a. Grading.

(1) All streets, roads and alleys shall be graded to their full width by the developer so that pavement extensions or sidewalks, where required or if installed in the future, can be constructed on the same level plane.

(2) Preparation of roadway: Before grading is started the entire area to be paved shall be first cleared of all stumps, roots, brush and other objectionable materials. In all areas to be graded or filled, the developer shall stockpile the topsoil later to be spread in all disturbed areas not paved.

b. Slopes and Shoulder Improvements. The maximum slope for all fill or cut slopes shall be two (2) feet of run for each one foot of rise or fall.

(1) The minimum width for all shoulders from back edge of the curb shall be twelve (12) feet. All shoulders shall slope one-fourth (1

/4) inch to the foot toward the roadway.

(2) On streets with swale ditch drainage, the shoulders shall slope three-quarters (3 /4) inch

to the foot away from the roadway for at least five (5) feet to the drainage channel.

(3) When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a stand of grass to prevent undue erosion, either by sprigging or seeding.

(4) Abutting property shall be suitably sloped at the right-of-way line.

c. Protection of Banks. Immediately after grading and filling and re-spreading of topsoil, all areas of disturbed soil shall be fertilized and seeded (or in steep areas sodded or otherwise appropriately treated) with suitable vegetative cover to retard erosion.

d. Installation of Utilities.

(1) After grading is completed and approved, to curb lines or edge of pavement lines, as applicable, shall be staked by the development Registered Land Surveyor. Before any bank is applied, all of the underground utilities—water mains, sewer mains, gas mains, or any other underground utilities and all service connections related thereto— shall be installed completely as provided throughout the length of the street and across the flat section. Service connections for sanitary sewer and water shall be extended to the right-of-way lines. The installation of all utilities shall be done by the city or by the city's contractor.

(2) No private improvements, such as private lawn sprinkler systems, yard lighting, and the like, shall be installed within a public right-of-way except by authorization of the Public Works Director. Such authorization, if issued, shall require the owner to assume all repair costs of the owner's facilities should they be damaged during the course of installation, maintenance, or repair work by the city.

e. Preparation of subgrade. Prior to placement of the street base, the subgrade shall be compacted to ninety-five (95) percent density.

f. Street base, curbing and paving. Street base, curbing and paving shall be installed by the developer in accordance with the requirements and standards of this ordinance.

History

The history line the source prints at the end of the section.

(Ord. of 5-10-96)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hawkinsville/zoning/5.5.1@2026-11-11-79f092a56b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hawkinsville Zoning Ordinance, Sec. 5.5.1. Basic requirements for all streets | Georgia Commons