Chapter 105
DEVELOPMENT STANDARDS AND REGULATIONS
Secs. 105-165—105-192. Reserved.
ARTICLE I. IN GENERAL*
Sec. 105-1. Authority and delegation.
The power of a local government to enact an ordinance such as the one from which this chapter is derived, which is intended to protect the public health, safety, and welfare, is provided by Georgia Constitution article 9, § 2, ¶ 4 and article 9, § 2, ¶ 3, the county's general police powers and other local and state law applicable hereto.
These regulations are adopted pursuant to powers vested in counties by the State of Georgia Constitution and pursuant to state administrative rules for the adoption and implementation of comprehensive plans and the protection of vital areas of the state. The Jasper County Board of Commissioners or their designee is vested with the authority to review, approve, conditionally approve, and disapprove sketch plats, and to grant variances from the requirements of chapter 105, chapter 107 and chapter 119 of this Code when applications for variance(s) are submitted simultaneously with a sketch plat application and pertain to the same property as the sketch plat application.
The director of planning and zoning is vested with the authority to review, approve, conditionally approve or disapprove minor subdivision plats and minor re-subdivisions, lot combination plats, lot line adjustments, construction plans of major subdivisions when such sketch plat approval of construction plans has been obtained.
The director of planning and zoning shall also be authorized to review major subdivisions and major re-subdivisions for conformity to the requirements of this Code, and to make reports and recommendations to the planning commission and board of commissioners on major subdivisions and major re-subdivisions, and to administer, interpret, and enforce the provisions of this chapter. The director of planning and zoning shall further be authorized to administratively approve variances where expressly authorized in this Code.
(Ord. of 11-7-2022, § VIII) Sec. 105-2. Jurisdiction.
This chapter applies to all land within the unincorporated areas of the county.
(Ord. of 11-7-2022, § VIII) Sec. 105-3. Applicability and prohibitions.
(a) The subdivision regulations of Jasper County shall apply to all real property within unincorporated Jasper County, but specifically excluding the subdivision of property.
(b) Effect of prior subdivision regulations. At the subdivider's request, a plat that received preliminary approval under prior subdivision requirements may be processed through the final plat process under such requirements.
(c) No person shall sell, advertise, or offer to sell, by deed, map, plat or other instrument, any parcel of land not subdivided under the requirements of this chapter.
(d) No plat of land subdivision shall be entitled to be recorded in the Office of the Clerk of the Superior Court of Jasper County, and it shall be unlawful to record such a plat of land subdivision, unless and until it shall have been approved in accordance with the requirements of this chapter.
(e) It shall be unlawful for any person to transfer or sell land by reference to, or by exhibition of, or by other use of, a plat of a land subdivision that has not been approved and recorded in accordance with the requirements of this chapter. The description of such land by metes and bounds in the instrument of transfer shall not exempt the transaction.
(f) No person shall commence construction of any improvements on any land, prior to the approval of construction plans and engineering plans for said improvements.
(g) No building permit or certificate of occupancy shall be issued for a building, structure, or use, nor shall any excavation, grading, or land disturbance applications be approved, on any parcel of land created by subdivision after the effective date of this Code that has not been approved in accordance with the provisions of this chapter.
(h) No land dedicated as a public street or for other public purpose shall be opened, extended, or accepted as a public street or for other purpose unless such improvements are constructed in accordance with the specifications of this chapter and formally approved and accepted as public improvements by the board of commissioners.
(i) No street or road will be accepted for maintenance by the county unless the property owner(s) first constructs the road to county standards.
(Ord. of 11-7-2022, § VIII) Sec. 105-4. Purposes.
This chapter seeks to encourage the development of desirable land use patterns within the county in accordance with the county zoning ordinance set forth in chapter 119 and the Jasper County Future Land Use Plan. The promotion of sound land use patterns and practices is intended to reduce or eliminate the occurrence of certain conditions that can threaten the general health, safety, and welfare of the residents of the county. This chapter serves the following purposes:
(1) To establish procedures for the subdivision and re-subdivision of land in order to further the orderly development of land and encourage the development of economically sound and stable communities.
(2) To promote the orderly, planned, efficient, and economic development of the unincorporated portions of Jasper County and to guide future growth in accordance with the Japer County Comprehensive Plan.
(3) To ensure that lands subdivided are of such character that they can be used for building purposes without danger to the health or safety of its residents, and to secure safety from fire, flood, or other menace.
(4) To provide for the proper documenting of subdivided land and proper legal descriptions.
(5) To ensure the proper provision of improvements such as drainage, water, sewerage, and capital improvements such as schools, parks, playgrounds, recreational facilities, and transportation facilities.
(6) To ensure the adequate protection of safe and convenient traffic access and circulation in new land development.
(7) To help eliminate the costly maintenance problems which develop when streets and lots are established without proper consideration given to various public purposes.
(8) To establish the provision of appropriate open spaces and building sites in new land developments through the dedication or reservation of land for recreational space, buffer areas, or other conservation purposes through the most efficient design and layout of the land.
(9) To prevent the pollution of air, streams, and ponds; to encourage the wise use and management of natural resources throughout the unincorporated portions of Jasper County, and to preserve the topography and beauty of the community and the value of land.
(10) To accommodate low-impact stormwater best management practices, where appropriate, to improve water quality and infiltration.
(11) To offer protection of natural resources through required buffers and undisturbed areas that minimize land disturbance and protect existing vegetation while allowing for the removal of non-native, invasive species at the discretion of the approval of the county.
(12) To facilitate and inform lot purchasers who generally lack the specialized knowledge needed to evaluate subdivision improvements and design.
(Ord. of 11-7-2022, § VIII) Sec. 105-5. Content.
This chapter:
(1) Defines certain terms used in this chapter.
(2) Establishes minimum standards for lots, streets, and other facilities associated with land development.
(3) Provides procedures for administering and amending this chapter.
(4) Provides penalties for violation of this chapter.
(5) Repeals conflicting ordinances.
(Ord. of 11-7-2022, § VIII) Secs. 105-6—105-26. Reserved.
ARTICLE II. DEFINITION OF TERMS
Sec. 105-27. Interpretation of certain common terms.
When used in this chapter, the following words and phrases have the meaning as defined in this article. Terms not defined here have the same meaning as is found in most dictionaries, where consistent with the context. The terms "must," "will," and "shall" are mandatory in nature, indicating that an action has to be done. The term "may" is permissive and allows discretion regarding an action. When consistent with the context, words used in the singular number include the plural, and those used in the plural number include the singular. Words used in the present tense include the future. The word "developer" includes a firm, corporation, co-partnership, association, institution, or person. The word "lot" includes the words plot and parcel. The word "building" includes the word structure. The words "used" or "occupied" as applied to any land or building include the words intended, arranged, or designed, to be used, or occupied.
(Ord. of 8-8-2005(2), § 201) Sec. 105-28. General definitions.
The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Acceleration lane means a speed change area or lane consisting of added pavement at the edge of through traffic lanes to permit vehicles to accelerate before merging with the through-traffic flow.
Alley or service drive means a minor, permanent, public service-way which is used primarily for vehicular service access to the back or the side for properties otherwise abutting on a street.
Applicant means a person, either the owner or the bona fide representative of the owner of land or structures governed by these regulations, who seeks authority to use, develop, construct upon or otherwise enjoy the use of property through any of the procedures established under these regulations.
As-built survey, also commonly referred to as record drawings, means a survey to provide formal documentation of exactly how a project was installed. It documents the actual results of the construction project rather than the planned layout shown in the project design and are critical for project closeout.
Block means a unit or area of land bounded by public highways or streets, other than alleys, or a combination of streets, public lands, railroad rights-of-way, waterways or any other barrier to the continuity of development.
Buffer means natural vegetated and/or landscaped areas used to physically and visually separate land uses to mitigate adverse impacts from adjacent permitted uses including, but not limited to, noise, odor, dust, fumes, glare, unsightly construction or unsightly activity or unsightly storage of merchandise and/or materials. This pertains to all buffers.
Buffer, disturbed means a buffer that is allowed to be altered through grading and/or clearing of vegetation during the development of a site.
Buffer, exterior means an existing and/or augmented buffer, where prescribed, that may be minimally disturbed for grading and/or development of a site. Where required, exterior buffers shall abut all lot lines and rights-of-way.
Buffer, large-scale non-residential means an existing and/or augmented buffer that meets country buffer standards and shall remain undisturbed as applied to large scale nonresidential when the subject property abuts a residential or agricultural zoning district.
Buffer, side and rear means an undisturbed and/or augmented buffer as applied to commercial, industrial, and mining zoning districts when subject property abuts a residential, agricultural, or zoning district.
Buffer, stream means an undisturbed buffer located on both sides of all state waters, measured horizontally from the top of the bank.
Buffer, undisturbed means a buffer that is unaltered from clearing and grading processes except for removal of invasive and non-native plants.
Building line means a line parallel to a specified minimum distance from the front, side, or rear property lines or the centerline of a right-of-way beyond which no foundation wall or part of the structure of any building projects with the exception of roof overhang, steps, and the subsurface projection of footings.
Centerline, right-of-way, means the line running midway between the edges of a surveyed or mapped dedicated right-of-way. Where the edges of right-of-way have not been established by subdivision plat or public purchase, the centerline shall be the line running midway between any adjoining drainage ditches or other publicly maintained road improvements.
Centerline, street, means that line surveyed and monumented by the board of county commissioners as the centerline of a street, or if such a centerline has not been surveyed, it is the line running midway between the outside curbs or ditches of the street.
Cluster mailbox units (CBU) means a structure or shelter housing multiple mailbox units to serve each residential dwelling of the development for the expressed purpose of regular mail delivery provided by the United States Post Office (USPS)
Commercial and industrial (aka non-residential) subdivision means a subdivision of land into two or more non-residential lots.
Comprehensive plan means any part or element of the overall plan for development adopted by the county commission, as amended.
Conservation area, primary, means the area with existing, regulatory restrictions on development potential, including but not limited wetlands, riverfront areas, and floodplains regulated by state or federal law, and steep slopes greater than 25 percent grade that are set aside as permanent open space on a development parcel.
Conservation area, secondary, means the unprotected landscapes or elements of the landscape with environmental or cultural significance, including but not limited to upland buffers to wetlands, woodlands, farmland, meadows and/or pastures of at least three contiguous acres, orchards, existing forests of three contiguous acres or more, wildlife habitat including corridors for wildlife movement, historic and archaeological sites, mature trees, scenic views, aquifer recharge areas, slopes between 25 percent and 35 percent, historic and archeological sites, trails, and trailheads constructed with pervious materials connecting to identified county trails, and existing dwelling units of historical significance.
Master and open space and recreation plan conservation goals are to be considered when identifying secondary conservation areas.
Conservation easement means a legally enforceable agreement between a property owner and the holder of the easement, in a form acceptable to the county attorney and recorded in the office of the Clerk of the Superior Court of Jasper County. A conservation easement restricts the existing and future use of the defined tract or lot to conservation use, agriculture, passive recreation, or other use approved by the Jasper County Board of Commissioners and prohibits further subdivision or development. Such agreement also provides for the maintenance of open spaces and any improvements on the tract or lot. Such agreement cannot be altered except with the express written permission of the easement holder and any other co-signers. A conservation easement may also establish other provisions and contain standards that safeguard the tract or lot's special resources from negative changes.
Conservation residential subdivision (aka conservation subdivision) means a subdivision, as defined by this Code, where open space is the central organizing element of the subdivision design and that identifies and permanently protects all primary and all or some of the secondary conservation areas within the boundaries of the subdivision.
Construction plans means a set of plans, consistent with the approved preliminary plat, which show street horizontal design and profile, grading, and drainage plans, utility construction plans, sediment and erosion control plans, and other design information which may be required by the director of planning. It is submitted to the director of planning and requires approval following review by individuals or entities specified by the county.
Contiguous common parcels means parcels adjoining or touching other land at a common point and having a common owner, regardless of whether or not portions of the parcels have separate tax lot numbers, or were purchased in different land lots, or were purchased at different times.
Crosswalk means a right-of-way within a block dedicated to public use, intended primarily for pedestrian use, and designed to provide access to adjacent roads and lots.
Curb cut means the point at which vehicular access is provided to an adjoining street from a lot.
Cul-de-sac means a dead-end street of limited length having a primary function of serving adjoining land, and constructed with a turnaround at its end.
Cul-de-sac, temporary means a nonpermanent vehicular turn around located at the termination of a street or alley.
Culvert means a structure designed to convey water from one side of a public right-of-way to the other.
Cut means a portion of land surface or area from which earth is removed by excavating;
the depth below original ground surface to excavated surface.
Cutoff fixture means an outdoor light fixture shielded or constructed in such a manner that it emits up to, but no more than, two and one-half percent light spillage above the horizontal plane of the fixture.
Deceleration lane means an added roadway lane, of a specified distance and which may include a taper, as approved by the director of engineering, that permits vehicles to slow down and leave the main vehicle stream.
Dedication means the deliberate appropriation of land by an owner for any general and public use or purpose, reserving to himself no other rights than such as are compatible with the full exercise and enjoyment of the public uses to which the property has been devoted.
Dedication plat means a plat that indicates property to be dedicated for public right-of-way or land for public use.
Design standards means required specifications for the preparation of plats and construction plans—both preliminary and final.
Developer means any individual, firm, association, syndicate, co-partnership, corporation, trust, or other legal entity having sufficient proprietary interest in the land sought to be subdivided to commence and maintain proceedings to subdivide the same under this chapter.
Development means all activities associated with the conversion of land or the expansion or replacement of an existing use to any new use intended for human operation, occupancy or habitation, other than for agricultural purposes devoted strictly to the cultivation of the land, dairying or animal husbandry. Such activities include land disturbance (clearing and grubbing the land of vegetation and stumps, and grading) and the construction of improvements such as but not limited to streets, driveways or parking areas, water or sewer mains, storm water drainage facilities, sidewalks or other structures permanently placed on or in the property. Where appropriate to the context, the term "development" also may be used to denote a specific subdivision or project which is a single entity or intended to be constructed as in interrelated whole, whether simultaneously or in phases.
Development agreement means a written contract between the county and a property owner or developer that specifies the system improvements to be provided by the developer for a specific project.
Development permit means an official authorization issued by the department permitting clearing, grubbing, grading, or construction of storm drainage facilities, access drives, streets, parking or other improvements exclusive of buildings.
Development plans means the detailed and professional plans showing the layout and design, site work and construction activities proposed for a project (other than architectural building plans) and including the preliminary plat or site plan (as applicable), grading plan, tree preservation/replacement plan, erosion and sediment control plan, buffer and landscape plan, and construction drawings for streets, storm water drainage facilities, sanitary sewers, water supply facilities, and other site improvements.
Director of planning means the person, officer, or official and his authorized representative, whom the county commission has designated as its agent for the administration of this chapter.
Drainageway means an open river, stream, gully, ditch, or swale—either natural or manmade—which serves as a collector and free-flowing channel for accumulated stormwater.
Easement means the right or privilege of using another's property for purposes such as constructing and maintaining sanitary sewers, water mains, electric lines, telephone lines, storm sewers, gas lines, bicycle paths, pedestrian ways, and other purposes.
Elevation, front, means the view of a building or group of buildings as seen from directly in front of the structure.
Existing grade means the vertical location of the existing ground surface prior to cutting, excavation, or filling.
Final plat means a recordable map of a subdivision, meeting all of the requirements of this chapter, and complying with the Georgia Plat Act, which is used to transfer portions of a property to others after development of a property has been completed.
Finished grade means the final grade or elevation of the ground surface forming the proposed design.
Flag lot means a lot, the main portion of which is located away from the public street, with a connecting strip to the public street, in conjunction with a cul-de-sac.
Flood boundary means that area in the county threatened by possible flood under normal to severe circumstance as defined by Federal Emergency Management Agency maps or engineering studies.
Footcandle means a unit of measure for illuminance on a surface that is everywhere one foot from a point source of light of one candle, and equal to one lumen per square foot of area.
Full cutoff fixture means an outdoor light fixture shielded or constructed in such a manner that it emits no light above the horizontal plane of the fixture.
Georgia DOT means the Department of Transportation of the State of Georgia.
Government agency means any department, commission, independent agency, or instrumentality of the United States or of the State of Georgia, or any county, city, authority, district, or other governmental unit.
Grading means the stripping, cutting, filling, stockpiling, or any combination thereof, and activities where the land itself is cut or filled.
Grading permit means a permit issued to authorize earth work to be performed under the terms of this Code. See "land disturbing permit."
Grading plan means a plan showing existing and proposed contour lines at an interval of no more than two-feet and shall outline the areas, including dimensions, that are required to remain undisturbed (i.e. tree protection areas, buffer, etc.) and shall indicate protective fencing or staking to be placed surrounding such areas. Grading for roads and improved ditches shall be shown as well as all storm water detention facilities.
Green space means that portion of a tract that is set aside for the protection of natural features, farmland, scenic views, and other unique features. Green space may be accessible to the residents of the development and/or the public or it may contain areas of conservancy lots that are not accessible to the public. Green space consists of all primary and secondary conservation areas. See "open space."
Health department means the Environmental Health Services Division of the Georgia Department of Human Resources for Jasper County.
Hearing means an official session of the planning commission or the county commission held to afford a developer or his agent and the public an opportunity to present information and confer on a proposed subdivision with the planning commission or the county commission.
Homeowners association means a community association in which membership of all the owners of property within the subdivision is mandatory, which holds title to certain common property, manages and maintains the common property, and enforces certain covenants and restrictions. The association shall have the duty and the authority to assess its members for such maintenance and improvements as set forth in the instrument creating the association.
House location drainage plan (HLDP) means a drawing showing lot information and all proposed improvements with a proposed method for detaining rainwater on your property, so that it doesn't pool up at your foundation, or run off onto your neighbor's property in a damaging way, perhaps even causing flooding.
House location and drainage plans are required on all lots marked "HLDP" on a final plat, on lots subject to periodic flooding, and on all lots which the development staff determines have a drainage problem. An HLDP shall be prepared by a qualified professional civil engineer, architect, landscape architect, or surveyor, and will be required before issuance of a building permit. A review period is required before permitting and therefore the HLDP should be submitted at least ten working days prior to the building permit request.
(1) House location and drainage plans shall be drawn to scale and may be shown on a certified boundary survey of the lot or any other drawing showing the information required below. The planning department may accept a house location and drainage plan drawn to the same scale as shown on the final plat where sufficient detail can be shown to support an adequate review and approval.
(2) The house location and drainage plan shall be a drawing with sufficient readability and accuracy to ensure that the proposed improvements will be constructed on the lot in conformance with the requirements of these development regulations, the zoning ordinance, or other regulations as applicable.
