Skip to content
Georgia Commons
Menu

Hawkinsville · Zoning Ordinance

Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article VI - PLANS AND PROCEDURES / Division 5 - DEVELOPMENT PERMIT

Sec. 6.5.4. Process for approval.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

An application for a development permit may proceed simultaneously with an application for a preliminary subdivision plat or site plan, but may not be issued prior to project approval of such plat or plan by the Planning Commission.

a. An application for a development permit shall include:

(1) Application on the form furnished by the Building Inspector, requesting review for issuance of a development permit.

(2) Six (6) copies of the civil design and construction drawings prepared in conformance with the specifications and standards in this ordinance.

(3) Payment of any development permit fee, as established from time to time by the Board of Commissioners.

b. The application shall be checked for completeness at the time of submission. Incomplete applications will be returned to the applicant.

c. The applicant may be required by the Building Inspector to secure development approval from other agencies if they are affected by the development. Development approval may be required from but not limited to:

(1) The Ocmulgee Soil and Water Conservation District

(2) Hawkinsville Public Works Department

(3) Pulaski County Health Department

(4) Georgia Department of Transportation

(5) Georgia Department of Natural Resources

(6) U.S. Army Corps of Engineers

(7) U.S. Environmental Protection Agency

d. If the civil design and construction drawings or supporting studies are not prepared by or under the direction of a professional engineer, the Building Inspector may forward the plans to the City's designated professional engineer for review and comment at the applicant's expense.

e. Upon receipt of comments from other City departments, the Building Inspector shall indicate on a copy of the civil design and construction drawings or in writing all comments related to compliance with this ordinance, conditions of zoning approval, and other regulations under the purview of the City, as appropriate.

f. The Building Inspector shall forward to the applicant the City's review comments.

g. The applicant shall be responsible for compliance with all codes, regulations, and zoning requirements and for the satisfaction of all of the comments of the Building Inspector. The owner shall also be responsible for obtaining approval from all other agencies affected by the project.

History

The history line the source prints at the end of the section.

(Ord. of 5-10-96)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hawkinsville/zoning/6.5.4@2026-11-11-5ab9893aac

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hawkinsville Zoning Ordinance, Sec. 6.5.4. Process for approval | Georgia Commons