Skip to content
Georgia Commons
Menu

Kennesaw · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 10 - ADMINISTRATIVE PROCEDURES

10.02.10. Subdivision Completion

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Upon completion of the installation of the improvements required by this chapter, the sub-divider shall present to the Community Development office three complete sets of the construction plans and drawings showing the subdivision and its improvements. This set of plans and drawings shall include:

1. "As-built" plans of all streets and alleys showing the planned and actual location of all utility lines.

2. "As-built" centerline profiles of all streets.

3. Profiles and invert elevations of all storm and sanitary sewer lines as such improvements shall have actually been installed by the sub-divider.

4. A letter submitted by a registered professional engineer and/or registered surveyor certifying that all sewers, storm drains, curbing and paving have been placed according to grade stakes set by him or his representatives to conform with construction plans submitted to and approved by the city engineer.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:kennesaw/zoning/10.02.10@2026-11-11-62a9aac604

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Kennesaw Zoning Ordinance, 10.02.10. Subdivision Completion | Georgia Commons