Skip to content
Georgia Commons
Menu

Harlem · Zoning Ordinance

Part III - LAND DEVELOPMENT CODE / Chapter 112 - STORMWATER MANAGEMENT / Article V - BASIC STORMWATER MANAGEMENT DESIGN CRITERIA

Sec. 112-120. Minimum control requirements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All stormwater management practices will be designed so that the specific storm frequency storage volumes (e.g., recharge, water quality, channel protection, ten-year, 100-year) as identified in the LDM are met, unless the city grants the applicant a waiver or the applicant is exempt from such requirements. In addition, if hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, the city's right to impose any and all additional requirements deemed in volume, timing, and rate of runoff.

History

The history line the source prints at the end of the section.

(Ord. No. 1812, § 5.1, 7-23-2018)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harlem/zoning/112-120@2026-11-11-99da2eb96a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harlem Zoning Ordinance, Sec. 112-120. Minimum control requirements | Georgia Commons