Skip to content
Georgia Commons
Menu

Norcross · Zoning Ordinance

Norcross Zoning Ordinance

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Part 2 of 3. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

(2) Govern the removal of signs determined to be physically unsafe or which create a safety hazard to the public.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-3. Sign definitions.

(a) Freestanding signs. Signs not attached to a building, including the following:

(1) Accessory ground sign. A small, less than six square feet in area, permanently affixed sign which is wholly independent of a building for support, and which is accessory and subordinate to a primary ground sign.

(2) Pole sign. A permanent freestanding sign supported by one or more uprights, poles, or braces placed in or upon the ground surface and not attached to any building.

(3) Ground sign. A permanent freestanding sign, other than a pole sign not attached to a building, which is placed upon or supported by the ground independently of any other structure. Such sign may also be known as a monument sign. A sign that is placed on two posts, where there is no more than one foot of distance between the base of the sign at grade and the bottom of the sign shall be considered a ground sign for the purposes of this article.

(4) Subdivision entrance sign. A ground sign placed at the entrance of a platted subdivision. The subdivision can be for any type of development, including residential, commercial, or industrial.

(b) Building signs. Signs attached to a building, including the following:

(1) Accessory building sign. A small, less than six square feet in area, permanently affixed sign to a building for support, and which is accessory and subordinate to a primary building sign.

(2) Awning sign. A building sign that is mounted or painted on or attached to an awning or canopy and does not project vertically above or horizontally beyond the physical dimensions of such awning or canopy.

(3) Projecting sign. A building sign whose nearest point projects no more than 18 inches from, and is supported by, a wall of a building.

(4) Wall sign. A building sign that is attached directly to a building wall and which does not extend more than 18 inches from nor above the roof line or beyond the limits of the outside wall, with the exposed face of the sign in a plane parallel to the building wall.

(5) Window sign. A building sign affixed to, in contact with, or inside a window; installed for purposes of viewing from outside the premises. This does not include merchandise located in a window.

(c) Temporary signs. A sign which is neither permanently anchored to the ground nor permanently affixed to a structure, nor mounted on a chassis, and intended for a limited period of display, including the following:

(1) Banner sign. A temporary sign constructed of canvas, plastic, fabric or similar lightweight, non-rigid material that can be mounted to a structure with cord, rope, cable, or a similar method.

(2) Flag, pennant or other moving or animated sign. Any temporary sign or part of such sign that changes physical position by any movement or rotation that gives the visual impression of such movement or rotation.

(3) Yard sign. Any temporary sign placed on the ground or attached to a supporting structure, posts, or poles, that is not attached to any building.

(d) Miscellaneous sign terms.

(1) Accessory sign. A small sign, less than six square feet in sign area, permanently affixed either to a building for support, or freestanding, and which is accessory and subordinate to other signs on the lot.

(2) Awning. A structure made of cloth, metal, or other material affixed to a building in such a manner that the structure may be raised or retracted to a flat position against the building, but not including a canopy or marquee.

(3) Canopy.A structure other than an awning made of cloth, metal or other material that may be totally or partially attached to a building for the purpose of providing shelter to patrons or automobiles, or as a decorative feature on a building wall. A canopy is not a completely enclosed structure and does not rise, nor is it capable of retraction.

(4) Changeable copy sign.A sign designed so that the characters, letters or illustrations can be changed or rearranged without altering the face or the surface of the sign;

also known as a reader board, if the copy is manually changed, or electronic message board, if remotely changed by computer.

(5) Clear sight triangle. The triangular area formed by a diagonal line connecting two points located on intersecting lines of a right-of-way, easement of access, or pavement edge of an access drive, each point being 20 feet from the intersecting lines.

(6) Clearance (of a sign). The smallest average vertical distance between the grade of where the sign is attached and the lowest point of any sign, including framework and embellishments, extending over that grade (compare "height").

(7) Electronic message board (EMB).A form of changeable copy sign that is electrically activated and whose variable message or graphic presentation capability can be electronically programmed by computer from a remote location. EMBs typically use light emitting diodes (LEDs) as a lighting source.

(8) Façade. That portion of an enclosed building facing the principal dedicated street or that wall of a building through which there is primary access for customers. Where more than one business occupies the same building, the facade for each business shall be that portion of the building occupied by the business which faces the street, or which provides the primary access.

(9) Face change. The removal or replacement of an existing surface display panel where the remaining structural frame is not changed. The changing of as message on a changeable copy sign is not considered a face change.

(10) Flashing sign. A sign that uses an intermittent, moving or flashing light source to attract attention.

(11) Frontage, building. Total lineal feet of enclosed building length along the facade that fronts the principal dedicated street, or the facade that contains the main entrance to the building.

(12) Frontage, secondary. The street which the developer selects to be the secondary access to the development.

(13) Frontage, street or lot. Total lineal feet of right-of-way or easement of access along the front yard of a lot.

(14) Height (of a sign). The vertical distance measured from the highest point of the sign, including decorative embellishments, to the average surface grade where the sign is attached (compare: "clearance").

(15) Illuminated sign. A sign either internally or externally illuminated.

(16) Maintenance. The cleaning, painting, repair, or replacement of defective parts of a sign in a manner that does not alter the basic copy, design or structure of the sign.

(17) Marquee. Any fixed hood (other than a canopy or awning), which is supported solely by the building to which it is attached, consisting of metal or other incombustible material and which included a sign or other message. The location of marquees shall be restricted to the main entrance to a building.

(18) Nonconforming sign. Any sign which was lawfully erected in compliance with applicable regulations in force at the time and maintained prior to the effective date of this zoning resolution, and which fails to conform to all applicable standards and restrictions of this resolution.

(19) Oversized sign. A ground sign which exceeds 30 feet in sign height or 300 square feet of sign surface area.

(20) Portable sign. A sign not permanently anchored or secured to either a building or the ground, but designed to be anchored or secured to a trailer, vehicle (where the primary purpose is to convey a message) or frame capable of being moved from place to place.

(21) Reader board. Form of changeable copy sign designed so that the characters, letters or illustrations can be manually changed or rearranged without altering the face or the surface of the sign.

(22) Roof sign.A sign that is mounted or painted on the roof of a building, or that is wholly dependent upon a building for support and that project above the highest point of a building with a flat roof, the eave line of a building with gambrel, gable, mansard, or hip roof.

(23) Sign. Any object, device, or structure, or part thereof, situated outdoors or indoors and intended to be visible from a public street right-of-way or public or private common area which is used to convey a message, advertise, identify, display, direct, or attract attention to an object, person, institution, organization, business, product, service, event or location by any means, including words, letters, figures, designs, symbols, fixtures, colors, illumination, or projected images. Signs do not include the flag or emblem of any nation, organization or nations, state, city, or any fraternal, religious or civic organizations; or works of art.

(24) Sign animation. The use of movement or some element thereof, to depict action or create a special effect or scene.

(25) Sign structure or support. Any structure that supports or can support a sign, including decorative cover.

(26) Snipe sign. A sign for which a permit has not been obtained which is attached to a public utility pole, light pole, service pole or supports for another sign or placed within the right-of-way.

(27) Surface display area. All solid surface areas of a sign, including air space surrounded by a solid surface of a sign. Sign area means the smallest square, rectangle, triangle, circle, or combination thereof, which encompasses the entire sign, inclusive of any border and trim but excluding the base, apron, supports, and other structural members.

(28) Vehicle sign. Signs on vehicles or trailers visible from the public right-of-way where the primary purpose of the vehicle or boat is to display a sign.

(29) Visible. Capable of being seen, whether or not legible, without visual aid by a person of normal acuity from a public right-of-way, or public or private common open space.

(30) Zoning district use category. A categorization of zoning districts by the land uses allowed in each for the purposes of this sign article. The categories are as follows:

a. Single-family residential—R-100, R-75, R-60, RTH including developments built under the provisions of the CSO overlay.

b. Multi-family residential—RD, PRD.

c. Office—OI.

d. Commercial—C1, C2, CAR.

e. Industrial—M1, M2.

f. Mixed-use—CX, HX, NX, BH.

g. Public—P.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 14-2019, 11-4-2019) Sec. 204-4. Signs requiring a permit.

(a) Unless expressly exempted in section 204-5, no sign shall be erected, enlarged, expanded, altered, relocated or reconstructed on private or public property unless a sign permit, showing compliance of the sign with the provisions of this article, shall have first been issued by the Community Development Director.

(b) Existing signs which conform to the provisions of this article that would be required to obtain a permit under the regulations of this article must register with the city within 90 days of the effective date of this article. The information provided for registration will be the same information required in a permit application under section 204-7. No permit fee will be required for the registration of existing signs.

(c) Each nonconforming sign shall be registered within 90 days of the enactment date of this article from by the owner, and if it is determined that such registered nonconforming sign was legally erected under the prior requirements, then a sign permit shall be issued to the sign owner. If the owner of a nonconforming sign fails to register such sign within 90 days from the enactment of this article, it shall be deemed a violation of this article, subject to citation in the recorder's court of the city.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 14-2019, 11-4-2019) Sec. 204-5. Signs exempt from having a permit.

The following signs and sign-related activities shall be exempt from the provisions of this article and shall not require a sign permit. All signs in this section, unless otherwise stated below, shall be setback a minimum of ten feet from the right-of-way, easement of access, or edge of pavement, whichever is the greater setback, and five feet from all other property lines.

(1) Routine maintenance. Routine sign maintenance includes cleaning, re-painting, replacing lighting elements, ballasts, and electrical components, and changing of lettering or parts of signs designed to be regularly changed.

(2) Face changes. Signs shall be allowed sign face changes that are non-structural only. Further modifications may be subject to the provisions of section 204-11, nonconforming or noncomplying signs.

(3) Copy changes. The change of a message on any changeable copy sign or any variable message sign may occur without a permit.

(4) Small non-illuminated temporary freestanding signs (excluding banners, which are regulated under section 204-12). For each residential or nonresidential lot, the quantity of these signs shall be limited to either one sign that is 16 square feet in area or any number of signs whose total combined area totals 16 square feet, such as four signs of four-square feet in area each. These signs shall not be located within the public street right-of-way and shall be no closer than ten feet to the back of the curb of a public roadway.

(5) Traffic or government signs. Any signs installed by the city, county, state, federal government or an authorized transit agency.

(6) ADA required signs. Any signs installed to meet the requirements of the Americans with Disabilities (ADA) Act.

(7) Signs meeting the requirements of section 204-18.

(8) For sale signs. The quantity of these signs shall be limited to either one sign that is 16 square feet in area or any number of signs whose total combined area totals 16 square feet, such as four signs of four-square feet in area each. These signs shall not be located within the public street right-of-way and shall be no closer than ten feet to the back of the curb of a public roadway.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 09-2025, § 1, 12-5-2025) Sec. 204-6. Signs specifically prohibited.

The following signs, in addition to all other signs not expressly permitted by this article, are prohibited in all zoning districts and shall not be erected, or maintained:

(1) Signs that are structurally unsound, unsafe, or hazardous to traffic or pedestrians.

(2) Permanent signs built of non-durable materials, such as corrugated plastic, paper, etc.

(3) Roof signs.

(4) Signs that move or give the appearance of moving, including sky dancers, pennants, streamers, or banners in excess of 32 square feet.

(5) Streamers, inflatable objects, and gas filled devices, other than permitted temporary signs.

(6) Flashing signs and signs containing any flashing or running lights, strobe lights, or lights creating an illusion of movement.

(7) Signs which imitate or may be easily confused with official traffic and government signs.

(8) Portable signs, except as permitted in section 204-17, vehicle signs.

(9) Multi-faced "V"-shaped signs with angles exceeding 60 degrees in diameter.

(10) Snipe signs.

(11) Signs mechanically rotating at greater than six revolutions per minute.

(12) Any sign placed or erected on property without the permission of the property owner.

(13) Signs which are obscene as defined by O.C.G.A § 16-12-80.

(14) Signs which emit or utilize in any manner any sound capable of being detected on any traveled road or highway by a person with normal hearing abilities.

(15) Signs which interfere with road or highway visibility or obstruct or otherwise interfere with the safe and orderly movement of traffic or which otherwise pose a hazard to traffic due to structural deficiencies in the structure of such signs.

(16) Signs which obstruct any fire escape, any means of egress or ventilation or shall prevent free passage from one part of a roof to any other part, as well as signs attached to any fire escape.

(17) Signs which do not conform to applicable building or electrical codes.

(18) Exterior exposed electrical signs including neon or LED used to attract attention such as outlining a building or building feature.

(19) Dilapidated or neglected signs.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-7. Application information.

Applications for sign permits required by this article shall be filed by the sign owner or the owner's agent upon official forms with the Community Development Department.

(1) The application shall describe and provide the information requested on the sign permit application and as stipulated by this article including, but not limited to, the following information:

a. The street address of the property upon which the sign is to be located and a plat map of the property which bears an indication of the proposed location of the sign. In the absence of a street address, a method of location acceptable to the Community Development Department shall be used.

b. The width of the face of the building, suite, or length of road frontage at the proposed location, as applicable.

c. The name and address of the owner of the real property upon which the subject sign is to be located.

d. An owner affidavit demonstrating owner consent, or the owner's agent consent, granting permission for the placement or maintenance of the sign.

e. Name, address, email address, phone number, proof of insurance, and business license number of the sign contractor.

f. The type of sign to be erected, the area of the sign, the height of the sign, the shape of the sign, and an explanation of how the sign is to be mounted or erected.

g. Identification of any existing signage on the property, and dimensioned size.

h. In the case of an oversized sign application, the distances as set forth in section 204-15, oversized signs, must be provided.

i. The size of the parcel on which the sign is to be placed.

j. A dimensioned drawing of the proposed signage, including: height, width, construction materials, source of illumination, colors, and placement on the structure or position on the lot. Such drawing shall be of sufficient detail and accuracy to permit an informed review.

(2) A separate building permit is required for monument signs over four feet in height and oversized signs.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-8. Sign permit application—Time for consideration.

(a) The city shall process all sign permit applications within 30 business days of the city's actual receipt of a completed sign permit application and a sign permit fee.

(b) The sign permit fee shall be established by the Mayor and Council.

(c) The Community Development Director or designee shall give notice to the applicant of a decision of the city by electronic means, by hand delivery, or by mailing a notice by certified mail with return receipt requested. Delivery will be mailed to the email address or mail address on the sign permit application on or before the 30th business day after the city's receipt of the completed application.

(1) If mailed, the notice shall be deemed to have been given upon the date of mailing in conformity with this section.

(2) If the city fails to act within the 30-day prescribed period, the permit shall be deemed to have been granted.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-9. Application—Denial and revocation.

(a) Procedure. The city shall deny sign permits to applicants that submit applications for signs that do not comply with the provisions of this article, incomplete applications, and applications containing any false material statements.

(1) Violation of any provision of this article and any other applicable federal or state law or city ordinance shall be grounds for revoking a permit granted by the city for the erection of a sign.

(2) If it is determined that a sign permit was issued pursuant to an incomplete application or an application containing a false material statement, or that a permit has been erroneously issued in violation of this article, the Community Development Department Director shall revoke the permit.

(3) If the Community Development Department Director denies or revokes a permit, the reasons for the denial or revocation of the permit shall be stated in writing.

(4) Any application denied and later resubmitted shall be deemed to have been submitted on the date of resubmission, instead of the date of the original submission.

(5) A modified application to rectify dimension or design considerations shall be considered a continuation of the original sign application, unless the applicant has constructed or installed the sign which was denied.

(6) No permit shall be denied or revoked, except for due cause. The term "due cause" means the violation of the provision of this article, state or federal law, or the submission of an incomplete application or an application containing false material statements.

(7) If a sign application is denied, a new sign application may be filed addressing the reasons for the denial, and such application will require a new sign application review fee.

(b) Appeals. In the event an applicant, property owner, or designated representative whose permit has been denied or revoked is dissatisfied with the decision of the Community Development Director, the applicant has the right to request a public hearing before the Zoning Board of Appeals.

(1) The applicant shall be given ten days to file a request for an appeal to the Zoning Board of Appeals after receipt of the denial or revocation notice from the city.

(2) When a timely appeal has been filed, the city shall advertise the appeal giving notice of the time and place of such hearing in the official organ of the city at least 15 days prior to the Zoning Board of Appeals next scheduled hearing.

(3) The date may be rescheduled by agreement of the city.

(4) At the hearing any party may appear in person or by agent or attorney.

(5) In the event an applicant, property owner or designated representative whose permit has been denied or revoked is dissatisfied with the decision of the Zoning Board of Appeals, the applicant, property owner or designated representative may appeal the decision of the Zoning Board of Appeals by filing a petition for writ of certiorari to the superior court of the county in the manner provided by law.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-10. Sign permit—Expiration.

A sign permit shall become null and void if the sign for which the permit was issued has not been completed, erected and installed within six months after the date of issuance of the permit.

(1) No refunds will be made for permit fees paid for permits that expired due to the failure to erect a completed permitted sign within the prescribed period.

(2) If at a later time an individual desires to erect a sign at the same location, a new application must be processed and another fee paid in accordance with the fee schedule applicable at that time.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-11. Nonconforming or noncomplying signs.

Signs existing on or before the effective date of this article that do not conform to the standards in this article are considered nonconforming and shall be subject to the provisions of this section.

(1) Grandfathered signs. In all use districts, signs which on the effective date of this article become nonconforming, with respect to the requirements set forth in this article, may continue in existence so long as the nonconforming sign is not enlarged, altered, modified, improved or rebuilt beyond that existing as of the effective date of this article.

(2) Existing signs which were legally erected which have become nonconforming and do not meet the setback requirements of this article due to a road widening project may be moved to meet the setback requirements of this article but shall not be increased in size, shape or changed in any manner except as to meet the requirements of this article; provided that:

a. This subsection shall not allow the relocation of any sign for which the value has been paid to the owner by any government or government agency in conjunction with a road widening project.

b. No sign shall be relocated pursuant to this subsection before the sign owner provides the Director with a signed copy of the purchase contract or condemnation documents showing transfer of the owner's land for road widening.

(3) In all use districts, signs which are prohibited shall be removed by the owner. Upon failure to comply with requirements of this division, the Community Development Director may cause the removal of such signs at the expense of the owners. These prohibited signs include:

a. Illegally erected or maintained with respect to prior ordinances.

b. Made of paper, cloth, or nondurable materials.

c. Located in the public right-of-way.

(4) A nonconforming sign shall not be replaced by another nonconforming sign.

