundwater infiltration to storm drains, uncontaminated pumped groundwater;
foundation or footing drains (not including active groundwater dewatering systems); crawl space pumps; air
conditioning condensation; springs;
noncommercial washing of vehicles;
natural riparian habitat or wetland flows;
swimming pools (if dechlorinated - typically less than one PPM chlorine); firefighting activities; and any other water source not containing pollutants;
2. Discharges specified in writing by the City of Hampton as being necessary to
protect public health and safety;
3. Dye testing is an allowable discharge, but requires a verbal notification to the authorized enforcement agency prior to
the time of the test; and
4. The prohibition shall not apply to any non-stormwater discharge permitted
under an NPDES permit, waiver, or waste discharge order issued to the discharger and administered under the authority of
the state and the federal environmental protection agency; provided that, the discharger is in full compliance with all requirements of the permit, waiver, or
order and other applicable laws and regulations, and provided that written approval has been granted for any discharge to the storm drain system.
B. Prohibition of illegal connections. The construction, connection, use, maintenance or continued existence of any illegal connection to the City's separate storm sewer system is prohibited.
5. This prohibition expressly includes, without limitation, illegal connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of the connection.
6. A person violates this article if the person connects a line conveying sewage to the
City's separate storm sewer system, or allows such a connection to continue.
7. Improper connections in violation of this article must be disconnected and
redirected, if necessary, to an approved on-site wastewater management system
or the sanitary sewer system upon approval of the Hampton Special Projects Manager.
8. Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by the owner or occupant of that property upon receipt of written notice of violation from the authorized enforcement agency
requiring that such locating be completed.
Such notice will specify a reasonable time period within which the location of the drain or conveyance is to be completed, that the drain or conveyance be identified as storm sewer, sanitary sewer or other, and that the outfall location or
point of connection to the storm sewer system, sanitary sewer system or other discharge point be identified. Results of these investigations are to be documented and provided to the authorized enforcement agency.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-4. Suspension of Access to the City's Separate Storm Sewer System.
A. Suspension due to illicit discharges in emergency situations. The code enforcement officer may, without prior notice, suspend the City's separate storm sewer system discharge access to a person when such suspension is necessary to stop an actual or threatened discharge which presents or may present
imminent and substantial danger to the environment, or to the health or welfare of persons, or to the City's separate storm sewer system or waters of the United States. If the violator fails to comply with a suspension order issued in an emergency, the code enforcement officer may take such steps as deemed necessary to prevent or minimize damage to the City's separate storm sewer system, state waters or waters of the United States, or to minimize danger to persons.
B. Suspension due to the detection of illicit discharge.
1. Any person discharging to the City's separate storm sewer system in violation of this article may have their city's
separate storm sewer system access terminated if such termination would abate or reduce an illicit discharge. The code enforcement officer will notify a
violator of the proposed termination of its city's separate storm sewer system access. The violator may petition the City of Hampton for a reconsideration and hearing.
2. A person commits an offense if the person reinstates without the prior approval of the code enforcement officer, city's
separate storm sewer system access to premises terminated pursuant to this section.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-5. Industrial or Construction Activity Discharges.
Any person subject to an industrial or construction activity NPDES stormwater discharge permit shall comply with the provisions of such permit.
Proof of compliance with said permit may be required in a form acceptable to the authorized enforcement agency prior to allowing discharges to the City's separate storm sewer system.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-6. Access and Inspection of Properties and Facilities.
A. Applicability. This section applies to all facilities that have stormwater discharges associated with industrial activity, including construction activity.
B. Access to facilities.
1. The code enforcement officer shall be permitted to enter and inspect facilities at reasonable times subject to regulation under this article as often as may be
necessary to determine compliance with this article. If a discharger has security measures in force which require proper
identification and clearance before entry into its premises, the discharger shall
make the necessary arrangements to allow access to representatives of the City of Hampton.
2. Facility owners or operators shall allow the code enforcement officer ready access to all parts of the premises for the
purposes of inspection, sampling, photographing, videotaping, examination and copying of records that must be kept under the conditions of an NPDES
permit to discharge stormwater, and the performance of any additional duties as defined by state and federal law.
3. The code enforcement officer shall have the right to set up on any permitted
facility such devices as are necessary in the opinion of the code enforcement officer to conduct monitoring and/or sampling of the facility's stormwater discharge.
4. The code enforcement officer has the right to require the discharger to install monitoring equipment as necessary and
make the monitoring data available to the code enforcement officer at the owner or operator's own expense. The facility's sampling and monitoring equipment shall
be maintained at all times in a safe and proper operating condition by the
discharger at its own expense. All devices used to measure stormwater flow and
quality shall be calibrated to ensure their accuracy.
5. Any temporary or permanent obstruction to safe and easy access to the property or facility to be inspected and/or sampled
shall be promptly removed by the operator at the written or oral request of the code enforcement officer and shall not be replaced. The costs of clearing such access shall be borne by the owner or operator.
