Skip to content
Georgia Commons
Menu

Leesburg · Zoning Ordinance

Appendix C - LAND DEVELOPMENT REGULATIONS / Article VII - STORM DRAINAGE SYSTEMS / Division 4 - CONSTRUCTION INSPECTIONS OF POST-DEVELOPMENT STORMWATER MANAGEMENT SYSTEM

Sec. 7.32. Final inspection and as-built plans.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Upon completion of a project, and before a certificate of occupancy or final approval shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual as-built plans for any stormwater management facilities or practices after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a professional engineer. A final

inspection by the development services director or his designee is required before the release of any performance bonds or securities can occur.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/7.32@2026-11-11-52b3540525

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 7.32. Final inspection and as-built plans | Georgia Commons