(5) Minor repairs and maintenance of nonconforming signs such as electrical repairs or lettering repairs shall be allowed. However, no structural repairs or changes in the size or shape of the sign shall be permitted except to make the sign comply with the requirements of this article. Signs damaged by fire or acts of God may be restored to their original condition.

(6) Existing signs visible from interstate highways that were legally erected which would become nonconforming as a result of these regulations will be allowed to remain until purchased by the state department of transportation or the city, provided that the sign owner meets the requirements of state laws, rules and regulations governing such signs.

(7) Existing signs on the property of newly annexed territory that were legally erected under the county ordinance which would become nonconforming under this section upon annexation by the city will be allowed to remain. Such signs shall be registered with the city within 90 days of being annexed by the city.

(8) No sign variances are allowed.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-12. Temporary signs.

(a) The following types of signs or devices shall be allowed by issue of a temporary sign permit:

(1) Flags or banners beyond the limits allowed in section 204-13 (flag section).

a. Banners are limited to 32 square feet in size area and may be double sided.

This includes institutional uses in residentially zoned properties such as places of worship and schools.

b. The location and means of mounting must be clearly depicted on the temporary sign permit application.

(2) Signs associated with a temporary outdoor activity or temporary outdoor retail sales and display events, as regulated in chapter 8, article IX, of this Code.

(b) Temporary signage is limited to a period not exceeding 15 consecutive days.

(c) The time limitation on temporary signage associated with a permitted temporary outdoor activity shall be waived to allow temporary signage to run concurrently only with the permitted term and duration of the specific temporary outdoor activity as stipulated in subsection 8-318(g)(1) of this Code, subject to Community Development Director approval.

(d) A fee as established by the City Council and posted by the Community Development Department shall be charged for each temporary sign.

(e) The city shall be exempted from temporary sign regulation and fees including, but not limited to: size, placement and duration of display when displaying signs.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 09-2025, § 1, 12-5-2025) Sec. 204-13. Flags.

(a) All flags shall be displayed on purpose-built, professionally fabricated flagpoles, which may be vertical or mast-arm flagpoles.

(1) In nonresidential districts, flagpoles shall not exceed the allowed height provided for a structure or building in the applicable zoning district or 50 feet, whichever is lower.

(2) The flagpoles in residential districts shall not exceed 25 feet in height or the height of the primary structure on the lot, whichever is less.

(b) Flag dimensions.

(1) The maximum dimensions of any flag shall be proportional to the flagpole height.

(2) The hoist side of the flag shall not exceed 20 percent of the vertical height of the flagpole.

(3) In addition, flags are subject to the following limitations:

Pole Height Maximum Flag Size (Total Square Feet) Up to 30 feet 30 square feet 31 and greater 60 square feet

(c) Each lot or parcel shall be allowed a maximum of three flagpoles.

(d) A maximum of two flags shall be allowed per flagpole.

(e) A vertical flagpole must be set back from all property boundaries a distance which is at least equal to the height of the flagpole.

(f) Flags and flagpoles shall be maintained in good repair, and to the extent applicable shall be in compliance with the building code. Flagpoles with broken halyards shall not be used and flags which are torn or frayed shall not be displayed.

(g) On officially designated county, state, or federal holidays, there shall be no maximum flag size or number or other limitations on display.

(h) This section shall not be construed to restrict the right to display eligible flags as banners or noncommercial signage, as provided elsewhere in this article.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-14. General standards.

Unless expressly exempted by section 204-5, signs exempt from having a permit, all signs within the city shall conform to the following general standards.

(1) Illumination.

a. Location and design of light source. No sign shall give off light which glares, blinds or has any other such adverse effect on traffic or adjacent properties.

The light from an illuminated sign shall be established in such a way that no direct light is cast upon adjacent properties and roadways.

b. Level of illumination. In no event shall the illumination of any sign exceed 50 foot-candles at the sign face.

(2) Height.

a. Height of freestanding signs. The height of a sign shall be equal to the vertical distance from the average grade at the base of the sign, or from the crown of the roadway of the nearest street within 100 feet of any portion of the sign, to the highest point of any portion of the sign, whichever results in the greater sign height. Any earthen berms and elevated foundations supporting signs, signposts or other sign supports shall be included in the height of the sign. No variances on sign height are allowed.

Freestanding sign in any: Maximum height Residential zoning district 4 feet Office or industrial district 6 feet Commercial or mixed-use district 10 feet

b. Height and placement of building signs.

1. Building signs shall be located within the limits of the outside wall of the building.

2. Marquee, awning, or projecting signs shall be designed to have a minimum clearance height of eight and one-half feet above grade.

(3) Minimum setback.

a. The closest part of any sign shall be setback a minimum of ten feet from edge of pavement.

b. The side yard setback for a sign in a non-residential district adjoining a single family residential district shall be setback a minimum of 25 feet from the adjoining residential district.

c. With the exception of accessory freestanding signs at driveways, all signs must be located outside of any clear sight triangle.

(4) Sign maintenance. The owner of a sign shall be responsible to maintain such sign, including its illumination sources, in full compliance with this article and all applicable laws, in a safe, secure, clean and orderly condition and in working order at all times.

(5) Sign replacement. Applicant shall be required to restore the wall/façade material to aesthetic conformance with its original color and texture on the surface area beneath a wall/façade mounted sign after it is removed, modified or replaced by a new sign.

a. Improvements must be completed within 30 days of the removal of the existing sign prior to installation of the new signage.

b. Property owner shall be responsible for retrofit of façade surface to original condition in the case of abandoned commercial signs which have been discontinued for a period of more than 90 days and are required to be removed.

(6) Architectural features. Signs shall be designed to be compatible with the general style, color and architectural elements of the building to which they serve.

(7) Ground sign base.

a. All ground signs shall be monument in style and have a sign base that matches the width of the copy area and support.

b. All ground signs are to be constructed with a base constructed of stone, brick, or other architecturally compatible solid and durable base material.

c. The sign shall be securely connected to the base.

d. The sign base shall be of a color that is compatible with the principal structure on the lot which the sign is located.

(8) Changeable copy boards. A changeable copy board may be incorporated into any sign, but shall constitute no more than 50 percent of the area of the sign. See subsection 204-21(c) for restrictions that apply to this provision on the location of electronic message boards in the city historic district.

(9) Window signs.

a. Window signs are considered "building signs" and are permitted but shall not cover more than 20 percent of the window.

b. Window signs are considered separate from the square footage allocation for wall signs.

c. Hand-written window signage is prohibited.

(10) Accessory signs.

a. Planned commercial centers, mixed use developments, multifamily developments, and any standalone commercial use with drive through services may have additional accessory signage subject to approval of a uniform sign plan.

b. The total sign area of accessory ground signs on a lot are not included in the calculations of total sign area for freestanding signs on a lot, but they may not exceed that total.

c. Accessory building signs are included in the calculations of total sign area for building signs.

d. Accessory ground signs cannot be taller than three feet.

(11) Convenience stores and service stations with pump islands. Convenience stores and service stations with pump islands may have additional accessory signage outside the approval of a uniform sign plan, if they meet the following limitations:

a. No more than two signs per canopy face with a maximum of eight square feet per sign.

b. Spreader bars (signs located under canopy over pumps islands) shall be limited to no more than two signs per pump, not to exceed four square feet per sign.

c. Accessory car wash, if a separate drive-through car wash building is on site, two additional wall signs may be allowed not to exceed 16 square feet each.

(12) Allocation of sign area and number of signs by land use.

a. The following table specifies the maximum limits of sign area for each zoning district use category in the absence of an approved uniform sign plan, see section 204-20. Note the provisions for accessory signs in subsections 204- 14(i) and (j).

Zoning District Use Category Freestanding Signs Building Signs Subdivision Entrance Signs A Temporary Signs B Single-Family Residential See subsection 204-19(b) N/A 25 sq. ft. at the entrance of a platted subdivision, see sec.

204-19 16 sq. ft. aggregate sign area Multi-family Residential Total sign area cannot exceed 4 sq. ft. per unit, up to 32 sq. ft. total 32 sq. ft. per building 32 sq. ft. 32 sq. ft. aggregate sign area Zoning District Use Category Freestanding Signs Building Signs Subdivision Entrance Signs A Temporary Signs B Office .75 sq. ft. per linear foot of lot frontage up to 32 sq. ft.

Total square footage equal to the width of the face of the building or suite times a factor of two. Unless the building fronts on two or more streets it shall be considered to have only one face. Where frontage on multiple roadways exists, each frontage is allocated a maximum square footage allowance.

2.0 sq. ft. per tenant up to 100 sq.

ft.

32 sq. ft. aggregate sign area Commercial 1. Not to exceed 50 square feet on one side, maximum two sides, for road frontage up to and not exceeding 500 linear feet.

2. 100 square feet on one side, maximum two sides, for road frontage between 501 and 1,000 linear feet of road frontage.

3. 150 square feet on one side, maximum two sides, for road frontage between 1,001 and 1,500 linear feet of road frontage.

Only allowed in planned centers, and per the limitations of an approved Uniform Sign Plan. Shall not exceed a total area equal to 10% of the linear road frontage, up to 150 sq. ft.

32 sq. ft. aggregate sign area Industrial 1.5 sq. ft. per linear foot of lot frontage up to 200 sq. ft.

2.0 sq. ft. per tenant up to 200 sq.

ft.

32 sq. ft. aggregate sign area Mixed Use As per the limitations of an approved Uniform Sign Plan. Shall not exceed commercial sign requirements.

32 sq. ft. aggregate sign area

NOTES

A. If the property owner selects a subdivision entrance sign, no other individual permanent freestanding signs shall be permitted on the lot. One monument entrance sign is permitted per street entrance.

B. Temporary signage square footage requirement indicates the total permitted square footage on the lot, both temporary yard signs and temporary building signs.

C. No variances for maximum sign size are allowed.

b. The following table specifies the number of signs greater than 16 square feet in size permitted for each zoning district use category per lot:

Zoning District Land Use Category Freestanding Sign Building Sign Subdivision Entrance Sign Temporary Sign Single-family Residential None None One per primary street entrance.

Unlimited - Not to exceed square footage requirement as indicated in the district.

Multi-family Residential 1 per 200 feet of frontage 1 per building Office 1 per 200 feet of frontage Unlimited—Not to exceed square footage requirement as indicated.

Commercial, Industrial and Mixed Use 1 per 300 feet of frontage (Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-15. Oversized signs.

Oversized signs located within 660 feet of streets that are part of the interstate or primary highway systems shall be regulated pursuant to O.C.G.A. §§ 32-6-70—32-6-97 and Georgia Department of Transportation (GDOT) Rules and Policies Chapter 672-1, 672-6, 672-7 and 672-14 and the following requirements.

(1) Location.Any property located within 660 feet of Interstate Highway 85 may contain one oversized sign if the sign is set back at least 75 feet from all buildings, structures, and property lines.

(2) Sign area. The sign area of any oversized sign shall not exceed 600 square feet.

The height of the sign area of any oversized sign shall not exceed 12 feet, and the length of the sign area of any oversized sign shall not exceed 50 feet, with or without trim.

(3) Illumination. All illuminated oversized signs shall use base LED, mounted fluorescent or mercury vapor lights and shall be activated by photoelectric cells. Additional lighting, including but not limited to neon, animation and running lights, is prohibited.

(4) Height.

a. Oversized signs shall not exceed 30 feet in height. Two oversized signs in the same location, back-to-back or in a "V" formation shall be the same height above the interstate surface.

b. All oversized signs on property adjacent to the Interstate Highway 85 shall be a minimum of 14 feet above the adjacent interstate pavement measuring from the lowest portion of the sign face.

(5) Extrusions prohibited. Extrusions beyond the face of any oversized sign, excluding aprons, are prohibited.

(6) Location and number of signs.

a. Oversized signs are only allowed in the M-1 or M-2 zoning districts.

b. Only one oversized sign shall be allowed per lot.

c. No oversized sign shall be placed on any lot which contains any other freestanding sign.

d. Oversized signs shall be no less than 1,000 feet apart measuring from the two closest points and only one sign face shall be allowed to face the same direction per location. This allows back-to-back or "V" formation signs, but prohibits two signs (side-by-side or over and under) facing the same direction.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-16. Sign measurement.

(a) Area of a freestanding sign.

(1) The area of a freestanding sign shall be determined by computing the visible surface display area including all solid surface areas, including air space surrounded by surface display area, and architectural or design features.

(2) The width of a sign face shall be in line with the width of the base of a freestanding ground sign.

(3) Area of building signs.

a. The area of a building sign shall be determined by computing the visible surface display area, including all text and graphics, which are completely enclosed by a frame or graphic design.

b. In the case of individually mounted letters, where there is not a defined sign background, the area of the sign shall be the area that is measured by taking the largest horizontal width multiplied by the largest vertical height of the sign as identified in the graphics below.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-17. Vehicle signage.

Vehicle signs viewed from a public road or public or private common areas with the primary purpose of providing signage not otherwise allowed by this article are not permitted in the front yard of a principal building. Vehicle signs include those attached to or placed on a vehicle or trailer. Vehicles or trailers shall not be parked continuously in one location to be used primarily as additional signage. This does not apply to a vehicle parked at a driver's residence and used as the primary means of transportation to and from his or her place of employment or vehicles commonly used for delivery or work purposes of the associated business, and parked temporarily for immediate loading and unloading.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-18. Signs permitted in single-family residential districts.

(a) Other than residential subdivision signs allowed under section 204-19, parcels located in residential zoning districts, shall not contain signs having an aggregate sign area greater than 16 square feet.

(b) No individual sign shall exceed six square feet in sign area in a residential zoning district.

(c) No sign in a residential district shall have a height of greater than four feet above the grade level of the center line of the adjacent street to which the parcel on which the sign is located.

(d) Signs meeting the standards of this section are exempt from permitting requirements.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-19. Residential subdivision signs.

(a) Platted residential subdivisions consisting of more than two parcels may erect one monument sign at each entrance to the subdivision. Such sign shall not exceed a height of four feet above the grade level of the center line of the adjacent street and shall not have a sign area greater than 25 square feet. Such entrance signs shall not count toward the maximum allowable signage on a residential parcel.

(b) Homeowners association recreation facility sign. In a platted residential subdivision, each lot that contains a building or recreation facility used for the common enjoyment of the members of a homeowners association is permitted one permanent ground sign per public road frontage with a maximum sign area of 64 square feet and a maximum copy area of 32 square feet.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-20. Uniform sign plan.

(a) A uniform sign plan is required for any planned commercial, mixed-use or multifamily, development, before any signs may be erected on the property.

(b) The uniform sign plan shall govern the placement and design of all signs within the planned development as to their location, materials, size, letter style, and color.

(c) A uniform sign plan shall be submitted and approved as follows:

(1) The uniform sign plan shall consist of such drawings and specifications as may be required to clearly illustrate the location, materials, size, letter style, and color of all and every sign to be placed as freestanding and building signs within the development.

(2) The uniform sign plan is to be submitted to the Director. The uniform sign plan shall be approved upon a finding by the Director that:

a. The plan provides that signs of a similar type and function within the development shall have a consistency of size, lettering style, color scheme, and construction materials so as to present a unified design concept while respecting the differences between tenant types and occupancies.

b. The signs proposed in the uniform sign plan shall comply with the requirements of this article, such as number, location, and size restrictions.

(d) All tenants of the planned commercial development, whether an owner, lessee, subtenant, purchaser, or other occupant, shall comply with the approved uniform sign plan.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-21. Signs in the Norcross Historic District.

In order to provide historical continuity in the geographic area within the city which appears on the U.S. National and Local Registers of Historic Places and which is known as the Norcross Historic District, all signs located within the District shall be governed by the following provisions:

(1) Historic character. A historical district sign, including lighting, should be in keeping with the turn-of-the-century architecture generally represented in the historic district.

(2) Review references. In reviewing signs within the historic district, the Community Development Department may require adherence to approved design studies or historic inventories of the historic district.

(3) Prohibited signs in the historic district. Subject to the grandfather clause provision set forth in subsection 204-11(a), the following signs shall not be allowed within the historic district:

a. Roof-mounted signs.

b. Oversized signs.

c. Neon signs and other internally lighted signs, with the exception of an internal window sign not to exceed 20 percent of the total glazed area of windows and doors.

d. Electronic message boards, or other signs exhibiting motion and electronic text changes.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 204-22. Electronic message boards.

(a) Location. Electronic message boards are permitted only in non-residential zoning districts, with the exception of subsection 204-22(b), or under the requirements of an approved uniform sign plan.

(b) Within residentially zoned areas, electronic message boards may be used by elementary and secondary public and private schools; churches and other nonprofit and governmental buildings provided the signs meet the following criteria:

(1) Must be set back 150 feet from a residential dwelling unit, unless the residential use is fully screened from the sign unit in which case the distance may be reduced at the discretion of the director of planning and development.

(2) The signs must be programmed to be turned off between 10:00 p.m. and 6:00 a.m.

(c) Sign types to utilize electronic message boards. Electronic messaging may be an element of a monument, freestanding, or window sign.

(d) Duration of display.

(1) Any electronic message displayed shall remain unchanged for a minimum of 15 minutes.

(2) The following display types are prohibited:

a. Animation is prohibited;

b. Flashing, blinking, fade in, fade out or scrolling text is prohibited; and

c. Video images are prohibited.

(e) Intensity of light.

(1) The electronic message board shall come equipped with an automatic dimming photocell, which automatically adjusts the display's brightness based on ambient light conditions.

(2) The brightness level shall not increase by more than 0.3 foot candles (or 3.23 lumens per square meter or lux), over ambient lighting levels, as measured using a foot candle meter at a pre-set distance.

(3) The procedure and distances for measurement of brightness shall be as established by the International Sign Association's "Recommend Night-time Brightness Levels for On-Premise Electronic Message Centers."

(f) Default control.

(1) Electronic message boards shall be equipped to freeze the display in one position if a malfunction occurs.

(2) Electronic message boards must also be equipped with a means to immediately discontinue the display if it malfunctions.

(3) The electronic message board's owner must immediately stop the display when notified by the Community Development Director that the sign is not complying with the standards of this article.

(Ord. No. 08-2019, § I, 6-3-2019)

ARTICLE V. TREE CONSERVATION, BUFFERS, AND LANDSCAPING

Sec. 205-1. Purpose.