6. Unreasonable delays in allowing the code enforcement officer access to a permitted facility is a violation of a stormwater
discharge permit and of this article. A person who is the operator of a facility with a NPDES permit to discharge stormwater associated with industrial activity commits an offense if the person denies
the code enforcement officer reasonable access to the permitted facility for the purpose of conducting any activity
authorized or required by this article.
7. If the code enforcement officer has been refused access to any part of the premises from which stormwater is discharged,
and he/she is able to demonstrate probable cause to believe that there may be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program
designed to verify compliance with this article or any order issued hereunder, or to protect the overall public health, safety and welfare of the community, then the
code enforcement officer may seek issuance of a search warrant from any court of competent jurisdiction.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-7. Notification of Accidental Discharges and Spills.
A. Notwithstanding other requirements of law, as soon as any person responsible for a facility, activity or operation, or responsible for emergency response for a facility, activity or operation has information of any known or suspected release of pollutants or non-stormwater discharges from that facility or operation which are resulting or may result in illicit discharges or pollutants discharging into stormwater, the City's separate storm sewer system, state waters, or waters of the U.S., said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release so as to minimize the effects of the discharge.
B. Said person shall notify the code enforcement officer in person, by phone, or by facsimile no later than 24 hours of the nature, quantity and time of occurrence of the discharge. Notifications in person or by phone shall be confirmed by written notice addressed and mailed to the code enforcement officer within three business days of the phone call or in person notice. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence.
Such records shall be retained for at least three years. Said person shall also take immediate steps to ensure no recurrence of the discharge or spill.
C. In the event of such a release of hazardous materials, emergency response agencies and/or other appropriate agencies shall be immediately notified.
D. Failure to provide notification of a release as provided above is a violation of this article.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-8. Requirement to Prevent, Control, and Reduce Stormwater Pollutants by the Use of Best Management Practices.
The authorized enforcement agency will adopt requirements identifying best management practices for any activity, operation or facility which may cause or contribute to pollution or contamination of stormwater, the storm drain system, state waters or waters of the U.S. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the municipal storm drain system or watercourses through the use of these structural and nonstructural BMPs. Further, any person responsible for a property or premises, which is, or may be, the source of an illicit discharge, may be required to implement, at said person's expense, additional structural and nonstructural BMPs to prevent the further discharge of pollutants to the City's separate storm sewer system. Compliance with all terms and conditions of a valid NPDES permit authorizing the discharge of stormwater associated with industrial activity, to the extent practicable, shall be deemed compliant with the provisions of this section. These BMPs shall be part of a stormwater pollution prevention plan (SWPP) as necessary for compliance with requirements of the NPDES permit.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-9. Watercourse Protection.
Every person owning property through which a watercourse passes, or such person's lessee, shall keep and maintain that part of the watercourse within the property free of trash, debris, excessive vegetation, and other obstacles that would pollute, contaminate, or significantly retard the flow of water through the watercourse. In addition, the owner or lessee shall maintain existing privately owned structures within or adjacent to a watercourse, so that such structures will not become a hazard to the use, function, or physical integrity of the watercourse.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-10. Violations, Enforcement, and Penalties.
A. Violations.
1. It shall be unlawful for any person to violate any provision or fail to comply
with any of the requirements of this article. Any person who has violated or continues to violate the provisions of this article, may be subject to the enforcement actions outlined in this section or may be restrained by injunction or
otherwise abated in a manner provided by law.
2. In the event the violation constitutes an immediate danger to public health or
public safety, the code enforcement officer is authorized to enter upon the subject
private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore the property. The authorized enforcement agency is authorized to seek costs of the abatement as outlined in
subsection (E) of this section.
B. Notice of violation. Whenever the code enforcement officer finds that a violation of this article has occurred, the code enforcement officer may order compliance by written notice of violation.
1. The notice of violation shall contain:
i. The name and address of the alleged violator;
ii. The address, when available, or a description of the building, structure or land upon which the violation is occurring, or has occurred;
iii. A statement specifying the nature of the violation;
iv. A description of the remedial measures necessary to restore compliance with this article and a time schedule for the completion of such remedial action;
v. A statement that, should the violator fail to remediate or restore within the established deadline, the work
will be done by a designated governmental agency or a contractor and the expense thereof shall be charged to the violator;
vi. A statement of the penalty or penalties that shall or may be assessed against the person to whom the
notice of violation is directed; and vii. A statement that the determination of violation may be appealed to the planning director by filing a written notice of appeal within 30 days of service of notice of violation.
2. Such notice may require without limitation:
i. The performance of monitoring, analyses and reporting;
ii. The elimination of illicit discharges and illegal connections;
iii. That violating discharges, practices, or operations shall cease and desist;
iv. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property;
v. Payment of costs to cover administrative and abatement costs; and vi. The implementation of pollution
prevention practices.
