Skip to content
Georgia Commons
Menu

Kennesaw · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE

6.11.10. Storm Drainage Easements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All permanent easements shall be:

A. A minimum of ten feet (10') for piped easements;

B. A minimum of twenty feet (20') wide for open channel;

C. Defined as ten feet ( 10') on each side of the centerline of drainage course;

D. Wide enough to allow for full depth excavation of pipe within the side slope limitations of the Trench Ordinance. Nominally, this requires the drainage easement to be four (4) times the depth of the pipe. As an alternative for consideration, engineers can submit concrete pipe designs.

History

The history line the source prints at the end of the section.

(Ord. No. 2012-03, 5-7-12)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:kennesaw/zoning/6.11.10@2026-11-11-c0b40d180d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Kennesaw Zoning Ordinance, 6.11.10. Storm Drainage Easements | Georgia Commons