Sec. 93-24-2. Building permits.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Building permits shall be issued in accordance with the following provisions:

(1) Building permit required. It shall be unlawful to commence the excavation or filling of any lot for any construction of any building, or to commence the moving or alteration of any building, or to commence the development of land for a use not requiring a building, until the building official has issued a building permit for that work.

(2) Issuance of building permit. In applying to the building official for a building permit, the applicant shall submit two copies of a dimensional sketch, or to-scale plan,

signed by the owner or his authorized agent, indicating the shape, size and location of the lot to be built upon and the shape, size, height, use and location of the

building to be erected, demolished, altered or moved, and of any buildings already on the lot, the number of dwelling units the building is designed to accommodate, if any, the setback lines of buildings on adjoining lots, the number and location of off-street parking spaces and

off-street loading spaces, the location of storm drainage pipes, and such other information concerning the lot or adjoining lots as may be essential for determining

whether the provisions of this chapter are being observed. If the proposed excavation, filling, construction or movement set forth in the sketch or plan are in conformity with the provisions of this chapter and other ordinances of the city then in

force, the building official shall sign and return one copy of the sketch or plan to the applicant and shall issue a building permit upon payment of any required fees. The building official shall retain one copy of the building permit and one copy of the sketch or plan.

(3) Refusal of building permit. If the sketch or plan submitted described work which does not conform to the requirements of this chapter, the building official shall not issue a building permit, but shall return one copy of the sketch or plan to the applicant along with a signed refusal in writing. This refusal shall state the reasons therefor and shall cite the portions of this chapter with which the submitted

sketch or plan does not comply. The building official shall retain one copy of the sketch or plan and two copies of the refusal.

( 4) Time limitations. Any building permit issued shall become invalid unless the work authorized by it shall have been within

six months of its date of issue, or if the work authorized by it is suspended or abandoned for a period of one year.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 1981, § 8-5-222)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:hapeville/zoning/93-24-2@2026-11-11-5492af89b2

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Hapeville Zoning Ordinance, Sec. 93-24-2. Building permits | Georgia Commons