Skip to content
Georgia Commons
Menu

Kennesaw · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE

6.11.11. Combined Easement for Sanitary and Pipe Storm Drainage.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Combined easement for both sanitary sewer and piped storm drainage shall be:

A. Minimum width of thirty feet (30');

B. If the storm drainage system consists of an open channel and a sanitary sewer easement;

C. Minimum construction easement width shall be forty feet (40');

D. City Code prohibits any structure being built within ten feet ( 10') of a permanent sewer easement on front and rear setbacks or within two feet (2') on side setbacks. A waiver of setback requirements can be obtained on a case-by-case basis from the Public Works Director or his or her designee

History

The history line the source prints at the end of the section.

(Ord. No. 2012-03, 5-7-12)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:kennesaw/zoning/6.11.11@2026-11-11-850f9f017c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Kennesaw Zoning Ordinance, 6.11.11. Combined Easement for Sanitary and Pipe Storm Drainage | Georgia Commons