Skip to content
Georgia Commons
Menu

Manchester · Zoning Ordinance

Appendix B - DEVELOPMENT ORDINANCE / Chapter 3 - PROCEDURE

Section 3.02. Pre-application conference and preliminary plan.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Purpose of conference. The subdivider shall consult with the city manager for advice and assistance prior to preparation of the preliminary plat and application for approval. This will

enable the subdivider to become familiar with the approval process, required documents, inspections, the comprehensive plan, subdivisions improvement standards adopted by the city

council, and development factors which may impact the immediate area near the subdivision.

For subdivisions that require access onto a state highway, the subdivider is required to consult

with the district engineer for the Georgia Department of Transportation (GDOT). The subdivider shall consult with the public works director for access onto city streets, and for improvements to existing streets.

B. Presentation of preliminary plan review.

The subdivider shall be prepared to present a preliminary plan at or following the preapplication conference. The preliminary concept plan shall be a general design of the proposed

subdivision including boundaries of the proposed subdivision, topographic contours, layout of lots and streets, size and dimensions of the property and proposed lots [including lot area], open

space and other planned improvements.

C. [Review and transmit; written response.]

Following the pre-application conference the city manager in consultation with the planning and

zoning board (PZB) shall review the preliminary plan and transmit the subdivider within 15 working days a written response, providing the following information:

1. Conformance to standards in the zoning ordinance.

2. Conformance of the proposed subdivision to the comprehensive plan and any other plans and development policies of the city.

3. Any recommendations or reports from the city engineer or other city departments.

4. Any additional information relative to the subdivision approval process or development standards.

5. Recommendations to improve the development and design of the subdivision.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:manchester/zoning/3.02@2026-11-11-890a3c073b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Manchester Zoning Ordinance, Section 3.02. Pre-application conference and preliminary plan | Georgia Commons