C. Appeal of notice of violation. Any person receiving a notice of violation may appeal the determination of the code enforcement officer.
The notice of appeal must be received within 30 days from the date of the notice of violation.
Hearing on the appeal before the planning director or his/her designee shall take place within 15 days from the date of receipt of the notice of appeal. The decision of the municipal authority or their designee shall be final.
D. Enforcement of measures after appeal. If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or, in the event of an appeal, within 30 days of the decision of the municipal authority upholding the decision of the code enforcement officer, then representatives of the City of Hampton shall enter upon the subject private property and are authorized to take any and all measures necessary to abate the violation and/or restore the property. It shall be unlawful for any person, owner, agent or person in possession of any premises to refuse to allow the authorized enforcement agency or designated contractor to enter upon the premises for the purposes set forth above.
E. Costs of abatement of the violation. After abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs. The property owner may file a written protest objecting to the assessment or to the amount of the assessment within 15 days of such notice. If the amount due is not paid within 30 days after receipt of notice, or if an appeal is taken, within 30 days after a decision on said appeal, the charges shall become a special assessment against the property and shall constitute a lien on the property for the amount of the assessment. Any person violating any of the provisions of this article shall become liable to the City by reason of such violation.
F. Civil penalties.
1. In the event the alleged violator fails to take the remedial measures set forth in
the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as the planning director shall deem appropriate, after the City of Hampton has taken one or more of the actions described
above, the Hampton Municipal Court may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the
notice of violation.
2. Injunctive relief. It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements
of this article. If a person has violated, or continues to violate, the provisions of
this article, the planning director may petition for a preliminary or permanent injunction restraining the person from activities which would create further violations or compelling the person to perform abatement or remediation of the violation.
3. Compensatory action. In lieu of enforcement proceedings, penalties and remedies authorized by this article, the planning director may impose upon a violator
alternative compensatory actions, such as storm drain stenciling, attendance at compliance workshops, creek cleanup, etc.
G. Criminal penalties. For intentional and flagrant violations of this article, the planning director may issue a citation to the alleged violator requiring such person to appear in the Hampton Municipal Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days, or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
H. Violations deemed a public nuisance. In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this article is a threat to public health, safety and welfare, and is declared and deemed a nuisance, and may be summarily abated or restored at the violator's expense, and/or a civil action to abate, enjoin, or otherwise compel the cessation of such nuisance may be taken.
I. Remedies not exclusive. The remedies listed in this article are not exclusive of any other remedies available under any applicable federal, state or local law and it is within the discretion of the authorized enforcement agency to seek cumulative remedies.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-11. Ultimate Responsibility.
The standards set forth herein and promulgated pursuant to this article are minimum standards;
therefore this article does not intend, nor imply that compliance by any person will ensure that there will be no contamination, pollution, nor unauthorized discharge of pollutants.
(Ord. No. 457, § 1, 8-14-18) Sec. 3-12. Adoption of Ordinance.
This article shall be in full force and effect after its final passage and adoption. All prior ordinances and parts of ordinances in conflict with this article are hereby repealed.
(Ord. No. 457, § 1, 8-14-18)
ARTICLE 4. SOIL EROSION,
SEDIMENTATION, AND POLLUTION
CONTROL
Sec. 4-1. Title.
This article will be known as the ACity of Hampton Soil Erosion, Sedimentation and Pollution Control Ordinance.A
(Ord. No. 457, § 1, 8-14-18) Sec. 4-2. Definitions.
The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:
Best management practices (BMPs). These include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia, published by the commission as of January 1 of the year in which the landdisturbing activity was permitted.
Board. The board of natural resources.
Buffer. The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified personnel. A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Coastal marshlands. Shall have the same meaning as in O.C.G.A. § 12-5-282.
Commission. The Georgia Soil and Water Conservation Commission (GSWCC).
CPESC. Certified professional in erosion and sediment control with current certification by EnviroCert, Inc., which is also referred to as CPESC or CPESC, Inc.
Cut. A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as excavation.
Department. The Georgia Department of Natural Resources (DNR).
Design professional. A professional licensed by the State of Georgia in the field of: engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a certified professional in erosion and sediment control (CPESC) with a current certification by EnviroCert, Inc. Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.
Director. The director of the environmental protection division or an authorized representative.
District. The Henry County Soil and Water Conservation District.
Division. The environmental protection division (EPD) of the department of natural resources.
Drainage structure. A device composed of a virtually non-erodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes.
Erosion. The process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, sedimentation and pollution control plan.
A plan required by the Erosion and Sedimentation Act, O.C.G.A. ch. 12-7, that includes, as a minimum, protections at least as stringent as the state general permit, best management practices, and requirements in subsection 4-4(C) of this article.
Fill. A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation.
Final stabilization. All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by
permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the Plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent permanent stabilization measures as defined in the Manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.