(3) House location and drainage plans shall show the following, as applicable:
a. Boundary lines of the lot, giving distances to the nearest one-tenth of a foot and bearings to the nearest minute.
b. Location and names of all abutting streets or other rights-of-way.
c. Minimum required front, side, and rear building setback lines with dimensions and notation of the existing zoning on the property.
d. The approximate outline of all buildings, driveways, parking areas, swimming pools, recreational courts, patios, accessory structures and other improvements existing or proposed on the property, and dimensions of buildings and distances between all structures and the nearest property lines.
e. All easements, public water, sewer or storm drainage facilities traversing or located on the property, septic tank, and septic tank drain field.
f. Subdivision name, lot designation, land lot, and district.
g. North arrow and scale.
h. Limit of the 100-year floodplain, wetland areas, streams, historic structures and any applicable buffers or special building setback lines.
i. All other applicable requirements of the zoning ordinance or conditions of zoning approval.
j. Name, address, and telephone number of the owner and the person who prepared the house location and drainage plan.
k. A two-foot contour map of the proposed final grading.
(4) A certificate of occupancy shall not be issued for the structure or other improvements until conformance to the provisions or other requirements of the house location and drainage plan with an as-built certification.
(5) The house location and drainage plan shall contain the following signature block:
"This House Location and Drainage Plan has been reviewed for general compliance with the Zoning Ordinance and Development Regulations of Jasper County, Georgia, and is approved for issuance of a building permit for the residential structure and other improvements shown hereon. This approval is granted with the provision that no Certificate of Occupancy shall be issued for the completion of construction until conformance to this House Location and Drainage Plan has been field verified with an as-built certification."
(6) An updated "as built certification" must be submitted prior to final inspection and issuance of a certificate of occupancy, in the following form:
"I, , a qualified registered Professional in the State of Georgia, hereby certify with my signature and seal, that I have made sufficient visits to the construction site and to the best of my knowledge, the structures located on Lot of the project known as
, and located in land lot , of the district, section of Jasper County, Georgia, have been constructed in substantial compliance with the approved House Location and Residential Drainage Plan for the above listed project.
This day of , 20 .
[Signature] [Seal] GA Registration No.
Impervious surface means a man-made structure or surface which prevents the infiltration of storm water into the ground below the structure or surface. Examples include but are not limited to buildings, roads, driveways, parking lots, decks, swimming pools, or patios.
Land disturbance permit means any permit other than a building permit issued by the county that authorizes clearing or grading activities on a site or portion of a site. Said permit may be a clearing, clearing and grubbing, a grading, or development permit as defined and authorized herein.
Land-disturbing activity means any grading, scraping, excavating, or filling of land, clearing of vegetation, and any construction, rebuilding, or alteration of a structure.
Land-disturbing activity shall not include activities such as farming, ordinary maintenance and landscaping operations, individual home gardens, yard and grounds upkeep, repairs, additions or minor modifications to a single-family dwelling, and the cutting of firewood for personal use unless regulated by other local, state or federal regulations.
Landscape plan means a plan that identifies areas of tree preservation and methods of tree protection within the protected zone, as well as all areas for replanting. Within replanting areas, the common and botanical names of the proposed species, the number of plants of each species, the size of all plants, the proposed location of all plants, and any unique features of the plants shall be indicated.
Landscaped areas means areas devoted to the installation and permanent maintenance of trees, shrubs, ground covers, turf grasses, mulch, and other similar materials. At least 75 percent of a landscaped area must be covered by live plant material at the time of plant maturity and must consist of at least three of the following elements: vegetative ground cover, herbaceous ornamentals, shrubs, trees. Examples of landscaped areas include landscape strips and landscaped open space.
Left turn lane means a lane placed between opposing lanes of traffic for the purpose of allowing traffic from either direction to make left turns off of a roadway.
Lot means a parcel of land occupied or capable of being occupied by a building and customarily incidental accessory buildings or uses, including such open spaces as are required by this chapter.
Lot, corner, means a lot located at the intersection of two streets.
Lot, multiple frontage, means a lot, other than a corner lot, which has frontage on more than one street.
Lot of record means a lot which is part of a subdivision, the plat of which has been recorded in the office of the clerk of the superior court of the county; or a parcel of land described by metes and bounds, the plat or description of which has been recorded in said office; or a leased lot that has remained in a consistent configuration and has been depicted on the tax assessor's maps as a discreet parcel, with or without a recorded legal description, since the year 2000. If a portion of a parcel has been conveyed at the time of the adoption of the ordinance from which this chapter is derived, the remaining portion of the lot or parcel will be considered a lot of record.
Lot remnant means any portion of a lot not suitable for building upon because of size or topography and remaining after the transfer of other portions of the lot to adjoining lots.
Lot width means the distance between side lot lines measured at the front building setback.
Minor division plat means divisions of land into no more than three lots, where no new streets are platted, constructed, or opened, no publicly-owned or central sewerage or water facilities are constructed, and no improvements of existing roads are planned. A minor division does not include the further subdividing of a lot within a platted and recorded subdivision. This definition does not include land zoned O-I, C-1, C-2, or M as defined by section 119-48 of part II of this Code, further dividing of land approved through the minor division process within a 36-month period where the total number of lots would exceed the three-lot limit previously approved shall follow the process for a minor division plat and require the review and approval of the planning commission and board of commissioners.
Mixed use subdivision means a complementary mix of residential, commercial, and/or industrial uses in a single district.
Mulching means the application of plant or other suitable materials on the soil surface to conserve moisture, hold soil in place, and aid in establishing plant cover.
Natural conditions means the flora, fauna, soil and water conditions that would develop on a specific tract of land if all human interference were to be removed. The tract of land must have been undisturbed for a sufficient period of time for natural processes to dominate the tract. This period of time will vary among environments.
Natural ground surface means the ground surface in its original state before any grading, excavation or filling.
Nonstructural stormwater management practice means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and green space areas, overland flow filtration areas, natural depressions, and vegetated channels.
Open space means, within the context of this chapter, any combination of primary conservation areas and secondary conservation areas, as defined, that together form a permanent, undivided or relatively undivided, undeveloped area. Easements for electric transmission lines or any other above-ground improvement shall not be considered open space. Within the context of other chapters of this Code, "open space" shall have more liberalized meaning to include buffers and areas not containing any man-made structures or pavements except for low impact stormwater designs that incorporate elements such as vegetated bioretention basins or community amenity features as expressly allowed elsewhere in this Code. For all zoning districts requiring open space, including conservation subdivisions, structural stormwater control practices shall not be counted toward the required open space except for low impact stormwater designs that satisfy requirements elsewhere in this Code. Nonstructural stormwater control practices may count toward required open space.
An active recreational facility may not be located in the required open space. Passive amenities, such as walking trails, may be located in required open space, but passive amenities may not comprise more than 25 percent of the required open space and may not include impervious materials. Areas dedicated to land application shall not be counted toward required open space unless the application is above ground and the area affected can be utilized for such activities as ball fields, golf courses, park areas, etc.
Open space, public means within the context of chapter 105, an area within a development or subdivision designed and intended for the use and enjoyment of all residents or for the use and enjoyment of the public in general.
Original tract means a unit of land which the owner holds under single or unified ownership, or which the owner holds controlling interest on the effective date of this Code, where all land abutting said tract is separately owned by others, not related to or associated by business partnership with the owner.
Owner of record means the owner of property as specified on the deed of the lot of record.
Parks and playgrounds means public or community land, open spaces, or recreation areas represented on a subdivision plat as dedicated, reserved, or intended to be reserved, for recreational purposes.
Pedestrian way means a public right-of-way or private easement across a block or within a block to provide access for pedestrians and which may, in addition to providing pedestrian access, be used for the installation of utility lines.
Percentage of grade means, measured down the street centerline, the change in elevation as it relates to horizontal distance, usually expressed as vertical change in elevation per 100 feet of horizontal distance.
Planned development means a coordinated large-scale or comprehensive group development designed and constructed according to a development plan that has been approved by the county commission.
Performance bond means a type of developmental improvement guarantee in the form of a bond, secured by the developer from a bonding company, in an amount specified by the board to cover the costs of required improvements, and payable to the county. The county may call in the performance bond in the event the developer defaults on required improvements.
Permanent stabilization (soil) means all soil disturbing activities at the site have been completed, and that a uniform and evenly distributed cover of perennial vegetation with a density of at least 90 percent has been established, without large bare areas, for unpaved areas of the site not covered by permanent structures.
Permit means any written authorization for building, construction, alteration, occupancy, or other matter required by this Code to be approved by a designated commission, board, official, or employee. The person to whom such permit is issued shall be known as the "permittee."
Planning commission means the Jasper County Planning and Zoning Commission.
Pole-mounted light means any luminaire set on a pole which raises the source of light off of the ground. The height of any pole-mounted light shall be measured from the base at grade after installation and include the pole, luminaire, and all structural and decorative components.
Pre-application review means an initial and informal stage of subdivision review at which the developer may present the sketch plat and the director of planning may discuss the applicable subdivision regulations.
Preliminary plat means a map of the proposed subdivision meeting the requirements of this chapter and showing the proposed layout in sufficient detail to show the intent of the developer.
Prescriptive easement means a road or right-of-way jointly or severally owned by the adjacent landowners. In the case of county roads, the county has the right to use and maintain the roadway from ditch to ditch. Subdivision roads are not allowed to exit into county roads that are limited to prescriptive easement rather than dedicated right-of-way with ownership in the county.
Private drive means a non-public, privately owned accessway.
Private street means any street within a planned development which meets appropriate public street design standards, but, for purposes of controlled access or privacy, is not dedicated to the county and is not public.
Property owners association means a community association in which membership of all the owners of property within the subdivision which hold title to certain common property, manages and maintains the common property and enforces certain covenants and restrictions. The association shall have the duty and authority to assess its members for such maintenance and improvements as set forth in the instrument creating the association.
Protected zone means all lands that fall outside of the buildable area of a parcel, all areas of the parcel required to remain in open space, and all areas required as landscaping strips according provisions of the Jasper County zoning regulations, or conditions of the zoning approval.
Protective private covenants means private contracts made between private parties, or conditions recorded with an approved plat and running with the title to the land, specifying the manner in which land may be used, developed, or improved with the intent of protecting and preserving the physical and economic integrity of a given area.
Public hearing means an official session of the planning commission or the county, advertised according to law and called for purposes specified in the public notice.
Reclamation plan means a written proposal for reclamation of mined or disturbed areas including land uses, maps, and documents as required to describe reclamation, and where relevant, grading specifications and manner and type of revegetation.
Redevelopment means a development on a previously developed site; but excludes ordinary maintenance activities, remodeling of existing building interiors, resurfacing of paved areas, and exterior building changes or improvements which do not materially increase or concentrate storm water runoff, or cause additional nonpoint source pollution.
Reserve strip means a strip or parcel of land along, around, or between properties for the purpose of restricting access.
Responsible party means in the context of enforcement procedures, a person (as defined above) who is alleged to have committed, caused, continued or created a violation of the terms, requirements, regulations, or provisions of these regulations whether as a direct act, through lack of action or neglect, or at the direction of or on behalf of others. A responsible party may be the owner of a premises where a violation has occurred; an occupant whether through ownership, lease or other tenancy; a contractor, builder or developer; an agent of or person otherwise acting on behalf of the aforementioned parties; or other person acting in violation of these regulations.
Retaining wall means a wall, terraced combination of walls, or similar structure located at a grade change to hold the soil on the up-hillside from slumping, sliding, or falling. Retaining walls are not integral to the structure and do not provide direct physical contact for the support of a building or structure.
Review agency means any so designated entity other than the planning commission or the county commission, which may review appropriate parts of plat submissions by reason of technical capability, authority, or interest.
Right-of-way means a fee simple strip of land designated, reserved, dedicated, or purchased for the purpose of pedestrian access, vehicular access, or utility line installation.
Road: See "street/road."
Scenic corridor means any corridor paralleling both sides of a public road that has been formally identified by resolution of the Jasper County Board of Commissioners as a scenic corridor worthy of special protection through an overlay district or other special provisions governing land uses and development and their aesthetic effects on road travelers.
Scenic views and sites means those geographic areas containing visually significant or unique natural features, as identified in the Jasper County Comprehensive Plan, or by an applicant of a conservation subdivision if such information is accepted by the planning commission in the sketch plat review process.
Semi-cutoff fixture means an outdoor light fixture shielded or constructed in such a manner that it emits up to, but no more than, five percent light spillage above the horizontal plane of the fixture.
Setback means a minimum distance from the front property line, side property line, or rear property line, for any construction except septic systems, storm drainage structures, private drives, sidewalks, on grade-patios without foundations, fences, retaining walls, and cantilevered roof overhangs. No parking for non-residential uses shall be allowed within front setbacks. Measurement shall be perpendicular to the property line or centerline of the prescriptive easement.
Site means any plot or parcel of land, or a combination of contiguous lots or parcels of land, where grading, building, construction, or alteration is performed or permitted.
Site plan means a drawing showing the following information: Proposed layout of streets and lots; lot or tract dimensions with required setbacks shown; buffers and natural areas proposed; buffer fences where appropriate; areas reserved for future construction; proposed structures with dimensions and square footages (except for single-family subdivisions);
proposed uses for each structure (i.e. retail sales, offices, single-family residence, etc.);
current zoning district of the subject property and abutting property, and the proposed zoning district, as applicable; location and use of all structures on abutting property;
right-of-way locations and dimensions and names of all roads and streets bounding the property in question; driveways and parking areas with number of parking spaces, where appropriate; loading and unloading facilities, where appropriate; storm drainage and structures, where appropriate; water, gas and electric utility lines preliminary locations plus points of utility access; and wastewater facilities including preliminary areas reserved for drain fields and septic tanks or point of access.
Sketch plat means a draft drawing of a proposed subdivision meeting requirements of this chapter and showing the proposed layout in sufficient detail, although not completely computed, to indicate the developer's intent.
Slope means a degree of deviation of a surface from the horizontal, usually expressed in percent or degree; the ratio of the difference in elevation between two points on the ground, and the horizontal distance between these two points. For purposes of determining steep slopes eligible for current use assessment under Georgia state law, slope shall be measured between two points on the ground separated by 500 feet or more.
State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural and artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership or corporation.
Street/road.
(1) County street/road means a road, paved or unpaved, which is maintained by the county.
(2) Local street/road means a street used primarily for access to the abutting properties and serves travel demands in the immediate area, and designated as such on the county street classification system map.
(3) Collector street/road means a street which usually serves to either provide direct access to lots or distribute traffic from individual lots to major streets. It may also connect neighborhoods with one another. It should be designed to discourage excessive speeds and through traffic. It is designated as such on the county street classification system map.
(4) Arterial street/road means a primary road connecting distant cities, towns, or regions exhibiting higher speeds, greater volumes, and fewer direct access points than collector streets.
(5) Dead-end street (cul-de-sac) means a local street designed to have one end permanently closed.
Subdivision.
(l) The term "subdivision" means the division of a parcel of land that is a lot of record at the time of enactment of the ordinance from which this chapter is derived into three or more lots, building sites, or other divisions, for the purpose, whether immediate or future, of sale, legacy, or building development. This definition includes all of the following:
a. All divisions of land involving a new street.
b. All divisions of land involving a substantial change in existing streets.
(2) The term "subdivision" does not include the following:
a. The combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards set forth in this chapter.
b. The transfer of unsubdivided land or the transfer of a lot or parcel of land established by deed or plat recorded in the office of the clerk of the superior court of the county prior to the initial effective date of the ordinance from which this chapter is derived.
c. The division of land among heirs by judicial decree.
d. The division of land into parcels of five or more acres where no new road is involved.
(3) All residential subdivisions in zoning district RES may comply with the provisions indicated in this chapter, article VI, conservation subdivisions.
Visual quality means the appropriate design, arrangement, and location of any structure in relation to the built or natural environment to avoid abrupt or severe differences.
Yard means an area of a lot between the principal structure and adjoining lot lines, unoccupied and unobstructed by any portion of a non-exempted structure from the ground upward.
Yard, required means the minimum landscaped area with a slope no greater than 5 to one for the purpose of a front, side and rear yard
(Ord. of 8-8-2005(2), § 202; Ord. of 3-2-2020, § 1; Ord. of 12-6-2021, § 7; Ord. of 11-7-2022, § I;
Ord. of 1-9-2023, § I; Ord. of 3-6-2023, § I; Ord. of 9-11-2023, § I; Ord. of 05-06-2024(1); Ord.
of 5-5-2025(2)) Secs. 105-29—105-59. Reserved.
ARTICLE III. RESERVED*
Secs. 105-60—105-82. Reserved.
ARTICLE IV. GENERAL PROCEDURES
Sec. 105-83. Initial information.
(a) This article outlines the procedures to be followed in order to comply with the requirements of this chapter. The developer, who initially may not be familiar with this chapter, first visits the office of the director of planning to get information concerning ordinances affecting his proposed development.
(b) The director of planning will show the developer a copy of this chapter. The developer may either review the document in the office or he may purchase a copy for his own use.
(Ord. of 8-8-2005(2), § 401) Sec. 105-84. Compliance with chapter required.
(a) Approval of subdivision plats. Any person proposing to subdivide land within the county must submit to the county plans and plats of the proposed subdivision which conform to all regulations set forth in this chapter. Application for approval of the documents must be made to the director of planning under procedures contained in this article.
(b) Platting authority. The Jasper County Board of Commissioners are the official platting authority of the county. No subdivision plat may be recorded in the office of the clerk of the superior court of the county unless the director of planning has verified its compliance with a preliminary plat that has first been approved by the Jasper County Board of Commissioners. The filing or recording of a subdivision plat without the approval of the director of planning as required by this chapter is a violation of this chapter and is punishable as provided by this article.
(c) Physical development. No developer or person may proceed with any construction work on a proposed subdivision before a preliminary plat and construction plan have been approved and a land disturbance permit has been obtained.
(d) Use of final plat. The transfer of, sale, agreement to sell, or negotiation to sell land by reference to, exhibition of, or other use of a final subdivision plat that has not been given approval by the director of planning and recorded in the office of the clerk of the superior court of the county is prohibited. The description in the instrument of transfer or other documents does not exempt the transaction from this prohibition.
(e) Acceptance and maintenance of roads. Land designated, reserved, proposed, or dedicated as a public road by a developer on a subdivision plat will be accepted and perpetually maintained by the county if any of the following conditions exist:
(1) The proposed street has been constructed according to a set of construction plans, preliminary plat, and final plat that have been properly approved according to this chapter and the intent of such dedication has been indicated on the final plat and the required maintenance bonds have been received as specified herein.