The purpose of this article is to preserve and enhance the city's natural environment and to ensure that the city will continue to enjoy the benefits provided by its urban forest in compliance with the policies of the city comprehensive plan. It does this through the following provisions of this article in order to:

(1) Maintain and expand the tree canopy on public and private lands in the city by prohibiting the destruction or removal of trees except in accordance with the standards set forth in this article;

(2) Maintain trees in the city in a healthy condition through professionally accepted arboricultural practices;

(3) Establish and revise as necessary the standards for the planting and maintenance of trees so as to improve the economic base of the city by improving property values, to enhance the visual quality of the city and its neighborhoods and to improve public health by lessening air pollution and the incidence of flooding;

(4) Minimize hazards and damage to streets and sidewalks and lessen public rightsof-way maintenance costs;

(5) Establish standards for the replacement of trees removed or destroyed by the site development and/or building process;

(6) Establish standards for buffer areas necessary for visual privacy for the conduct of residential lifestyles in an undisturbed environment and to provide protection to preserve property values in residential districts.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 205-2. Applicability/exemptions.

The provisions of this chapter shall apply to any land disturbing activity on real property within the corporate limits of the city and to any removal or destruction of a tree with a diameter breast height (DBH) of six inches or greater regardless of whether it is associated with land disturbing activity. Please note that the topping of a tree or trees is not an approved pruning method is not permitted by any entity or owner unless the topping of a tree is a specifically acceptable pruning method for select trees such as Crape Myrtle.

Determination of acceptable pruning method is subject to the determination of the City Arborist.

(1) Activities performed by a federal, state, county, municipal or other governmental agency during the course of their daily work shall be exempt from this article.

However, best management practices for tree care shall be incorporated into the activities.

(2) Activities performed by public utility companies conducting operations on public and utility rights-of-way and easements.

(3) When the Community Development Director or their designee finds that any tree presents a danger or hazard to the health, safety and welfare of the public, such tree may be removed immediately by the owner or the owner's agent upon written authorization by the Community Development Director or their designee.

(4) Removal of dead, diseased, hazardous, or infested trees, after verification by a qualified forestry professional acceptable to the Community Development Director or their designee.

(5) During a period of any emergency, such as a tornado, ice storm, flood or any other act of nature, the requirements of this chapter may be waived by the Community Development Director or their designee.

(6) The removal of trees within burial plots.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 04-2022, § I, 7-5-2022) Sec. 205-3. Zoning buffers.

(a) A zoning buffer is required along perimeter lot lines between dissimilar zoning districts, as specified in table 205-03 below. These buffer depths may be reduced by 50 percent if they include an eight-foot-high screening wall.

Table 205-03—Minimum required buffer width/depth between zoning districts (in feet).

Zoning Districts R100, R75,

R60, RTH RD, PRD OI, NX, C1

C2, CX, HX,

M1, M2, BH,

CAR

R100, R75, R60,

RTH

— 20' 20' 40'

RD, PRD 20' — 20' 40'

OI, NX, C1 20' 20' — 20'

C2, CX, HX, M1,

M2, BH, CAR

40' 40' 20' — Notes:

1. Developments approved through legislative review and tied to an approved concept plan will follow the buffers laid on that plan.

2. The Public zoning district (P) is exempt from these buffer requirements

3. Minimum zoning buffer depths may be reduced by 50 percent if they include an eight-foot-high screening wall.

(b) All buffer areas and screening shall be constructed and maintained in accordance with the following requirements:

(1) Trees and shrubs to be planted shall be selected from the table of pre-approved buffer species.

(2) The Director may approve the use of species not listed.

(3) No one species may comprise more than one-third of the total buffer.

(4) Two-thirds of the species must be overstory species and shall be evenly distributed throughout the buffer.

(5) The buffer must be in place prior to approval of a final plat for residential projects or certificate of occupancy for non-residential projects.

(6) Trees or shrubs that die in the first year must be replaced by the Developer.

Table of Pre-Approved Buffer Species Plant Type Minimum Height (at planting) Maximum Spacing within Rows (on center) Notes Form Green Giant Arborvitae (Thuja standishii x plicata 'Green Giant') 6 feet 12 feet Sun to partial shade Overstory Eastern Hemlock (Tsuga canadensis) 6 feet 10 feet Sun Overstory Deodar Cedar (Cedrus deodara) 6 feet 12 feet Sun, drought tolerant Overstory Eastern Red Cedar (Juniperus virginiana) 6 feet 10 feet Sun Overstory Virginia Pine (Pinus virginiana) 5 feet 6 feet Sun Overstory Japanese Cryptomeria (Cryptomeria japonica) 6 feet 15 feet Sun Overstory Southern Magnolia (Magnolia grandiflora) 6 feet 15 feet Sun to shade, drought tolerant Overstory American Holly (Ilex opaca) 6 feet 8 feet Sun to shade, drought tolerant Understory Savannah Holly (Ilex X attenuata 'Savannah') 6 feet 8 feet Sun to shade, drought tolerant Understory Foster Holly (Ilex x attenuata 'Fosteri') 6 feet 8 feet Sun to shade, drought tolerant Understory Nellie R. Stevens Holly (Ilex x 'Nellie

R. Stevens') 6 feet 8 feet Sun to shade, drought tolerant Understory Plant Type Minimum Height (at planting) Maximum Spacing within Rows (on center) Notes Form Yaupon Holly (Ilex vomitoria) 6 feet 6 feet Sun to shade, drought tolerant Understory Southern Waxmyrtle (Myrica cerifera) 6 feet 10 feet Sun, drought tolerant Understory Plant Type Minimum Height (at planting) Maximum Spacing within Rows (on center) Notes Form Devilwood (Osmanthus americanus) 6 feet 8 feet Semishade Understory Carolina Cherry Laurel (Prunus caroliniana) 6 feet 8 feet Sun to semishade, drought tolerant Understory Loropetalum (Loropetalum chinense) 3 feet 5 feet Semishade Shrub Florida Leucothoe (Agarista populifolia) 3 feet 5 feet Shade Shrub Florida Anise (Illicium floridanum) 3 feet 8 feet Shade Shrub

Small Anise-Tree (Illicium parviflorum) 3 feet 8 feet Semishade to full shade

Shrub Formosa Firethorn (Pyracantha koidzumii) 3 feet 8 feet Sun, drought tolerant Shrub Example Buffer Design:

(c) All buffers shall be designated on the appropriate permit application and indicated on the required site plan or final subdivision plat.

(d) Structures including driveways, parking facilities, or retaining walls will be located a minimum of five feet from any buffer.

(e) The Community Development Director or their designee may require additional screening outside or inside buffer areas, to obscure objectionable features such as dumpsters, rear entrances, utility and maintenance structures, loading facilities, and other objectionable features.

(f) The screening requirements of this section may be waived or modified, as appropriate, by the Community Development Director or their designee, if and only if any one or more of these criteria apply:

(1) It is clearly demonstrated to the Community Development Director or their designee that existing topography and/or vegetation achieve the purpose and intent of this section.

(2) It is clearly demonstrated to the Community Development Director or their designee that because of existing topography, a fence, wall and/or other screening device will not screen activities conducted at ground level from view as required.

(3) Required screening would obscure sight distances necessary for safe ingress and egress from subject properties.

(4) All required buffers shall be designated on the appropriate permit application and shown as a permanent buffer on the required site plan or final subdivision plat, as appropriate.

(g) All buffers strips are required to be provided or created at the time of construction of any new development.

(h) Maintenance of buffers.

(1) Prior to issuance of a certificate of occupancy for a structure, the developer or record title holder shall guarantee to the city to replace any required landscaping materials which die within one year after approval or acceptance thereof by the city, and shall warrant all work in the buffer area for a period of one year after approval or acceptance thereof by the city, whichever is later. The Community Development Director or their designee may at his/her option require that a bond or other suitable security be posted to ensure compliance with this provision.

(2) The required buffer shall be maintained by the record title holder at the time of development, for so long as he holds title, and thereafter by any subsequent record title holders, so as to provide an opaque visual screen to a height of six feet on a continuous, year-round basis.

(3) In the event a screen, wall, fence, planted dividing strip or any other type of buffer that is required by the UDO will be subjected to periodic inspections by the Community Development Department to determine that such required walls, fences, etc., are being properly maintained. After a lot is rezoned and a buffer is required, the lot shall not be used unless and until the required buffer is in place and is the required height and width. Failure to maintain such required walls, fences, etc., to an acceptable standard may be deemed a violation of this UDO.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 205-4. Landscaping requirements and tree preservation.

(a) Applicability.

(1) New construction. Any new building or site improvement must comply with the landscaping and screening requirements of the UDO.

(2) Maintenance and repair.An existing building or site may be repaired, maintained or modernized without providing additional landscaping or screening, provided there is no increase in gross floor area or improved site area.

(3) Additions.

a. When an existing building is increased in gross floor area or improved site area by up to 25 percent cumulatively, landscaping and screening is required for the additional floor or site area only.

b. When an existing building is increased in gross floor area or improved site area by more than 25 percent cumulatively, both the existing building and the additional floor or site area must conform to the landscaping and screening requirements of this UDO.

(4) Change in use. A change in use does not trigger the application of these requirements except when there is a specific use standard requiring landscaping or screening for the new use.

(b) Landscape plan required.

(1) Landscape design and planning must be integrated with the overall design concept for any project; therefore, the UDO Administrator will as part of site plan approval evaluate landscaping schemes as presented in a landscape plan. The reviewer will evaluate these schemed in terms of their relationship to the existing natural landscape, developed or proposed landscapes on adjacent properties and public rights-of-way, and the building or buildings existing or proposed on the subject property and adjacent sites.

(2) Before any building permit is issued, any site improvements must be found by the UDO Administrator to be in compliance with any required landscape plan, if applicable.

(c) Street trees.A minimum of one overstory tree for every 40 linear feet of road frontage is required on both sides of any new street, except alleys. The minimum caliper shall be two inches.

(d) Parking lot landscaping.

(1) Applicability. Parking lot landscaping is required on all on-site surface parking lots with more than 20 spaces created after the effective date of this UDO. Multiple platted lots contained on a single site plan and any separate parking areas connected with drive aisles are considered a single parking area.

(2) Perimeter screening. Parking lots that are not next to a public street must be provide perimeter screening a minimum of five feet in width with a single hedgerow.

(3) Landscape strips.All surface parking areas (of any size) abutting a public street (not including an alley) must be screened using one of the following options.

a. Landscape strip with shrubs.A minimum ten-foot wide landscape strip planted with a minimum of ten shrubs per 35 linear feet of street frontage, excluding driveway openings. Shrubs shall be provided to screen paved areas and parking lots from the right-of-way. Shrubs shall be two feet tall at time of planting. They must be planted two rows deep, and provide a screen within three years of planting.

b. Landscape strip with screening wall.

1. A two-and-one-half-foot high screening wall in a minimum four-foot planting strip.

2. Screening walls must be closed and be constructed of high quality materials including one or a combination of the following: decorative blocks; brick; stone; cast-stone; split-faced block; stucco over standard concrete masonry blocks; glass block; or other material approved by the Architectural Review Board or Historic Preservation Commission, as applicable.

c. Landscape strip with berm.

1. An earth berm a minimum of two and one-half feet higher than the finished elevation of the parking area, planted with five shrubs for every 35 linear feet of street frontage, excluding driveway openings.

2. The berm must contain a rounded crown suitable for planting, and a stabilized side slope of no greater than three to one.

d. Landscape strip with grade change. A six-foot landscaped strip with a minimum three-foot grade drop from the public street to the parking area, planted with five shrubs for every 35 linear feet of street frontage, excluding driveway openings.

e. Location. A required landscape strip must be located at the outer perimeter of the parking area and must be provided along the entire parking area abutting the street, excluding breaks for pedestrians, bicycles and driveways.

f. Plant material. Required shrubs must be a minimum of two and one-half feet in height at time of planting. 70 percent of the required amount of shrubs must be evergreen.

(4) Interior islands.

a. A landscaped interior island must be provided every eight parking spaces.

Interior islands must be distributed evenly throughout the parking area. Interior islands may be consolidated, or intervals may be expanded to preserve existing trees.

b. An interior island abutting a single row of parking spaces must be a minimum of nine feet in width and 200 square feet in area. Each island must include one shade tree.

c. An interior island abutting a double row of parking spaces must be a minimum of nine feet in width and 400 square feet in area. Each island must include two shade trees.

d. All required shade trees must be chosen from the approved tree list. The approved tree list is available from the Community Development Department.

e. All required shade trees must have a minimum caliper of two inches and be at least ten feet tall at time of planting.

f. Each parking space must be no greater than 40 feet from the trunk of a tree.

(5) Median islands.

a. A landscape median island must be provided between every six single parking rows. Intervals may be expanded to preserve existing trees.

b. A landscape median island must be a minimum of six feet wide.

(6) Pedestrian corridor.

a. Every fourth row of parking shall have a minimum 15-foot wide continuous pedestrian corridor consisting of landscaping and a minimum five-foot wide walkway dividing the parking row and connecting sidewalks on the street and along the front entrance of the principal building.

b. The walkway shall be either patterned or colored material other than asphalt and may be at grade and a minimum of 5 feet wide. The remainder of the pedestrian corridor should be a landscaped area planted with ornamental trees every 40 feet on center at a minimum.

c. The walkway is allowed to meander through the corridor, but in no case shall the walkway be less than five feet wide or closer than 3 feet to a parking space.

d. If the development has less than four rows of parking or an uneven amount of parking rows then the location of the required walkway shall be subject to the approval by the Community Development Director.

(e) General requirements.

(1) Limit on one genus. No more than 30 percent of all trees planted shall be of any one genus.

(2) Deciduous requirement. At least two genera of trees must be deciduous.

(3) Limit on understory trees. Not more than 30 percent of the total number of trees planted shall be understory trees.

(4) Vision clearance at intersections. In all zoning districts, no fence, wall, structure, shrubbery or other obstruction to vision between the heights of three feet and 15 feet, except utility poles, light or street sign standards or tree trunks shall be permitted within 20 feet of the intersection of the right-of-way lines of streets, roads, highways or railroads.

(f) Streetscape standards.

(1) Streetscapes shall be installed along public rights-of-way as specified in the streetscape table below, except as provided in (2) immediately below for an alternative multi-use trail. Streetscapes shall include a sidewalk landscape strip adjacent to the roadway, a sidewalk, and a landscape strip at the back of the sidewalk on private property.

(2) A multi-use trail may be required instead of a sidewalk landscape strip and sidewalk where identified as a multi-use trail in any plan that has been adopted by the city.

(3) Sidewalks shall be constructed with an additional two-foot by eight-foot concrete pad, located outside of the right-of-way, designed to accommodate existing or future pedestrian amenities such as benches, planters, and trash containers, at the following locations:

a. At intersections of roadways with an arterial, major collector or minor collector identified on the long range road classification map as identified in the city's comprehensive plan.

b. At locations along roadways designated for a transit stop or future transit stop by the County Department of Transportation.

c. At locations along roadways designated for a school bus stop by the County Board of Education.

d. Such pedestrian amenity sidewalk pads shall not be required closer than 300 feet from another such pad on the same side of the roadway.

(4) All amenities required and listed above shall be decorative, commercial-quality fixtures. Sidewalk design and placement of any of these amenities shall be reviewed and approved by the appropriate review and approval authority. Locations of pedestrian amenity sidewalk pads shall be coordinated to avoid locations of curb inlets, guardrails, and bridges.

(5) All new utility lines shall be buried.

(6) Streets lights in conformance with this UDO shall be provided.

Streetscape Table Street type Sidewalk landscape strip Sidewalk Landscape strip Street lights Principal arterial, major arterial, minor arterial, major collector Min. 2 ft. Min. 8 ft. Min. 10 ft. per Sec. 205-4(d)(3) Required (see Sec. 406-3) Local Min. 2 ft. Min. 5 ft. Min. 10 ft. per Sec. 205-4(d)(3) Required (see Sec. 406-3) (Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 12-2020, § I, 12-7-2020; Ord. No. 05-2021, § I, 5-3-2021)

Sec. 205-5. Tree conservation.

(a) Tree density requirements.

(1) Use of tree units. The landscaping requirements of this article regarding the preservation or planting of trees is expressed in terms of "tree units" rather than the number of trees or tree canopy. This approach provides the applicant with wide latitude of choice as to the number and sizes of trees to be planted, and their distribution following aesthetic landscaping practices, while achieving a common standard on all properties.

(2) Establishment of tree unit values. The diameter of a tree's trunk establishes the "tree unit" value of an existing tree, as shown on table 205-5(1), or for a newly planted tree as shown on table 205-5(2).

a. The values assigned to trees of the same size are different for existing and new trees, as indicated in the table. One "unit" is not the same as one "tree."

b. Actual tree diameters or calipers are to be rounded to the nearest whole number for the calculation of tree unit values (e.g., four and one half inches in diameter = five inches).

Table 205-5(1): Tree Units for Existing Trees Tree Diameter (DBH) in inches Tree Units Seedlings 0.0 1 0.0 2 0.0 3 0.0 4 0.6 5 0.8 6 1.0 7 1.2 8 1.3 9 1.5 10 1.7 11 1.9 12 2.1 13 2.3 14 3.0 15 3.3 16 3.6 17 4.0 18 4.2 19 4.4 Tree Diameter (DBH) in inches Tree Units 20 4.6 21 4.8 22 5.0 23 5.2 24 5.4 25 5.6 26 5.8 27 6.0 28 6.2 29 6.4 30 6.6 31 7.2 32 7.8 33 8.4 34 9.0 35 10.0 36 11.0 37 or greater 12.0 + 1.0 for each inch in diameter greater than 37 Notes

1. Minimum DBH to receive credit in tree units for an existing tree is four inches.

Table 205-5(2): Tree Units for New (Replacement) Trees Tree Caliper in inches Tree Units Seedlings 0.0 1 0.0 2 0.3 3 0.4 4 0.5 5 0.6 6 0.7 7 0.9 8 1.1 9 1.3 10 1.5 Tree Caliper in inches Tree Units 11 1.7 12 1.9 13 2.2 14 2.5 15 2.8 16 3.1 17 or greater 3.5 + 0.5 for each inch in caliper greater than 17 Notes

1. Minimum caliper to receive credit in tree units for a new tree is two inches.

(3) Tree unit values for specimen trees or tree stands.

a. Specimen trees and specimen tree stands; defined.

1. Specimen tree: any tree which qualifies for special consideration for preservation due to size, type and condition, as follows.

a) Any tree in fair or better condition which equals or exceeds the following diameter breast height (dbh) sizes:

1) 28-inch dbh—overstory hardwoods such as oaks, hickories, yellow poplars, sweetgums, etc.

2) 12-inch dbh—understory small trees such as dogwoods, redbuds, sourwoods, etc.