Finished grade. The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Grading. Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.
Ground elevation. The original elevation of the ground surface prior to cutting or filling.
Land-disturbing activity. Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in subsection 4-3(5).
Larger common plan of development or sale. A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, BplanB means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
Local issuing authority. The governing authority of any county or municipality which is certified pursuant to O.C.G.A. § 12-7-8(a).
Metropolitan River Protection Act (MRPA). A state law referenced as O.C.G.A. § 12-5-440 et seq. which addresses environmental and
developmental matters in certain metropolitan river corridors and their drainage basins.
Natural ground surface. The ground surface in its original state before any grading, excavation or filling.
Nephelometric turbidity units (NTU). Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
NOI. A notice of intent form provided by EPD for coverage under the state general permit.
NOT. A notice of termination form provided by EPD to terminate coverage under the state general permit.
Operator. The party or parties that have: (A) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications;
or (B) day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
Outfall. The location where stormwater in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on-site, becomes a point source discharging into that receiving water.
Permit. The authorization necessary to conduct a land-disturbing activity under the provisions of this article.
Person. Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State of Georgia, any interstate body or any other legal entity.
Phase or phased. Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site.
Project. The entire proposed development project regardless of the size of the area of land to be disturbed.
Properly designed. Designed in accordance with the design requirements and specifications contained in the CManual for Erosion and Sediment Control in GeorgiaC (manual), published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the manual as approved by the commission up until the date of NOI submittal.
Roadway drainage structure. A device such as a bridge, culvert, or ditch, composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Sediment. Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by wind, water, ice, or gravity as a product of erosion.
Sedimentation. The process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.
Soil and water conservation district approved plan. An erosion, sedimentation and pollution control plan approved in writing by the Henry County Soil and Water Conservation District.
Stabilization. The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.
State general permit. The National Pollution Discharge Elimination System (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or re-issued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251 et seq., and O.C.G.A.
§ 12-5-30(f).
State waters. Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
Structural erosion, sedimentation and pollution control practices. Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc.
Such practices can be found in the publication Manual for Erosion and Sediment Control in Georgia.
Trout streams. All streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A.
§ 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.gaepd.org. Streams designated as primary trout waters are defined as water supporting a selfsustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.
Vegetative erosion and sedimentation control measures. Measures for the stabilization of erodible or sediment-producing areas by covering the soil with:
1. Permanent seeding, sprigging or planting, producing long-term vegetative cover;
or
2. Temporary seeding, producing shortterm vegetative cover; or
3. Sodding, covering areas with a turf of perennial sod-forming grass.
Such measures can be found in the publication Manual for Erosion and Sediment Control in Georgia.
Watercourse. Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
Wetlands. Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
(Ord. No. 457, § 1, 8-14-18; Ord. No. 471, § 1, 12-27-18)
Sec. 4-3. Exemptions.
This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:
1. Surface mining, as the same is defined in O.C.G.A. § 12-4-72, the DGeorgia Surface Mining Act of 1968D;
2. Granite quarrying and land clearing for such quarrying;
3. Such minor land-disturbing activities as home gardens and individual home
landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;
4. The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this
paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements
as set forth in O.C.G.A. § 12-7-6 and this paragraph. For single-family residence
construction covered by the provisions of this paragraph, there shall be a buffer
zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In
any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow
or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director may grant variances to no
less than 25 feet. Regardless of whether a trout stream is primary or secondary,
for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of O.C.G.A. § 12-
7-6(b) and the buffer zones provided by this paragraph shall be enforced by the local issuing authority;
5. Agricultural operations as defined in O.C.G.A. § 1-3-3, EdefinitionsE, to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys; producing
plants, trees, fowl, or animals; the production of aqua culture, horticultural, dairy, livestock, poultry, eggs and apiarian
products; farm buildings and farm ponds;
6. Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or
other activities otherwise prohibited in a buffer, as established in subsections
4-4(C)(15) and (16) of this article, no other land-disturbing activities, except for normal forest management practices,
shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
7. Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the
United States Department of Agriculture;
8. Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any
land-disturbing activity within a larger common plan of development or sale with
a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, Estate watersE excludes channels and drainage ways
which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one
acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way,
must prevent sediment from moving beyond the boundaries of the property on which such project is located; and
provided, further, that nothing contained herein shall prevent the local issuing
authority from regulating any such project which is not specifically exempted by
subsections (1), (2), (3), (4), (5), (6), (7),
(9) or (10) of this section;
9. Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the department of
transportation, the Georgia Highway Authority, or the state road and tollway authority; or any road construction or
maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or the state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1; except where the department of transportation, the
Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or
sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
10. Any land-disturbing activities conducted by any electric membership corporation
or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the federal energy regulatory commission, any cable television system
as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United
States engaged in the generation, transmission, or distribution of power;
except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the federal energy regulatory commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the
United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing
authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
11. Any public water system reservoir.
(Ord. No. 457, § 1, 8-14-18) Sec. 4-4. Minimum Requirements for Erosion, Sedimentation, and Pollution Control Using Best Management Practices.
