Skip to content
Georgia Commons
Menu

Hapeville · Zoning Ordinance

Part II - CODE OF ORDINANCES / Part C - PLANNING AND DEVELOPMENT / Chapter 93 - ZONING / Article 24 - ADMINISTRATION, ENFORCEMENT AND PENALTIES

Sec. 93-24-2. Building permits.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Building permits shall be issued in accordance with the following provisions:

(1) Building permit required. It shall be unlawful to commence the excavation or filling of any lot for any construction of any building, or to commence the moving or alteration of any building, or to commence the development of land for a use not requiring a building, until the building official has issued a building permit for that work.

(2) Issuance of building permit. In applying to the building official for a building permit, the applicant shall submit two copies of a dimensional sketch, or to-scale plan,

signed by the owner or his authorized agent, indicating the shape, size and location of the lot to be built upon and the shape, size, height, use and location of the

building to be erected, demolished, altered or moved, and of any buildings already on the lot, the number of dwelling units the building is designed to accommodate, if any, the setback lines of buildings on adjoining lots, the number and location of off-street parking spaces and

off-street loading spaces, the location of storm drainage pipes, and such other information concerning the lot or adjoining lots as may be essential for determining

whether the provisions of this chapter are being observed. If the proposed excavation, filling, construction or movement set forth in the sketch or plan are in conformity with the provisions of this chapter and other ordinances of the city then in

force, the building official shall sign and return one copy of the sketch or plan to the applicant and shall issue a building permit upon payment of any required fees. The building official shall retain one copy of the building permit and one copy of the sketch or plan.

(3) Refusal of building permit. If the sketch or plan submitted described work which does not conform to the requirements of this chapter, the building official shall not issue a building permit, but shall return one copy of the sketch or plan to the applicant along with a signed refusal in writing. This refusal shall state the reasons therefor and shall cite the portions of this chapter with which the submitted

sketch or plan does not comply. The building official shall retain one copy of the sketch or plan and two copies of the refusal.

( 4) Time limitations. Any building permit issued shall become invalid unless the work authorized by it shall have been within

six months of its date of issue, or if the work authorized by it is suspended or abandoned for a period of one year.

History

The history line the source prints at the end of the section.

(Code 1981, § 8-5-222)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hapeville/zoning/93-24-2@2026-11-11-5492af89b2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hapeville Zoning Ordinance, Sec. 93-24-2. Building permits | Georgia Commons