Lee County · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article VII - STORM DRAINAGE SYSTEMS / Division 3 - POST DEVELOPMENT STORMWATER MANAGEMENT
Sec. 38-305. Overbank flooding protection.
About this text
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 4.2 is exempted, then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided.
(1) This requirement may be adjusted or waived by the development services director or his designee for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.
History
(Res. No. LD05-A049, 9-23-2005)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.