A. General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES general permit are not met. Therefore, plans for those landdisturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of subsections (b) and (c) of this section. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this article and the NPDES general permit.
B. Minimum requirements/BMPs.
1. Best management practices as set forth in subsections (b) and (c) of this section shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management
practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance
with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5- 30(f), the FGeorgia Water Quality Control ActG. As used in this subsection the
terms Gproper designG and Gproperly designedG mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and
Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b).
2. A discharge of stormwater runoff from disturbed areas where best management
practices have not been properly designed, installed and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A.
§ 12-5-30(f), the GGeorgia Water Quality Control ActG, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for
waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving
waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of
development or sale unless the planned disturbance for such construction is equal to or greater than five acres.
3. Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A.
§ 12-5-30(f), the GGeorgia Water Quality Control ActG, for each day on which such failure occurs.
4. The director may require, in accordance with regulations adopted by the board,
reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.
5. The LIA may set more stringent buffer requirements than stated in subsections
(c)(15), (16) and (17) below, in light of O.C.G.A. § 12-7-6(c).
C. The rules and regulations, ordinances or resolutions adopted pursuant to O.C.G.A. § 12- 7-1 et seq. for the purpose of governing landdisturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia, published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the landdisturbing activity was permitted, as well as the following:
1. Stripping of vegetation, re-grading and other development activities shall be
conducted in a manner so as to minimize erosion;
2. Cut-fill operations must be kept to a minimum;
3. Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;
4. Whenever feasible, natural vegetation shall be retained, protected and
supplemented;
5. The disturbed area and the duration of exposure to erosive elements shall be
kept to a practicable minimum;
6. Disturbed soil shall be stabilized as quickly as practicable;
7. Temporary vegetation or mulching shall be employed to protect exposed critical
areas during development;
8. Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
9. To the extent necessary, sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is
stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et
seq.;
10. Adequate provisions must be provided to minimize damage from surface water to
the cut face of excavations or the sloping of fills;
11. Cuts and fills may not endanger adjoining property;
12. Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
13. Grading equipment must cross flowing streams by means of bridges or culverts
except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
14. Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and
adequate sedimentation control facilities to retain sediments on-site or preclude
sedimentation of adjacent waters beyond the levels specified in subsection (b)(2) of this section;
15. Except as provided in paragraphs (16) and (17) of this subsection, there is
established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the
director determines to allow a variance that is at least as protective of natural resources and the environment, where
otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed; provided
that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or
where bulkheads and sea walls are installed to prevent shoreline erosion on Lake Oconee and Lake Sinclair; or along
any ephemeral stream. As used in this provision, the term Hephemeral streamH means a stream that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the groundwater table year-round; for which groundwater is not a source of water; and for which runoff
from precipitation is the primary source of water flow. Unless exempted as along
an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the HGeorgia Water Quality Control ActH, shall remain in force unless a variance is
granted by the director as provided in this paragraph. The following requirements shall apply to any such buffer:
i. No land-disturbing activities shall be conducted within a buffer, and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a
natural canopy is left in sufficient quantity to keep shade on the stream bed; and ii. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause
a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or (ii) stream crossings for sewer lines.
16. There is established a 50-foot buffer as measured horizontally from the point
where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as Itrout streamsI pursuant to Article 2 of Chapter 5 of Title 12, the IGeorgia
Water Quality Control ActI, except where a roadway drainage structure must be
constructed; provided, however, that small springs and streams classified as trout
streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the
landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream
landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures
are incorporated in the project plans and specifications and are implemented. The
following requirements shall apply to such buffer:
i. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a
natural canopy is left in sufficient quantity to keep shade on the stream bed; and ii. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause
a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or (ii) stream crossings for sewer lines.
17. There is established a 25-foot buffer along coastal marshlands, as measured
horizontally from the coastal marshlandupland interface, as determined in accordance with Chapter 5 of Title 12 of this title, the ICoastal Marshlands Protection Act of 1970I and the rules and regulations promulgated thereunder,
except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8,
where an alteration within the buffer area has been authorized pursuant to O.C.G.A. § 12-5-286, for maintenance of any currently serviceable structure, landscaping or hardscaping, including bridges, roads, parking lots, golf courses, golf cart paths, retaining walls, bulkheads and patios; provided, however, that if
such maintenance requires any landdisturbing activity, adequate erosion control measures are incorporated into
the project plans and specifications and such measures are fully implemented,
where a drainage structure or roadway drainage structure is constructed or maintained; provided, however, that if such maintenance requires any landdisturbing activity, adequate erosion control measures are incorporated into
the project plans and specifications and such measures are fully implemented, on
the landward side of any currently serviceable shoreline stabilization structure, or for the maintenance of any manmade
stormwater detention basin, golf course pond, or impoundment that is located entirely within the property of a single individual, partnership or corporation;
provided, however, that adequate erosion control measures are incorporated into
the project plans and specifications and such measures are fully implemented.
