Section 6.03. Minimum inspection requirements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following inspections shall be made and documented by the city:

1. Street improvement:

a. Check results of subgrade, base, and embankment compaction tests.

b. Test rolling of the finished subgrade and base course shall be

accomplished using a three axle tandem-axle truck with a minimum gross weight of 15 tons. Rolling shall be performed as directed by the city engineer.

c. Inspect for compaction around all drainage pipes and drainage structures.

d. Inspect and document the alignment and condition of curb and gutter.

e. Check fill material before authorizing use.

f. Inspect and document the placement of asphalt pavement. Check core testing results.

g. Obtain from the subdivider all records of asphalt mix and materials quantities.

h. Require as-graded street profiles and review for compliance to the

approved construction plans prior to installing any curb and gutter or base material.

2. Storm drainage improvements:

a. Inspect cross drain pipes to assure that metal pipe is properly coated and sized according to plans.

b. Reject any defective pipe and assure it is not used on the job.

c. Observe pipe-laying operation to assure that pipes are true to line and grade, properly located, and bedding and backfill is compacted according to specifications. Document the depth the type of bedding, trench conditions, and backfilling

operations.

d. Inspect rip-rap or concrete headwalls for proper installation; ensure that drainage catch basins and

manholes are installed properly.

e. Inspect drainage ditches within the street right-of-way and drainage easements within the subdivision to assure proper embankment slope and grade according to specifications.

f. For enclosed storm drainage systems, inspect to ensure that pipes are true to line and grade. Storm drain sewer pipes on steep slopes, greater than 12 percent, should be checked to see that they are properly anchored. Inspect pipe materials and document pipe manufacturer, class and size. Pipe materials for storm sewers shall be reinforced concrete, asphalt coated corrugated steel or other approved materials.

Inspect to ensure that sewers are laid with uniform slope between structures and have straight alignments between structures.

g. Inspect storm water detention facilities to assure compliance with approved plans, capacity volumes

and city construction standards.

3. Sanitary sewer and water main improvements. The water and sewer department shall inspect the following:

a. Pipe material, manufacturer, class, and size for conformance with water and sewerage authority specifications.

b. Reject any defective materials to assure that they will not be used on the job.

c. Observe pipe laying operation to ensure that all joints are properly made, pipes are true to line and grade, compaction and backfill are done according to specifications.

d. Document the depth and type of bedding, trench conditions, compaction, the location of all service stub outs and connections, backfilling and

location of all utilities.

e. Perform and document all final acceptance testing.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:manchester/zoning/6.03@2026-11-11-fa83edb631

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Manchester Zoning Ordinance, Section 6.03. Minimum inspection requirements | Georgia Commons