3) 30-inch dbh—pine trees (all species).

b) A tree in fair or better condition must meet the following minimum standards:

1) A life expectancy of greater than 15 years.

2) A structurally sound trunk, not hollow and having no extensive decay, and less than 20 percent radial trunk dieback.

3) No more than one major and several minor dead limbs (hardwoods only).

4) No major insect or pathological problem.

c) A lesser sized tree can be considered a specimen tree if it is a rare or unusual species, of exceptional or unique quality, or of historical significance, subject to approval of the Community Development

Director or their designee.

d) A lesser size tree can be considered a specimen tree if it is specifically used by a builder, developer, or design professional as a focal point in a landscape project, subject to approval of the Community Development Director or their designee.

2. Specimen tree stand: A contiguous grouping of trees which has been determined to be of high value in the opinion of the Community Development Director or their designee. Determination is based upon the following criteria:

a) A relatively mature, even-aged stand.

b) A stand with purity of species composition or of a rare or unusual nature.

c) A stand of historical significance.

d) A stand with exceptional aesthetic quality.

b. The tree unit values shown in table 205-5(1) may be increased by 100 percent for an existing tree that meets the definition of a "specimen tree" or for a "specimen tree stand" as defined herein, provided that extraordinary measures as needed are taken to protect the tree and assure its survival. Such measures may include but are not limited to the provision of tree wells, retaining walls, aeration, or supplementary irrigation, as applicable to the site of the tree and as approved by the Director. Any specimen tree determined to be part of a tree save plan for any development which is damaged or ultimately needs to be removed due to the development process will result in a penalty assessed at $1,000.00 per tree density unit of specimen(s) removed. Said funds from this section to be deposited to the city's tree bank.

c. Specimen tree removal specifications. A specimen tree is any tree, in fair or better condition, which qualifies for special consideration for preservation due to size, species, or condition, and which meets the DBH specifications outlined above. Calculate the specimen tree removal fee at $500.00 for each tree density unit of the specimen tree(s) removed. For example, one 28-inch DBH Oak = 6.2 units x $500.00/unit = a fee of $3,100.00. The tree removal permit shall not be issued, nor shall the specimen(s) be removed, until funds are received by the city. Tree removal without or prior to a lawfully issued tree removal permit will result in a penalty assessed at $1,000.00 per tree density unit of specimen(s) removed. Said funds from this section to be deposited to the city's tree bank.

(b) Tree density standards.

(1) Tree retention. On each property for which a tree preservation and/or replacement plan is required, existing trees shall be retained and new trees shall be planted such that the property shall attain or exceed a tree density standard as follows:

a. Residential—16 tree density units per acre for developments in the preliminary, final or exemption plat process. For residential lots with established homes, see table below.

Residential tree density unit requirements for lots with established homes Zoning Tree density units

R100 1.6 TDU

R75 1.6 TDU

R60 1.6 TDU

RD 1.6 TDU

b. Office/commercial/mixed-use—16 tree density units per acre.

c. Industrial—16 tree density units per acre.

(2) Distribution. Trees, both existing and new, shall be reasonably distributed throughout the site, with emphasis on tree groupings to achieve aesthetic results following professional landscaping standards. Trees, including street trees, may be retained or planted for credit within a public street right-of-way.

(3) Trees in stream buffer. Trees located in a stream buffer may not be counted toward fulfilling the tree density standard.

(4) Easement exclusion. Properties possessing natural gas, petroleum or electric power transmission easements, or major sanitary sewer main (greater than eight inches in diameter) or water main (greater than 16 inches in diameter) distribution easements, may exclude the land area contained in the easement from the total acreage of the property in fulfilling the tree density standard provided that no improvements (e.g. parking lots, tennis courts, driveways, greenways, storm water detention facilities, etc.) are proposed within the easement. If any improvements are proposed within the easement, then the land area so used within the easement for the improvements, plus an additional ten feet of land area surrounding the improvements, shall be included in the total acreage of the property to fulfill the tree density standard.

(5) Lake and pond exclusion. Properties with a lake or pond may exclude the land area contained in the lake or pond from the total acreage of the property in fulfilling the tree density standard.

(6) Invasive and nuisance species exclusion. Invasive species and nuisance species are exempt from the tree removal permit fee but are subject to a $25 assessment fee by the community development designee. Invasive and nuisance species include Tree-of-Heaven, Mimosa, Chinaberry, Princesstree, Chinese Tallow Tree, Bradford Pear, and Leyland Cypress.

(c) Tree density standard calculation. The tree density standard shall be calculated by summing the credits and dividing the sum by the total acreage of the project included within the limits of the permit application.

(d) Community tree species list.

(1) The tree preservation board shall maintain a list of tree species approved for conservation and planting within the city as well as those not recommended. The list shall be known as the city's community tree species list, hereinafter referred to as the tree species list. The tree species list includes the mature size category of each species, notations on which species may be planted beneath utility lines, and other species characteristics.

(2) The list is maintained by the tree preservation board and may change without notice to incorporate results of research and experience with individual species and is available from the Community Development Department.

(e) Permeable surfaces under tree driplines. The minimum permeable surface area requirements under tree driplines are as follows.

(1) For conserved trees in residential zones no more than 20 percent of the dripline can be encroached upon by impermeable surfaces provided the remaining area is mulched.

(2) For planted trees in all zones the amount of permeable surface area required shall be based upon the mature tree size category on the community tree species list as follows:

a. Large trees: 640 square feet.

b. Medium trees: 360 square feet.

c. Small trees: 160 square feet.

(3) For planted trees the dripline shall be mulched.

(f) Tree protection.

(1) Conserved trees. All conserved trees shall be actively protected during the development process and passively protected throughout the life of the development.

The entire tree, including the crown, trunk, and roots, and the critical root zone, shall be protected.

(2) Minimum tree protection measures. Active tree protection shall consist of, at a minimum, establishing a tree protection zone around each tree or grouping of trees by the installation of fencing at the outer edge of the dripline or critical root zone, whichever is greater. Minimum tree protection measures for boundary trees, existing on adjacent properties, whose critical root zones extend onto the project site is mandatory.

a. No more than 25 percent of a boundary tree's mature crown or one third of a young tree's canopy shall be removed in one season.

b. Pruning of conserved trees should only be done by an ISA (International Society of Arboriculture) certified arborist.

c. Tree protection fencing and tree protection area signs shall be installed after the issuance of a disturbance permit and prior to any land disturbance activity or building activity.

1. Tree protection fencing shall be four feet high, made of orange highvisibility polypropylene, and erected with sturdy wooden or metal posts around the tree protection zone. A heritage tree, or a significant species tree, as determined by the Director, may require increased protection.

Methods and extent of increased protection will be as directed by the Director.

2. Signs shall be fabricated out of a sturdy material, shall be waterproof, and contain the following legible text in English and Spanish: "TREE PROTECTION AREA, ENTRY PROHIBITED." The signs shall be a minimum of 8.5×11 inches, shall be placed on a sturdy post a minimum of 30 inches off the ground, and shall be spaced a maximum of 50 feet apart.

3. Tree protection fencing and signage shall remain in good condition throughout the development and construction processes, and shall only be removed after the final plat approval or a certificate of occupancy has been issued.

d. Encroachment into the tree protection area shall result in the loss of tree density unit credit for preserved trees.

e. The critical root zone within the tree protection area shall be mulched with a minimum of three inches and not more than five inches of organic mulch such as pine straw, wood chips, tree leaves, or compost, for a minimum of three years, or prior to issuance of the final certificate of occupancy for the project, whichever occurs last.

f. The Community Development Director or their designee may require the installation of additional tree protection measures to ensure survivability of conserved trees.

(3) Prohibited activities. Within the tree protection areas, without proper authorization or permit the following activities shall be prohibited:

a. Vehicle traffic or parking;

b. Materials or equipment storage;

c. Soil disturbance;

d. Soil excavation;

e. Removal of topsoil;

f. Trenching;

g. Soil fill;

h. Change in soil pH;

i. Change in soil drainage;

j. Equipment washouts or disposal (including concrete);

k. Fires;

l. Chemical or trash disposal;

m. Other activities harmful to the trees as determined by the Community Development Director or their designee;

n. Encroachment into tree save area; and

o. Destruction or removal of trees.

(4) Planted trees. All planted trees shall be actively protected during the development process and passively protected throughout the life of the development. The entire tree, including the crown, trunk, and roots, and the critical root zone, shall be protected.

(5) Existing trees in construction zones. All trees that are outside the formal tree protection zone(s) as outlined in the tree protection and replacement plan and are equal to or greater than 12 inches DBH, and are in areas where construction will occur inside the crown of the tree shall be required to have an enhanced protection program. In order to maximize the ability of the selected trees to survive construction the proposed program will include the following steps.

a. The tree will be surveyed and located with the species and DBH noted and approximate crown diameter shown.

b. Prior to the beginning of construction activities, the trees shall be inspected by a city approved arborist to determine their overall condition and ability to withstand construction activity around them.

c. Should the city approved arborist determine that with a proper protection plan the tree would survive the construction activity the arborist shall prepare a care plan for the tree. The plan may involve elements such as crown pruning, fertilization, irrigation, root pruning or other activities.

d. The contractor will be required to implement the arborist's protection plan and to maintain the necessary activities to protect the tree until such time as the site construction is completed and accepted for maintenance by the property owner. The city approved arborist shall submit bi-weekly reports to the contractor and the Department of Community Development during the construction process.

e. The owner of the property shall receive a 20-percent bonus credit for canopy coverage for all trees that are under the enhanced protection program.

f. No land disturbing activity or construction activity, including, but not limited to, grading, digging, soil disturbance or other activity within the critical root zone of any boundary tree, is permitted that will deprive the boundary tree of continued viability as determined by a certified arborist.

g. The following parameters shall be followed when determining boundary tree viability interference:

1. CRZ/TPZ 19 percent or less impact and protected by tree protection, no arboricultural prescription required.

2. CRZ/TPZ 20 percent—33 percent impact but protected by tree protection (no structural root plate impact) provide arboricultural prescription with a plan for review by the city.

3. CRZ/TPZ 20 percent—33 percent impact and structural root plate has impact/not protected.

h. The builder/developer/construction site property owner must submit a boundary tree agreement signed by the tree owner/co-owner and notarized giving permission for the tree that has construction impact to be treated or removed (see Community Development Department for the city boundary tree agreement). The minimum time length of the boundary tree agreement shall be three years. The receipt for the paid arboricultural prescription and signed agreement will need to be submitted with the plans for review.

1. The builder/developer/construction site owner must make at least three attempts to contact the owner of the boundary tree to enact a boundary tree agreement. The first two attempts may be in person or via telephone.

The third attempt must be in the form of a written letter sent certified, return receipt requested to the property owner's address of record in the county tax database. If there is no response to any of the attempts, the builder/developer/construction site owner shall provide evidence to the city of the attempts at contact in addition to the arboriculture prescription for the affected tree.

2. If no boundary tree agreement is reached, the affected tree shall not be removed but shall be protected during development based on this chapter and in accordance with the arboriculture prescription.

3. A boundary tree bond or escrow account may be required based on the arboricultural prescription depending on the impact to a boundary tree covered under a boundary tree agreement.

4. A boundary tree bond or escrow account shall be required where a boundary tree agreement cannot be reached.

5. A boundary tree bond or escrow shall be 125 percent of the cost of removal and replacement of the tree(s) affected and will be held for three years by the city. The property owner of the affected tree(s) may apply to the city for the escrow funds to remove and replace the tree(s) during the three-year escrow period. If the boundary tree(s) is/are deemed healthy at the end of the three-year period by an arborist, the developer may apply to the city for a refund of the original amount of escrow.

6. The site/landscape plans cannot be approved without signed boundary tree agreement(s) or proof of attempts to contact the boundary tree owner in an attempt to reach a boundary tree agreement in addition to an arboriculture prescription where needed.

(g) Seasonal planting. Final plat approval or a certificate of occupancy may be issued prior to the establishment of trees planned to meet the tree canopy cover requirements, if the Community Development Director or their designee determines that the season is inappropriate for planting. In such cases the trees shall be planted by the last day of February following the date of issuance of the certificate of occupancy or final plat approval.

If they have not been planted by the last day of February following the issuance of the certificate of occupancy or final plat approval, the permit holder shall be considered to be in violation of the provisions of this article.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 14-2019, 11-4-2019; Ord. No. 09-2021, § III, 9-7-2021; Ord. No. 04-2022, § I, 7-5-2022)

Sec. 205-6. Tree bank.

The intent of the requirements of this section is to ensure that a minimum number of trees are replaced and/ or preserved on newly developed or redeveloped sites. The tree bank is an alternative option and may be used only in the event the site tree density or recompense tree requirement cannot be met on-site due to hardship. Hardship must be documented by the developer and presented to the Director before the tree bank may be used. The tree bank provides two options, which are described in full below.

(1) Option one, planting trees off-site. Install an equal amount of required tree density units in the form of an approved number of trees on an alternate site. In this case the following criteria shall be observed:

a. The tree preservation board has identified alternate "option one" sites. The Community Development Department has contacted the owners of these sites and these owners have expressed an interest in receiving trees from the tree bank. Persons wishing to use option one should consult with the UDO Administrator to see if their required tree density units can be located on one of these alternate sites. The developer may present the UDO Administrator with alternate sites. Planting on individual residential lots is prohibited.

b. The developer shall submit a tree preservation and/or tree replacement plan showing a location for the planted trees on the proposed site. The developer shall also provide calculations on the plan for tree density or recompense trees from the developed site. The site plan shall state the size, genus, species, and quantity of trees to be planted. Each tree must be two inches caliper at a minimum. For trees in which double recompense is required each tree must be three inches caliper at a minimum. Recompense calculations must be shown on plan.

c. If the proposed site is not one of the alternate sites, discussed above, an authorization from the title holder of the site indicating that the owner agrees to the planting of trees by the developer upon the site shall also be submitted along with the tree preservation and/or tree replacement plan.

d. Trees are to be maintained and guaranteed for one full year after planting by the developer. Any trees that die during the one-year time period must be replaced by the developer. Standards for transplanting shall be in keeping with those established by the International Society of Arboriculture, as included in the "Tree and Shrub Transplanting Manual," latest edition.

(2) Option two, monetary compensation for trees. A developer may choose to provide the city with monetary compensation for trees. If this alternative for the development is chosen, then the following criteria shall be observed:

a. Provide tree density calculations on the tree preservation and/or tree replacement plan. Show the total amount of tree density units that cannot be met on-site.

b. Multiply the tree density units that cannot be met on-site by the monetary compensation value. The product of those two numbers shall be provided on the tree preservation and/or tree replacement plan. Contact city approved certified arborist or landscape architect for the current monetary compensation value.

c. Provide a certified check made payable to the city in the amount of the product as listed in item (2) above and as provided on the tree preservation and/or tree replacement plan. Submit the certified check to a UDO Administrator along with a copy of the approved tree preservation and/or tree replacement plan.

d. The monies collected for the tree bank option two may be used by the city for the planting of trees at parks, greenways, fire stations, libraries, and other similar community facilities. Alternate planting locations may be approved by the Director.

(3) Standards for administering these alternative compliance methods. The Director must review and approve all requests for alternative compliance. In no instance shall the alternative compliance options be used to comply with any other ordinance requirement than the tree density or specimen tree requirement. The site development permit shall be issued after the Director has approved the request for either compliance option and received the necessary documentation and funds.

(4) Exclusions. Trees used to meet requirements for parking lots, landscape strips, street frontage buffers, or buffer replanting must be planted on site and are excluded from the tree bank procedures. Trees that are required to meet minimum tree density units and/or recompense requirements can be contributed toward the tree bank in accordance with option one or option two above.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 205-7. Redevelopment sites.

(a) For redeveloped sites the Department of Planning and Development strongly recommends the developer, authorized registered professionals, design professionals and staff schedule a pre-submittal meeting with the department to discuss the potential of the site and any issues that may be present on the site.

(b) Redeveloped sites shall comply with the buffer and specimen tree requirements as set forth in this UDO and provide compliance with parking lot, landscape strip and tree density unit requirements.

(c) Where the scope of a project results in disturbance, removal, and replacement of

25.1 percent or greater of the site area, a tree preservation and/or tree replacement plan is required. The plan shall show landscape strip planting, parking lot trees, tree density units, buffers and shall comply with the requirements of this UDO.

(d) Where the scope of a project results in disturbance, removal, and replacement of 25 percent or less of the site area, a tree preservation and/or tree replacement plan is required.

The plan shall include the existing and proposed landscape conditions that verify compliance with this UDO.

(1) At a minimum the plan must show the following existing and proposed elements with intent to comply:

a. Buffers.

b. Landscape strips.

c. Parking lot trees.

d. Tree density units.

e. Tree save areas.

(2) Director shall review the proposed tree preservation and/or tree replacement plan.

(e) Disturbance on a redevelopment site shall include a building replacement where the footprint of the building counts toward the site disturbance.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 205-8. Tree conservation, buffers, and landscaping compliance.

(a) Tree removal. An application for a tree removal permit when land disturbing activity is not involved shall follow the requirements of section 104-7(m), tree removal permit.

(b) Site inspections.

(1) Authority. The Community Development Director or their designee has the authority to perform site inspections and enforce the provisions of this chapter.

(2) Visits to site for discussions regarding regulations. Prior to the issuance of a tree removal permit or right-of-way encroachment permit, a visit shall be made to the proposed site by the Community Development Director or their designee and the applicant for the purpose of discussing the provisions of this chapter.

a. After a permit is issued and tree protection measures have been installed, and prior to any land disturbance, another site inspection shall be made by the Community Development Director or their designee.

b. Another site inspection shall occur prior to the issuance of final plat approval or a certificate of occupancy.All provisions of this chapter shall be met before final plat approval or a certificate of occupancy can be issued.

c. Other site inspections may take place without notice at any time prior to or after the issuance of a certificate of occupancy or final plat approval to ensure continuing compliance with the provisions of this chapter.

(3) Access by authorized representatives. No person, corporation or association shall refuse entry or access to any authorized representative or agent of the Community Development Director or their designee who requests entry for the purposes of inspection and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out his official duties.

(c) Tree maintenance. The owner shall be responsible for maintaining the health of all conserved and new trees. The owner shall replace any new tree that dies within three years, or prior to issuance of the final certificate of occupancy for the project, whichever occurs last.

(d) Penalties.

(1) Failure to obtain permit. If any person commences any land disturbing activity, tree destruction, tree cutting, tree removal or building activity requiring a tree removal permit without first obtaining said permit, the person shall be deemed to be in violation of the provisions of this chapter.

