Sec. 38-305. Overbank flooding protection.

About this text

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 4.2 is exempted, then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided.

(1) This requirement may be adjusted or waived by the development services director or his designee for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.

History

The history line the source prints at the end of the section.

(Res. No. LD05-A049, 9-23-2005)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lee-county/zoning/38-305@2026-06-23-f865475fed

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lee County Zoning Ordinance, Sec. 38-305. Overbank flooding protection | Georgia Commons