(2) The street has been accepted as a public road or otherwise received the legal status of a public road by the county prior to the adoption of the ordinance from which this chapter is derived.
(f) Erection of structures. No building permit will be issued, no building may be erected, and no factory-manufactured building may be installed on any lot in any subdivision unless the road giving access to the lot and all utilities serving the lot have been approved as meeting the standards required by this chapter, or unless such a street has attained the status of a public road prior to the effective date of the ordinance from which this chapter is derived.
(Ord. of 8-8-2005(2), § 402; Ord. of 12-6-2021, § 2) Sec. 105-85. General overview of subdivision plat review and approval procedures.
(a) Five stages of subdivision review and approval. The procedure for the review and approval of a subdivision consists of five required stages. These are as follows:
(1) Pre-application review.
(2) Preliminary plat.
(3) Construction plans.
(4) Final plat.
(5) Recording of final plat.
(b) Summarization of stages. These five steps are summarized in subsections (b)(2) through (6) of this section. Details of each step are provided in sections 105-86 through 105-93.
(1) Pre-application review stage. Whenever the subdivision of a tract of land is proposed, the developer is to consult early and informally with the director of planning. The developer will submit sketch drawings and basic data reflecting existing conditions at the site and in its vicinity and the proposed development layout of the subdivision.
The purpose of the pre-application review stage is to facilitate the subsequent preparation of plans and plats by discussing matters relating to the proposed subdivision, the county zoning ordinance set forth in chapter 119, and this chapter.
(2) Preliminary plat stage.
a. The developer must submit to the planning commission for recommendation and to the Jasper County Board of Commissioners for approval a preliminary plat of the proposed subdivision prepared in accordance with the provisions of this chapter. If the proposed subdivision abuts a state highway, a letter of tentative approval by the state department of transportation must accompany the preliminary plat submission.
b. If any lots are smaller than three acres and on-site sewage disposal systems are proposed for those lots, the county health department must have reviewed the project prior to planning commission review and signed the preliminary plat indicating which lots are acceptable for conventional or alternative sewage disposal systems. The developer must also furnish a copy of the preliminary plat to the utility company that serves water to the immediate area if applicable.
c. Approval of the preliminary plat by the Jasper County Board of Commissioners will be indicated on the face of the preliminary plat following a vote of approval at the meeting by the signature of the chairperson of the board of commissioners.
(3) Construction plan stage. Prior to the issuance of a land disturbance permit, the developer must submit to the director of planning a set of construction plans of the proposed subdivision prepared in accordance with the provisions of this chapter. The design presented in the construction plans must conform to the preliminary plat.
The construction plans shall include street profiles, topography, utility plans, drainage plans, sediment and erosion control plans, construction details, and other information as may be required by the director of planning. The construction plan stage requires the approval of the director of planning and any other review entities specified by the county commission. It is the responsibility of the director of planning to ensure that the plans are reviewed and approved by the appropriate entities for compliance with technical requirements of this chapter prior to issuance of the land disturbance permit.
(4) Final plat stage. After completion of the physical development of all or a phase of the area shown on the preliminary plat as approved by the Jasper County Board of Commissioners, and before selling any lots, a final plat together with the required certificates must be submitted to the director of planning for approval.
(5) Recording and dedication. After the final plat is signed by the chairman of the board of commissioners, it is to be recorded in the office of the clerk of the superior court of the county. After recording, the appropriate deeds and documents must be presented to the county commission for dedication and acceptance if applicable.
(Ord. of 8-8-2005(2), § 403; Ord. of 12-6-2021, § 2; Ord. of 11-7-2022, § IX) Sec. 105-86. Pre-application review stage.
Before the submission of any plats to the director of planning, the developer must submit a sketch plat showing the proposed development layout of the subdivision. The developer and director of planning should informally discuss what this chapter requires and what the developer proposes to do. This will assist the developer in preparing a preliminary plat and construction plans that meet from the very beginning the intent and standards specified by this chapter so as to reduce undue time and expense in preparing plans that cannot be approved by the Jasper County Board of Commissioners.
(Ord. of 8-8-2005(2), § 404(intro. ¶); Ord. of 12-6-2021, § 2) Sec. 105-87. Submission and approval of preliminary plat.
(a) Preliminary plat submission. After completing the pre-application review stage, and at least 60 days before the regularly scheduled monthly meeting of the planning commission at which the developer desires planning commission recommendation, the developer must submit the following:
(1) A letter requesting review and approval of a preliminary plat and giving the name and address of a person to whom the notice of hearing and action on the preliminary plat is to be sent.
(2) Seven copies of the preliminary plat and one digital copy.
(3) If the proposed subdivision abuts a state highway, a letter of tentative approval of the proposed subdivision by the state department of transportation.
(b) Additional information. The director of planning may ask for any additional information he feels is necessary for the planning commission and the Jasper County Board of Commissioners to properly evaluate the preliminary plat.
(c) Official date of submission. The official date of submission of the preliminary plat will be the date of the next regularly scheduled monthly meeting of the planning commission that is more than 60 days following proper preliminary plat submittal to the director of planning.
(d) Preliminary plat review. The planning commission will review the preliminary plat for conformance to this chapter including compliance to section 105-4, Purposes, the county zoning ordinance set forth in chapter 119, and other relevant regulations and will consider the comments or suggestions of other appropriate review agencies, persons, or entities in regard to the plat. The planning commission or director of planning will indicate on the preliminary plat, or by a written memorandum attached to the preliminary plat, any comments or suggested changes that are necessary to meet the intent of this chapter or to serve the best interests of the county.
(e) Public hearing. Before acting on the preliminary plat, the planning commission will hear public input on the preliminary plat. Notice of the hearing must be published in a newspaper of general circulation in the county at least 15 days before the hearing stating the date both the planning commission meeting and the Jasper County Board of Commissioners hearing dates.
(f) Action of the planning commission. No more than 60 days after the official date of submission of the preliminary plat, the planning commission will either recommend approval of the plat, conditionally recommend conditional approval of the plat (noting the conditions of approval on the plat), recommend disapproval of the plat, or table the plat for further consideration. Action may be taken on the entire preliminary plat or any portion of it.
(g) Failure of Jasper County Board of Commissioners to act. If the Jasper County Board of Commissioners fails to act within 90 days of the official date of submission of the preliminary plat, the preliminary plat will be deemed automatically approved by the Jasper County Board of Commissioners.
(h) Approval of preliminary plat. Approval of a preliminary plat is effective and binding upon the Jasper County Board of Commissioners for a period of no more than two years.
Before the two-year period expires, the developer may submit to the Jasper County Board of Commissioners a request in writing for an extension of time. If the Jasper County Board of Commissioners grants such an extension, final subdivision construction drawings must be submitted, approved, and work must begin within the limits of the extension. If no extension is sought prior to two-year time period, the preliminary plat is deemed void and the developer must start the process over.
(Ord. of 8-8-2005(2), § 404A; Ord. of 12-6-2021, § 2; Ord. of 11-7-2022, § IX) Sec. 105-88. Specifications for preliminary plat.
The preliminary plat must meet the minimum standards of design set forth in this chapter and must include the following:
(1) Generally.
a. Title block including the proposed name of subdivision and name of former subdivision, if any or all of the proposed subdivision has been previously subdivided.
b. Plat key including:
1. Name and address of person in charge of plat preparation.
2. Date of plat preparation with space for revision dates.
3. Graphic scale of one inch equals 200 feet or smaller.
4. North point, identified as magnetic, true, or grid north.
5. Area of proposed subdivision in acres.
6. Appropriate legend of symbols used on plat.
c. Location sketch map locating the subdivision in relation to the immediately surrounding area and showing generally:
1. Well-known landmarks such as railroads, highways, bridges, creeks, etc.
2. Zoning district classification of land to be subdivided and adjoining properties.
3. Government jurisdictional boundaries and land lot lines, if applicable.
d. Entire tract. The developer shall submit a preliminary plat of his entire tract, even though his present plans may call for the actual development of only a small portion of the property. Regardless of the area covered by the preliminary plat, any unit divisions or phasings of unit divisions intended in the future must be generally represented on the preliminary plat.
e. Resubdivision. In the case of resubdivision, a copy of the existing plat with the proposed resubdivision superimposed on it must be provided.
f. Elevations. All elevations must refer to mean sea level datum.
g. Sheet size must be no larger than 36 inches wide and 24 inches long. A margin one inch wide must be on the left side for binding purposes, and margins of one-half inch must be on the other three sides. If the complete plat cannot be shown on one sheet of this size, it may be shown on more than one sheet with an index map on a separate sheet of the same size.
(2) Existing features of site to be shown on plat.
a. Bearings (to nearest degree, minute, and second) and dimensions (to nearest 1/100 of a foot) of all existing exterior property boundary lines of the parcel to be developed as determined by a field-run boundary survey.
b. A level three soils map and soil descriptions in areas where lots smaller than three acres will be proposed with on-site sewage disposal.
c. A field-run topographic survey or aerial mapping using standard photogrammetric methods is required for all major subdivisions. In areas where lots of less than three acres are proposed, a contour interval of two feet is required. If all lots will be larger than three acres, the topography requirements of section 105-90(2)a will apply.
d. Location and size of existing cultural features on or adjacent to the proposed subdivision including:
1. Right-of-way, pavement widths, and names of existing and platted streets.
2. Railroads and railroad rights-of-way.
3. Bridges, buildings, and other structures.
4. All surface utility lines within easements or rights-of-way on or adjoining the tract (showing the location of towers or poles).
5. Existing wells, sewers, water mains, drains, culverts, and other underground facilities or utilities within easements or rights-of-way on or adjoining the tract (grades and invert elevations of manholes must also be shown).
6. All other easements and rights-of-way.
7. Cemeteries.
(3) Proposed conditions and facilities.
a. Layout of all streets and other accessways with right-of-way and pavement widths, as well as proposed street names.
b. Layout of all lots, including all building setback lines; approximate dimensions of interior proposed property lines; utility easements with width and use; block numbers; and lot numbers.
c. A description of proposed sewage disposal systems (individual, community, or public), with approval by the county health department or other applicable agency shown by type of system proposed.
d. A description of the proposed water supply system (individual, non-public, or public). Where an EPD-approved public water supply will not be utilized, lots shall be sized to accommodate individual wells.
e. A general indication of proposed drainage provisions.
f. Designation of lands to be reserved or dedicated to public use.
g. All land uses, including areas to be occupied by uses other than single-family dwellings, including the following non-single-family residential uses:
1. Multifamily residential.
2. Commercial.
3. Industrial.
4. Recreation, open space, conservation, and areas for other such uses.
h. All roads, utilities and other infrastructure will be shown as required in article VIII of this chapter.
(4) Certificates of approval. The following certificates shall be inscribed on the preliminary plat:
a. Certificate of approval of the preliminary plat by the Jasper County Board of Commissioners.
b. Signed seal of a state-registered land surveyor, certified landscape architect or state professional engineer.
c. Certificate of approval of the preliminary plat by the county health department.
d. Owner's certificate stating property ownership, consenting to development, and that all appropriate taxes have been paid.
(Ord. of 8-8-2005(2), § 405; Ord. of 12-6-2021, § 2) Sec. 105-89. Submission and approval of construction plans.
(a) Construction plan submission. After the preliminary plat of the proposed subdivision has been given approval by the Jasper County Board of Commissioners, the developer may submit construction plans to the director of planning.
(b) Format. Six copies of the construction plans must be submitted to the director of planning. The scale on the construction plans must be at least 100 feet to the inch.
(c) Approval of construction plans. Approval of the construction plans and issuance of a land disturbance permit constitutes authorization to proceed with the installation of planned improvements.
(d) Materials testing fee. The developer is responsible for the cost of construction materials testing and inspection as approved by the county. Testing will be accomplished by a registered testing firm approved by the director of planning. All required testing will be paid for by the developer. Test results will be submitted to the county and maintained by the county.
(e) Inspection reports. A copy of the NPDES inspection reports will be furnished by the developer to the director of planning at the time they are submitted to EPD. All inspection reports submitted by the developer will be maintained by the county.
(Ord. of 8-8-2005(2), § 406; Ord. of 12-6-2021, § 2) Sec. 105-90. Specifications for construction plans.
The construction plans must include the following:
(1) A copy of the preliminary plat or equivalent information including proposed centerline and horizontal curve data, and all proposed easements.
(2) Grading and drainage information to include at a minimum:
a. Existing and proposed contour lines at a contour interval no greater than two feet in all areas of proposed land disturbance. A minimum 200-foot-wide field-run strip topo is required for all proposed roads. In areas where lots will exceed three acres and no disturbance is proposed LIDAR topo is acceptable.
b. Locations and types of all proposed stormwater drainage structures to include inlets, junction boxes, flumes, headwalls and outlet structures. (State DOT specification concrete inlets and headwalls are required.)
c. A pipe chart indicating the diameter, length, slope, design flow, maximum flow capacity, and maximum flow velocity for each pipe proposed. (Asphalt-coated, corrugated metal pipe or approved equivalent or reinforced concrete pipe is required.)
d. Profiles of all proposed storm pipe runs.
e. Grassed swales along property lines to facilitate drainage where appropriate. A 20-foot easement must be provided for these features.
f. All stormwater structures and facilities shall be designed to accommodate the 100-year storm event.
g. One or more permanent stormwater detention basins shall be required if determined appropriate to mitigate negative impacts of increased off-site flow.
(3) Erosion and sediment control plan with appropriate detail sheets if necessary. The county has adopted the Manual for Erosion and Sediment Control in Georgia. Any specifications and details required by this chapter shall be adhered to and exhibited on plans submitted by the developer.
(4) Proposed road cross-section to comply with county minimum standards. Curb and gutter shall be constructed in any development where the majority of lots (excluding cul-de-sac lots) have less than 125 feet of road frontage or where specifically required by the zoning district.
(5) Road centerline profiles showing existing and proposed grade.
(6) Utility plans to include proposed water and sewer line locations if applicable.
Locations of proposed water meters and sewer laterals shall be indicated. Profiles for all proposed sewer lines are required. Locations of all hydrants, valves, tees, plugs, and bends shall be identified.
(7) Locations and details of proposed road striping and signage.
(8) Landscaping plans as required.
(9) Hydrology report to include narrative summarizing site conditions, assumptions made, and all hydrograph and flow calculations required to properly design the site drainage features including detention basin routing data for two-year and 100-year storm events.
(10) Construction details shown in construction plans shall conform to county-approved construction plan details as amended. County-approved construction plan details may be amended by the director of planning in conjunction with the public works director and other appropriate reviewers. In the event that information shown in an approved construction detail conflicts with information in the text of this chapter, the chapter shall govern.
(11) Certifications. The following certifications must be in a form and substance approved by the planning commission and inscribed directly on the construction plans:
a. Construction plans for residential subdivisions must bear the signed seal of a state registered professional engineer or state registered surveyor. Construction plans for commercial subdivisions must bear the signed seal of a professional engineer.
b. Statement of approval of the water system in the proposed subdivision obtained from the Jasper County Water Authority, the City of Monticello, the City of Shady Dale, Turtle Cove, or Alcovy Shores Water Authority, as applicable, for extensions of those systems or the environmental protection division of the state department of natural resources.
c. The erosion control plan must include the required National Pollutant Discharge Elimination System certification statement signed by a professional engineer, surveyor, or landscape architect.
(Ord. of 8-8-2005(2), § 407; Ord. of 11-7-2022, § IX) Sec. 105-91. Submission and approval of final plat.
(a) Final plat submission. After the preliminary plat of the proposed subdivision has been given approval by the Jasper County Board of Commissioners, the construction plans have been approved by the director of planning and the appropriate reviewers, and required improvements have been completed and approved by the road building inspector, the developer may, within two years from the date of the preliminary plat approval, apply for final plat approval. The developer must submit to the director of planning the following:
(1) A letter requesting review and approval of a final plat and giving the name and address of the person to be notified of the action on the final plat.
(2) Seven copies of the final plat and other documents as may be specified. The scale of the plat must be at least 200 feet to the inch. If more than one sheet (maximum size 17 inches by 22 inches) is required, a cover sheet index shall be included.
(b) Official date of submission. The official date of submission of the final plat will be the date that all required documents have been received by the director of planning.
(c) Final plat review. The director of planning will review the final plat for conformance with the approved preliminary plat and construction plans and with this chapter and other relevant regulations.
(d) Action of the director of planning. No more than 60 days after the official date of submission of the final plat, the Jasper County Board of Commissioners will either certify the final plat for recording, conditionally approve the plat (noting the conditions of approval on the plat), or disapprove the plat. If the final plat is conditionally approved, once the developer has complied with the conditions indicated, the Jasper County Board of Commissioners will certify the plat, or disapprove the plat. If the final plat is disapproved, the planning commission will cause the developer to be notified in writing, stating the reasons for the disapproval. One copy and the original of the plat will be returned to the developer, and one copy will be made part of the records of the planning office. Action may be taken on the entire final plat or any portion of it.
(e) Failure of director of planning to act. If the Jasper County Board of Commissioners fails to act within 60 days of the official date of submission of the final plat, the final plat will be deemed automatically approved by the Jasper County Board of Commissioners.
(f) Approval of final plat. Following recommendation for approval of the final plat by the planning commission, the final plat shall be submitted to the Jasper County Board of Commissioners for review at its next available meeting. Using the same review standards as the planning commission, Jasper County Board of Commissioners shall review the plat for sufficiency and may also inquire from various county departments as to whether all improvements shown on the final plat have been satisfactorily completed and installed as required. Failure of the owner to satisfactorily complete such improvements as are shown on the plat shall result in disapproval of the plat. The board of commissioners may approve, disapprove or defer action on the plat if required improvements have not been satisfactorily completed. Once the final plat has been approved by the Jasper County Board of Commissioners, the owner may record the plat which shall constitute acceptance by the county of all roads and other public improvements shown on the final plat. Only after such approval and recordation of the final plat may building permits be issued on the properties described by the plat.
(Ord. of 8-8-2005(2), § 408; Ord. of 12-6-2021, § 2; Ord. of 11-7-2022, § IX) Sec. 105-92. Specifications for final plat.
The final plat must meet the minimum standards of design set forth in this chapter and must include the following:
(1) Generally.
a. Title block including:
1. Name and address of owner of record.
2. Proposed name of subdivision and name of former subdivision, if any or all of the proposed subdivision has been previously subdivided.