(2) Violations. The owner of any property wherein a violation exists, and any builder, contractor, or agent who may have assisted in the commission of any such violation, may be chargeable with separate offenses for each such violation. Any person violating any of the provisions of this chapter other than as hereinabove provided shall, upon conviction, be punished as prescribed in this subsection (d). Each day during which such violation occurs or continues shall constitute and be punishable as a separate offense.

(3) Stop work orders.A stop work order may be issued by the Community Development Director or their designee for violation of any provision of this chapter. All stop work orders shall be effective immediately upon issuance and shall remain in effect until the necessary corrective action or mitigation has occurred and permission has been granted by the city to resume work. No certificate of occupancy or final plat approval shall be issued while a stop work order is in effect or until an assessed fine has been paid and permission has been granted by the city in writing for a certificate of occupancy or final plat approval.

(4) Responsibility. The Community Development Director, or their designee is responsible for determining whether a violation has occurred. Violations may include, but are not limited to: failure to obtain a tree removal permit, deviation from the approved plan; failure to properly install tree protection structures; failure to maintain tree protection structures in effective condition; evidence of harmful activities occurring within the tree protection zone; improper planting; failure to conserve or establish the required tree canopy cover; unauthorized delay in tree planting;

damage to a conserved or established tree's crown, trunk, roots, or critical root zone; and damage to a city tree's crown, trunk, roots, or critical root zone.

(5) Monetary penalties. Any person who violates any provision of this chapter, any permit condition, or who negligently or intentionally fails or refuses to comply with any order, notice of code violation or formal charge of violation which the Community Development Director or their designee issues as provided in this chapter shall be liable for a penalty of up to $1,000.00 per day for each violation of the provisions of this chapter. Each day that such failure or refusal continues shall constitute a separate violation.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 14-2019, 11-4-2019)

ARTICLE VI. NONCONFORMING SITUATIONS

Sec. 206-1. Purpose.

(a) Within the districts established by this UDO or amendments thereto that may later be adopted there exist lots, structures and uses of land and structures which were lawful before this UDO was passed or amended, but which would be prohibited under the terms of this UDO or any future amendment.

(b) It is the intent of this UDO to permit these nonconformities to continue until they are removed, but not to encourage their survival. It is further the intent of this UDO that nonconforming uses shall not be enlarged upon, expanded nor extended, nor be used as a basis for additional structures or uses prohibited elsewhere in the same district.

(c) Variances of area, width, and yard requirements may be granted by the Zoning Board of Appeals where necessary and where such addition does not create an unusual neighborhood building type.

(d) To avoid undue hardship, nothing in this UDO shall be deemed to require a change in the plans, construction or designated use of any building on which actual construction was lawfully begun prior to the effective date of adoption or amendment of this UDO and upon which actual building construction has been diligently carried on. Actual construction is hereby defined to include the placing of construction materials in permanent position and fastened in a permanent manner, and demolition, elimination and removal of an existing structure in connection with such construction, provided that actual construction work shall be diligently carried on until the completion of the building involved.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 206-2. Nonconforming lots of record.

In any district in which single-family dwellings are permitted, notwithstanding limitations imposed by other provisions of this article, a single-family dwelling and customary accessory buildings may be erected on any single lot of record, as officially recognized by the city, at the effective date of adoption or amendment of this UDO. This provision shall apply even though such lot fails to meet the requirements for area or width, or both, that are generally applicable in the district, if yard dimensions and other requirements not involving area or width, or both, of the lot shall conform to the provisions of this article.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 206-3. Nonconforming uses.

(a) The lawful use of any building or structure or land existing at the time of the enactment or amendment of this article may be continued, even though such use does not conform with the provisions of this article, except that the nonconforming use shall not be:

(1) Extended to occupy a greater area of land.

(2) The nonconforming use must continue in the original building, structure or on land area that was originally occupied by the nonconforming use.

(3) No such nonconforming use shall be moved in whole or in part to any portion of the lot or parcel other than that occupied by such use at the effective date of adoption of this UDO.

(4) Reestablished after discontinuance for six months as based on available city records.

(5) Changed to another nonconforming use.

(6) Reinstated if it fails to obtain a new occupational tax certificate within six months of the closure of the previous non conforming use or renew an existing occupational tax certificate per the city's prescribed renewal schedule for existing occupational tax certificates.

(7) A change in tenancy or ownership is not considered a change to another nonconforming use, provided that the use itself remains unchanged.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 08-2022, § I, 8-1-2022) Sec. 206-4. Nonconforming buildings and structures.

Where a lawful building or structure (excluding signs) exists at the effective date of adoption or amendment of this UDO that could not be built under the terms of these regulations and standards by reason of restrictions on area, lot coverage, height, yards, its location on the lot, or other requirements concerning the structure, such structure may be continued so long as it remains otherwise lawful, subject to the following provisions:

(1) No such nonconforming structure may be enlarged or altered in a way which increases its nonconformity, but any structure or portion thereof may be altered to maintain or improve its condition or to decrease its nonconformity.

(2) Should such nonconforming structure or nonconforming portion of structure be destroyed by any means to an extent of more than fifty percent of its replacement cost at time of destruction, it shall not be reconstructed except in conformity with the provisions of this UDO.

(3) Should such structure be moved for any reason for any distance whatever, it shall thereafter conform to the regulations for the district in which it is located after it is moved.

(4) Structures which are nonconforming due to front, side or rear yard requirements may be expanded or extended only in conformance with this UDO.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 206-5. Nonconforming signs.

(a) The lawful use of a permanent sign existing at the time of the adoption of this article is derived may be continued in nonconformance with the requirement of this article, except that the nonconforming sign shall not be enlarged, altered, modified, improved or rebuilt.

However:

(1) A nonconforming sign may be repaired to the extent necessary to maintain it in a safe condition and neat and orderly appearance.

(2) A change in the advertising message on the sign shall not constitute an alteration or modification of the sign.

(3) Routine maintenance and changing of copy shall be permitted as long as such maintenance or changing of copy does not result in or change the shape, size or design.

(b) No structural repair or change in shape, size or design, shall be permitted except to make a nonconforming sign comply with all requirements of this chapter or to render the sign structurally sound.

(c) A nonconforming sign may not be removed by an act of the owner and later replaced by another nonconforming sign.

(d) No sign variances are allowed.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 206-6. Uses under prior special use permits and rezoning with conditions.

Any use for which a special use permit or a rezoning with conditions has been issued under a prior zoning code or ordinance shall not be deemed a nonconforming use but shall be deemed a conforming use in the district under the conditions required for the issuance and validity of the special use permit or rezoning.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 206-7. Repairs and maintenance.

(a) Work may be done on any nonconforming structure, or portion of a structure, containing a nonconforming use, on ordinary repairs, or on repair or replacement of load bearing or non-bearing walls, fixtures, wiring, or plumbing, to an extent not exceeding fifty percent of the current replacement cost of the nonconforming structure or on conforming portion of the structure as the case may be, provided that the square footage or cubic content existing when it became nonconforming shall not be increased.

(b) If a nonconforming structure or portion of a structure containing a nonconforming use becomes physically unsafe or unlawful due to lack of repairs and maintenance and is declared by any duly authorized official to be unsafe or unlawful by reason of physical condition, it shall not thereafter be restored, repaired or rebuilt except in conformity with the regulations of the district in which it is located.

(c) Nothing in this UDO shall be deemed to prevent the strengthening or restoring to a safe condition of any building or part thereof declared to be unsafe by any official charged with protecting the public safety, upon order of such official.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 206-8. Exceptions.

(a) Front yard requirements.

(1) The front yard requirements of this chapter shall not apply on any lot where the average depth of the front yards of existing buildings on adjoining lots located wholly or in part within 100 feet on each side of such lot within the same block and zoning district and fronting on the same side of the street is either greater or less than the minimum required front yard depth.

(2) If the average depth of the front yards is greater than the required minimum front yard depth, the depth of the front yard of such lot shall be the average of the front yards of such buildings but need not be greater than 150 percent of the required front yard depth.

(3) If the average depth of the front yards is less than the required minimum front yard depth, the depth of the front yard of such lot may be less than the required front yard depth but shall not be less than the average of the front yards of such buildings.

(b) Permitted encroachments upon required setbacks. Cornices, eaves, chimneys, landings, porches, bay windows or other similar architectural features may extend into the required front, side or rear yard setbacks, provided such extensions do not exceed three feet into the setback. Unenclosed and uncovered decks and patios may extend into the side or rear yard setbacks but no closer than five feet from any property line. Steps and landings may extend into the required setbacks, provided such extensions do not exceed ten feet into the front yard setback. Steps and landings may extend into the rear yard setback, but no closer than five feet from the property line.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 08-2022, § I, 8-1-2022; Ord. No. 09-2025, § 1, 12-5-2025)

ARTICLE I. LAND DEVELOPMENT STANDARDS

DIVISION 1. IN GENERAL

Sec. 401-1. Adopted portions of the Gwinnett County Unified Development Ordinance.

The following chapters of the land development standards of the county unified development ordinance, as described in title 3, development and permitting, or as amended, are hereby adopted as a general ordinance of the city to the extent that the development regulations are not inconsistent with this UDO or city local amendments under section 401-2:

(1) Chapter 800, stormwater management.

(2) Chapter 810, stormwater conveyance systems.

(3) Chapter 380, public utilities installation.

A copy of the current Gwinnett County Unified Development Ordinance and any additions, deletions or local amendments thereto shall be maintained in the office of the Community Development Department and be available for inspection by the public.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-2. Local amendments.

For the purposes of applying portions of the Gwinnett County Unified Development Ordinance, the following sections and chapters of the Gwinnett County Unified Development Ordinance are amended as follows:

(1) Section 110-40. Definitions.

a. Board of commissioners, read Mayor and City Council.

b. Comprehensive plan, read City of Norcross Comprehensive Plan as amended.

c. County, read city.

d. Department, read Community Development Department.

e. Engineering department, read Community Development Department and/or city engineer as applicable.

f. Erosion control regulations, read Norcross UDO, Chapter 400, Article II, Erosion, Sediment and Pollution Control.

g. Planning commission, read city Planning and Zoning Board.

h. Zoning resolution, read Norcross UDO, Chapter 200 as amended.

(4) Section 810-10 General Requirements. Add to the text of Section 810-10 the following:

Section 810-10.4 Surface drainage. All drainage in right-of-way or proposed rightof-way shall be piped using reinforced concrete pipe. Also, road culverts, even if private roads, shall be reinforced concrete pipe. Any modifications to these requirements shall follow the provision for quasi-judicial relief as outlined in Section 104-6 of the City of Norcross UDO.

(6) Section 380.10 Placement of Utilities. Add new Section 380.10.3 the following:

Section 380.10.3. In residential subdivisions all electrical utilities shall be underground.

(Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 12-2020, § I, 12-7-2020; Ord. No. 05-2021, § I, 5-3-2021; Ord. No. 06-2025, § I, 9-2-2025)

Sec. 401-2.1. Adopted portions of the Official Code of Georgia (O.C.G.A.).

The following article(s) of the Official Code of Georgia (O.C.G.A.) are hereby adopted as a general ordinance of the city to the extent that the development regulations are not inconsistent with this UDO or city local amendments under this UDO:

(1) O.C.G.A. 12-5-6 (2010), installation and definition of "rain sensor shut-off switch";

penalty for violations.

(Ord. No. 12-2020, § I, 12-7-2020)

DIVISION 2. STREAM BUFFER PROTECTION

Sec. 401-3. Title.

Division 2 shall be known as the "stream buffer protection ordinance of the city of Norcross."

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-4. Reserved.

Sec. 401-5. Applicability.

(a) This division shall apply to all land development activity on property containing a stream protection area as defined in chapter 100, article II. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under state law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under state law or from other applicable local, state or federal regulations.

(b) After the effective date of the ordinance from which this article is derived, this article shall apply to new subdividing and platting activities.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-6. Grandfather provisions.

This division shall not apply to the following activities:

(a) Work consisting of the repair, maintenance or replacement within the same disturbed area of any lawful use of land that is zoned and approved for such use on or before the effective date of the ordinance from which this article is derived.

(b) Existing development and ongoing land disturbance activities including but not limited to existing agriculture, silviculture, landscaping, gardening and lawn maintenance, except that new development or land disturbance activities on such properties will be subject to all applicable buffer requirements.

(c) Any lawful land development activity that is under construction, has a valid permit, or has submitted a valid and complete application for a permit as of the effective date of the ordinance from which this article is derived, provided the permit is or can be issued within 90 calendar days of the effective date of the ordinance from which this article is derived and all time frames associated with said permit are observed.

(d) Any lawful land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as a house in a subdivision or a building in an office park or other phased development that has a valid preliminary plat permit per subsection (c) of this section, or an approved concept plan, or has submitted a valid and complete application for approval of a concept plan and receives approval within 90 calendar days as of the effective date of the ordinance from which this article is derived, provided the future permit is or can be issued within two calendar years of the effective date of the ordinance from which this article is derived and all time frames associated with said permit are observed.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-7. Exemptions.

(a) The following specific activities are exempt from this division, however any activity within a state waters' buffer must meet state requirements:

(1) Activities for the purpose of building one of the following:

a. A stream crossing by a driveway, transportation route including but not limited to bike paths and pedestrian trails, or utility line;

b. Public water supply intake or public wastewater outfall structures;

c. Land development necessary to provide access to a property;

d. Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks;

e. Unpaved foot trails and paths;

f. Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used; or

g. Stormwater outfalls to the stream, by pipe or channel, necessary to protect the buffer from erosion caused by high flow velocities due to steep slopes.

(2) Public sewer line installation in easements running parallel with the stream where necessary, except that all easements (permanent and construction) and land disturbance within a state waters' buffer must meet state requirements. This includes such impervious cover as is necessary for the operation and maintenance of the utility including, but not limited to, manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in subsection (1) of this section.

(3) Land development activities within a dedicated transportation right-of-way existing at the time that the ordinance from which this article is derived takes effect or approved under the terms of this article.

(4) Within an easement of any utility existing at the time the ordinance from which this article is derived takes effect or approved under the terms of this article, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility including, but not limited to, manholes, vents and valve structures.

(5) Emergency work necessary to preserve life or property. However, when emergency work is performed under this subsection, the person performing it shall report such work to the Community Development Department on the next business day after commencement of the work. Within ten business days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by the Community Development Department to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area.

(6) Forestry and silviculture activities on land that is zoned for forestry, silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be prohibited, then no other land disturbing activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the buffer.

(b) Exemption for these activities does not constitute an exemption for any other activity proposed on a property.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-8. Stream buffer and setback requirements.

All land development activity subject to this article shall meet the following requirements:

(1) An undisturbed buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank. The land forming the bank is also considered part of the buffer for purposes of this article.

(2) An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed buffer, in which all impervious cover shall be prohibited.

Grading, filling and earthmoving shall be minimized within the setback.

(3) No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback.

Any land development activity within a buffer established hereunder or any impervious cover within a setback established hereunder is prohibited unless a variance is granted pursuant to section 401-9.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-9. Variance; procedures.

(a) Variance requests from the requirements of this article shall be submitted on an application form as prescribed by the Community Development Department or the Director's designee, along with such fees as shall be established by the Mayor and City Council.

The Director of the Community Development Department or the Director's designee shall coordinate the review of each variance request with all other affected city departments and shall forward such comments or recommendations as may be received to the Mayor and City Council for action in their normal course of business. The review must include a recommendation from the Public Works Department.

(b) This section describes how to apply for a variance from this division; however, any activity within a state waters' buffer must meet state requirements.

(c) Variances may be granted in accordance with the following provisions:

(1) If the project involves the construction of one single-family home for residential use by the owner of the subject property on a parcel that was platted prior to the effective date of the ordinance from which this article is derived, and its shape, topography or other existing physical condition prevents land development consistent with this article, and the Public Works Department finds and determines that the requirements of this article prohibit the otherwise lawful use of the property by the owner, the Mayor and City Council may grant a variance from the buffer and setback requirements hereunder, provided such variance requires mitigation measures to offset the effects of any proposed land development on the parcel. The Mayor and City Council are authorized to use a consent agenda to fulfill the terms of this subsection.

(2) Except as provided above, the Mayor and City Council shall grant no variance from any provision of this article without first conducting a public hearing on the application for variance and authorizing the granting of the variance by an affirmative vote of the Mayor and City Council. The Community Development Department shall give public notice of each such public hearing in a newspaper of general circulation within the city at least once a week for two consecutive weeks before it is heard. The Community Development Department shall require that the applicant post a sign giving notice of the proposed variance and the public hearing at least 15 days prior to the date of the hearing. The sign shall be of a size and posted in such a location on the property as to be visible from the primary adjacent road right-of-way.

(3) No application or reapplication for a variance affecting the same stream segment on a property shall be heard within 12 months from the date of last action by the Mayor and City Council unless such 12-month period is waived by the Mayor and City Council, and in no case may such application or reapplication be reconsidered in less than six months from the date of last action by the Mayor and City Council.

(4) Variances will not be considered when, following adoption of the ordinance from which this article is derived, actions of any property owner of a given property have created conditions of a hardship on that property.

(5) Variances will be considered only in the following cases:

a. The applicant provides evidence that impacts to the buffer have been avoided or minimized to the fullest extent practicable; and

b. The project involves the construction or repair of a structure that, by its nature, must be located within the buffer. Such structures include dams and detention/ retention ponds;

c. Paved recreational foot trails and viewing areas, providing that impacts to the buffer are minimal;

d. The proposed land disturbing activity within the buffer will receive a permit from the United States Army Corps of Engineers (USACE) under section 404 of the Federal Water Pollution Control Act Amendment of 1972, 33 USC 1344, and the Corps of Engineers has received a mitigation plan to be implemented as a condition of such a permit. In addition, land disturbing activities in the buffer that are outside the USACE's jurisdiction must be mitigated;

e. The buffer intrusion is mitigated using the procedure established in the city stormwater design manual; or

f. A valid and complete application for rezoning of the property is submitted prior to the effective date of the ordinance from which this article is derived and approval of the rezoning application by the Mayor and City Council occurs after the effective date of the ordinance from which this article is derived, and the variance request is consistent with the intent of this article factoring into account the property owner's reliance on standards in effect at the time of the rezoning.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-10. Variance request information.

