Sec. 113-162. Earthwork.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(1) Clearing and grubbing.
a. The area within the typical grading section shall be cleared of all trees, brush, stumps, logs, grass roots, vegetable matter, poles, stubs, rubbish, refuse dumps, sawdust piles, and all
other matter resting on or protruding through the original ground surface or appearing or being placed on the area within the typical grading section before final acceptance of work.
b. This item also includes the removal and proper disposal of all the debris or any obstructions not to be salvaged such as
fences and incidental structures within the proposed area to be graded, which might interfere with construction.
c. Clearing and grubbing operations shall be conducted in such a manner as to
prevent damage to existing structures, trees to remain and/or protected by ordinance, equipment and any proposed work that has been completed, and to provide for the safety of workmen and other personnel on the job site.
(2) Grading.
a. Grading shall be done in accordance with the lines and grades shown on the approved plan.
b. Grading plans shall show existing and proposed contour lines at an interval of not more than two feet and spot
elevations and flow arrows where needed.
c. A grading plan showing building pad locations may be required to be submitted to ensure adequate lot-to-lot drainage.
d. Grading plans shall outline the areas which are required to remain
undisturbed, i.e. tree protection areas, undisturbed buffers, stream buffers,
wetlands, floodplains etc., and shall indicate protective fencing or staking to be placed around such areas.
e. Shoulder sections shall be provided as required in article XI.
f. If the proposed grading is within the jurisdiction of the Metropolitan River
Protection Act, the grading shall be consistent with the river corridor certificate approved for the project.
g. Grading for all roads and improved ditches and channels shall be shown.
h. Unclassified excavation consists of all roadway and drainage excavation,
regardless of the nature of the material or the manner in which it is removed. It includes the removal and disposal of
unsuitable or unstable material under the roadbed section and back filling with suitable materials.
i. All rock and boulders in the roadbed shall be excavated to a depth of at least 12 inches below the sub-grade and the
space back-filled to the correct grade with material suitable as sub-grade.
j. Where materials unsuitable for foundation or roadway purposes occur within the limits of the roadbed and front slopes, the same would be excavated to
the bottom of their depth and removed.
(3) Cuts and fills.
a. All depressions below the ground surface containing water shall be drained,
unsuitable material removed and filled with suitable material and compacted to the ground surface before the embankment proper is begun. Any area deemed jurisdictional under federal, state or local regulations shall obtain required approvals or permits prior to any land disturbing activities in those areas.
b. The entire area upon which the cut or fill is to be placed shall be plowed, scarified and finely broken up to a depth of at
least six inches and all cleavage plains shall be destroyed before the
embankment is begun.
c. The fill material shall be deposited and spread in uniform horizontal layers not
to exceed six inches thick for the full width of the cross sections and the layers shall be kept level by any approved
equipment.
d. Each layer shall be compacted at moisture content proper to permit the compaction specified below. Material containing too much water shall be dried to the correct moisture content. If the
material is too dry, water shall be added and uniformly mixed with the soil before it is compacted.
e. The top 12 inches of embankment shall be compacted to at least 100 percent of
the maximum laboratory dry density as determined by AASHTO method T-99.
Embankment material located between one foot and six feet below the top of the embankment shall be compacted to at
least 90 percent of maximum laboratory dry density as determined by AASHTO method T-99. The measurements of depth as described above shall begin at an elevation equal to the bottom of sub-grade treatment where sub-grade treatment material is used.
f. Maximum slope in cut or fill sections shall be 2:1. The slope of cut or fill shall be uniform throughout for each section
of cut or fill unless benching is approved by the city.
g. If the 2:1 slope shows evidence of shearing, non-cohesiveness, sliding, or inability to maintain compaction, the slope shall be stabilized at 3:1 or by using such mechanical methods as needed (such as retaining walls or "grow mats" stapled in place) to maintain slope, height, and integrity.
h. When a cut is made in rock that requires blasting, slope may be changed to
vertical slope upon the written approval of the city engineer and only under the
following conditions:
1. When accompanied by a certification from a registered professional geotechnical engineer stating that the slope material is stable;
2. In no instance shall the slope face be steeper than vertical - one-eighth-inch batter is preferred;
and
3. The slope face is free from all deleterious material and is not subject to long-term erosion due to excessive runoff on the face of the slope.
[i.] All slopes steeper than 2.5:1 and greater than ten feet in height shall be
hydro-seeded and covered with GDOT approved matting and blankets. All slopes must be protected until a permanent vegetative stand is established.
[j.] Slopes over 20 feet in height shall be stabilized in stages by matting and
vegetation. Stabilization measures shall be placed in vertical increments not to
exceed 20 feet immediately at the completion of each 20 foot lift. A minimum of a four-foot bench every 20 feet is required on 2:1 slopes.