3. Land lot, land district, and state militia district.
b. Plat key including:
1. Name and address of person in charge of plat preparation.
2. Date of plat preparation with space for revision dates.
3. Graphic scale of one inch equals 100 feet or larger.
4. North point, identified as magnetic, true, or grid north.
5. Area of proposed subdivision in acres.
6. Appropriate legend of symbols used on plat.
7. Zoning of adjoining properties.
c. Location sketch map locating the subdivision in relation to the immediately surrounding area and showing generally:
1. Well-known landmarks such as railroads, highways, bridges, creeks, etc.
2. Government jurisdictional boundaries and land lot lines, if applicable.
d. Sheet size must be no larger than 17 inches wide and 22 inches long and margins of one-half inch must be on all sides. If the complete plat cannot be shown on one sheet of this size, it may be shown on more than one sheet with an index map on a separate sheet of the same size.
(2) Features of site to be shown on plat.
a. Exact boundary lines of the tract, to be indicated by a heavy line, giving distances to the nearest 1/100 foot and bearings to the nearest second, which must be balanced and closed with an error of closure not to exceed one to 10,000.
The error of closure must be stated.
b. Location of natural features, including streams and watercourses with direction of flow and appropriate buffers, water bodies, swamps, and floodplains.
c. Location of adjoining property lines and names of owners of record and/or the location of adjoining subdivision lines and names.
d. All existing buildings and structures within the proposed subdivision.
e. Exact locations, widths, and names of all streets and public accessways within and immediately adjoining the platted property. All horizontal curves shall depict chord bearing and length, curve radius, and curve length.
f. Lot lines with dimensions to the nearest 1/100 foot area, necessary internal bearings, arcs, chords, tangents, and radii.
g. Labeled building setback lines.
h. Lots or sites numbered in numerical order and blocks lettered alphabetically if appropriate.
i. Locations of all drainage structures and of any easements (including slope easements if required) and public service utility right-of-way lines; any areas to be reserved, donated, or dedicated to public use; any sites for other than single-family residential use, with designations stating purpose or proposed use, area, any use limitations; any areas to be reserved by deed covenants for common use of all property owners.
j. Location of cemeteries within the developed area.
k. A reference to any private covenants to be recorded with the plat.
l. Existing wells.
(3) Certifications.
a. The following certifications must be in a form and substance approved by the Jasper County Board of Commissioners and inscribed directly on the final plat:
1. The certification of a state-registered land surveyor, certified landscape architect or the state professional engineer.
2. An owner's certification.
3. A certificate of approval for recording by the Jasper County Board of Commissioners.
4. A certificate of approval by the county health department, if applicable.
b. The following certificates or statements must be attached to the final plat when applicable:
1. Certificate or statement of guaranty to dedicate.
2. Certificate or statement of approval of streets by the director of planning, whether or not the streets are to be dedicated to the public.
(Ord. of 8-8-2005(2), § 409; Ord. of 12-6-2021, § 2) Sec. 105-93. Recording and dedication.
(a) Recording of final plat. Upon approval of a final plat, the developer must have the final plat recorded in the office of the clerk of the superior court of the county. The developer will be responsible for the payment of the recording fee at the time of recording of the final plat.
(b) Dedication of platted streets, other public spaces, and utilities. At the time of final plat approval by the Jasper County Board of Commissioners, the developer must prepare appropriate documents and plans as constructed, if required, and request that the county board of commissioners accept dedicated streets, other public spaces, and utilities as presented on the final plat.
(Ord. of 8-8-2005(2), § 410; Ord. of 12-6-2021, § 2) Sec. 105-94. Appeals and variances.
The minimum design standards and minimum improvements as described in article V of this chapter are hereby declared to be mandatory and non-appealable. These provisions shall not be waived by any commission, agent, or employee of the county. Only the board of county commissioners can modify the minimum design standards and minimum improvements by modification of this chapter.
(Ord. of 8-8-2005(2), § 411) Sec. 105-95. Chapter amendments.
(a) If a developer or landowner finds that a proposed subdivision of land does not meet the requirements of this chapter, he may request that this chapter be amended. The developer or owner wishing to request an amendment must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing under the owner's signature. The planning commission or the county commission may also propose an amendment. However, the power to approve and enact an amendment rests with the county commission.
(b) Application for an amendment may be made with the director of planning. The director of planning will take the required information and transmit it to the planning commission for its consideration. No application is to be accepted from any person in violation of this chapter. If an applicant for an amendment or any other action by the planning commission or county commission is, at the time of such an application, determined by the director of planning to be in violation of this chapter, then the director of planning will be prohibited from accepting or processing any application from that applicant until the applicant does one of the following:
(1) He must voluntarily remove or change the cause of the violation and cease to be in violation. The applicant must notify the director of planning that he has ceased the violation and obtain a release from the director of planning as to the violation.
(2) He must be tried before a court of competent jurisdiction and acquitted of charges and present a certified copy of the court order to the director of planning within 30 days of the final order of the court.
(c) All applications for amendment must first be reviewed by the planning commission.
The planning commission will study the proposed amendment and determine if it furthers the goals and intent of this chapter, as well as other applicable ordinances of the county.
Prior to the review, the director of planning may review the proposed amendment and make written recommendations to the planning commission.
(d) The planning commission must then conduct a public hearing on the amendment.
Notice of the hearing must be published in a newspaper of general circulation in the county at least 15 days but not more than 45 days before the hearing. The time, place and purpose of the hearing, the location of the property, name of subdivision and the present zoning classification must be indicated in the newspaper notice.
(e) The following policies and procedures will be observed in conducting the required public hearing:
(1) The hearing will be held in the planning commission meeting room or county courthouse.
(2) Written comments on the subject of the hearing may be submitted by any citizen or property owner at any time prior to the adjournment of the hearing.
(3) Persons desiring to be heard orally may present their views at the hearing. The length of time of oral presentations permitted to each speaker will be governed by the planning commission chairperson, depending upon the number of persons present and desiring to speak, provided that the minimum time allotted proponents and opponents shall be no less than ten minutes per side. Remarks of a personal nature will not be tolerated during the hearing.
(4) Any person desiring a transcript of the hearing must arrange for a court reporter at their expense.
(5) Cross examination of persons making oral presentations by non-commission members will not be permitted.
(6) All questions will be addressed to the chairperson of the planning commission or the planning commission member then presiding.
(f) The planning commission will, when considering a proposed amendment to this chapter, determine whether the amendment is substantially related to promote the public health, safety, or general welfare. In considering the proposed amendment, the planning commission will balance the benefit to the public of the regulations against the limitations it may impose upon property owners, and scrutinize the application in light of the character of the land to which it may apply.
(g) The planning commission will make a written record of the comments received at the public hearing. After the public hearing, and at an official meeting of the planning commission, the planning commission will formulate its recommendations to the county commission, recording them in the minutes for that meeting. The planning commission must send the written record of comments received at the public hearing along with its recommendations on the proposed amendment in writing to the county commission within 30 days of the close of the public hearing. If the planning commission fails to send its recommendations to the county commission within 60 days of the close of the public hearing, it will mean that the planning commission approves.
(h) After reviewing the record of the public hearing and considering recommendations from the planning commission, the county commission will then make an official decision on the proposed amendment. The decision need not concur with the recommendation of the planning commission.
(i) If the county commission denies a proposed amendment, a minimum period of 12 months must pass before the same amendment proposal is again submitted for consideration.
(Ord. of 8-8-2005(2), § 412) Sec. 105-96. Appealing an action of the county commission.
If the county commission executes an action that the developer or other aggrieved party believes to be contrary to law, that action may be appealed to the superior court of the county.
Findings of fact, however, may not be appealed. Such an appeal must be filed within 30 days of the date on which the action of the county commission was taken.
(Ord. of 8-8-2005(2), § 413) Sec. 105-97. Penalties.
(a) Any person who violates any of the provisions of this chapter must face penalties. If a developer or landowner exhausts the decision and appeals procedures contained herein and is still dissatisfied with the decision, he must then comply with the final decision or face penalties. Anyone who violates any of the provisions of this chapter, upon conviction, will be fined no more than $1,000.00 for each offense. In addition, he must pay all costs and expenses involved in the case. Each week such a violation continues constitutes a separate offense.
(b) The owner or tenant of any building, structure, premises, or part thereof, and any architect, builder, contractor, agent, or other person who commits, participates in, assists in, or maintains such a violation may each be found guilty of a separate offense and suffer the penalties provided here.
(Ord. of 8-8-2005(2), § 414) Sec. 105-98. Remedies.
If any building or land is used or maintained in violation of this chapter, anyone, including the county, who would be harmed by such a violation may initiate legal proceedings to obtain an injunction or other appropriate remedy to stop the violation or to prevent any act that would constitute such a violation. Other legal remedies are also available as provided by state law.
(Ord. of 8-8-2005(2), § 415) Secs. 105-99—105-124. Reserved.
ARTICLE V. GENERAL REQUIREMENTS
Sec. 105-125. Development standards in general.
(a) Suitability of land. Land on which there is a danger to health, safety, or property must not be platted for residential use or other use that will continue or increase such danger, unless such hazards can be and are corrected. Examples of such conditions are as follows:
(1) Land subject to flooding or improper drainage.
(2) Land with excessive slope or other physical constraints that make it unsuitable for development.
(b) Name of subdivision. The name of the subdivision must have the approval of the planning commission. The name must not duplicate or closely approximate the name of an existing subdivision.
(c) Access. Access to every subdivision must be provided over a paved public road, and every lot within a subdivision must be served by a publicly dedicated street or a private street meeting the standards of a public street and approved by the planning commission.
(d) Density development. The planning commission will consider proposals from developers concerning conservation subdivision (the reduction of minimum lot sizes in exchange for the setting-aside of public space or undisturbed space) or other smart-growth proposals.
Regulations for conservation subdivisions are set forth in article VI of this chapter.
(e) Community assets. In all subdivisions, reasonable best efforts shall be utilized by the developer to maintain and preserve all natural features such as large trees, watercourses, historical sites, and similar community assets which add attractiveness and aesthetic value to the property if preserved. In addition the developer shall comply with all county ordinances and state and federal laws which govern the development and construction activities undertaken by the developer regarding the subdivision.
(f) Vegetative buffer. A vegetative buffer with a minimum width of 50 feet shall be maintained on the public road access street of the subdivision in order to preserve a rural appearance. This buffer shall consist of a combination of trees, shrubs, and grass. This buffer shall not be occupied with structures.
(Ord. of 8-8-2005(2), § 501) Sec. 105-126. General standards for streets.
All streets established in the county after the effective date of the ordinance from which this chapter is derived must comply with the following development standards. Specific, technical requirements are found in section 105-221.
(1) Continuation of existing streets. Wherever slope will permit, the arrangement of streets in a subdivision must provide for the alignment and continuation or projection of existing streets into adjoining areas.
(2) Street names. Streets or roads that are extensions of or obviously in alignment with existing streets should have the same name as the existing street. The names of new streets and roads are subject to the approval of the planning commission and must not duplicate or be similar in sound to existing names—even if the suffix (street, avenue, drive, etc.) is different.
(3) Development along arterial and major collector streets. Where a subdivision abuts or contains an arterial street or major collector street (where street classification exists) the planning commission may require a driveway or road approximately parallel to and on either side of the right-of-way of the arterial street to provide access to lots along the arterial street while avoiding direct driveway access on the arterial street.
Such a road shall be at least 20 feet from the major road or railroad. The planning and zoning commission may require a turn lane in the center of the arterial or major collector streets to facilitate traffic flow and ensure the safety of entering into the subdivision.
(4) Intersections. The centerlines of no more than two streets may intersect at any one point. Streets must be laid out so as to intersect as nearly as possible at right angles.
No street may intersect at any other street at an angle of less than 80 degrees. The angle of intersection is to be measured at the intersection of the street centerlines.
(5) Offset intersections (street jogs). Offset intersections with centerline offsets of less than 100 feet are not permitted.
(6) Cul-de-sac streets.
a. The maximum permitted length of a cul-de-sac street (street with no outlet) is 1,000 feet. Cul-de-sac street length is measured from the nearest intersection of street centerlines or the nearest paved, fire-marshal-approved emergency vehicle turnaround.
b. Cul-de-sac streets must be provided with a turnaround at the closed end having a right-of-way of at least 116 feet in diameter. The paved area of the turnaround shall be an uninterrupted area of pavement at a minimum diameter of 85 feet and a right-of-way of at least 116 feet in diameter. However, with the consent of the director of planning, the paved area of the turnaround may be a circular street with an outside diameter of at least 80 feet, a pavement width of at least 24 feet, and a right-of-way diameter of 100 feet, with an unpaved interior area to allow for the planting of trees and shrubs.
c. The developer is encouraged to provide bikeways and trails to connect the homes on the cul-de-sac to other parts of the neighborhood.
(7) Private streets. The planning commission may permit private streets in planned developments where controlled access or privacy is desired by the developer. Such streets must meet the development standards for public streets and shall be maintained by the developer or homeowners' association. Private street planned developments shall have temporary and permanent accommodation for ingress and egress of public safety, utilities, U.S. mail and garbage disposal during construction and post development.
(8) Half streets. Half streets are prohibited. Whenever a street is planned adjacent to the proposed subdivision tract boundary, the entire street right-of-way must be platted within the proposed subdivision.
(9) Split-level streets. Streets which are constructed so as to have two traffic ways (each at a different level within the same right-of-way) must provide any additional right-of-way required by this chapter when cut and fill techniques have been used in the construction of the street.
(10) Alleys. Alleys or service drives may be required at the rear of all lots used for multifamily, commercial, or industrial developments, but are not required for one- or two-family residential development unless the alley or service drive is to provide secondary access to a lot whose natural grade is more than six feet above the finished street grade, or unless the developer shows the need for an alley or service drive to the satisfaction of the planning commission.
(11) Marginal access streets. These are streets which are constructed so as to provide secondary access only. No more than six lots may abut any such street, and no such street may exceed 1,000 feet in length. Such streets may not be used as through streets and should be permitted only when lots abut an arterial or major collector street.
(12) Minimum required street right-of-way width. The right-of-way is the perpendicular distance across a street from property line to property line. Minimum required street right-of-way is as follows:
a. Arterial street: 80 feet.
b. Collector street: 80 feet.
c. Local street: 60 feet (50 feet is acceptable with curb and gutter).
d. Marginal access: 30 feet.
e. Alley/service: 24 feet.
f. Cul-de-sac: 116 feet diameter.
(13) Curb and gutter. Curb and gutter construction is required for developments where the majority of lots (excluding cul-de-sac lots) have less than 150 feet road frontage.
(14) Culvert installation. The developer is required to install a driveway culvert at the time of construction for each lot when constructing new roads without curb and gutter construction on streets where the majority of lots have less than 200 feet of road frontage. Culverts are only required on cul-de-sac lots if the requirement holds for remainder of the street.
(15) Striping. Streets shall be striped as required by the applicable ordinances and regulations of the county as well as the applicable provisions of state law and the applicable regulations of the Georgia Department of Transportation (GDOT). Local streets with speed limits of 30 miles per hour or less shall not require striping. All remaining streets shall be striped in accordance with GDOT standard specifications.
(16) Minimum required street pavement width. Pavement widths listed here do not include curb and gutter width, which is four feet minimum. Minimum required asphalt pavement width is as follows:
a. Arterial street: 24 feet.
b. Collector street: 22 feet.
c. Local street: 22 feet.
d. Marginal access: 12 feet.
e. Alley/service: 12 feet.
f. Cul-de-sac: 85 feet diameter.
(17) Additional right-of-way on existing streets. In subdivisions that abut existing streets, the developer must provide additional rights-of-way to meet stated minimum right-of-way requirements on the existing street as follows:
a. Where any part of the subdivision is on both sides of the street, the entire right-of-way must be provided.
b. When the subdivision is located on one side of an existing street, one-half of the required right-of-way measured from the centerline of the existing roadway must be provided.
(18) Grading and paving standards for roads. Grading associated with road construction must be performed as specified in article XIII of this chapter. All roads must be paved according to the specifications outlined in articles XIV and XV of this chapter.
(Ord. of 8-8-2005(2), § 502; Ord. of 12-6-2021, § 4) Sec. 105-127. Development standards for lots.
All lots established in the county after the effective date of the ordinance from which this chapter is derived must comply with the development standards contained in this section.
However, where provisions of chapter 119 apply and are stricter, those provisions take precedence. Development standards for lots are as follows:
(1) Lot lines. As far as practical, side lot lines must be roughly perpendicular or radial to street lines.
(2) Lot frontage arrangements. Land must be subdivided in a manner that provides each lot in the subdivision with direct abutting access to an existing public street or to an approved street contained within the proposed subdivision. Each non-cul-de-sac lot must meet the minimum buildable width by zoning district as outlined in chapter
119. (See flag lots in subsection (6) of this section.) Lots fronting on cul-de-sac must maintain at least 60 feet of frontage.
(3) Adequate building sites. Each lot must contain an adequate building site not subject to flooding and outside the limits of existing easements or building setback lines required by this chapter or any existing ordinance as is appropriate.
(4) Double frontage lots. Double frontage lots are prohibited unless required by the planning commission.
(5) Reverse frontage lots. Reverse frontage lots may be included in major subdivisions and private street subdivisions abutting a minor collector, major collector or arterial road provided the following standards are satisfied:
a. An easement of at least 25 feet in width, across which there shall be no right of access, shall be provided along the line of lots abutting any minor collector, major collector or arterial road or local street.
b. The backs of the adjacent houses must be screened from view as follows:
1. The easement may retain its natural, undisturbed vegetation if existing trees and understory shrubs will adequately screen the view of the backs of the adjacent houses.
2. Supplemental vegetation may be added within the easement to provide adequate screening.
3. The easement may be improved with a landscaped earthen berm of no less than four feet in height.
(6) Flag lots. A flag lot is a lot, the main portion of which is located away from the public street with a connecting strip of land at least 60 feet wide providing a minimum of 60 feet of frontage on the public street and which does not have a buildable site (exhibiting minimum lot width) within 300 feet of a public road. Flag lots are prohibited in subdivisions unless topographic conditions or the shape and orientation of the property to be subdivided make the inclusion of some flag lots necessary in the judgment of the planning commission. A flag lot is not intended to provide access to other properties so as to circumvent the street and right-of-way requirements of this chapter. A flag lot is intended only to provide a means of using a portion of a property for residential purpose that might not be accomplished through conventional street development and is limited to no more than two flag lots per division of the parent property unless approved by a variance to this Code.
(7) Lot remnants. Lot remnants are prohibited. Such remnant areas must be added to adjacent lots, rather than remain as unusable parcels. Cemeteries are excepted.
(8) Monuments. All lot corners must be marked with solid steel rods no less than one-half inch in diameter, and at least two and one-half feet long, driven into the ground such that no more than two inches protrudes from the ground surface.
(9) Cemeteries. The area within cemeteries shall not contribute to the minimum required lot area.
(10) Off-street parking. Each lot is required to provide a minimum of two spaces, and a maximum of four spaces for off-street parking of passenger cars and light trucks. A minimum of two of these spaces must be either a carport or a garage that is complementary to the principal structure erected on the lot.