For the purposes of this paragraph maintenance shall be defined as actions necessary or appropriate for retaining or restoring a currently serviceable improvement to the specified operable condition to achieve its maximum useful life.
Maintenance includes emergency reconstruction of recently damaged parts of a currently serviceable structure so
long as it occurs within a reasonable period of time after damage occurs.
Maintenance does not include any modification that changes the character, scope or size of the original design and serviceable shall be defined as usable in its current state or with minor
maintenance but not so degraded as to essentially require reconstruction.
i. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover
remains to protect water quality and aquatic habitat; and ii. The buffer shall not apply to crossings for utility lines that cause a width of disturbance of not more
than 50 feet within the buffer, provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented.
iii. The buffer shall not apply to any land-disturbing activity conducted pursuant to and in compliance with a valid and effective land-disturbing permit issued subsequent to April 22, 2014, and prior to December 31,
2015; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented or any lot for which the preliminary plat has been approved prior to December 31, 2015 if roadways, bridges, or water and sewer lines have been extended to such lot prior to the effective date of this Act and if the requirement to maintain a 25-foot buffer would consume at least 18 percent of the high ground of the platted lot otherwise avail- able for development; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented.
iv. Activities where the area within the buffer is not more than 500 square
feet or that have a Jminor buffer impactJ as defined in 391-3-7-.01(r), provided that the total area of buffer impacts is less than 5,000 square feet are deemed to have an approved buffer variance by rule. Bank stabilization structures are not eligible for coverage under the variance by rule and notification shall be made to the division at least 14
days prior to the commencement of land-disturbing activities.
v. Nothing contained in O.C.G.A. § 12- 7-1 et seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances or resolutions which contain stream buffer requirements that exceed the minimum requirements in subsections (b) and (c) of this section.
vi. The fact that land-disturbing activity for which a permit has been issued results in injury to the
property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(Ord. No. 457, § 1, 8-14-18) Sec. 4-5. Application/Permit Process.
A. General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management
ordinance, subdivision ordinance, flood damage prevention ordinance, the ordinance codified in this article, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.
B. Application requirements.
1. No person shall conduct any land-disturbing activity within the jurisdictional boundaries of the City of Hampton without first obtaining a permit from City of
Hampton Community Development Department and Building Department, or other appropriate city official, to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.
2. The application for a permit shall be submitted to the City of Hampton Community Development Department and Building Department, or other appropriate city official, and must include the applicant's erosion, sedimentation and
pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in subsection (c) of this section.
Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land-disturbing activity proposed will be carried out in such a manner that the provisions of subsections 4-4(B) and (C) of this article will be met. Applications for a permit will not be accepted unless accompanied by ten copies of the
applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-
3-7-.10.
3. In addition to the local permitting fees, fees will also be assessed pursuant to
O.C.G.A. § 12-5-23(a)(5), provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the
primary permittee as defined in the state general permit for each acre of landdisturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a), half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. §§ 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
4. Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning
the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a
plan within 35 days of receipt. Failure of the district to act within 35 days shall be considered an approval of the pending
plan. The results of the district review shall be forwarded to the local issuing
authority. No permit will be issued unless the plan has been approved by the district, and any variances required by subsections 4-4(C)(15), (16) and (17) has been obtained, all fees have been paid, and
bonding, if required as per subsection (B)(6) below of this section, have been obtained. Such review will not be required if the local issuing authority and the
district have entered into an agreement which allows the local issuing authority to conduct such review and approval of
the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt.
Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval
of the revised plan submittal.
5. If a permit applicant has had two or more violations of previous permits, this article section, or the Erosion and
Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit
application.
6. The local issuing authority may require the permit applicant to post a bond in the form of government security, cash,
irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant
does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a
contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not
apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
C. Plan requirements.
1. Plans must be prepared to meet the minimum requirements as contained in subsections 4-4(B) and (C) of this article, or through the use of more stringent,
alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article.
The plan for the land-disturbing activity shall consider the interrelationship of
the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent
structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons
involved in land development design, review, permitting, construction, monitoring, or inspections or any land-disturbing activity shall meet the education and training certification requirements,
dependent on his or her level of involvement with the process, as developed by the commission and in consultation with
the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12- 7-20.
2. Data required for site plan shall include all the information required from the
appropriate Kerosion, sedimentation and pollution control plan review checklist,K established by the commission as of January 1 of the year in which the landdisturbing activity was permitted.
D. Permits.
1. Permits shall be issued or denied as soon as practicable, but in any event not later than 45 days after receipt by the local
issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all
applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may
be undertaken.
