Skip to content
Georgia Commons
Menu

Leesburg · Zoning Ordinance

Appendix C - LAND DEVELOPMENT REGULATIONS / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 1 - GENERALLY

Sec. 5.08. Cleanup, site restoration and site maintenance.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Project sites shall be kept clean at all times. Loose dirt shall not be allowed to clog ditches or cover sidewalks. Soft clay or other undesirable material removed from the trenches shall be removed from the streets, sidewalks, ditches, curb and gutter and any other drainage structures.

(b) All pavement, sidewalks, driveways, curb, gutter, drains or similar items removed or damaged during or by construction shall be replaced with construction of first class materials and workmanship. All pavement shall be replaced in accordance with the provisions of this ordinance.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:leesburg/zoning/appendix-c-article-v-division-1-5.08@2026-11-11-00628a1cf4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Leesburg Zoning Ordinance, Sec. 5.08 (Appendix C, Article V, Division 1). Cleanup, site restoration and site maintenance | Georgia Commons