Kennesaw · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT CODE
6.11.10. Storm Drainage Easements.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All permanent easements shall be:
A. A minimum of ten feet (10') for piped easements;
B. A minimum of twenty feet (20') wide for open channel;
C. Defined as ten feet ( 10') on each side of the centerline of drainage course;
D. Wide enough to allow for full depth excavation of pipe within the side slope limitations of the Trench Ordinance. Nominally, this requires the drainage easement to be four (4) times the depth of the pipe. As an alternative for consideration, engineers can submit concrete pipe designs.
Historia
(Ord. No. 2012-03, 5-7-12)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.