At a minimum, a variance request shall include the following information:

(1) A site map that includes locations of all streams, wetlands, floodplain boundaries and other natural features, as determined by field survey, vegetation and other physical characteristics of the property;

(2) A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;

(3) A dated site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the buffer and setback. The exact area of the buffer to be affected shall be accurately and clearly indicated;

(4) Documentation that impacts to the buffer have been avoided or minimized to the fullest extent practicable;

(5) A calculation of the total area and length of the proposed intrusion;

(6) A stormwater management site plan, if applicable;

(7) Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed;

(8) A description of the project, with details of the buffer disturbance, including estimated length of time for the disturbance and justification for why the disturbance is necessary;

(9) Any other reasonable information related to the project that the Public Works Department may deem necessary to effectively evaluate the variance request;

(10) A copy of the permit application, supporting documentation, and proposed mitigation plan as submitted to the United States Army Corps of Engineers under section 404 of the Federal Water Pollution Control Act Amendment of 1972, 33 USC 1344, if applicable;

(11) A copy of the permit application, supporting documentation, and proposed mitigation plan as submitted to the Georgia Environmental Protection Division for a variance from the state waters' buffer; and

(12) A buffer mitigation plan in accordance with the procedure outlined in the city stormwater design manual.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-11. Factors for issuing variance.

The following factors will be considered in determining whether to issue a variance:

(1) The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property;

(2) The locations of all streams on the property, including along property boundaries as determined from field inspection;

(3) The location and extent of the proposed buffer or setback intrusion;

(4) Whether alternative designs are possible which require less intrusion or no intrusion;

(5) The long term and construction water-quality impacts of the proposed variance;

(6) Whether issuance of the variance is at least as protective of natural resources and the environment;

(7) The value of mitigation activities as calculated in accordance with the city stormwater design manual.

(Ord. No. 08-2019, § I, 6-3-2019)

DIVISION 3. SPECIAL BUFFER REGULATIONS AND REQUIREMENTS

Sec. 401-12. Applicability.

(a) Whichever provisions of this article are more restrictive or impose higher protective standards for human health or the environment shall be considered to take precedence.

(b) The general grandfather provisions, exemptions, and variance procedures sections of this UDO do not apply to this article. Applicable exemptions and variances are given in this division.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-13. Chattahoochee Corridor.

(a) Vegetation shall be left in its natural state, and impervious surfaces shall not be permitted, for a distance of 50 horizontal feet as measured from both banks of the Chattahoochee River and its impoundments, and for a distance of 35 horizontal feet as measured from both banks of all other flowing stream channels within the Chattahoochee Corridor, except for footpaths, designated public access areas, river or stream crossings by transportation facilities, public water supply intake structures, public wastewater treatment plant outfalls and utility line crossings.

(b) Subject and in addition to the restrictions set forth in subsection (a) of this section, impervious surfaces and structures shall not be permitted within, on or over any land that is 150 horizontal feet or less from either bank of the Chattahoochee River and its impoundments, except for footpaths, designated public access areas, river or stream crossings by transportation facilities, public water supply intake structures, public wastewater treatment plant outfalls and water supply and sewerage manholes that are designed and built at grade, unless it is determined by the Atlanta Regional Commission, after consideration by a Committee of the Atlanta Regional Commission as authorized by the Atlanta Regional Commission, and based in part upon the affidavit of, and substantial evidence submitted by, a registered professional engineer qualified in water quality and hydrology that the impervious surfaces and structures will be not be harmful to the water and land resources of the Chattahoochee Corridor, will not significantly impede the natural flow of waters and will not result in significant land erosion, stream bank erosion, siltation or water pollution.

(c) Not including the impervious surfaces and structures that are excepted above, any impervious surfaces or structures that, in the judgment of the Atlanta Regional Commission, must legally be permitted within, on or over any land that is 150 horizontal feet or less from either bank of the Chattahoochee River and its impoundments on lots of record as of March 16, 1973, for the portion of the Chattahoochee Corridor water intake, which were designated by the local governing authority for a single-family detached residential use, shall meet the following standard: For each one foot incursion into the 150-foot impervious surface buffer, one foot of natural vegetation shall be added to the 50-foot natural vegetation buffer. In the event that the Atlanta Regional Commission determines that legal, physical, biological or hydrologic conditions on the site prevent the addition of all the required natural vegetation, substitute measures satisfactory to the Atlanta Regional Commission shall be taken to provide an equivalent level of land and water resource protection.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-14. Additional information requirements for development on stream buffer zone properties.

Any permit applications for property requiring buffers and setbacks hereunder must include the following:

(1) A site plan showing:

a. The location of all streams on the property;

b. Limits of required stream buffers and setbacks on the property;

c. Buffer zone topography with contour lines at no greater than two-foot contour intervals;

d. Delineation of forested and open areas in the buffer zone; and

e. Detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback.

(2) A description of all proposed land development within the buffer and setback; and

(3) Any other documentation that the Public Works Department may reasonably deem necessary for review of the application and to ensure that the buffer zone ordinance is addressed in the approval process.All buffer and setback areas must be recorded on the final plat of the property following plan approval.

(Ord. No. 08-2019, § I, 6-3-2019)

DIVISION 4. ADMINISTRATION AND ENFORCEMENT

Sec. 401-15. Responsibility.

Neither the issuance of a development permit nor compliance with the conditions thereof, nor with the provisions of this article shall relieve any person from any responsibility otherwise imposed by law for damage to persons or property; nor shall the issuance of any permit hereunder serve to impose any liability upon the city, its officers or employees, for injury or damage to persons or property.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-16. Inspection.

(a) Either the Public Works Department or the Community Development Department may cause inspections of the work in the buffer or setback to be made periodically during the course thereof and shall make a final inspection following completion of the work. The permittee shall assist representatives or either department in making such inspections.

Both the Director of the Public Works Department and the Director of the Community Development Department or the Director's designee shall have the authority to conduct such investigations as he may reasonably deem necessary to carry out the duties as prescribed in this article, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the protection area.

(b) No person shall refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out official duties.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-17. Violations, enforcement and penalties.

Any action or inaction that violates the provisions of this article or the requirements of an approved plan or permit shall be subject to the enforcement actions or penalties outlined herein. Any such action or inaction that is continuous with respect to time is deemed to be a public nuisance and also may be abated by injunctive or other equitable relief. The imposition of any of the enforcement actions or penalties described herein shall not prevent such equitable relief.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-18. Enforcement procedures.

The following are the enforcement procedures authorized by this article. In the event the owner or responsible person fails to correct the violations after the deadline contained in the notice of violation, both the Director of the Public Works Department and the Director of the Community Development Department or the Director's designee are authorized to take or impose any one or more of the additional actions contained herein:

(1) Notices of violation. Enforcement shall begin with the issuance of a written notice of violation to the owner or responsible person by the Director of the Public Works Department or the Director of the Community Development Department or the Director's designee. The notice may be delivered personally or sent by first class mail. The notice of violation shall contain at least the following information:

a. The name and address of the owner or responsible person;

b. The location or address of the site upon which the violation is occurring;

c. A description of the nature of the violation;

d. A description of the remedial actions or measures necessary to bring an action or inaction into compliance with a permit, approved plan or this article;

e. The deadline or completion date of any such remedial actions or measures;

and

f. A statement of the penalties that may be assessed against the owner or responsible person to whom the notice of violation is directed.

(2) Stop work orders. The Director of the Public Works Department or the Director of the Community Development Department or the Director's designee is authorized to issue stop work orders to an owner or responsible person. Stop work orders are effective immediately and shall remain in effect until the necessary corrective actions or remedial measures as set forth in the notice of violation have occurred.

Stop work orders may be withdrawn or modified by the Director of the Public Works Department or the Director of the Community Development Department or the Director's designee in order to enable an owner or responsible person to take necessary remedial actions or measures to correct the violations.

(3) Refusal to issue certificates of occupancy or completion. The Director of the Community Development Department or the Director's designee is authorized to refuse to issue certificates of occupancy or completion for the building or other improvements constructed or being constructed on a site until the owner or responsible person has taken the remedial actions or measures as set forth in the notice of violation or has otherwise corrected the violations described therein.

(4) Suspension, revocation, or modification of permit. The Director of the Community Development Department or the Director's designee is authorized to suspend, revoke or modify a permit that was issued authorizing land disturbing activities or development. The Director of the Community Development Department or the Director's designee is authorized to reinstate a suspended, revoked or modified permit after the owner or responsible person has taken the remedial actions or measures stated in the notice of violation or has otherwise corrected the violations described therein. The Director of the Community Development Department or the Director's designee is also authorized to reinstate such permit, which may include conditions as the Director of the Community Development Department or the Director's designee may deem necessary, to enable the owner or responsible person to take the necessary remedial actions or measures to correct the violations.

(5) Refusal to approve final subdivision plats. The Director of the Community Development Department or the Director's designee is authorized to refuse to approve final plats until the owner or responsible person has taken the remedial actions or measures set forth in the notice of violation or has otherwise corrected the violations described therein.

(6) Issuance of citations or summons to court. Both the Director of the Public Works Department and the Director of the Community Development Department or the Director's designee are authorized to issue a citation or summons to the owner or responsible person requiring such person to appear in a court of competent jurisdiction to answer charges for violations of this article.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-19. Legal penalties and/or remedies.

(a) Fine and/or sentence. Any person convicted by a court of competent jurisdiction of violating any provision of this article shall be guilty of violating a duly adopted ordinance of the city and shall be punished either by a fine not less than $100.00 per day and not greater than $1,000.00 per day, or by a sentence of imprisonment not to exceed 30 days in jail, or both a fine and jail or work alternate. Each day that a violation continues after due notice has been served shall be deemed a separate offense.

(b) Other legal remedies. In any case in which a violation of this article has occurred, the city, in addition to other remedies provided by law, may petition for a restraining order, injunction, abatement, or take any other appropriate legal action or proceeding through a court of competent jurisdiction to prevent, restrain, or abate such unlawful use or activity.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-20. Remedies.

In any case in which any land is, or is proposed to be, used or activities are undertaken in violation of this article or any amendment thereto adopted by the Mayor and City Council, the city, in addition to other remedies provided by law, may petition for a restraining order, injunction, abatement, or take any other appropriate legal action or proceeding through a court of competent jurisdiction to prevent, restrain, or abate such unlawful use or activity.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-21. Administrative appeal and judicial review.

(a) Administration. This article shall be administered, interpreted, and enforced by both the Director of the Public Works Department and the Director of the Community Development Department or the Director's designee.

(b) Administrative appeal. Appeals of the interpretation by either the Director of the Public Works Department or the Director of the Community Development Department or the Director's designee of the requirements of this article shall first be submitted in writing (on a form provided by the Community Development Department) to either Director who shall review the request in a timely manner and receive comments from other affected departments. Such appeal shall be made within 15 days after the decision to be appealed.

The appeal thereupon shall be forwarded to the Mayor and City Council for action in their normal course of business.

(c) Judicial review. Any person aggrieved by a decision or order of either the Director of the Public Works Department or the Director of the Community Development Department or the Director's designee, after exhausting all administrative remedies, shall have the right to appeal by writ of certiorari to the superior court of the county.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-22. Fees imposed.

The fees imposed for actions undertaken pursuant to the provisions under this article shall be as follows:

(1) Application filing, permit, inspection, and other fees shall be as may be established from time to time by the Mayor and City Council.

(2) Permit fees, if any, shall be submitted as a prerequisite to issuance of the permit.

Nonpayment as a result of submission of a check having insufficient funds on account, or for any other reason, shall cause the permit to be voided and reissuance subject to penalty as may be established by the Mayor and City Council.

(3) Application fees, if any, shall be submitted with the application and upon acceptance of said submission for review and consideration shall not be refundable.

Failure to pay a required application fee shall cause the application to be returned to the applicant without acceptance for review or consideration by the city.

(4) Following the approval of development plans, and prior to authorization to begin construction, the developer shall provide for the payment of such fees as may be established from time to time by the Mayor and City Council. Such fees shall not be refundable following issuance of a development permit, except upon approval of the Mayor and City Council.

(5) Prior to approval of a final plat or certificate of occupancy, the developer shall provide to the Public Works Department such fees and performance and/or maintenance bonds as shall be required by this article or established from time to time by the Mayor and City Council.

(Ord. No. 08-2019, § I, 6-3-2019)

DIVISION 5. TRAFFIC IMPACT STUDIES

Sec. 401-23. Purpose and intent.

Understanding the demands placed on the community's transportation network by development is an important dimension of assessing the overall impacts of development.

All development generates traffic, and it may generate enough traffic to create congestion and thus require the community to invest more capital funds into the transportation network in the form of new roads, traffic signals and intersection improvements. Traffic congestion results in a number of problems, including economic costs due to delayed travel times, air pollution and accidents. By requiring traffic impact studies for proposed developments meeting certain thresholds, the city will be better able to determine the transportation demands of development proposals and provide for reduction of adverse impacts on the transportation system.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-24. Objectives.

The city finds that requiring a traffic impact study for proposed developments that meet certain thresholds will help to achieve the following objectives:

(1) Forecast additional traffic associated with new development, based on accepted practices.

(2) Determine the improvements that are necessary to accommodate the new development.

(3) Allow the local government to assess the impacts that a proposed development may have and assist the local government in making decisions regarding development proposals.

(4) Help to ensure safe and reasonable traffic conditions on streets after the development is complete.

(5) Reduce the negative impacts created by developments by helping to ensure that the transportation network can accommodate the development.

(6) Protect the substantial public investment in the street system.

(7) Provide information relevant to comprehensive planning, transportation planning, transit planning and the provision of programs and facilities for traffic safety, road improvements, transportation demand management, pedestrian access and other transportation system considerations.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-25. Reserved.

Sec. 401-26. Thresholds of applicability.

A traffic impact study shall be required for any discretionary development proposal which meets or exceeds the thresholds in the following table.

Type of Development Threshold Office Greater than 125,000 gross square feet Commercial Greater than 100,000 gross square feet Warehouse Greater than 175,000 gross square feet Hotel Greater than 150 rooms Type of Development Threshold Assembly spaces Greater than 2,000 seats Residential, single-family detached Greater than 125 units Residential, multi-family Greater than 150 units General Any use that generates more than 1,800 daily trips (Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-27. Exemptions.

(a) A traffic impact study is not required if a discretionary development proposal is initiated by the city.

(b) A discretionary development proposal may be exempted from the traffic impact study requirement by the Community Development Department Director if a prior traffic impact study for the subject property has been submitted to the city and the proposed development is substantially similar to that for which the prior traffic impact study was conducted.

(c) Any development of regional impact that complies with rules of the Georgia Regional Transportation Authority (GRTA) shall be exempt from this article.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-28. Determination of applicability.

At the time a discretionary development proposal is filed, or during any pre-application meeting if possible, Community Development Department staff shall determine whether a traffic impact study shall be required according to this article. Community Development Department staff shall calculate the expected trip generation of the proposed development using professionally accepted trip generation rates or other data and compare it to the thresholds specified in this article to determine whether a traffic impact study is required.

Applicants for discretionary development proposals shall provide sufficient information about the development proposal (e.g., number of dwelling units, square footage of buildings, number of employees, land area of the development, etc.) for Community Development Department staff to apply professionally accepted trip generation rates to the proposed development. Community Development Department staff shall not accept a discretionary development proposal for processing unless it contains the data on the proposed development necessary to apply available trip generation rates.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-29. Scoping meeting.

Once it is determined that a traffic impact study is required, a scoping meeting may be held with the developer or his or her consultant and the appropriate representatives of the city. It will be the responsibility of the developer or his or her consultant to initiate this meeting. The purpose of this meeting is to discuss the availability of site-specific information concerning the development, available forecasts of traffic volumes, and to ensure the applicant understands the content requirements for traffic impact studies.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-30. Required contents of a traffic impact study.

(a) The traffic impact study shall be prepared following and meeting the standards of the GRTA development of regional impact technical guidelines, dated January 14, 2002, as may be amended from time to time. In addition, the following components shall be included:

(1) Alternative transportation. Alternative transportation (sidewalk, bicycle, transit) impacted or needed as a result of the development.

(2) References. A listing of all technical documents and resources cited or consulted in preparing the traffic impact study.

(3) Technical appendix. Relevant technical information, including but not limited to:

copies of raw traffic count data used in the analysis, calculation sheets and/or computer software output for all LOS and V/C calculations in the analysis, and warrant worksheets for signals, turn lanes, signal phasing, etc. used in the analysis.

(4) Mitigation measures and costs. Listing of all intersections and road segments that are forecasted to be level of service "E" and "F" in the horizon year, or if phased, in the years that each phase is planned to be complete, and an identification and description of specific mitigation measures including signal, turn lane, or other warrant analyses as appropriate and necessary to bring these intersections and road segments into compliance with a level of service "D" or other city-adopted level of service for said road segment or intersection.

(b) If roadway improvements are needed, the study shall show a drawing at an engineering scale of one inch equals 20 feet for all recommended lane configurations.

(c) If signalization is warranted by the traffic signal warrants outlined in the Manual on Uniform Traffic Control Devices (MUTCD), a warrant analysis shall also be conducted as a part of the traffic impact study. If a traffic signal is warranted, the warrant package in the study shall show a drawing at an engineering scale of one inch equals 20 feet, detailing the signal design and phasing plans.

(d) The estimated cost associated with implementing all such mitigation measures shall be provided in the traffic impact study. The traffic impact study may take into account any city/county/state-approved roadway, traffic signalization and other improvements in determining mitigation measures and providing recommendations.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-31. Additional technical specifications.

Community Development Department staff is further authorized to promulgate and require the use of additional technical specifications for conducting traffic impact studies, which shall be consistent with analysis methods included in the most recent Highway Capacity Manual, Manual on Uniform Traffic Control Devices, Trip Generation published by the Institute of Transportation Engineers (ITE), and/or Traffic Access and Impact Studies for Site Development: A Recommended Practice (Washington, DC: Institute of Transportation Engineers, 1991), as may be amended or republished from time to time.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-32. Costs and fees.

The city assumes no liability for any costs or time delays (either direct or consequential) associated with the preparation and review of traffic impact studies. There shall be no application review fee for a traffic impact study.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-33. Submittal and review of study.

The applicant for the proposed development or the qualified professional shall submit one electronic copy of the traffic impact study and technical appendix, two paper copies of the traffic impact study and one paper copy of the technical appendix to the Community Development Department. Community Development Department staff may submit copies of the report to applicable review agencies which may include the Georgia Department of Transportation, GRTA, an adjacent local jurisdiction and/or metropolitan planning organization or regional development center. Within ten working days of receipt of a traffic impact study, Community Development Department staff shall review all calculations and analyses and determine if they are complete, reasonable, understandable, consistent and fully explained. The conclusions presented in the traffic impact study shall be consistent with and supported by the data, calculations and analyses in the report. Calculations, graphs, tables, data and/or analysis results that are contrary to good common sense or not consistent with and supported by the data will not be accepted. In such events, Community Development Department staff shall return the traffic impact study to the development applicant for correction.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-34. Recommendations for mitigation of impacts.