(11) Driveways. Each lot shall have a driveway connecting the required off-street parking to the street. The driveway must be constructed of concrete, asphalt, or brick pavers.
(12) Storage shed/utility buildings. Storage sheds and utility buildings are used to store lawn and garden equipment/tools, small household items. Only one such building is permitted on a subdivision lot. It must be complementary to the principal structure.
(Ord. of 8-8-2005(2), § 503; Ord. of 11-7-2022, § X) Sec. 105-128. Development standards for utility installations.
(a) Utility easements. When it is found to be necessary and desirable to locate public utility lines in other than street rights-of-way, easements must be shown on the plat for such purposes. Such easements must not be less than 20 feet wide and, where possible, must be centered on rear or side lot lines.
(b) Installation of utilities. After grading is completed and approved and before any base is applied, all of the underground work within the street right-of-way (water mains, gas mains, etc.) must be installed completely and approved throughout the length of the road and across the flat section. At the same time, all service connections must be stubbed out to each lot.
(c) Water supply systems.
(1) Public water system. If a state environmental protection division (EPD) approved public water supply is available to a proposed subdivision and connection to it is permitted, water mains, fire hydrants, and stub connections to each lot within the subdivision must be provided as shown on approved construction plans. If an EPD-approved public water supply is not available, the developer must size all lots to accommodate a well and an on-site septic system in accordance with county health department specifications. In order to meet minimum fire protection needs, all water mains must be six inches or greater (as required by the applicable water authority), with approved hydrants at not more than 500-foot intervals. Systems shall be tested by county fire services.
(2) Individual water supply. When an EPD-approved public water supply is not available, the developer must carefully consider the capability and suitability of the general area of the subdivision to support individual water supplies and on-site septic systems on each lot. The planning commission must consider the recommendation of the county health department and county fire services (see hydrant requirement in subsection (c)(1) of this section) regarding any proposed private water supplies in considering approval of a plat.
(d) Sanitary sewerage disposal systems.
(1) Public sewage system. If an EPD-approved public sewage system is available to a proposed subdivision and connection to it is permitted, sewage mains and lateral connections to each lot within the subdivision must be provided as shown on approved construction plans.
(2) Community sewage system. If an EPD-approved public sewage system is not available, the developer may install a central sewage system developed according to plans and specifications shown on the approved construction plans and approved by the EPD or the county health department, as applicable.
(3) Individual sewage system. When an EPD-approved public sewage system is not available and a community sewage system is not proposed by the developer, the developer must carefully consider the capability and suitability of the general area of the subdivision to support individual sewage systems (septic tanks). A level three soil study will be required and the proposed sewage system must be approved by the county health department.
(Ord. of 8-8-2005(2), § 504; Ord. of 11-7-2022, § XI) Sec. 105-129. Development standards for drainage facilities.
(a) Watercourse and drainage easements. Where a proposed subdivision is traversed by a watercourse, drainageway, or stream, appropriate provisions must be made to accommodate stormwater and drainage through and from the proposed subdivision. Such an easement must conform substantially with the lines of the watercourse and be wide enough and of adequate construction to be satisfactory for the purpose. Proposed road construction shall be designed to cross existing waterways roughly perpendicularly to minimize disturbance near the waterway. All state and federal regulations regarding wetlands and stream crossings shall be followed.
(b) Storm drainage. An adequate drainage system, including necessary grassed open swales, pipes, culverts, drains, drop inlets, bridges, etc., must be provided for the proper drainage of all surface water. Cross-drains must be provided to accommodate 100-year flow and must be long enough to traverse the full width of the roadway and required slopes. All such facilities must be profiled and must also be shown on road profiles. Outfall ditching must follow property lines on a 20-foot easement to rear property line or natural drainage course.
(c) Additional regulations. For additional drainage standards, see section 105-227.
(Ord. of 8-8-2005(2), § 505) Sec. 105-130. Surety for completion of improvements.
(a) Guarantee and maintenance bond. The developer shall guarantee to the county, for a period of four years after completion and acceptance of the public improvements, all material and workmanship of such improvements. The developer shall post a maintenance bond in the amount of 20 percent of the value of such improvements with the county director of planning, conditioned upon the faithful performance of such guaranty. In lieu of furnishing the developer's bond, the developer may assign to the county an approved contractor's guaranty and bond in the amount of ten percent of the value of improvements. Such guaranty and bond shall be posted prior to acceptance of the improvements by the planning commission. The developer shall have the duty and obligation to maintain all streets, rights-of-way, easements and drainage facilities (including detention ponds and basins) within the subdivision for four years after completion and acceptance and to insure complete coverage of permanent grassing. Should the developer fail to maintain the improvements within this four-year period, the bond may be forfeited and the proceeds used to maintain the improvements.
(b) Violations and penalties.
(1) Violations.
a. It shall be unlawful to convey or improve property by the construction of buildings on lots of any land subdivision which has not been approved and recorded as provided in these regulations, except those parcels recorded prior to the effective date of the ordinance from which these regulations are derived.
b. It shall be unlawful to record a subdivision plat, or once recorded, to make any changes thereon whatsoever which have not been approved by the planning commission and in accordance with the provisions of these regulations.
c. Each week's violation is a separate offense. Each and every week's violation of any provision of this chapter shall constitute a separate offense.
(2) Penalties. For penalties, see section 105-97.
(Ord. of 8-8-2005(2), § 506) Secs. 105-131—105-158. Reserved.
ARTICLE VI. SUBDIVISION DESIGN STANDARDS*
Sec. 105-159 Types of subdivisions.
(a) Minor plat.
(b) Land division plat.
(c) Conservation residential subdivision.
(d) Mixed use subdivision.
(e) Commercial and industrial (aka non-residential) subdivision.
(Ord. of 11-7-2022, § II; Ord. of 9-11-2023, § II) Sec. 105-160. Minor plat design.
(a) Application requirements.
(1) Submit two copies or a digital copy of the minor plat and supporting data to be reviewed by the Jasper County Planning and Zoning Office and applicable review agencies. The plat shall meet the minimum standards for plat preparation including, but not limited, to:
a. General.
a. Name, address, and phone number of the designer of subdivision plat.
b. Name, address, and phone number of the owner and developer (if applicable) of subdivision.
c. Name of subdivision or address of project location.
(b) Minor subdivisions on state routes require GDOT comments to be submitted to the planning department of planning and zoning along with the minor (aka final) plat.
(c) Approval of a minor plat shall be deemed an expression of approval of the layout submitted, pending fulfillment of the requirements of these regulations and the conditions of the minor plat, if any.
(d) If the minor plat is not recorded within six months of approval, the approval shall expire, unless a request for an extension of time has been submitted to and is subsequently approved by the planning commission in a public hearing.
(Ord. of 11-7-2022, § III; Ord. of 1-9-2023, § II) Sec. 105-161. Land division plat.
Prior to submitting construction plans for any street, utility, or other site improvements (as applicable), the developer shall submit to the director of planning and zoning to forward for review and recommendation by the planning commission and review and final decision by the Jasper County Board of Commissioners, a plat showing any combination or subdivision of the proposed lot/s prepared in accordance with these regulations.
(1) Pre-application review stage. Before the submission of any plats to the director of planning, the developer must submit a sketch plat showing the proposed development layout of the subdivision. The developer and director of planning should informally discuss what this chapter requires and what the developer proposes to do.
This will assist the developer in preparing a land division plat that meet from the very beginning the intent and standards specified by this chapter so as to reduce undue time and expense in preparing plans that cannot be approved by the planning commission.
(2) Application requirements.
a. Submit seven paper copies and one digital copy of the plat and supporting data.
The plat shall meet the minimum standards for plat preparation including, but not limited, to:
1. General.
i. Name, address, and phone number of designer of subdivision plat.
ii. Name, address, and phone number of developer of parcel.
iii. Date of plat preparation with space for revision dates.
iv. North point, identified as magnetic, true or grid.
v. Minimum graphic scale of one inch equals 200 feet.
vi. Appropriate legend of symbols used on plat.
vii. List any conditions of zoning, rezoning, variance and date of approval, if applicable.
viii. Certificates of approval. The following certificates shall be inscribed on the land division plat:
(A) Certificate of approval of the preliminary plat by the board of commissioners.
(B) Signed seal of a state-registered land surveyor, certified landscape architect or state professional engineer.
(C) Certificate of approval of the plat by the county health department for lots less than five acres.
(D) Owner's certificate stating property ownership, consenting to development, and that all appropriate taxes have been paid.
ix. A table showing each lot's total amount of road frontage.
2. Existing conditions.
i. Zoning district of land to be subdivided and zoning classification of adjoining properties.
ii. Exact boundary lines of the tract indicated by a heavy line giving lengths and bearings. The boundary lines should include the entire tract to be developed. Provide date and source of survey.
iii. Location map showing the parent parcel in relation to the surrounding area at a minimum scale of one inch to 2,000 feet. Include well-known landmarks such as railroads, highways, bridges, creeks, etc. and city and/or county jurisdictional boundaries and land lot lines, if applicable.
iv. Location of natural features including streams and watercourses with direction of flow on the proposed project.
v. Location and/or size of existing cultural features on or adjacent to the proposed subdivision.
vi. Limits of 100-year floodplain. If none, note indicating such with data source and date.
vii. Location and square footage of wetland areas.
viii. Note as to provision of water supply and sewer disposal.
ix. Existing sewers, water mains, drains, culverts, and other underground facilities or utilities within easements or rights-of-way on or within 300 feet of the tract to be subdivided, as relevant.
x. Adjoining property information, lot arrangement and/or adjoining property owners' names, rights-of-way and easements within 300 feet of subdivision.
xi. Total acreage, minimum dwelling size and minimum lot size of project.
b. Land division plats on state routes require GDOT comments to be submitted to the planning department of planning and zoning along with the land division (aka final) plat.
c. A letter requesting review and approval of a land division plat and giving the name and address of a person to whom the notice of hearing and action on the land division plat is to be sent.
d. Official date of submission. The official date of submission of the land division plat will be the date of the next regularly scheduled monthly meeting of the planning commission that is more than 60 days following proper land division plat submittal to the director of planning.
e. The planning commission will review the land division plat for conformance to this chapter, the county zoning ordinance set forth in chapter 119, and other relevant regulations and will consider the comments or suggestions of other appropriate review agencies, persons, or entities in regard to the plat. The planning commission or director of planning will indicate on the land division plat, or by a written memorandum attached to the land division plat, any comments or suggested changes that are necessary to meet the intent of this chapter or to serve the best interests of the county.
f. Public hearing. Before acting on the land division plat, the planning commission will hear public input on the plat. Notice of the hearing must be published in a newspaper of general circulation in the county at least 30 days before the hearing.
g. Action of the board of commissioners. No more than 60 days after the official date of submission of the land division plat, the board of commissioners will either approve the plat, conditionally approve the plat (noting the conditions of approval on the plat), disapprove the plat, or table the plat for further consideration. Action may be taken on the entire land division plat or any portion of it.
h. Failure of board of commissioners to act. If the board of commissioners fails to act within 90 days of the official date of submission of the land division plat, the plat will be deemed automatically approved by the board of commissioners.
(3) Approval of a land division plat shall be deemed an expression of approval of the layout submitted, pending fulfillment of the requirements of these regulations and the conditions of the land division plat, if any.
(4) If the land division plat is not recorded within six months of approval, the approval shall expire, unless a request for an extension of time has been submitted to and is subsequently approved by the planning commission in a public hearing.
(Ord. of 11-7-2022, § IV; Ord. of 9-11-2023, § IV) Sec. 105-162. Conservation subdivision design.
(a) Purposes. The purposes of conservation subdivisions are as follows:
(1) To provide flexibility of design in order to promote environmentally sensitive and efficient uses of the land when developing as a residential subdivision.
(2) To preserve in perpetuity unique or sensitive natural resources such as groundwater, floodplains, wetlands, streams, steep slopes, woodlands and wildlife habitat.
(3) To preserve important historic and archaeological sites.
(4) To permit clustering of houses and structures on less environmentally sensitive soils which will reduce the amount of infrastructure, including paved surfaces and utility easements, necessary for residential development.
(5) To reduce erosion and sedimentation by minimizing land disturbance and removal of vegetation in residential development.
(6) To promote interconnected greenways and corridors throughout the community.
(7) To promote contiguous green space with adjacent jurisdictions.
(8) To encourage street designs that reduces traffic speed and reliance on main arteries.
(9) To promote construction of convenient landscaped walking trails and bike paths both within the subdivision and connected to neighboring communities and businesses.
(10) To conserve scenic views and reduce perceived density by maximizing the number of houses with direct access to and views of open space.
(11) To protect prime agricultural land and preserve farming as an economic activity.
(b) Applicability.This district is to be used to preserve conservation space and to protect natural resources. For properties which are submitted for a conservation subdivision, the applicant shall declare the intent to preserve conservation space at the time of application.
The application shall be accompanied by an existing features site analysis plan, and a map that clearly indicates what is found on site according to the existing features site analysis plan. The conservation district shall not be used on property that has been timber harvested within seven years prior to adoption filing an application for a conservation subdivision.
(c) General regulations.
(1) Applicability of regulations. The conservation subdivision option is available as a use by right in RES zoning districts. An applicant shall comply with all other provisions of this chapter, chapter 119 and all other applicable laws, except those that are incompatible with the provisions contained herein. Where there is any conflict in language, these regulations shall supersede.
(2) Ownership of development site. The tract(s) of land to be subdivided may be held in single and separate ownership or in multiple ownership. If held in multiple ownership, however, the site shall be developed according to a single plan with common authority and common responsibility.
(3) Housing density determination. The housing density determination will be determined by subtracting all the roads and right-of-way, required exterior buffers, and all conservation areas, and meeting the minimum lot size for each new lot as shown in the chart below:
Zoning District RES Lot Size 5 Acre Minimum Lot Size Allowed 3 Acre
(4) Required buffers.
a. A 50-foot buffer shall be maintained around the perimeter of the subdivision adjoining outside parcels. This shall be counted toward the total required greenspace.
b. A 100-foot buffer shall be maintained adjacent to existing public county streets and a 150-foot natural buffer along all state routes that abut the subdivision.
This should be counted toward total required greenspace.
c. A buffer of not less than 50 feet at rear property line that is outside the buildable lot.
(d) Application requirements.
(1) Site analysis map required. Concurrent with the submission of a site concept plan, the applicant shall prepare and submit a site analysis map. The purpose of the site analysis map is to ensure that the important site features have been adequately identified prior to the creation of the site design, and that the proposed open space will meet the requirements of this article. The preliminary site plan shall include the following features:
a. Property boundaries;
b. All streams, rivers, lakes, wetlands and other hydrologic features;
c. Topographic contours of no less than ten-foot intervals;
d. All primary and secondary conservation areas labeled by type, as described in section 105-162(e), Open space;
e. General vegetation characteristics;
f. General soil types;
g. The planned location of protected open space;
h. Existing roads and structures;
i. Potential connections with existing green space and trails.
(2) Open space management plan required. An open space management plan, as described in section 105-162(e), Open space, shall be prepared and submitted prior to the approval of the preliminary plat.
(3) Instrument of permanent protection required. An instrument of permanent protection, such as a conservation easement or permanent restrictive covenant and as described in section 105-162(e), Open space, shall be placed on the open space concurrent with the issuance of a land disturbance permit.
(4) Other requirements. The applicant shall adhere to all other applicable requirements of the underlying zoning and this chapter.
(e) Open space.
(1) Definition. Open space is the portion of the conservation subdivision that has been set aside for permanent protection. Activities within the open space are restricted in perpetuity through the use of an approved legal instrument.
(2) Standards to determine open space.
a. The minimum restricted open space shall comprise at least 40 percent of the gross tract area.
b. The following are considered primary conservation areas and are required to be included within the open space, unless the applicant demonstrates that this provision would constitute an unusual hardship and be counter to the purposes of this article:
1. The 100-year floodplain.
2. Riparian zones of at least 100 feet in width along all perennial and intermittent streams.
3. Slopes above 25 percent of at least 5,000 square feet contiguous area.
4. Wetlands that meet the definition used by the Army Corps of Engineers pursuant to the Clean Water Act.
5. Populations of endangered or threatened species, or habitat for such species.
6. Archaeological sites, cemeteries and burial grounds.
(3) The following are considered secondary conservation areas and should be included within the open space to the maximum extent feasible:
a. Important historic sites.
b. Existing healthy, native forests of at least one acre contiguous area.
c. Individual existing healthy trees greater than eight inches caliper, as measured from their diameter breast height (DBH).
d. Other significant natural features and scenic view such as ridge lines, peaks and rock outcroppings, particularly those that can be seen from public roads.
e. Prime agricultural lands of at least five acres contiguous area.
f. Existing trails that connect the tract to neighboring areas.
(4) Aboveground utility rights-of-way and small areas of impervious surface may be included within the protected open space but cannot be counted towards the 40 percent minimum area requirement (exception: historic structures and existing trails may be counted). Large areas of impervious surface shall be excluded from the open space.
(5) At least 25 percent of the open space should consist of land that is suitable for building.
(6) Open space should be in a contiguous tract to every extent possible. The open space shall adjoin any neighboring areas of open space, other protected areas, and non-protected natural areas that would be candidates for inclusion as part of a future area of protected open space.
(7) The open space shall be directly accessible to the largest practicable number of lots within the subdivision. Non-adjoining lots shall be provided with safe, convenient access to the open space.
(8) Permitted uses of open space. Uses of open space may include the following:
a. Conservation of natural, archeological or historical resources.
b. Meadows, woodlands, wetlands, wildlife corridors, game preserves, or similar conservation-oriented areas.
c. Walking or bicycle trails, provided they are constructed of porous paving materials.
d. Passive recreation areas, such as open fields.
e. Active recreation areas, provided that they are limited to no more than ten percent of the total open space and are not located within primary conservation areas. Active recreation areas may include impervious surfaces. Active recreation areas in excess of this limit must be located outside of the protected open space.
f. Agriculture, horticulture, silviculture or pasture uses, provided that all applicable best management practices are used to minimize environmental impacts, and such activities are not conducted within primary conservation areas.
g. Landscaped stormwater management facilities, community wastewater disposal systems and individual wastewater disposal systems located on soils particularly suited to such uses. Such facilities shall be located outside of primary conservation areas.
h. Easements for drainage, access, and underground utility lines.
i. Other conservation-oriented uses compatible with the purposes of this chapter.
j. Cluster box units.
(9) Prohibited uses of open space.
a. Golf courses;
b. Roads, parking lots and impervious surfaces, except as specifically authorized in subsections (b) and (c) of this section;
c. Agricultural and forestry activities not conducted according to accepted best management practices;
d. Impoundments;
e. Other activities as determined by the applicant and recorded on the legal instrument providing for permanent protection.
