(1) Connection to an approved sanitary disposal system. Connection to an approved sanitary sewage disposal system shall be made, which may require the construction of an on-site
system or the extension of public sanitary sewerage and associated appurtenances, as required by the county.
(2) Construction standards.All sanitary sewer construction shall conform to the requirements of the county.
(3) Septic tank and drain-field location. Septic tanks and tile drain-field sewerage disposal systems may be required to be located outside
of the 100-year floodplain, stream buffers and impervious setbacks as required by the county health and wellness department and city regulations.
(4) Health department requirements. The health department may require a notation that certain lots must meet additional requirements prior to issuance of a building permit, or other wise limit development relative to health department regulations.
a. Such lots may include lots upon which adequate depth to water table must be demonstrated during the appropriate season of the year, adequate percolation tests must be performed, limitations upon
the number of bedrooms in a dwelling, etc.,
b. No lot shall be included on a final plat which the health department is not confident will meet all health department regulations at a reasonable cost or within
a reasonable period of time, except lots proposed to be served by sanitary sewer in subdivision where "dry" sewer has been installed. Such lots shall be noted:
"Approval by Fulton County for connection to sanitary sewer required prior to issuance of a building permit."
(5) Health department approval required.
Where applicable, approval of the sanitary sewer system by the county may be required prior to the issuance of a land disturbance permit.
(6) Installation prior to paving. Whenever the installation of a sanitary sewer is required by the service provider, no new street shall be paved without the sanitary sewer being first installed.
History
(Ord. No. 2009-06-18, (12.4), 6-29-2009)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.