Sec. 502.1. Improvement to existing roads and rights-of-way.

About this text

  • As published by Municode, current through 2024-12-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Every minor and major subdivision, every planned development, and every commercial or industrial/manufacturing use over one (1) acre shall have an entrance on a paved county public road.

A. Existing unpaved public road: Any unpaved public road upon which a development has frontage and access shall be paved and widened according to the functional class of the public road (see section 502 Development standards for streets) along the frontage of the development to the nearest intersection with a paved county road. The minimum rightof-way required according to section 502 shall be dedicated along the entire frontage of the subdivision. The developer shall be responsible for all cost incurred

in meeting the requirements of this section. The administrative officer may waive this requirement for developments that

will have little to no impact on the existing unpaved road.

B. Existing paved public road: Any existing paved county road upon which a development has frontage and access, and which is deficient relative to county specifications, shall be resurfaced and widened for the full length of the frontage of the

subdivision as determined by the county's appointed engineer. The minimum rightof-way required according to section 502 shall be dedicated along the entire frontage of the subdivision. The developer shall be responsible for all costs incurred

in meeting the requirements of this section.

C. Right-of-way acquisition: In the event that the proposed development has frontage on a road with less than the required minimum right-of-way, the developer shall

contact each property owner having road frontage along the county road where the paving is to be extended and determine whether or not they desire to participate in the paving of the road and obtain such right-of-way deeds as are required by the county. If the developer cannot acquire the required number of property owners to consent, the county will acquire the necessary right-of-way through any means necessary, including condemnation. The developer shall be required to pay to the county the estimated costs for acquisition including, but not limited to, appraisals, engineers, legal fees, expert witnesses, and any out-of-pocket expenses incurred.

The county may, at any time during the development, require the payment of additional amounts if the county determines that there is insufficient money deposited to cover the costs of completion. At the conclusion of the project, the county will reimburse the developer any excess amounts it has deposited. Under no circumstances shall development of the proposed subdivision continue until all of the required funds have been tendered to the county.

History

The history line the source prints at the end of the section.

(Ord. No. 2022-06, § 1, 8-16-22)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lamar-county/zoning/502.1@2024-12-17-bcb1ba9a70

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lamar County Zoning Ordinance, Sec. 502.1. Improvement to existing roads and rights-of-way | Georgia Commons