Leesburg · Ordenanza de zonificación
Appendix C - LAND DEVELOPMENT REGULATIONS / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 1 - GENERALLY
Sec. 5.08. Cleanup, site restoration and site maintenance.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Project sites shall be kept clean at all times. Loose dirt shall not be allowed to clog ditches or cover sidewalks. Soft clay or other undesirable material removed from the trenches shall be removed from the streets, sidewalks, ditches, curb and gutter and any other drainage structures.
(b) All pavement, sidewalks, driveways, curb, gutter, drains or similar items removed or damaged during or by construction shall be replaced with construction of first class materials and workmanship. All pavement shall be replaced in accordance with the provisions of this ordinance.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.