(10) Ownership and management of open space.
a. Ownership of open space. A homeowners' or property owners' association representing residents of the conservation subdivision shall own the open space. Membership in the association shall be mandatory and automatic for all homeowners of the subdivision and their successors. The homeowners' association shall have lien authority to ensure the collection of dues from all members.
The responsibility for maintaining the open space and any facilities located thereon shall be borne by the homeowners' or property owners' association.
b. Management plan. The applicant shall submit a plan for management of open space and common facilities ("plan") that:
1. Allocates responsibility and guidelines for the maintenance and operation of the open space and any facilities located thereon, including provisions for ongoing maintenance and for long-term capital improvements;
2. Estimates the costs and staffing requirements needed for maintenance and operation of, and insurance for, the open space and outlines the means by which such funding will be obtained or provided;
3. Provides that any changes to the plan be approved by the board of commissioners; and
4. Provides for enforcement of the plan.
c. Maintenance responsibility. In the event the party responsible for maintenance of the open space fails to maintain all or any portion in reasonable order and condition, the county may assume responsibility for its maintenance and may enter the premises and take corrective action, including the provision of extended maintenance. The costs of such maintenance may be charged to the homeowners' association, or to the individual property owners that make up the homeowners' association, and may include administrative costs and penalties.
Such costs shall become a lien on all subdivision properties or through a special tax district encompassing the subdivision and levy an ad valorem property tax annually in an amount adequate to fund maintenance and operations of the open space.
(11) Legal instrument for permanent protection.
a. The open space shall be protected in perpetuity by a binding legal instrument that is recorded with the deed. The instrument shall be one of the following:
1. A permanent conservation easement in favor of either:
i. A land trust or similar conservation-oriented nonprofit organization with legal authority to accept such easements. The organization shall be bona fide and in perpetual existence and the conveyance instruments shall contain an appropriate provision for retransfer in the event the organization becomes unable to carry out its functions; or ii. A governmental entity with an interest in pursuing goals compatible with the purposes of this chapter.
If the entity accepting the easement is not the county, then a third right of enforcement favoring the county shall be included in the easement.
2. A permanent restrictive covenant for conservation purposes in favor of a governmental entity.
3. An equivalent legal tool that provides permanent protection, if approved by the county.
b. The instrument for permanent protection shall include clear restrictions on the use of the open space. These restrictions shall include all restrictions contained in this article, as well as any further restrictions the applicant chooses to place on the use of the open space.
(12) Tax assessment of open space. Once a legal instrument for permanent protection has been placed upon the open space, the board of tax assessors may be requested to reassess the open space at a lower value to reflect its more limited use.
(f) Reserved.
(g) Entrance. Historic and rural Jasper County seeks to protect its most precious resource, its land, and further protect the viewshed to maintain a small town feel by establishing a required 100-foot natural buffer adjacent to existing public county streets and a 150-foot natural buffer along all state routes that abut exterior road frontage at the entrance of the interior subdivision roads.
(h) Other design standards.
(1) Lot layout design.
a. Circulation is desired. In order to create a more walkable environment, streets shall be interconnective and block style whenever possible.
(2) Road design.
a. Required number of entrances, decel, left-turn lane, road improvements required (explain when).
1. Entrances.
i. All new subdivision road entrances shall provide a deceleration lane of at least 150 feet. Depending on the number of lots, there may be other requirements such as a left turn lane and/or acceleration lane.
Additional traffic calming devices shall be decided by the director of the road department or their designee.
ii. For subdivisions with up to 30 lots there shall be one entrance required.
iii. For subdivision with up to 99 lots there shall be two entrances required.
iv. For subdivisions over 100 but less than 200 lots there shall be three entrances and shall have road frontage on at least two existing roads.
v. For subdivisions over 200 lots there shall be at least four entrances and shall have road frontage on a least two existing roads.
2. Road improvements required.
i. When a new subdivision accesses from an existing county road that is substandard and not consistent with good transportation engineering practices (for example, dirt or gravel road, inadequate width of
pavement or right-of-way, improper angel of approach), provides the primary means of access to a development, the developer shall enter into a contract with the county regarding the upgrading of the
substandard street. Said contract shall specify the improvements to be completed by the developer and the improvements, if any, to be
completed by the county. Any such contract shall be approved by the board of commissioners.
(A) All new roads shall be paved to county standards found in chapter 20, Roads and Bridges, article V, Paving Roads.
(B) Minimum width of right-of-way for all new roads shall be 60 feet.
(C) All new roads shall have street signage including but not limited to stop signs, road name signs, and other public safety signage.
(D) Driveways shall not exceed a slope of 15 percent.
(3) Health, safety, welfare.
a. Reserved.
(4) Stormwater and development runoff shall be required. Some lots with the potential for drainage to an adjoining lot or right-of-way may be deemed as an HLDP lot.
(5) Required amenities.
a. Cluster box units.
1. All cluster box units shall be designed out of the public right-of-way and capable of being accessed in compliance with ADA standards.
2. Required parking spaces.
i. There shall be a minimum of two parking spaces for up to the first 50 lots and an additional parking space for every 50 lots within the
subdivision. There shall be at least one ADA parking space provided.
3. Cluster box units shall accommodate the following:
i. A minimum of one box per residence and four large parcel units, two at each end of at least three feet by four feet.
ii. A shelter or covering shall be provided for all mailbox units that includes at least three feet of space to walk around the mailbox unit.
4. Security lights shall be provided.
(Ord. of 11-7-2022, § V; Ord. of 3-6-2023, § II; Ord. of 05-06-2024(1)) Sec. 105-163. Mixed use subdivision (reserved).
Sec. 105-164. Commercial and industrial (aka non-residential) subdivision design.
Prior to making any street improvements or clearing or grading a site planned for development, installing any utilities or selling any parcels, the developer shall submit to the director of planning and zoning for review and recommendation by the planning commission and review and final decision by the board of commissioners, a plat, showing any combination or subdivision of the proposed lot/s prepared in accordance with these regulations.
(1) Pre-application review stage. Before the submission of any plats to the director of planning, the developer must submit a sketch plat showing the proposed development layout of the subdivision. The developer and director of planning should informally discuss what this chapter requires and what the developer proposes to do.
This will assist the developer in preparing a residential subdivision plat that meet from the very beginning the intent and standards specified by this chapter so as to reduce undue time and expense in preparing plans that cannot be approved by the planning commission.
(2) Application requirements.
a. Submit seven paper copies and one digital copy of the plat and supporting data.
The plat shall meet the minimum standards for plat preparation including, but not limited, to:
1. General.
i. Name, address, and phone number of designer of subdivision plat.
ii. Name, address, and phone number of developer of parcel.
iii. Date of plat preparation with space for revision dates.
iv. North point, identified as magnetic, true or grid.
v. Minimum graphic scale of one inch equals 200 feet.
vi. Appropriate legend of symbols used on plat.
vii. List any conditions of zoning, rezoning, variance and date of approval, if applicable.
viii. Certificates of review of the environmental health department and/or water authority (as applicable).
2. Existing conditions.
i. Zoning district of land to be subdivided and zoning classification of adjoining properties.
ii. Exact boundary lines of the tract indicated by a heavy line giving lengths and bearings. The boundary lines should include the entire tract to be developed. Provide date and source of survey.
iii. Location map showing the parent parcel in relation to the surrounding area at a minimum scale of one inch to 2,000 feet. Include well-known landmarks such as railroads, highways, bridges, creeks, etc. and city and/or county jurisdictional boundaries and land lot lines, if applicable.
iv. Location of natural features including streams and watercourses with direction of flow on the proposed project.
v. Location and/or size of existing cultural features on or adjacent to the proposed subdivision.
vi. Limits of 100-year floodplain. If none, note indicating such with data source and date.
vii. Location and square footage of wetland areas.
viii. Note as to provision of water supply and sewer disposal.
ix. Existing sewers, water mains, drains, culverts, and other underground facilities or utilities within easements or rights-of-way on or within 300 feet of the tract to be subdivided, as relevant.
x. Adjoining property information, lot arrangement and/or adjoining property owners' names, rights-of-way and easements within 300 feet of subdivision.
xi. Total acreage, minimum dwelling size and minimum lot size of project.
b. Commercial and industrial subdivisions on state routes require GDOT comments to be submitted to the planning department of planning and zoning along with the commercial and industrial subdivision (aka final) plat.
c. A letter requesting review and approval of a commercial and industrial subdivision plat and giving the name and address of a person to whom the notice of hearing and action on the commercial and industrial subdivision plat is to be sent.
d. Official date of submission. The official date of submission of the commercial and industrial subdivision plat will be the date of the next regularly scheduled monthly meeting of the planning commission that is more than 60 days following proper commercial and industrial subdivision plat submittal to the director of planning.
e. The planning commission will review the commercial and industrial subdivision plat for conformance to this chapter, the county zoning ordinance set forth in chapter 119, and other relevant regulations and will consider the comments or suggestions of other appropriate review agencies, persons, or entities in regard to the plat. The planning commission or director of planning will indicate on the commercial and industrial subdivision plat, or by a written memorandum attached to the commercial and industrial subdivision plat, any comments or suggested changes that are necessary to meet the intent of this chapter or to serve the best interests of the county.
f. Public hearing. Before acting on the commercial and industrial subdivision plat, the planning commission will hear public input on the plat. Notice of the hearing must be published in a newspaper of general circulation in the county at least 15 days before the hearing.
g. Action of the board of commissioners. No more than 60 days after the official date of submission of the commercial and industrial subdivision plat, the board of commissioners will either approve the plat, conditionally approve the plat (noting the conditions of approval on the plat), disapprove the plat, or table the plat for further consideration. Action may be taken on the entire commercial and industrial subdivision plat or any portion of it.
h. Failure of board of commissioners to act. If the board of commissioners fails to act within 90 days of the official date of submission of the commercial and industrial subdivision plat, the plat will be deemed automatically approved by the board of commissioners.
(3) Approval of a commercial and industrial subdivision plat shall be deemed an expression of approval of the layout submitted, pending fulfillment of the requirements of these regulations and the conditions of the residential plat, if any.
(4) If the commercial and industrial subdivision plat is not recorded within six months of approval, the approval shall expire, unless a request for an extension of time has been submitted to and is subsequently approved by the planning commission in a public hearing.
(Ord. of 11-7-2022, § VII) Secs. 105-163—105-192. Reserved.
ARTICLE VII. POWERS AND DUTIES OF VARIOUS OFFICIALS CONCERNING
THIS CHAPTER
Sec. 105-193. Purpose.
This article formalizes the powers and duties of the director of planning, the planning commission, and the county commission where this chapter is concerned. It should also provide a convenient list of services provided by each official to aid in complying with the requirements of this chapter.
(Ord. of 8-8-2005(2), § 701) Sec. 105-194. Powers and duties of the director of planning.
The director of planning has the power and duty to provide the following services related to this chapter:
(1) Provide initial information about this chapter upon request.
(2) Advise how to contact members of the planning commission, the county building inspector, the public works director, fire services, board of health and the county commission for services provided by those bodies.
(3) Offer to the developer practical suggestions and guidance on how to comply with the requirements of this chapter.
(4) Maintain complete records concerning this chapter and related matters, and make such records available to the public upon request.
(5) Propose amendments to this chapter if appropriate.
(Ord. of 8-8-2005(2), § 702) Sec. 105-195. Powers and duties of the planning commission.
The planning commission has the power and duty to provide the following services related to this chapter:
(1) Review preliminary plats and hold appropriate public hearings as directed by this chapter.
(2) Advise the county commission on applications for amendment to this chapter by examining amendment applications and providing written recommendations with reasons for the recommendations to the county commission as specified in section 105-95.
(3) Dispense general information about this chapter to the public upon request.
(4) Propose amendments to this chapter if appropriate.
(5) Approve preliminary and final plats.
(Ord. of 8-8-2005(2), § 703) Sec. 105-196. Powers and duties of the county commission.
The county commission has the power and duty to provide the following services related to this chapter:
(1) Accept applications for amendment of this chapter and render official decisions on them after referring them to the planning commission for review and recommendations as specified in section 105-95.
(2) Propose amendments to this chapter.
(3) Accept streets utilities and other authorized offers of dedication as property of the county.
(Ord. of 8-8-2005(2), § 704) Secs. 105-197—105-215. Reserved.
ARTICLE VIII. INFRASTRUCTURE IMPROVEMENTS
Sec. 105-216. Purpose; applicability.
The purpose of this article is to establish additional standards and requirements for the provision of infrastructure by all development in the county. All of the regulations of this chapter shall apply in addition to these additional standards. If these standards conflict with the subdivision standards, the subdivision standards shall apply.
(Ord. of 8-8-2005(2), § 801) Sec. 105-217. Transportation system standards generally.
(a) No person shall do any paving work, or any other related or similar roadwork, on, or adjacent to, a county road without a permit.
(b) All transportation system design, street design, and construction shall comply with Georgia Department of Transportation (GDOT) requirements. The latest edition of the GDOT manual, entitled "Standard Specifications, Construction of Roads and Bridges," shall apply.
(c) Where conflict arises between GDOT standards and this article, the stricter standard shall apply.
(d) All materials, equipment, labor and other matters related to street construction shall be provided by the applicant. The following is a summary of the improvements required:
(1) All streets, roads, and alleys shall be graded to their full width right-of-way by the applicant so that the pavements and sidewalks, when installed in the future, can be constructed on the same level plane. The preparation of the right-of-way before grading is started and the construction of cuts and fills shall be accomplished according to the specifications of the county (see section 105-221(9) and (11)).
(2) An adequate drainage system, including necessary curb, pipes, culverts, headwalls, intersectional drains, drop inlets, bridges, swale ditches, and detention areas, shall be provided for the proper drainage of all surface water. The drainage system shall be designed by a registered professional engineer, licensed in the state.
(3) After preparation of the subgrade, the roadbed shall have base material and paving applied according to county specifications (see section 105-221(9) and (11)).
(e) Roadways may be created by:
(1) Dedication;
(2) Prescription;
(3) Express grant of an easement;
(4) Deed;
(5) Special statutory proceeding; or
(6) Condemnation.
(f) Upon compliance with all of the provisions of this chapter and all other county applicable regulations, building permits may be issued for building on public roads upon the applicant signing a "statement of understanding" that said roadway is a public road and that the county assumes no responsibility for the maintenance of said road until such time as it becomes feasible and advisable to accept said roadway as a county road. The county at such time shall accept said road as a county road provided that the property owners along said road convey a right-of-way to the county conveying the minimum width required by the county.
(g) Upon compliance with the provisions of this chapter and all other applicable county regulations, building permits may be issued on county roads.
(Ord. of 8-8-2005(2), § 802) Sec. 105-218. Access requirements.
(a) Requirements for connection to existing street system.
(1) All proposed development shall provide a street system that is connected to the existing or planned street system as shown in the comprehensive plan. All proposed streets shall be continuous and in alignment with existing, planned or platted streets.
(2) Whenever there exists adjoining the tract to be subdivided a dedicated or platted half-width street or alley, the other half-width shall be platted.
(b) Frontage on a state highway or arterial street.
(1) When a tract fronts on a state highway, major arterial street, or minor arterial street, a frontage street may be required for access to individual lots.
(2) All residential lots in a subdivision shall take direct access only from a frontage street, collector street, or local street.
(3) Any access to a state highway shall be consistent with the requirements of the state department of transportation.
(c) No approval shall be granted for a subdivision, or subsequent phase or addition to an existing subdivision, unless the property is served by a paved county road, with right-of-way sufficient to meet the requirements of Table 105-218.
(d) Following is a table of street access requirements and sidewalk requirements by zoning district:
Table 105-218 Zoning District Minimum street access classification Paved Road Sidewalks Agricultural Local* Pavement required Not required Rural Residential Local Pavement required Not required R1-40 Residential Local Pavement required Required R3 Residential Local Pavement required Required R2-15 Residential Local Pavement required Required PM/PR Arterial Pavement required Required Office/Institutional Arterial Pavement required Required Commercial C-1, 2, 3 Arterial Pavement required Required Manufacturing Arterial Pavement required Required *Unless road is designated otherwise, see section 105-28.
(e) Specific access requirements for subdivisions.
(1) Emergency vehicle access shall be provided to all lots within a subdivision.
(2) In order to ensure emergency vehicle access, every subdivision with 20 or more lots must contain two or more points of ingress/egress from the existing street system.
Every development with less than 20 lots shall not be required to provide two points of ingress/egress.
(3) Where two or more entrances take access from the same street, the entrances shall be located not closer than 125 feet.
(4) Where a subdivision is providing two or more connections to the existing street system pursuant to subsection (e)(2) of this section, the requirement for two points of ingress/egress is met. The requirement for access shall not be satisfied by a stub-out to a future, planned, or platted street that has not been constructed.
(5) A subdivision containing 19 or fewer lots shall not be required to provide two points of ingress/egress as otherwise required in subsection (e)(2) of this section.
(6) Where a subdivision is allowed one point of access pursuant to subsection (e)(5) of this section, that entrance street shall be designed with a three-lane divided entrance street, as shown in Figure 7 of article XV of this chapter.
(f) Limitations on curb cuts. Within any zoning district where the lowering or cutting away of any curbs for purposes of ingress and egress is required, such curb cut shall be subject to the following provisions:
(1) Any parcel of property with frontage of more than 200 feet on any one street shall be permitted additional entrances or exits after showing of actual requirements of convenience and necessity and upon approval of the planning commission.
(2) At street intersections, no curb cut shall be located within 50 feet of the intersections of two curblines or such lines extended, or within 15 feet of the intersection of two property lines extended. When a culvert is required it shall receive approval from the county department of transportation.
(3) The distance between any two curb cuts on the same side of the street and located on one property shall be not less than ten feet. Curb cut distance shall be measured between the points of tangency of the curb return radii and the established curbline of the abutting street.
(4) All driveways shall be constructed so as to be at least two feet from any property line.
(5) The maximum width of any driveway shall not exceed 40 feet measured at the right-of-way line.
(6) The maximum width of any curb cut including curb returns shall not exceed 50 feet.
(7) The sum of the two-curb return radii for any one curb cut shall not exceed 15 feet.
(Ord. of 8-8-2005(2), § 803) Sec. 105-219. Joint access driveways and cross access easements.
Joint access driveways and cross access easements shall be required in commercial development areas according to the following provisions:
(1) Adjacent commercial or office properties shall provide a cross access drive and pedestrian access to allow circulation between sites through a system of joint use driveways and cross access easements. The design of the joint or cross access area shall incorporate the following:
a. A continuous service drive or cross access corridor extending the entire length of each block served to provide for driveway separation;
b. Stub-outs and other design features to make it visually obvious that the abutting properties may be tied in to provide cross access via a service drive; and
c. Sufficient separation between side street access to the property and the major road to ensure safety.
