Skip to content
Georgia Commons
Menu

Heard County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 46 - ZONING / Article IX.1 - SOLAR ENERGY SYSTEMS

Sec. 46-271. Solar energy system, building-mounted.

About this text

  • As published by Municode, current through 2024-07-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A building-mounted solar energy system shall be subject to the following regulations:

(a) Placement.

(1) No solar energy system shall be mounted or affixed to any freestanding wall or fence.

(2) Panels and building mounts shall be installed per manufacturer's specifications.

(3) In residential zoning districts, a solar energy system for aesthetic reasons shall not be located on the front slope of a pitched roof of a principal residential structure unless no other location for the solar energy equipment is feasible. The county may require sun and shadow diagrams specific to the installation to ensure compliance with this provision.

(b) Height. Building-mounted solar panels or systems shall not exceed four feet above the height of any principal building on the site.

(c) Permits and code compliance. A building permit shall be required for installation of all building-mounted solar energy systems, except for flushmounted panels.

History

The history line the source prints at the end of the section.

(Ord. of 12-19-2017(1), § 2)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:heard-county/zoning/46-271@2024-07-16-4c077d3d87

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Heard County Zoning Ordinance, Sec. 46-271. Solar energy system, building-mounted | Georgia Commons