Manchester · Ordenanza de zonificación
Appendix B - DEVELOPMENT ORDINANCE / Chapter 3 - PROCEDURE
Section 3.02. Pre-application conference and preliminary plan.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Purpose of conference. The subdivider shall consult with the city manager for advice and assistance prior to preparation of the preliminary plat and application for approval. This will
enable the subdivider to become familiar with the approval process, required documents, inspections, the comprehensive plan, subdivisions improvement standards adopted by the city
council, and development factors which may impact the immediate area near the subdivision.
For subdivisions that require access onto a state highway, the subdivider is required to consult
with the district engineer for the Georgia Department of Transportation (GDOT). The subdivider shall consult with the public works director for access onto city streets, and for improvements to existing streets.
B. Presentation of preliminary plan review.
The subdivider shall be prepared to present a preliminary plan at or following the preapplication conference. The preliminary concept plan shall be a general design of the proposed
subdivision including boundaries of the proposed subdivision, topographic contours, layout of lots and streets, size and dimensions of the property and proposed lots [including lot area], open
space and other planned improvements.
C. [Review and transmit; written response.]
Following the pre-application conference the city manager in consultation with the planning and
zoning board (PZB) shall review the preliminary plan and transmit the subdivider within 15 working days a written response, providing the following information:
1. Conformance to standards in the zoning ordinance.
2. Conformance of the proposed subdivision to the comprehensive plan and any other plans and development policies of the city.
3. Any recommendations or reports from the city engineer or other city departments.
4. Any additional information relative to the subdivision approval process or development standards.
5. Recommendations to improve the development and design of the subdivision.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.