Within ten working days of receipt of a completed traffic impact study, Community Development Department staff shall complete his or her review of the study and submit to the applicant all recommendations for mitigation measures as stated in the traffic impact study and include any interpretations or recommended conditions of approving the discretionary development proposal that will mitigate traffic impacts of the proposed development.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-35. Determination of project and system improvements.

Community Development Department staff shall determine which mitigation measures constitute "project" improvements and which mitigation measures constitute "system" improvements within the context of the Georgia Development Impact Fee Act of 1990.

In the event that a particular improvement is called for in the traffic impact study or recommended by Community Development Department staff, and Community Development Department staff is unable to uniquely attribute the recommendation as a project or system improvement or finds that such improvement has characteristics of both a project improvement and a system improvement, Community Development Department staff shall determine the proportion of the cost of such improvement that can reasonably be attributed to the development as a project improvement, and the portion of such improvement that can reasonably be considered a system improvement.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-36. Conditions of development approval for project improvements.

Upon the determination of project improvements needed to mitigate the traffic impacts of the discretionary development proposal as provided in this article, Community Development Department staff shall recommend that the project improvements be completed by the developer as conditions of approval of the discretionary development proposal.

(Ord. No. 08-2019, § I, 6-3-2019) Sec. 401-37. System improvements.

When Community Development Department staff recommends improvements as a condition of a discretionary development proposal that Community Development Department staff determines are wholly or partially "system" improvements, the Community Development Department may include such recommendations in the recommended conditions of approval for the discretionary development application. The development applicant and the city in the case of system improvements shall have the following options:

(1) The applicant for a discretionary development proposal may voluntarily agree to pay for the cost of providing the system improvements, or a pro-rated share of the cost of said system improvements that are reasonably attributed to the subject development, as determined by the city.

(2) In the case of an application for discretionary development proposal before the Mayor and City Council, the city may find that the proposed development will provide substantial adverse impacts on the transportation system. The city may find further that the existing transportation system is insufficient to serve the proposed development and the city is unable to provide adequate transportation facilities within a reasonable amount of time after the impacts of said development would occur. Given such findings, the Mayor and City Council may reduce the development density or intensity to the degree that the impacts of the development proposal do not degrade transportation facilities below adopted level of service standards, require a phasing of the development in a manner that adequate public facilities will be provided publicly or privately, or in cases where such other alternatives do not address the adverse impacts, deny an application for a discretionary development proposal.

(Ord. No. 08-2019, § I, 6-3-2019)

DIVISION 6. INFRASTRUCTURE, STREETS, AND SIDEWALKS

Sec. 401-38. Street classification and right-of-way requirements.

(a) Street classifications.

(1) Dedication of street right-of-way. Right-of-way for all existing and proposed public streets within a project shall be dedicated in accordance with the street classifications as shown on the officially adopted long range road classification map in the city comprehensive plan or as required by the City Director or designee.

(2) Street improvements. All streets and project access improvements shall be constructed or improved to the standards as established in the UDO. Roadway improvements shall be made in accordance with the street classifications as shown on the officially adopted long range road classification map.

(b) Minimum right-of-way and street improvements.

(1) Right-of-way and pavement widths. Minimum widths of street right-of-way and roadway pavement shall be as shown on table 401-38(b) unless a modification is granted by the director.

Table 401-38(b) Minimum Right-of-Way and Roadway Widths for New Streets and Project Access Improvements

Street category Minimum right-of-way1 Minimum roadway2 Major collector 80' 52' Minor collector 60' to 80' 28' Local street Non-residential 60'3 32' Non-residential cul-de-sac 60' radius 50' radius Residential—Urban 50'4 28' Residential—Urban culde-sac 50' radius 40' radius

1. The greater right-of-way width shall apply under circumstances as described in section 401-38(b).

2. Roadway width dimensions are back-of-curb to back-of-curb except where noted.

3. Utility easement shall be provided in a location and size as required by the county department of water resources.

4. The minimum right-of-way may be reduced to 40 feet, and the sidewalk width to four feet for a dead-end local street that is shorter than 500 feet and serves ten or fewer single-family homes.

(2) Street rights-of-way.

a. The minimum width of street right-of-way shall be dedicated based upon the street classification as shown on the officially adopted long range road classification map and as contained in the UDO.

b. Additional street right-of-way width shall be required to be dedicated at intersections or other locations to accommodate required traffic safety improvements (e.g. deceleration lanes, turning lanes, storage lanes, medians, or realignments), future projects identified in official planning documents, or within 500 feet of a major intersection and minimum right-of-way standards would be inadequate to accommodate the improvements.

c. If a new street or thoroughfare is proposed by the officially adopted long range road classification map or the state to adjoin or traverse the property, permits shall not be issued until the Community Development Department has subLAND DEVELOPMENT § 401-38 mitted the project to the Mayor and Council for review in order to seek a determination if the city should acquire the right-of-way or if a study of alternate routes should be undertaken.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-39. Requirements for new streets and roadways.

(a) Construction standards. Streets, whether public or private, shall be constructed or improved at least to the standards contained in this UDO in accordance with the category of said streets or as otherwise required by the Mayor and Council.

(b) General layout requirements.

(1) Conformance. The arrangement, character, extent, width, grade, and location of all streets shall conform at a minimum to the officially adopted long range road classification map and this UDO.

(2) Local streets and minor collectors.

a. Local streets shall be laid out so that their use by through traffic will be discouraged. Minor collectors shall be provided to channel through traffic movements within a development, where appropriate to the design and a major thoroughfare is not proposed by the officially adopted long range road classification map. Minor collectors also may be provided as central routes within large residential subdivisions, where appropriate to the design, based on project traffic demands exceeding 2,000 trips per day (ADT). Traffic calming measures for new local streets are required to encourage and maintain maximum vehicle operating speeds of 25 miles per hour. In order to achieve this objective, the maximum length of roadway section between speed control points shall be 500 feet. Such design and construction should be in substantial conformance with the City of Norcross Traffic Calming Design Guide for traffic calming measures and requirements.

(3) Cul-de-sac streets.

a. Dead end streets designed to have one end permanently closed shall provide a cul-de-sac or other approved turnaround and may be no more than 600 feet in length. Additional length necessitated by topography or property configuration may be approved by the City Engineer.

b. The length of a cul-de-sac street shall be measured from the center of the cul-de-sac or other approved turnaround to the center of the intersection with another street, whether a through street or another cul-de-sac or dead-end street.

c. Eyebrow cul-de-sac (half cul-de-sacs) will be allowed only at "right-angled" intersections having an interior angle between 80 degrees and 100 degrees.

d. Culs-de-sac shall conform to the layout and dimensional requirements as shown in the standard drawings in appendix A [of the county unified development ordinance].

(4) Substandard streets. In the event that a development has access to a substandard street (i.e. a dirt or gravel road), the following project access improvements shall be required:

a. If the abutting substandard street provides access to the development and is dirt or gravel, the street shall be upgraded by the developer to a paved roadway from the project entrance to the nearest standard paved road along the route of access.

b. Off-site project access improvements required under subsection a. above, and chapter 400 shall at a minimum, result in a full-section roadway meeting the requirements of a local residential roadway. Responsibilities shall be as follows:

1. The developer shall design the road and provide the labor, equipment, and materials required for roadway improvements and necessary drainage improvements.

2. If the city desires the roadway to be improved to a standard greater than that for a local residential roadway, the city shall provide or pay the cost of the additional materials and labor.

3. All right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the city.

4. In the event that access to a new development is through an existing local city maintained road, the developer and/or builder is responsible for any and all damages to the existing road. Developer and/or builder may be required to document existing conditions of this access road prior to any construction, may be required to post a bond or some form of guarantee and make necessary repairs as deemed appropriate per the Public

Works Director.

c. Half streets. Half-streets (new boundary streets having one-half of the minimum required right-of-way or pavement width) shall not be allowed nor access to same be permitted should it exist.

(5) Improvements along state highways or county roadways. For any development which abuts a state highway or county roadway, or other right-of-way controlled by the state, improvements to the roadway and the location and design of any street or driveway providing access from the state highway or county roadway shall comply with the standards and requirements of the state department of transportation or the county department of transportation. A permit for the proposed access or improvements shall be required to have been approved by the state department of transportation or the county department of transportation and incorporated into the construction drawings for the project prior to issuance of a development permit by the department.

(6) Dead end streets.

a. A dead-end street shall be provided to the boundary of a subdivision where necessary to provide access to a land-locked abutting property, for planned continuity of future circulation, for improved access for public safety vehicles, or for the extension of public water or other utilities to neighboring lands. Such dead-end streets shall be designed so as to allow their reasonable extension and shall be located so as to be reasonably incorporated into a street design for the neighboring property. The stub street requirement may be waived by the Community Development Director.

b. Dead end streets on abutting property shall be extended into a proposed subdivision and incorporated into the street design of the development. This requirement may be modified by the Community Development Director. in cases of serious topographical hardship or dissimilar zoning which would create unacceptable land use conflicts between the two developments. This modification may be conditioned on the provision of easements necessary for the extension of public utilities, the provision of cul-de-sac or other permanent turnaround on the dead-end street, or the removal of the dead-end street back to its nearest intersection.

c. Where a dead-end street (other than a cul-de-sac) serves more than three lots, the developer shall be required to provide a temporary vehicular turnaround within the right-of-way. This requirement may be waived if extension of the dead-end street is approved and under construction prior to its inclusion in a final plat.

d. Where a street dead ends at the property boundary and the street exceeds 600 feet in length, a permanent cul-de-sac or other approved turnaround shall be required. In this situation, right-of-way to the property boundary shall be required, but the pavement shall not be extended to the property boundary beyond the edge of the paved cul-de-sac or other approved turnaround. In no case shall a dead-end street exceed 2,000 feet in length unless approved by the Community Development Director due to unusual topographic conditions or property configuration.

e. Connections for future extension of all public utilities shall be constructed as part of the subdivision. Curb returns shall be constructed as part of the subdivision. Curb returns shall be provided to the future "stub" street roadway location, and curb and gutter shall be installed across the roadway stub at the right-of-way line (extended).

f. The right-of-way for the "stub" street shall be dedicated as part of the final plat.

Slope easements or construction easements, if required by the street design, shall be shown on the final plat.

(7) Service roads. Where a development borders on or contains a railroad right-of-way, or limited access highway right-of-way or major thoroughfare, a public street may be required to be constructed and dedicated within the development approximately parallel to and on each side of such right-of-way.

(c) Reserve strips. Land in private ownership adjacent to public rights-of-way which could control or are intended to control access to streets, alleys, or public lands shall not be permitted unless their control is given to the city under ownership, dedication, or easement conditions approved by the City Attorney or acceptable to the Public Works Director. No development shall be designed so as to deny access to abutting properties.

(d) Street jogs.

(1) Street jogs shall either directly align or have offsets as shown in table 401-41(h), as measured between centerlines of said streets.

(2) All major thoroughfares shall provide offsets as required by the Community Development Department, where alignment is not desirable or feasible, but in no case be spaced less than 600 feet apart as measured between centerlines of said streets.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-40. Project access improvements.

(a) Project access improvements for single-family detached, single-family attached, and duplex residential subdivisions.

(1) When property that abuts upon an existing or proposed city road is to be developed or redeveloped as a single-family detached, attached, or duplex subdivision and the city street will provide access to the property, project access improvements to the city road (deceleration lanes, turn lanes, etc.) shall be provided by the developer as required herein. Two remote entrances shall be required for developments with more than 120 dwelling units unless an administrative modification is granted by the Community Development Director and an administrative variance is granted by the county fire marshal.

(2) A deceleration lane shall be required to be provided at each project driveway or subdivision street entrance that is provided street access to a minor collector street or major thoroughfare. In the event a street has an existing or proposed median, and the developer desires to construct a median break to serve the subdivision, a left turn lane leading to the median break shall be required to be provided by the developer if approved by the Community Development Department and shall meet the standards contained herein. The preferred spacing for median breaks shall be 2,000 feet between the centerlines of the openings, and the minimum spacing for median breaks shall be 1,000 feet between centerlines of the openings. Other factors will also be considered, such as distance to other median openings, adjacent land use, expected traffic volumes, and the resulting volume of U-turns that are likely to occur without the median opening. Meeting the spacing criteria is not, in itself, an indication that median openings will be allowed.

(3) Deceleration lanes shall have a length of 200 feet, with an additional 50-foot taper length, a pavement width of 12 feet (exclusive of curb and gutter) and shall be provided with curb and gutter. Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder measured from back of curb shall be dedicated by the developer to the city at no cost. Associated stormwater infrastructure as deemed necessary by the construction of the deceleration lane shall also be required.

(4) A left turn lane shall be provided into each project driveway or subdivision street that accesses a minor collector or major thoroughfare in accordance with the state department of transportation.

(5) Other project access improvements may be required by the Community Development Department in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.

(6) The developer shall be responsible for the relocation of public or private utilities and stormwater infrastructure, as may be occasioned by the required project access improvements.

(b) Project access improvements for multifamily and non-residential developments.

(1) When property that abuts upon an existing or proposed city road is to be developed or redeveloped for multifamily or non-residential uses and the city road will provide access to the property, project access improvements to the city road (deceleration lanes, turn lanes, etc.) shall be provided by the developer.

(2) A deceleration lane shall be required to be provided at each project driveway or subdivision street entrance, as applicable, that is provided street access to a minor collector street or major thoroughfare. In the event a street has an existing or proposed median, and the developer desires to construct a median break to serve the project, a left turn lane leading to the median break shall be required to be provided by the developer if approved by the Community Development Department and shall meet the standards contained herein. The preferred spacing for median breaks shall be 2,000 feet between the centerlines of the openings, and the minimum spacing for median breaks shall be 1,000 feet between centerlines of the openings. Other factors will also be considered, such as distance to other median openings, adjacent land use, expected traffic volumes, and the resulting volume of U-turns that are likely to occur without the median opening. Meeting the spacing criteria is not, in itself, an indication that median opening will be allowed.

(3) Deceleration lanes shall have a length of 200 feet, with an additional 50-foot taper length, pavement width of 12 feet (exclusive of curb and gutter) and shall be provided with curb and gutter. Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder shall be dedicated by the developer to city at no cost. Associated drainage improvements as deemed necessary by the construction of the deceleration lane shall also be required.

(4) A left turn lane shall be provided into each project driveway or subdivision street that accesses a minor collector or major thoroughfare in accordance with the state department of transportation.

(5) Other project access improvements may be required by the Community Development Department upon the recommendation of the Public Works Department in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.

(6) The developer shall be responsible for the relocation of public or private utilities and stormwater infrastructure, as may be occasioned by the required project access improvements.

(c) If alternate project access improvements are requested, the applicant shall have a traffic study performed, at their expense but at the direction of the City Engineer, utilizing a traffic professional from the city's on-call list. Should the results of the traffic study validate alternate access improvements, the applicant can pursue approval from Public Works and the Community Development Director based on recommendation from the City Engineer.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-41. Driveway design standards.

(a) Angle and improvements. Driveways shall generally intersect streets at right angles.

The portion of a driveway located within a public right-of-way shall be paved.

(b) Driveway design standards. Driveways serving single-family detached or duplex residences may be no less than ten feet wide at the right-of-way line and shall provide a radius to the back of curb or edge of pavement of the roadway of no less than five feet.

Driveways shall provide a parking area of at least 18 feet deep measured from the edge of the sidewalk or curb if a sidewalk is not present or required. All other driveway curb cuts on public streets shall conform to the standards shown on the driveway details contained in appendix A [of the county unified development ordinance].

(1) Driveway detail 1 (32-foot width, 25-foot radius) for:

a. Commercial and retail uses (over 80,000 square feet).

b. Office/institutional/cultural uses (over 100,000 square feet).

c. Multifamily residential developments (over 200 units).

d. Mobile or manufactured home developments (over 200 lots).

e. Service stations.

(2) Driveway detail 2 (28-foot width, 25-foot radius) for:

a. Commercial and retail use sites (80,000 square feet or less).

b. Office/institutional/cultural use complexes (100,000 square feet or less).

c. Multifamily residential developments (200 units or fewer).

d. Mobile or manufactured home developments (200 lots or fewer).

(3) Driveway detail 3 (32-foot width, 40-foot radius) for:

a. Industrial sites.

(4) Driveway detail 4 (optional design with island) for:

a. Private commercial/office street entrances.

b. Private entrances to multifamily residential developments (over 200 units).

c. Private entrances to mobile or manufactured home developments (over 200 lots).

d. All driveways and driveway curb cuts on state highways or county roadways shall conform to state department of transportation standards or county standards.

(c) Driveways on collector or higher-classification roads. Driveways shall be configured to enable vehicles to turn around on-site, eliminating the need to back onto the roadway.

(d) Maximum number of driveways. Developments shall be limited to one driveway access on city maintained roadways. Additional driveways may be permitted subject to the review and approval of the Public Works Department.

(e) Auxiliary lanes. Along any major thoroughfare, a deceleration lane, acceleration lane, larger turning radius, traffic islands, or other devices or designs may be required to avoid specific traffic hazards which would otherwise be created by the proposed driveway location.

(f) Corner sight distance. All driveways approaching a minor collector or major thoroughfare shall provide adequate corner sight distance, and shall meet or exceed the following design standards:

(1) The sight distance criteria are based on the time required for a vehicle to make a left turn from a stop-controlled approach to the highway (AASHTO Case B1). The time to execute the maneuver is based on recommendations contained in NCHRP Report 383, Intersection Sight Distance. The sight distances, for a two-lane road, are the distances traveled at the arterial speed during 7.5 seconds. The time is increased by 0.5 seconds for each additional lane to be crossed.

(2) The sight distances given in table 401-41(g) are for undivided highways and streets.

If the highway or street is divided, the effect of the median should be considered in determining the required sight distance. Based on the conditions, it may be feasible for the crossing maneuver to be done in two stages with a stop in the median.

However, the intersection should only be treated in this manner if the signing and marking is accordingly provided. Otherwise, the sight distance requirements should be increased to account for the additional width that must be crossed. See AASHTO Green Book, Chapter 9 Intersections, for adjustments due to grades greater than three percent and design vehicles other than passenger cars.