(2) In order to ensure continuous availability of access to all properties, all property owners shall:
a. Record an easement with the deed allowing cross access to and from other properties served by the joint use driveways and cross access or service drive;
b. Record an agreement with the deed that remaining access rights along the thoroughfare shall be dedicated to the county and preexisting driveways shall be closed and eliminated after construction of the joint-use driveways; and
c. Record a joint maintenance agreement with the deed defining maintenance responsibilities of property owners.
(Ord. of 8-8-2005(2), § 804) Sec. 105-220. Design and construction standards for streets.
(a) Location.
(1) The location, arrangement, extent, width, and grade of all streets shall conform to the types of uses and densities reflected in the comprehensive plan and shall be considered in relation to existing and planned streets, topographical conditions, public safety and convenience, and proposed use of land to be served by the streets. The layout of a subdivision shall conform to the requirements and design principles described in this chapter.
(2) The location of all streets and roads shall conform to the comprehensive plan.
Provision shall be made in developments for the construction of streets at locations shown in the comprehensive plan.
(3) Whenever a tract to be subdivided includes any part of a major arterial, minor arterial, major collector, or minor collector street designated on the comprehensive plan, such part of said street shall be installed by the applicant in the location and at the full width indicated by the functional classification for right-of-way and pavement widths indicated in this article.
(b) Design and construction standards for curb cuts.
(1) Curbs shall be required in all residential subdivisions as specified in this chapter.
(2) Curbs may be required for streets in commercial and industrial subdivisions.
(3) Curbs in all subdivisions shall be L-back curbs 24 inches long, six inches thick, with an 18-inch gutter. Rollback curbs may be installed in the R-R zoning district.
(4) All curbs shall be constructed of Portland cement concrete.
(5) Curbs shall be designed to provide handicapped access at street intersections, wherever sidewalks are constructed.
(c) Street grade standards.
(1) Grades on major and minor arterials shall not exceed five percent and grades on local residential streets shall not exceed 12 percent.
(2) All changes in grade shall be connected by vertical curves, which adhere to the design criteria as set forth by the more restrictive of the 2000 AASHTO Guide, A Policy on Geometric Design of Highways and Streets.
(d) The radius of horizontal curves on local residential streets within a subdivision shall be no less than 150 feet. The horizontal radius for collector and arterial streets or any streets with a design speed of more than 25 miles per hour shall comply with American Association of State Highway and Transportation Officials (AASHTO) standards.
(e) Street intersection standards.
(1) Street intersections shall be as nearly at right angles as possible.
(2) In residential subdivisions no intersection shall be at an angle of less than 80 degrees or more than 100 degrees.
(3) Street intersections in commercial and industrial subdivisions shall be at an angle of not less than 90 degrees.
(4) The minimum curb radius at street intersections shall not be less than 20 feet in residential subdivisions. A minimum 25-foot radius shall be required at intersections with existing collector and arterial roads maintained by the county.
(5) The minimum curb radius of street intersections for industrial and commercial subdivisions shall be 50 feet.
(6) Pedestrian ramps shall be designed for all intersections in accordance with standard drawings for subdivisions and residential developments designed to include sidewalks and shall meet the minimum standards of the Georgia Accessibility Code, Ga. Comp.
Rules & Regs. ch. 120-3-20, of the Rules and Regulations of the Georgia Safety Fire Commissioner. The curb shall be depressed to accommodate future installations at the same time as the curb.
(7) Street intersections shall have a minimum centerline offset of at least 100 feet.
(f) A tangent of at least 100 feet long shall be introduced between reverse curves on major and minor arterial streets, or on any street where the posted speed limit shall be 35 miles per hour or greater.
(g) Local streets designed to have one end permanently closed and not connected with any existing street, proposed future street, or not intended to extend to the property line of an adjacent tract, shall be no longer than 1,000 feet unless necessary due to the topographic or other physical conditions of the property. In no event shall a cul-de-sac street exceed a distance of 1,000 feet.
(1) Permanent dead-end streets shall be joined by a cul-de-sac with a paved turnaround having an outside diameter of 85 feet and a right-of-way of at least 116 feet in diameter. Dead-end streets designed to be permanent and that exceed more than 800 feet in length may be required to have a cul-de-sac turnaround midway between the entrance intersection and the end of the street to provide maneuvering for emergency vehicles, when the dead-end street is the only street in a subdivision.
(2) Stub streets which are intended to provide access for future development within a tract of land or adjacent tracts shall be required to have a temporary turnaround area having a diameter of at least 85 feet, consisting of six inches of graded aggregate base.
(3) For subdivisions with a temporary turnaround, it shall be required of the applicant to provide a letter of credit equal to the cost of permanent cul-de-sac construction, in accordance with the standards of subsection (g)(1) of this section.
(h) Alleys may be provided at the rear of lots in residential, commercial, and industrial subdivisions. (Also see section 105-126(10).)
(i) Right-of-way and pavement width standards.
Table 105-220.1 Right-of-Way and Pavement Width Standards Required Pavement Width (feet) Street type Minimum Required Right-of-Way (feet) With curb Without curb Collector 80 28 24 Local street Residential 60 22 Prohibited Industrial 80 30 Prohibited Commercial 80 30 Prohibited Cul-de-sac Residential 116 85* Prohibited Commercial/industrial 150 110 Prohibited Rural Residential & Agricultural 116 85 85 Alley 0 10 10 *See section 105-126(6)b.
*The county may not require curbs in certain residentially zoned areas.
(j) Additional street system requirements for major subdivisions.
(1) Private streets are permissible where access to subdivisions is limited.
(2) Subdivisions that adjoin existing streets shall dedicate additional right-of-way if needed to meet the minimum street right-of-way requirements.
(3) Half streets shall be prohibited except where essential to the reasonable development of the subdivision.
(4) Where it is determined to be practical to require the dedication of the additional half when adjoining property is subdivided, the other half of the street shall be platted to create a full width right-of-way serving the adjoining tracts of land.
(5) Any subdivision shall provide lanes for acceleration/deceleration, ingress, and egress, according to Table 105-220.2. Any subdivision on a state highway or arterial road (as shown in the current comprehensive plan) shall provide lanes for acceleration/ deceleration, ingress, and egress regardless of traffic counts. Design requirements of the state department of transportation shall be met.
Table 105-220.2 Minimum Volumes Requiring Right Turn Lanes 2 Lanes on Main Road 40 MPH or less Greater than 40 MPH Estimated traffic volume 2,000 1,000 Daily right turning volume 75 40
(6) Proposed streets which are obviously in alignment with other already existing and named streets shall bear the names of the streets with which they align. The names of proposed streets shall not duplicate existing street names, irrespective of the use of the word street, avenue, boulevard, drive, place, court, etc., in the naming of the street.
(k) No-parking areas shall be established for the use of fire equipment and emergency vehicles to ensure access to the premises in cases of emergency. Said areas shall be marked "Fire Lane - No Parking."
(Ord. of 8-8-2005(2), § 805) Sec. 105-221. Construction requirements for residential, industrial, and commercial subdivision streets.
The grading, base, and pavement for street construction shall be as follows:
(1) Grading. All streets shall be graded to the elevations shown on the approved construction plans.
a. The contractor may begin clearing and grubbing the project after:
1. A development permit has been issued by the county;
2. A pre-construction conference has been held, the director of planning duly notified; and
3. In conjunction with installation of required silt and erosion control measures and compliance with all applicable provisions of the Georgia Manual for Sediment and Erosion Control and the applicable provisions of state law.
b. Clearing and grubbing.
1. All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed from within the construction limits of the project.
2. A minimum 30-foot undisturbed buffer shall be maintained on all property lines. Reference should be made to ordinance requirements of the county which require a buffer of greater width than the minimum stated herein.
3. No rubbish or other material resulting from the clearing and grubbing of the roadway shall be buried on site.
4. If burning is permitted, all burn pits shall be located outside of the roadway construction limits. After burning, the pit shall be cleared out. A county inspection is required prior to backfilling. Burn pits will be annotated on as-built drawing and furnished to the county on sheet not larger than 17 inches by 22 inches.
c. Excavation.
1. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material for the roadway with the top 12 inches compacted to 100 percent maximum dry density, 95 percent below the top. (Standard Proctor)
2. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of 12 inches and backfilled with suitable material.
3. All rock and boulders in the roadbed shall be excavated and the space backfilled to the correct grade with suitable material.
4. Any stones, broken rock, or boulders resulting from the grading of the roadway may not be placed in any roadway fill area except when approved by the director of planning and then under his supervision.
5. During the construction of the roadway on a day-to-day basis, the roadbed edges shall be kept lower than the center and the grading shall be done so that the surfaces of the excavated areas and fill shall be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes.
d. Placement of fill.
1. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed.
2. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density of the surrounding soil before placement of the fill is begun.
3. The entire area upon which fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six inches.
4. Before the placement of fill material is begun, all loosened soil shall be compacted the approximate density of the underlying soil.
5. Where a depth of fill and surfacing is three feet or less, the original ground shall be compacted a minimum 12 inches deep to at least 95 percent of the maximum laboratory dry density as determined from representative samples of the material being compacted.
6. In areas where layers of organic or other unstable materials exist, the existing ground shall be excavated, for the full width of the fill area, to an underlying stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material.
7. All fill material shall be deposited and spread in uniform horizontal layers, not more than six inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers or other approved equipment.
8. Each layer shall be compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted. Moisture content shall be maintained to within plus or minus three percent of optimum.
9. Fill shall be compacted to at least 95 percent of the maximum dry density to within the top 12 inches of the fill. The top 12 inches of the fill shall be compacted to at least 100 percent of the maximum dry density. A minimum of one compaction test per 300 square yards of every 24 inches of lift shall be taken and results provided to the director of planning.
10. The entire roadbed shall be scarified and compacted with a sheep's foot or other approved rollers.
11. While the work is in progress, the contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface.
12. The contractor shall have available on the job at all times at least one motor grader with adequate power to blade and maintain the roadbed. Suitable scarifiers shall also be available for use whenever necessary.
13. All density testing will be in accordance with ASTM D-698.
e. Final finishing of roadway.
1. After all excavation has been completed and all fills have been placed, the entire roadbed surface shall be finally shaped with a grading machine supplemented with hand work whenever required, to secure a smooth
surface and uniform cross section.
2. Slopes of cuts and fills shall also be carefully shaped to the true section specified.
3. When final shaping is finished, the road surface shall conform accurately to the line, grade and cross section shown of plans, and no roots, sod, grass, stones, or other unsuitable material shall remain in the top 12 inches of the finished roadbed.
4. All ditches and drains shall be opened to effectively drain the roadway.
(2) Placement of curb and gutter.
a. After sanitary sewer lines have been installed, all storm drainage in place, and the final finishing of the roadway has been approved by the director of planning, and the centerline profile has been approved, the installation of the concrete curb and gutter may begin.
b. All concrete curb and gutter shall be in accordance with Figure 12 of article XV of this chapter, which provides for either a roll-back curb and gutter or a square back curb and gutter. The design shall be subject to the approval of the director of planning.
c. Any curb and gutter which does not conform to a true section, texture, line, and grade shall be removed and replaced as directed by the director of planning.
d. Water lines shall be installed after installation of the curb and gutter.
(3) Subgrade.
a. Before placing any pavement base the entire surface of the subgrade shall be plowed, harrowed, and mixed to a depth of at least six inches. If a subgrade stabilization material is required it shall be incorporated into the subgrade at this time.
b. After the material has been thoroughly mixed the subgrade shall be brought into a proper line and grade and compacted to 100 percent of maximum dry density just prior to placing the base material.
c. The centerline profile shall conform to the established elevations with an acceptable tolerance of six inches.
d. The acceptance crown tolerance shall be one-half inch.
(4) Base construction.
a. The director of planning or a designee shall be notified 24 hours prior to the placing of any base material.
b. The director of planning or a designee may authorize the placing of the base material after all equipment necessary for the proper construction of road base is on the project and the subgrade has been brought to the proper line, grade and crown, and compacted to the required density.
c. The director of planning or a designee shall check the completed base course after the base material has been placed and compacted to the required density. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified or the exposed edge of the concrete gutter is less than the minimum depth required shall be reshaped and rolled to obtain the required cross section.
d. After the compacted material has been approved, cores shall be taken as directed by the director of planning to determine the thickness of the constructed base course. Areas found to be deficient in thickness shall be corrected as directed by the director of planning.
e. All work and materials shall be in accordance with the pertinent graded aggregate construction sections of the state department of transportation's "Standard Specifications," latest edition.
(5) Soil cement.
a. A soil cement base may be used to improve the subgrade, but shall not be used as a substitute for base construction.
b. Where allowed, the soil cement base shall be a minimum of five inches in thickness, while the thickness of the surface course shall remain at two inches.
c. All soil cement construction shall be in accordance with the soil cement construction sections of the state department of transportation's "Standard Specifications," latest edition.
d. The preparation of the soil cement base shall be done under the supervision of a professional engineer registered in the state. A letter stamped and signed by the engineer attesting to the construction of the soil cement base shall be submitted to the county. Core tests of the surface course shall also be submitted to the county for approval.
(6) Paving.
a. The contractor shall begin the construction of the asphaltic concrete pavement upon approval of the road base by the director of planning or a designee.
b. All asphaltic concrete material and construction shall be in accordance with the hot mix asphaltic concrete construction sections of the state department of transportation's "Standard Specifications," latest edition.
c. The director of planning or a designee shall check the cross section of the finished pavement. Any area found to be deficient shall be marked and a record of deficiencies made by the director of planning.
d. If, in the opinion of the director of planning or a designee, the extent of deficiencies will impair the performance of the pavement, he shall direct that an overlay of a minimum thickness of one inch be placed before the roadway is opened to traffic.
e. A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the director of planning at the time of completion of the work. If the delivery tickets indicate a shortage in the material used from the quantity estimated, the director of planning may require a minimum one-inch overlay of the roads.
f. The applicant shall have core tests made to verify the thickness of the street base and asphalt pavement complies with state department of transportation standards, upon acceptance of the surface course by the director of planning. If these indicate a deficiency in thickness of the street base and asphalt pavement, an overlay shall be required when the following deficiencies occur:
1. When the number of cores deficient in thickness within the allowable one-quarter of an inch tolerance exceeds 35 percent of the total cores taken on one road.
2. When two or more consecutive tests show a deficiency of more than one-quarter of an inch allowable tolerance. When a core shows a deficiency in excess of the allowable tolerance, additional cores shall be taken to delineate the area of the deficient thickness.
g. The applicant shall correct any deficiency with an overlay extending a minimum of 150 feet beyond the outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be saw cut normal to the roadway for full depth of asphalt pavement, removing the original pavement for a minimum of ten feet at each end of the overlay. The thickness of the overlay shall be determined by the depth of the deficient area and shall not be less than one inch in compacted thickness. The county engineer shall specify the type of material used in the overlay.
(7) Shoulder and drainage improvements. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be backfilled and compacted and the ditches and back slopes properly graded, shaped, seeded and mulched. An 80 percent stand of grass shall be obtained. All swales and ditches excavated below required depth shall be backfilled and compacted to 95 percent of maximum dry density.
(8) Road design and construction for residential subdivisions. Road design and construction for residential subdivisions shall comply with the minimum standards shown in Table 105-221.1. Acceleration and deceleration lane construction shall comply with the standards set forth in Table 105-221.2.
(9) Table of residential subdivision street construction standards.
Table 105-221.1 Residential Subdivision Street Construction Standards Construction Standards Specifications
Surface topping (plant mix)1 11 /2 inch 9.5 mm superpave mix with hydrated lime (level B), 165 pounds per square yard Tack coat1
0.04—0.06 GAL/YD
Asphalt (binder course) Two-inch 12.5mm superpave mix with hydrated lime (level A) asphalt topping, 220 pounds per square yard
Curbs/shoulder and ditch construction 24-inch by six-inch concrete "L" back curb 18 inch gutter; six inches high six-inch curb
width Base construction Six-inch base (graded aggregate); 100 percent dry density compaction Subgrade Top 12-inch subgrade compacted to 100 percent dry density Pavement width See section 105-126(16) and Table 105-220.1
Street grade 12 percent maximum on subdivision streets;
Four percent maximum grade at intersections
- 100 feet from curbline Turnaround area 42.5 feet radius cul-de-sac pavement; 85 feet diameter Intersections 25-foot pavement radius at intersection within subdivision; 25-foot pavement radius required where intersecting existing county or state roads Right-of-way 60-foot right-of-way minimum for local streets (Additional right-of-way and/or slope easements may be required for cut and fill areas);
110 feet diameter right-of-way for cul-de-sac.
A five-foot utility easement is required along all street rights-of-way Fill areas and back slopes 2:1 maximum slope allowed Storm sewers and cross drains GDOT materials specifications; RCP or asphalt coated metal pipe required or as approved by the county DOT; pipe location and size shall be approved by county building
department Grassed areas Shall comply with article XII of this chapter Construction Standards Specifications Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement Letter of credit Four-year maintenance letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catchbasins, cross drains) and stormwater detention facilities; on phased developments, certain sections may require a renewed letter
of credit if used for construction access on newer phases (see section 105-130(a)). 1 Surface topping and tack coat shall be applied before the subdivision build out is 75 percent
complete, and no later that six months prior to the maintenance letter of credit being released
(10) Design and construction requirements for county arterial roads. The design and construction requirements for subdivision developments for industrial, commercial, or office use and streets which are to be county arterial roads shall:
a. Be required to have concrete curb and gutter along each side in accordance with Figure 6 of article XV of this chapter.
b. Comply with the minimum standards shown in Table 105-221.2.
(11) Table of industrial, commercial, and office subdivision street construction standards.
