Sec. 38-87. Additional documentation and/or conditions required for utility work, potable water, sanitary sewer or other work in county rights-of-way or easements.

About this text

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Utility work permit.

(1) Information and plans for a utility work permit shall be limited to small drawings depicting location, scope, limits of work and time schedule for completion.

(2) Plans do not require an engineer's seal and signature.

(b) Potable water and sanitary sewer.

(1) Plans approved by the utilities authority;

(2) Erosion and sedimentation control plan;

(3) Stormwater management plan, if the project is more than main line construction; and

(4) Any specifics required for design stated elsewhere in this chapter.

History

The history line the source prints at the end of the section.

(Ord. of 9-18-00(2), § 38-87)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lee-county/zoning/38-87@2026-06-23-e583fee965

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lee County Zoning Ordinance, Sec. 38-87. Additional documentation and/or conditions required for utility work, potable water, sanitary sewer or other work in county rights-of-way or easements | Georgia Commons