2. No permit shall be issued by the local issuing authority unless the erosion,
sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by subsections 4-3(C)(15), (16) and (17) are obtained, bonding requirements, if necessary, as per subsection (b)(6) of this section are met and all
ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met.
If the permit is denied, the reason for denial shall be furnished to the applicant.
3. Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and
any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.
4. If the tract is to be developed in phases, then a separate permit shall be required for each phase.
5. The permit may be suspended, revoked or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that
the holder or his successor in the title is not in compliance with the approved
erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the
conditions contained in the permit.
6. The LIA may reject a permit application if the applicant has had two or more
violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. § 12-7-7(f)(1).
(Ord. No. 457, § 1, 8-14-18) Sec. 4-6. Inspection and Enforcement.
A. The City of Hampton Community Development Department and Building Department, or other appropriate city official, will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.
B. The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.
C. The City of Hampton Community Development Department and Building Department, or other appropriate city official, shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
D. No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials; nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
E. The district or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A.
§ 12-7-8(a). The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
F. The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of the county or municipality as a local issuing authority.
(Ord. No. 457, § 1, 8-14-18) Sec. 4-7. Penalties and Incentives.
A. Failure to obtain a permit for landdisturbing activity. If any person commences any land-disturbing activity requiring a landdisturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
B. Stop-work orders.
1. For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop-work order requiring that land-disturbing
activities be stopped until necessary corrective action or mitigation has occurred;
provided, however, that, if the violation presents an imminent threat to public
health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit,
the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning.
2. For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stopwork order.
3. All stop-work orders shall be effective immediately upon issuance and shall be
in effect until the necessary corrective action or mitigation has occurred.
4. When a violation in the form of taking action without a permit, failure to
maintain a stream buffer, or significant amounts of sediment, as determined by
the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices
have not been properly designed, installed and maintained, a stop-work order shall
be issued by the local issuing authority or by the director or his or her designee.
All such stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such
stop-work orders shall apply to all landdisturbing activity on the site with the exception of the installation and
maintenance of temporary or permanent erosion and sediment controls.
C. Bond forfeiture. If, through inspection, it is determined that a person engaged in landdisturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be
completed. If the person engaged in the landdisturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of subsection 4-5(B)(6). The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the landdisturbing activity and bring it into compliance.
D. Monetary penalties. Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city Charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.
(Ord. No. 457, § 1, 8-14-18) Sec. 4-8. Education and Certification.
A. Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
B. For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in
responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on-site whenever landdisturbing activities are conducted on that site.
A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
C. Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on-site may contract with certified persons to meet the requirements of this article.
D. If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7- 19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
(Ord. No. 457, § 1, 8-14-18) Sec. 4-9. Administrative Appeal and Judicial Review.
A. Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance; shall entitle the person submitting the plan or holding the permit to a hearing before the City Council within 30 days after receipt by the local issuing authority of written notice of appeal.
B. Judicial review. Any person, aggrieved by a decision or order of the local issuing authority, after exhausting his administrative remedies, shall have the right to appeal de novo to the Superior Court of Henry County, Georgia.
(Ord. No. 457, § 1, 8-14-18) Sec. 4-10. Effective Date, Validity, and Liability.
A. Effective date. The ordinance from which this article derives shall become effective immediately upon its adoption by the Mayor and City Council of the City of Hampton.
B. Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article.
C. Liability.
1. Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose
any liability upon the local issuing authority or district for damage to any person or property.
2. The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
3. No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and
approved thereunder or pollute any waters of the state as defined thereby.
(Ord. No. 457, § 1, 8-14-18) Ordinance Number 39 42 43 34-A 34-1A 1-B 45 2tB 47 2tc Section 1,2 4 5,6 7234 5,6I89 10(c) 11 t2 14 t,2J46 art. II art. I art. IIIart. V art. YI art. VIIart. XV 39 art. I art. III, art. fV art.
