Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 3 - DAMS

1016.03. Existing Category II dams.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

When an existing Category II dam may be reclassified to a Category I dam because of a proposed development downstream of the dam, the following shall be provided by the developer for review by the Georgia Safe Dams Program.

(a) Location of the Category II dam and the proposed development; and

(b) A surveyed cross-section of the stream valley at the location of the proposed

development including finished floor elevations; and

(c) A dam breach analysis using the Dambreak computer model to establish the height of the flood wave in the downstream floodplain. The Dambreak modeling shall

be completed in accordance with the Safe Dams Program Quality Assurance Program by a qualified registered engineer.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/1016.03@2023-12-05-c068e6dd31

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.