Harris County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE / Article 9 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division II - PROJECT CONSTRUCTION STANDARDS
910.01. Responsibility during construction.
About this text
- As published by Municode, current through 2023-12-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) The developer and his/her Design Professional of Record have full responsibility for quality control and inspection during construction to ensure substantial conformance with the approved construction plans, County standards,
County regulations, and generally accepted construction practices. County personnel only provide construction observation to intermittently check the adequacy of the developer's quality control and inspection.
(b) Any construction issues requiring an interpretation and/or change in the plans, standards, and/or regulations are to be resolved by the Design Professional of Record and presented to the County for written concurrence or approval. Any design changes must be revised on the construction plans and issued as a change to the approved construction plans.
(c) Failure of the developer to provide adequate quality control and inspection which results in a substantial nonconformance with the plans, standards, regulations or generally accepted construction practice or endanger the public health, safety, and welfare shall be cause for the County to issue a Stop Work Order for any or all portion(s) of the construction in accordance with County procedures and ordinances. The order will remain in effect until the developer or his/her Design Professional of Record can demonstrate to the County that adequate quality control and inspection will be provided to address and correct the nonconformance and
minimize the potential for further nonconformance issues or endangerment issues.
(d) Each day of continued construction on the scope of work covered by the Stop Work Order under this Development Code shall be considered a separate violation.
(e) The developer controls the means, sequence, and methods of construction. As such, the developer has full responsibility for safety on the project site and compliance with all federal, state, and local regulations pertaining to safety and environmental requirements.
(f) Preconstruction activity.
(1) Following the issuance of any permit authorizing clearing and grading of a site, areas required to be undisturbed, such as natural landscape buffers or stream buffers, must be designated by survey stakes, flags, ribbon, or other appropriate markings and shall be inspected and approved by the County Inspector prior to the commencement of any clearing or grading activities.
(g) Grading.
(1) Grading shall be done in accordance with the lines and grades drawn on the approved grading plan.
(2) Required erosion and sedimentation control measures and stormwater drainage facilities are to be installed in accordance with the approved plans as
development progresses.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.