V art. VI 1 2-6 12234 4(A) 4(B) 5,6 7(A),7(B) 8 9-t2 1-3 art. I, S Aart. I, $ D art.2 art. 3, $ Aart. 3, $ G art. 4, $ Aart. 4, $ F art. 5, $ A, art. 5, $ B Section this Code 78-t,78-2 78-2 78-4,78-5 22-23L 22-236 22-238 22-240 22-239 22-24L,22-242 22-234 22-232 22-237 22-233 22-235 22-243 22-244 58-1, 58-2 58-3-58-12 58-13--58-16 58-17 6-1 6-31 6-32-$-34 6-35 6-36--6-44 54-4 70-31 70-33, 70-34 70-36-70-38 70-32 22-81,22-82 22-83-22-87 22-tt6 22-tL7,22-L18 22-29L 22-27t 22-29L 22-296 22-292 22-293,22-294 22-297,22-298 22-295 22-272-22-275 86-135 14-56-14-58 46-7-46-4 46-5 46-H'6-r2 46-4t-46-46 46-76,46-77 6- 8-82 6- 8-82 Date L2-tt-79 4-t4-87 9- 8-81 8-10-82 3- 8-83 11- 8-83 11- 8-83 2-14-84 7-10-84 1- B-85 7- 9-85 Ordinance Number 90-10 90-03 68 90-04 90-05 90-06 90-07 90-08 90-09 69 91-03 70 26-A 7l 45-A 92-04 72 Date 8-14-90 9-17-90 9-18-90 9-18-90 9-19-90 9-19-90 9-19-90 9-19-90 9-19-90 9-19-90 L2-tt-90 4-L6-91 7- 9-97 8-13-91 10- 8-91 10- 8-91 5-79-92 6- 9-92 6- 9-92 11-10-92 3-16-93 3-16-93 10-12-93 57-A 73 Section t-4 1200-L204 L205-t2t3 Section this Code 62-23H2-239 App.A, $ 3-7-231- App.A, $ 3-7-235 App. A, $ 3-7-236- App.A, $ 3-7-244 App.A, $ 3-7-22 82-2 App.A, $ 3-7-35 App. A, $ 3-7-50 App.A, $ 3-7-58, App.A, $ 3-7-61 App.A, $ 3-7-74 App.A, $ 3-7-79 App.A, $ 3-7-91 App.A, $ 3-7-92- App.A, $ 3-7-105 App.A, $ 3-7-142- App.A, S 3-7-148 App.A, $ 3-7-151- App.A, $ 3-7-154 66-2 App.A, S 3-7-144 18-61-18-67 14-1 t4-76 t4-77-t4-79 t4-3, t4-4 62-32 70-35 App.A, O 3-7-22 90-31 90-61-90-64 90-32, 90-33 90-3,1-90-44 22-344,22-345 22-347 62-61 62-62---62-69 62-70--42-73
62-L0L--$2-7L5
62-73t,62-L32 62-133-62-136 62-151 62-t52,62-153 62-t54--{.2-t59 62-t8t--42-L84 62-L85--62-L87 App.A, $ 3-7-147 App. A, $ 3-7-146 86-1-{6-10 86-41--86-46 7-7 234 5,6 art. II 1 2-5 6 7-t7 4(d), 4(e) 5 Pt.I Pt.L$1- Pt.I,$8 Pt. I,$9 Pt. il, $ 1- Pt. II, $ 15 Pt. III Pr. III, S 1- Pt. III, $ 4 Pt. Iv Pt'ry $ r Pt'ry $ ePt.rY $ a Pt.v, $ 1- Pt'V $ + Pt.v $ 0- Pr.v,$8 1.01-1.10 2.Ot-z.06 93-09 93-04 tl 83-A Ordinance Number 83-1A 87 89 91 Section this Code 26-4 26-5-26-9 26-10 22-3r 62-207 62-208 62-ztt 62-2Lt-62-217 62-209 62-2t0 62-2t2-42-217 62-2L8 62-2t9 62-220,62-22L 22-50 66-31--66-36 66-4 18-96 18-97-18-100 18-121-18-126 18-147, 18-148 18-146 18-149-18-154 18-101 18-2 86-5, 86-6 86-135 Adopting Ordinance, p.xi 50-3s(aX7) 54-9 App. A, $ 3-7- 146(f)(7) App. A, $ 3-7- L47(f)(7\ App. A, $ 3-7-61(8) 74-51-74-60 74-4t-74-43 40-31---40-36 70-39-70-41 42-3t-42-38 22-42,22-51 18-96-18-154 18-96-18-109 66-2 66-1 54-3 App.A, $S 3-7-35, 3-7-762 App.A, $ 3-7-163 2-t20 78-7|-J8-82 App.A, $ 3-7-162 2-120(c) App.A, $ 3-7-400 Date 12-12-95 2-13-96 4- 9-96 6-11-96 6-11-96 7-10-96 9-10-96 12-10-96 6-10-97 2-10-98 3-10-98 Section 2.2.03 2.3-2.7 3.2 1 art. I art. II art. II art. III art. IV(A) art. fV(C)-art.
IV(H)
art. V art. VI art. YII, art. VIII 1 2-7 1 2(a)-2(d) 3(a)-3(f) 4,5 6(a) 6(b)--6(e) 7 arts. I, II art. III Rpld 1 Dltd 1 Added 1 2 3 Added Added 1-+ 1 Rpld Added 1 1 r(1)
I-VII
t-12 m 1 96 92 94 97 98 99 100 101 702 103 104 105 106 108 109 110 111 LLz 113 LL4 115 116E 3-10-98 3-10-98 6- 9-98 6- 9-98 6- 9-98 7-14-98 8-11-98 1-12-99 1-12-99 5-11-99 9-14-99 1-11-00 12-t2-00 L2-12-00 4-10-01 6- 6-01 6-28-01
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.