Table 105-221.2 Industrial, Commercial, and Office Subdivision Street Construction Standards
Surface topping plant mix 11 /2 inch 9.5 mm superpave mix with hydrated lime (level B) asphalt topping, 165 pounds per square yard or 12.5 mm (level A) with hydrated lime, at 165 pounds per square inch Tack coat 0.04—0.06 GAL/YD
Binder Three-inch 19 mm superpave mix with hydrated lime (level B) - 330 pounds per square yard
Curb and gutter required 24-inch by six-inch concrete "L" back curb; 18 inch gutter; six inch high; six-inch curb width
Base construction Eight-inch base (graded aggregate), compacted to 100 percent maximum dry density Street width 26 feet wide with curb and gutter; 30 feet back
of curb to back of curb Pavement width 26 feet Street grade Eight percent maximum on industrial/commercial streets; two percent maximum grade at intersections; 100 feet from curbline
Turnaround area 55-foot radius cul-de-sac pavement; 110-foot diameter Intersections 50-foot pavement radius at intersections; 50 feet straight section from curved streets required Driveway entrances GDOT specifications Right-of-way 80 feet right-of-way minimum; additional rightof-way or slope easement may be required for cut and fill areas; 150 feet diameter right-ofway for cul-de-sac. A five-foot utility easement is required along all street rights-of-way
Fill areas & back slopes 2:1 maximum slope allowed Storm sewers & cross drains GDOT materials specifications: RCP or asphalt coated metal pipe required, or as approved by the county DOT, pipe location and size approved by the director of planning
Grassed areas Shall comply with the erosion and sedimentation control requirements forth in article XII of this chapter
Core testing Core samples shall be taken as directed to determine thickness of base and pavement (at applicant's expense) Maintenance letter of credit Four-year maintenance letter of credit on all improvements within public right-of-way
(streets, sidewalks, sanitary and storm sewer, catchbasins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter
of credit if used for construction access on newer phases (Ord. of 8-8-2005(2), § 806) Sec. 105-222. Improvements to existing streets and rights-of-way for subdivisions.
(a) Existing unpaved road. Any unpaved road upon which a subdivision has frontage and/or access shall be paved and widened, according to the functional class of the road, as set forth in Table 105-221.1 along the frontage of the subdivision to the nearest intersection with a paved county road. The minimum right-of-way required according to Table 105-221.1 shall be dedicated along the entire frontage of the subdivision.
(b) Existing paved road. Any existing paved county road upon which a subdivision has frontage and/or access and which is deficient relative to county specifications (see Tables 105-221.1 and 105-221.2) shall be resurfaced and widened as determined by the county department of transportation for the entire frontage of the subdivision. The minimum right-of-way required according to Table 105-221.1 shall be dedicated along the entire frontage of the subdivision.
(Ord. of 8-8-2005(2), § 807) Sec. 105-223. Visibility at intersections.
(a) Corner lots. On corner lots within all zoning districts, no fence, shrubbery or other obstruction to the traffic sight vision shall exceed a height of 21 /2 feet within a triangular area
formed by the intersection of the right-of-way line, and a diagonal line which intersects the right-of-way lines at two points, each 20 feet distant from the intersection of the right-of-way lines, or, in the case of a rounded corner, from the point of intersection of their tangents.
(b) Centerline sight distance for local and collector streets.
(1) Minimum street centerline sight distances shall be designed relative to the designed speed of the street and shall be measured above the street centerline using a driver-eye height of 3.5 feet and an object height of six inches.
(2) Following is a table of minimum centerline stopping site distances relative to design speed posted on streets:
Table 105-223.1. Local and Collector Street Sight Distance Speed (MPH) 25 30 35 40 45 50 55 Intersection sight distance (stopping distance in feet) 280 335 390 445 500 555 610 Source: 1990 AASHTO Guide, A Policy on Geometric Design of Highways and Streets.
(3) The minimum stopping distance for streets shall be no less than 200 feet.
(c) Sight distance. For intersections with collector streets and minor/major arterials, use an intersection sight distance measured from a driver's-eye height of 3.5 feet to an object height of 3.5 feet.
Table 105-223.2 Arterial Sight Distance Speed (MPH) 0—30 40 50 55 Centerline sight distance (stopping distance in feet) 375 580 840 990 Source: 1990 AASHTO Guide, A Policy on Geometric Design of Highways and Streets.
(Ord. of 8-8-2005(2), § 808) Sec. 105-224. Pedestrian access and facilities requirements.
(a) Sidewalks shall be at least four feet in width and four inches in thickness and shall be constructed of Portland cement concrete. Sidewalks shall be installed no closer than four feet to the back of curbline and shall not be constructed over any underground gas, electric, communications, or water and sewer utilities. Sidewalks and curbs, at street intersections, shall be designed to permit handicapped access (see construction standard detail for location of sidewalks).
(b) Typically, sidewalks shall be installed by the builder before the issuance of a certificate of occupancy. However, all sidewalks are required to be complete throughout the subdivision (by the applicant) before the end of the four-year maintenance period. Broken curbing and sidewalk after this four-year period shall be repaired by the builder before the issuance of a certificate of occupancy.
(Ord. of 8-8-2005(2), § 809) Sec. 105-225. Street names and signs requirements.
(a) Street names.
(1) All proposed street names within the county for new roads or roads within commercial, industrial, or residential subdivisions shall be approved by the director of planning during the preliminary plat review process or prior to recording of the road and its right-of-way deed.
(2) Any request to change the name of an existing road shall be submitted to the director of planning for review and approval.
(b) Street signs.
(1) The county DOT shall determine the need and location of street signs within a subdivision. The location of the street signs shall be determined during the review of the preliminary plat.
(2) The county's standard steel street posts or wooden four-inch by four-inch posts with horizontal reflectorized street name plates with four-inch letters shall be furnished and installed by county DOT.
(3) The cost of street signs and their installation shall be paid by the applicant at a fee determined by the county DOT. All funds collected for these signs shall be deposited into the county general fund account.
(4) The required fee shall be paid by the applicant when submittal of a final plat is made to the county.
(5) The request for an invoice and the ordering of signs shall come from the director of planning to the county DOT.
(Ord. of 8-8-2005(2), § 810) Sec. 105-226. Streetlight requirements.
(a) In order to ensure adequate illumination of public rights-of way and promote safety and security, The American National Standard Practice for Roadway Lighting of the Illumination Engineering Society (RP-8-00), as approved by the American National Standards Institute (1993), as from time to time amended, is hereby adopted as the standard for the installation and operation of lighting in new subdivisions.
(b) Approval of lighting plan.
(1) A lighting plan, which may be prepared by the streetlight provider, shall be provided to the director of planning for the erection, construction, or installation of street light fixtures or equipment upon which the illumination thereof falls upon public rights-ofway. This shall include security lights of all kinds and nature.
(2) Lighting plans shall be submitted with the final plat and any additions.
(3) Plans shall demonstrate how the proposed lighting meets the standards of this section and include a drawing showing the exact location of streetlights.
(4) No lighting shall be installed or operated without approval of the director of planning.
(c) Streetlight fixtures or equipment shall be erected, constructed, or installed by the applicant in such a manner to insure that the lateral light distribution which causes a glare does not inhibit the users of the rights-of-way from safely traversing and using the rights-ofway.
(d) Streetlight requirements for new development.
(1) Streetlights shall be provided in new subdivisions, except in the A-G and RR zoning districts, where new streets are required to be dedicated to the county or which allow lot access to existing county roads.
(2) New residential subdivisions shall install streetlights with underground wiring. It shall be the responsibility of the applicant to coordinate the installation of the streetlights with the appropriate utility and the county consistent with the standards contained in this article.
(3) Each property owner shall be assessed a rate based on the total cost of annual lighting charge within the district divided by the number of properties within the district. Unit cost of street lighting charges shall be based on fees provided by electric utility companies of both overhead and underground installation.
(4) The rates or charges for street light service shall constitute assessments on the property so served. Those assessments shall be added to tax bills at the end of each year and shall constitute a lien upon the property. Said lien shall have the same priority as tax assessments and an execution may issue for the purpose of enforcing the lien including foreclosure and/or judicial sale.
(e) Streetlight requirements in existing residential development.
(1) Individuals owning real property in an existing residential area desiring to install streetlights may apply with the county to establish a streetlight district.
(2) The application shall be supported by a petition signed by property owners representing more than 75 percent of the property owners in the district, which is sought to be established.
(3) Upon receipt of a complete streetlight application, the director of planning will contact the utility provider to request a layout, price, and contract, if necessary, for the streetlights.
(4) Up to three additional streetlights may be added to an existing streetlight district by the director of planning. If four or more additional streetlights are required, the request must follow the procedure in subsection (e)(2) of this section.
(Ord. of 8-8-2005(2), § 811) Sec. 105-227. Drainage standards for streets.
(a) The size, length, and location of all surface drainage pipe or structures shall be shown on all final plats. All storm drain pipes or culverts carrying stormwater from the street and adjacent property or through lots in the subdivision shall be extended to at least 30 feet behind the rear of the structure to be located on the lot. Stormwater shall be released into a channel or swale without causing scouring, erosion, or resulting in sedimentation of the receiving channel. The outlet channel shall include structural and vegetative measures to assure non-erosive velocities of stormwater. All channels and swales shall be lined with concrete or mat jutting, as approved by the county.
(b) Installations, backfilling, and compaction around drainage pipes shall be in accordance with state department of transportation specifications. All pipes shall have a minimum cover of 18 inches from the bottom of the road base, and head walls or inlet basins constructed at the ends of the pipes.
(c) All cross drain pipes within public rights-of-way for the purpose of providing storm drainage shall be coated metal pipe, concrete, or other material approved by the county.
Ninety-five percent compaction shall be required around all pipes.
(d) The design of drainage structures shall be based on recognized hydrological formulae.
(e) Piped collection systems for public streets (catchbasins, inlets, cross drains, longitudinal piping), shall be designed for the 50-year storm.
(f) Road culverts, which carry live streams, and off-site drainage, shall be designed for the 100-year storm.
(Ord. of 8-8-2005(2), § 812) Secs. 105-228—105-247. Reserved.
ARTICLE IX. RESERVED
Secs. 105-248—105-272. Reserved.
ARTICLE X. STANDARDS FOR UTILITY INFRASTRUCTURE
Sec. 105-273. General compliance to standards.
(a) All development shall include adequate provision for utility infrastructure in full compliance with the standards of this article.
(b) All potential utilities shall be identified on the development plan in order to indicate compliance with placement standards set forth in section 105-274.
(c) All construction drawings shall be prepared and sealed by a professional engineer registered in the state.
(Ord. of 8-8-2005(2), § 1001) Sec. 105-274. Placement standards for all utilities.
(a) The standards for the placement of all utilities are shown on the detail drawings located in section 105-528.
(b) Utilities shall be located within six inches, plus or minus, of the specified plan locations shown on the approved drawings.
(c) All utilities must be underground unless exempted herein or approved by the planning commission.
(d) All utilities other than storm drains and sewage shall be sleeved under paved roadways.
(Ord. of 8-8-2005(2), § 1002) Sec. 105-275. Potable water system requirements.
(a) Compliance with state standards. All potable water systems shall comply with the design and construction standards of the state EPD.
(b) Extension within subdivisions. The applicant shall be responsible for the material and labor cost of extending water systems within a subdivision as directed and inspected by the entity approved by the state EPD which provides water to the subdivision in question.
(1) The extensions of water mains within a subdivision shall be designed to provide adequate hydraulic capacity for future extensions to the surrounding area and shall be connected to existing surrounding water mains to accomplish desirable hydraulic looping.
(2) Dead-end mains within a subdivision shall be avoided, based on a determination by the entity approved by the state EPD to provide water to the subdivision in question.
Water mains in dead-end streets shall have a fire hydrant installed at the end of the line on a common lot corner according to the standard details provided by said entity approved by state EPD.
(c) Hydrants.
(1) Hydrants shall be placed to ensure free and clear access from the nearest public right-of-way. No equipment, landscaping, mail boxes, or other structures shall be placed in such a manner as to obstruct clear access from the right-of-way to the fire hydrant.
(2) Hydrants will be as approved by county fire services. Hydrants shall be of the standard three-outlet type, shall be not more than 500 feet apart, and not more than 500 feet from any structure. Hydrants must pass a minimum flow rate of 500 GPM.
(Ord. of 8-8-2005(2), § 1003; Ord. of 11-7-2022, § XI) Sec. 105-276. Wastewater system requirements.
All wastewater systems shall comply with the design and construction standards of the county health department and, if applicable, the state EPD.
(Ord. of 8-8-2005(2), § 1004) Sec. 105-277. Other utilities.
(a) Certificate of occupancy. A certificate of occupancy shall not be issued for structures in a subdivision or development until all necessary utilities have been installed in full compliance with the design, construction, and placement standards set forth in this article.
(b) Exemptions. The following specific facilities shall be exempt from the requirements of this section, provided that the placement of these facilities complies with the requirements for free and clear access to fire hydrants as set forth in section 105-275(c):
(1) Poles used exclusively for street lighting, provided that the street lighting standards set forth in section 105-226 are met.
(2) Existing poles, overhead lines, and associated overhead structures owned by a utility company crossing over any portion of an area from which overhead wires are allowed.
(3) Overhead lines in commercial and industrial areas attached to the exterior of a building by means of a bracket or similar device and extending from one location on the building, or to an adjacent building without crossing any street or right-of-way.
(4) Radio antennae and associated structures and equipment used for furnishing communications service.
(5) Service terminals and necessary pad-mounted electric transformer equipment installed above ground, used to distribute communications and electric service in underground systems.
(c) Electrical substations. Electrical substations are permissible in any zoning district, subject to the approval of the county. The utility company shall obtain an easement for these installations. The easement shall be clearly indicated on the preliminary and final plats.
(Ord. of 8-8-2005(2), § 1005) Secs. 105-278—105-302. Reserved.
ARTICLE XI. STANDARDS FOR STORMWATER MANAGEMENT
Sec. 105-303. Intent; purpose.
(a) Intent. It is the intent of this article to provide standards and criteria to protect, maintain, and enhance the public health, safety, environment, and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment. It has been determined that proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic resources.
(b) Purpose.
(1) Require that new development and redevelopment maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, stream bank erosion, nonpoint source pollution, increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats.
(2) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality.
(Ord. of 8-8-2005(2), § 1101; Ord. of 6-4-2007, § 1(1101)) Sec. 105-304. Applicability, exemptions, and compliance.
(a) Applicability.
(1) An adequate drainage system, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be provided for the proper drainage of all surface water.
(2) All persons proposing the residential or commercial subdivision of property as defined in the county zoning ordinance set forth in chapter 119 shall prepare a stormwater management plan. No final subdivision plat shall be approved and no development or building permit shall be issued until and unless the stormwater management plan, consisting of a hydrology study report and engineering plans and specifications, has been reviewed and approved by the director of planning or his appointed reviewing entity, and has been installed, except as exempt in subsection
(b) of this section.
(3) This article is applicable to new development and/or redevelopment that disturbs one acre or more.
(b) Exemptions from storm drainage requirements. The following development activities are exempt from the provisions of this section and the requirement of providing a stormwater management plan:
(1) Agricultural land management.
(2) Additions or modifications to existing single-family detached dwellings.
(c) Compliance.
(1) Georgia Department of Transportation (GDOT) Standard Specifications and Details shall be used for construction of all stormwater management structures and appurtenances.
(2) Erosion control practices shall comply with county development regulations and the Georgia Manual for Sediment and Erosion Control.
(Ord. of 8-8-2005(2), § 1102; Ord. of 6-4-2007, § 1(1102)) Sec. 105-305. Hydrologic and hydraulic study required.
(a) Permanent stormwater detention facilities providing for the storage and controlled release of stormwater runoff shall be required for any residential or commercial development activity that will increase the peak rate of discharge from pre-development conditions, except:
(1) The subdivision of property for residential purposes where no new roadway construction is proposed and all the lots exceed three acres in size.
(2) The subdivision of property for residential purposes where all lots exceed five acres.
(3) The re-development of existing commercial sites where the post-development peak stormwater discharge from the site can be shown to be less than 110 percent of the pre-development discharge for the two-, five-, ten-, and 25-year storm return frequencies.
(b) Calculations shall he provided to demonstrate existing and proposed conditions for stormwater conveyance, stormwater detention and routing, and site discharge. A hydrology and hydraulic study shall be required for all stormwater detention facilities.
(c) Hydrology studies shall be prepared and sealed by a design professional registered to practice in the state and must include the following:
(1) A narrative of site description.
(2) A summary showing existing and developed conditions and allowable release rate, including any bypass or off-site sub-basins, for the two-, five-, ten-, 25-, 50-, and 100-year storm events.
(3) An explanation of the methodology used for hydraulic and hydrologic calculations.
(4) The following exhibits:
a. Drainage area maps for existing and proposed conditions.
b. Sub-basin delineation and identification.
c. Drainage area, hydrologic data/parameters.
d. Detail of outlet control structure.
e. All hydrology and hydraulic studies shall meet the standards and employ the methods listed here:
1. The reservoir routing method or an equivalent method shall be used in sizing detention ponds (the bowstring method is not acceptable.)
2. Output from this routing is required for each design storm.
3. Runoff from areas that bypass detention, when combined with discharge from detention basins, must be shown to be less than or equal to predeveloped flow rates in the receiving waterway.
4. The minimum time of concentration used for hydrologic calculations shall be five minutes.
5. Appropriate intensity-duration-frequency curves for the study area shall be used in rainfall calculations.
6. The maximum drainage area for use of the rational method is five acres.
Drainage areas exceeding five acres should be analyzed by the soil conservation service method or other appropriate technique.
(Ord. of 8-8-2005(2), § 1103; Ord. of 6-4-2007, § 1(1103)) Sec. 105-306. Standards to be used in designing detention facilities.
Permanent detention facilities will be required, except where exempt as listed in section 105-305(a), and shall be designed so that the following standards shall apply:
(1) All stormwater detention facilities shall be designed to accommodate the two-, five-, ten-, 25-, 50-, and 100-year storm events.
(2) Detention facilities shall be subject to the provisions of Georgia Safe Dam Program, and the Georgia EPD Rules for Dam Safety (Ga. Comp. Rules & Regs. ch. 391-3-8).
(3) Detention facilities shall provide a minimum of one foot of freeboard between the maximum water surface elevation and the top of the detention berm.
(4) Ponds shall be designed to discharge to defined drainage ditches or natural drainage pathways.
(5) All closed drainage systems (i.e., culverts, pipes, etc.) must have a headwall, or safety end section when appropriate, on their inflow and outflow ends meeting state department of transportation standards, along with the required riprap or other erosion and sediment control device found in the Manual for Erosion and Sediment control in Georgia. As part of the hydrology study, consideration should be given to the flow capacity of downstream drainage structures.
(6) The steepest fill slopes shall be 3:1, and cut slopes shall be no steeper than 2:1. Slopes proposed to be steeper shall be reviewed and conditionally approved on a case-by-case basis by the director of planning or other engineering reviewer approved by the county.
(7) A ten-foot-wide access road shall be required along the top of the berm and around the circumference of the pond where topography does not prohibit its construction.
(8) A fence of high quality, durable material, including wood, iron, or other metal, shall be required for all detention facilities having a maximum water storage depth of more than four feet. The fence must also comply with the following standards:
a. The fence shall be at least six feet high.
b. Fence posts shall be set in concrete ten feet on centers.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.