Table 401-41(g) Sight Distance Sight distance (feet) Speed, mph 2 lane 3 lanes 4 lanes 5 lanes

SDL=SDR SDL SDR SDL SDR SDL SDR

25 280 280 295 280 310 295 335 30 335 335 355 335 375 355 400 35 390 390 415 390 440 415 465 40 445 445 475 445 500 475 530 45 500 500 530 500 565 530 600

(g) Separation and spacing. All driveways except those serving residential units on individual lots shall meet the following criteria:

(1) Minimum separation for driveways, public roads, and side streets.

Table 401-41(h) Minimum Separation for Driveways, Public Roads, and Side Streets Posted speed mph Minimum driveway spacing

25 125 30 219 35 244 40 294 45 369

(2) Driveway spacing. Spacing shall be measured from centerline to centerline of driveways, public roads, or side streets. Where there is an arterial or major collector intersecting with a side street, the measurement may be taken from the edge of pavement or back of curb, as opposed to the centerline of the arterial/major collector. Greater separation may be required for safe operation of intersections and right or left turning lanes. Whenever possible, proposed driveways along one side of a street shall coincide with existing or proposed driveways on the opposite side of such street. If offset driveways cannot be avoided, the same driveway spacing criteria as given in table 401-41(h) should be provided. Spacing shall be measured from centerline to centerline. If the highway involved is a divided facility and the driveways do not align with a median crossover, the driveway spacing would only apply to the adjacent driveway on the same side of the highway as provided in table 401-41(h).

(3) Interior driveways. The placement of the first interior drive which intersects the driveway from a city-maintained roadway should be as far as possible from the road for safe, more efficient operation. The distance between the roadway traffic and the first internal movement shall be a minimum of 200 feet as referenced in the Georgia Department of Transportation Regulations for Driveway Encroachment Control Manual, Figure 3-1.2. Lots less than 500 deep should maintain, a minimum distance of 100 feet. The distance required should be maintained or increased so as to avoid interference with the mainline traffic flow for large sites with high volumes, heavy truck traffic, and on high volume roadways. If no other design alternatives exist and interior drives are proposed which do not meet minimum spacing, the left turning movement should be restricted with a raised barrier. Site planning should be done such that interior driveways accommodate the right-of-way at least 100 feet of storage.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-42. Street intersections.

(a) Angle of intersection. Intersections shall generally be at right angles and shall not be at an angle of less than 85 degrees, unless approved by the Public Works Department, nor less than 80 degrees unless the intersection is signalized, in which case the angle of the intersection may be reduced subject to the review and approval of the Public Works Department.

(b) Maximum grade. Street intersections should be designed with a flat grade wherever possible, but in no case should the grade exceed two percent in normal situations (or four percent in topographical hardship situations on local streets).

(c) Intersection approaches; horizontal alignment.

(1) New local streets which approach an intersection with a street in a category higher than itself on a horizontal curve having a centerline radius less than 240 feet shall provide a tangent section of roadway at least 30 feet long. Minor collectors approaching an intersection with a major thoroughfare on a horizontal curve having a centerline radius of less than 550 feet shall also provide the 30-foot tangent section. The tangent length shall be measured along the centerline of the street, from the right-of-way line of the intersecting street, extended, to the point of tangency with the centerline of the curve section.

(2) New major thoroughfares shall provide tangent sections at intersections with streets in equal or higher categories as needed to provide adequate stopping distances at their design speeds.

(d) Intersection approaches; vertical alignment.

(1) For intersections with local or minor collector streets, a leveling of the street at a grade not exceeding two percent shall be provided but no level approach distance is required for streets approaching at less than seven percent, and a minimum 25-foot level approach distance shall be provided for streets approaching at a grade of seven percent or more.

(2) As a street approaches an intersection with a major thoroughfare, there shall be a suitable leveling of the street at a grade not exceeding two percent and for a distance not less than the following minimums, as set forth in table 401-42(d) below:

Table 401-42(d) Approach Distances at Major Intersections Approaching street category Minimum approach distance Major collector 75 feet Minor collector 75 feet Local 50 feet

* Distance of the approach is measured from edge of pavement of the intersecting street to the point of curvature in the approaching street.

(e) Intersection radii. Intersection radii for roadways measured at back of curb and for the right-of-way lines shall be as set forth in table 401-42(e) below. For intersecting streets of different classifications, the larger radii shall be provided. In all cases, adequate right-of-way shall be provided to maintain minimum of 11 feet from back-of-curb. Larger radii may be required for streets intersecting at angles less than 90 degrees.

Table 401-42(e) Intersection Radii Street category Roadway radii R/W radii Major collector 40 feet 20 feet Minor collector—Residential 25 feet 9 feet Minor collector— Non-residential 40 feet 20 feet Local residential 20 feet 9 feet Local—Commercial or office 25 feet 11 feet Local—Industrial 40 feet 25 feet

* Intersecting right-of-way lines may be joined by an arc having the minimum radius shown, or by a miter which cuts across the right-of-way lines connecting the points where the required radius would have otherwise been tangent.

(f) Islands. Islands in street intersections shall conform to the design requirements of the standard drawings in the appendix A of the [county] UDO. In no case shall anything in an island extend more than three feet above the street grade within the right-of-way, except traffic regulatory devices and other infrastructure erected or approved by the Public Works Department. No island shall be approved which contains less than 100 square feet.

(g) Intersection corner sight distance.

(1) Intersections shall be designed with adequate corner sight distance for each street which approaches a street in an equal or higher street category (except an intersection of two local streets). Where necessary, backslopes shall be flattened and horizontal or vertical curves lengthened to provide the minimum required sight distance.

(2) The minimum corner sight distance shall meet the standards as shown in table 401-41(g) sight distance.

(3) The sight distance criteria are based on the time required for a vehicle to make a left turn from a stop-controlled approach to the highway (AASHTO Case B1). The time to execute the maneuver is based on recommendations contained in NCHRP Report 383, Intersection Sight Distance. The sight distances, for a two-lane road, are the distances traveled at the arterial speed during 7.5 seconds. The time is increased by 0.5 seconds for each additional lane to be crossed. The sight distances given in table 401-41(g) are for undivided highways. If the highway is divided, the effect of the median should be considered in determining the required sight distance. Based on the conditions, it may be feasible for the crossing maneuver to be done in two stages with a stop in the median. However, the intersection should only be treated in this manner if the signing and marking is accordingly provided. Otherwise, the sight distance requirements should be increased to account for the additional width that must be crossed. See AASHTO Green Book, Chapter 9 Intersections, for adjustments due to grades greater than three percent and design vehicles other than passenger cars.

(h) Obstructing visibility at intersections. In all zoning districts, no fence, wall, structure, shrubbery, or other obstruction to vision between the heights of three feet and 15 feet, except utility poles, light or street sign standards or tree trunks shall be permitted within 20 feet of the intersection of the right-of-way lines of streets, roads, highways, or railroads.

(i) Turning lanes at intersections. Right turning lanes may be required to meet traffic demands or safety concerns. When provided, turning lanes shall meet the following criteria:

(1) Storage length. A minimum of 150 feet of storage length for turning lanes on any arterial roadway shall be used. A minimum of 100 feet of storage length for turning lanes on all collectors shall be used.

(2) Taper length. The minimum taper length shall be 50 feet.

(3) Left turning lanes. Left turning lanes from arterial roads shall be subject to longer storage lengths and tapers and as determined on a case-by-case basis.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-43. Street design standards.

(a) Street grades and design speeds.

(1) Minimum grade for all local and minor collector streets shall be 1.5 percent.

Minimum grades for all major collector and arterial streets shall conform to state department of transportation standards and regulations.

(2) Minimum grade of less than 1.5 percent on a local street may be approved by the Public Works Department, based on adequate engineering designs, where at least

1.5 percent cannot reasonably be achieved due to topographical limitations imposed by the land. In such cases, a record drawing, and such computations as necessary shall be provided after construction to establish that the street will drain in accordance with this UDO. Street sections where unacceptable pooling, excessive spread at catch basins, or other hazardous conditions occur shall be reconstructed or otherwise improved to eliminate such conditions.

(3) Minimum vehicle design speeds and maximum grades allowable in the city by street classification shall be as shown in table 401-43(a). This requirement may be modified by the Mayor and Council in cases of topographical hardship or property configuration.

(4) Maximum grade on any cul-de-sac turnaround shall be six percent.

Table 401-43(a) Minimum Design Speeds and Maximum Grades Street category Maximum grade Design speed Major collector 10% 40 mph Minor collector 10% 30 mph Local 15%* 25 mph

* Grades between 11 percent and 15 percent shall not exceed a length of 150 feet and shall require an "as graded" survey prior to the installation of the curb or utilities. The distance shall be measured as the tangent length between points of curvature.

(b) Vertical street alignment.

(1) All changes in street profile grades having algebraic difference greater than one percent shall be connected by a parabolic curve having a minimum length (L) equal to the product of the algebraic difference between the grades in percent (A) and the design constant (K) assigned to the street according to its category (i.e. L=KA).

(2) Constant (K) values are shown in the table 401-43(b) for both desirable and minimum acceptable ("hardship") conditions. In all cases, the "desirable" value shall be used, unless it cannot be achieved due to topographic conditions beyond the developer's control. In such hardship situations, the department may approve a lesser value to the extent required by the hardship situation, but in no event less than the value shown in table 401-43(b) as "minimum."

Table 401-43(b) Constant (K) Values for Vertical Curves Crest curves Sag curves Street category Minimum Desirable Minimum Desirable Major collector 44 80 64 70 Minor collector 19 30 37 37 Local 12 20 26 26

(c) Horizontal street alignment.

(1) All new streets shall adhere to the standards governing horizontal curvature and superelevation as set forth in table 401-43(c)(1) below:

Table 401-43(c)(1) Horizontal Curves Street category Minimum radio (ft.) Maximum superelevation Major collector 560 0.04 Minor collector 300 0.04* Local 181 0.00

* No superelevation will be allowed on minor collectors internal to residential subdivisions

(2) Superelevation for horizontal curves shall be calculated utilizing the following formula:

R = minimum radius curve v = vehicle design speed (mph) e = rate of superelevation (decimal of a foot rise per foot roadway) f = side friction factor

Vehicle design speed (v) 30 40 50 Side friction factor (f) .16 .15 .14

(3) Widening section along existing streets shall be designed reflecting existing curvature and superelevation, if any, unless the existing street has been included in a specific design by the county department of transportation or state department of transportation which calls for different standards, in which case the project will be coordinated with the overall design.

(4) Superelevation runoff. Roadway edge curves shall be provided for tangent runout (bringing edge from a normal crown to centerline elevation) and superelevation runoff (from the end of tangent runout to the point of design superelevation) in accordance with design standards of the Georgia Department of Transportation or other professional engineering standards.

(5) Tangents and compound curves. Between reverse horizontal curves there shall be not less than the minimum centerline tangents shown in table 401-43(c)(5) unless otherwise specified by the state department of transportation. Compound radii curves are prohibited. At least the "desirable" length shall be provided unless hardship conditions of topography or property configuration will not allow lengths greater than those shown as "minimum." For compound circular curves, the ratio of the flatter radius to the sharper radius shall not exceed 1.5 to 1.

Table 401-43(c)(5) Tangents Street category Minimum tangent length Desirable tangent length Major collector 100 120 feet Minor collector 75 90 feet Local 50 60 feet Note: Minimum tangents are based on the distance traveled in 1.7 seconds at the design speed for each category of street. Desirable length is based on distance traveled in 2.0 seconds.

(d) Horizontal and vertical clearances.

(1) Horizontal clearances.

a. A shoulder of no less than 11 feet from the back of curb or edge of pavement, appropriately graded and having gentle slopes of not more than 0.5 inch per foot and rounded cross-sectional design shall be maintained along all streets.

Beyond the shoulder but within the right-of-way, slopes shall not exceed one foot of rise for each two feet of horizontal distance on a cut slope, and one foot of fall for each three feet of horizontal distance on a fill slope.

b. Along all public streets, a clear zone shall be provided per current AASHTO standards wherein nothing may be located above ground level except traffic/ street signs, public utility structures, driveways, and mailboxes.

c. At selected locations, such as the outside of a sharp curve, a wider clear zone with greater horizontal clearances provided to any roadside obstruction may be required.

d. The Department of Transportation, in accordance with O.C.G.A. § 32-6-51, is authorized to remove or direct the removal of any sign, signal, device, or other structure erected, placed, or maintained on the right-of-way of a public road which because of its nature, construction, or operation constitutes a danger to or interferes with the vision of drivers of motor vehicles.

(2) Vertical clearances. Vertical clearance at underpasses shall be at least 14.5 feet over the entire roadway width.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-44. Street construction standards and specifications.

(a) Specifications. Unless otherwise specifically set forth herein, all of the materials, methods of construction, and workmanship for the work covered in reference to street construction shall conform to the latest specifications of the state department of transportation.

(b) Subgrade preparation for all streets.

(1) Specifications. Subgrade preparation shall be in accordance with state department of transportation specifications.

(2) Removal of unsuitable material. If any sections of the subgrade are composed of topsoil, organic, or other unsuitable or unstable material, such material shall be removed and replaced with suitable material and then thoroughly compacted as specified for fill or stabilized.

(3) Compaction. Fill shall be placed in uniform, horizontal layers not more than eight-inch thick (loose measurement). Moisture content shall be adjusted as necessary to compact material to 95 percent of maximum dry density except for the top 12 inches which shall be compacted to 98 percent of maximum dry density.

(4) Brought to line and grade. After the earthwork has been completed, all storm drainage, water, and sanitary sewer utilities have been installed within the right-ofway as appropriate, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades, and typical roadway section shown on the plans.

(5) Utility trenches to be compacted. All utility crossings within the right-of-way must be installed prior to subgrade approval. All manhole covers must be flush with top of intermediate course if there is a delay in applying the final surface course for new roadway pavement. Manhole covers will be required to be adjusted flush when final surface course is installed. Utility trenches cut in the subgrade shall be backfilled as specified herein. Compaction tests at the rate of one per 150 feet of trench shall be provided to verify compaction.

(6) Roll testing required. The subgrade must pass roll testing prior to placement of the base material. The roll test of the subgrade and base material shall be observed and approved by a department development inspector prior to paving.

(7) Temporary traffic surface. When the street is to be used for construction traffic before the paving work is completed, a layer of stone (except crusher run) shall be laid as a traffic surface. This material shall not be used as a part of the base material.

It may be worked into the subgrade, or it shall be removed before the base course is set up for paving.

(8) Provisions to drain low points. Provisions shall be made to drain low points in the road construction when the final paving is delayed. A break in the berm section is required when the curbing has not been constructed. Drainage under the curb to side slopes after installation is required, using minimum four-inch diameter pipe sections. Vegetated or stabilized swales should be considered for managing road construction runoff. Swales shall be constructed in accordance with the Georgia Stormwater Management Manual.

(c) Project access improvement standards.

(1) Sections wider than four feet in width. For sections four feet or greater in width, the section shall comply with the construction standards for new streets, in accordance with the street's category as shown on the officially adopted long range road classification map. The base course must pass all testing prior to paving. If a delay is expected, then the base must be sealed and retested prior to paving.

(2) Sections less than four feet in width. For sections less than four feet in width, minimum of eight inches of graded aggregate base shall be provided below the widening section. Six inches of class "B" concrete shall be poured until 1.5 inches below the adjacent pavement surface. The final asphaltic surface course of 1.5 inches of 9.5 millimeter Superpave Type II for local roads and 1.5 inches of 12.5 millimeter Superpave Type II for collector roads shall be applied flush with the adjacent pavement surface.

(d) New local and minor collector streets. At the minimum the following standards shall apply to new local and minor collector streets in residential subdivision and non-residential projects.

(1) The base course shall consist of at least eight inches of graded aggregate base.

After being thoroughly compacted and brought to proper section, an intermediate course of two inches of 19 millimeter Superpave shall be applied.

(2) The final asphaltic surface course of 1.5 inches of 9.5 millimeter Superpave Type II shall be applied.

(3) If a delay in paving is anticipated, then the base course shall be primed the same day it is compacted and cured in accordance to Georgia DOT standards.

(4) Upon the final acceptance of the final surface course, a maintenance bond for a period not to exceed 18 months following the date of approval of development conformance shall be required.

(e) New major collector. At the minimum the following standards and GDOT specification shall apply to new major collector streets.

(1) The base course shall consist of at least ten inches of graded aggregate base. After being thoroughly compacted and brought to proper section, an intermediate course of four inches of 19 millimeter Superpave shall be applied.

(2) The final asphaltic surface course of 1.5 inches of 9.5 millimeter Type II Superpave (volumes less than 10,000 ADT), or 1.5 inches of 12.5 millimeter Superpave (volumes greater than 10,000 ADT).

(3) If a delay in paving is anticipated, then the base course shall be primed the same day it is compacted and cured in accordance to Georgia DOT standards.

(4) Upon the final acceptance of the final surface course, a maintenance bond for a period not to exceed 18 months following the date of approval of development conformance shall be required.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-45. Curbs and gutters.

(a) Curb and gutter required. All new streets and project access improvements shall be provided with curb and gutter. All gutters shall drain smoothly with no areas of ponding.

(b) Residential curbing. Residential curbing shall meet the following requirements:

(1) Concrete shall be class "B" (as defined by Georgia Department of Transportation) and have a minimum strength of 3,000 PSI at 28 days.

(2) Typical minimum section shall be 6" × 24" × 12".

(3) Vertical curbing only. Rollback curbing may be specified in townhouse on the garage side the townhouse street.

(c) Industrial or commercial curbing. Industrial or commercial curbing shall meet the following requirements:

(1) Concrete shall be class "B" (as defined by Georgia Department of Transportation) and have a minimum strength of 3,000 PSI at 28 days.

(2) Typical minimum section shall be 8" × 24" × 14".

(3) Vertical curbing only.

(d) Collector curbing. Collector curbing shall meet the following requirements:

(1) Concrete shall be class "B" (as defined by Georgia Department of Transportation) and have a minimum strength of 3,000 PSI at 28 days.

(2) Typical minimum section shall be 8" × 30" × 14".

(3) Vertical curbing only.

(e) Construction methods.

(1) Curb and gutter shall be set true to line and grade, be field staked, and finished to the section shown on the plans.

(2) Line and grade shall be field staked for grades less than two percent and grades over ten percent, and within 100 feet in both directions from all low points.

(3) One-half inch expansion joints or pre-molded bituminous expansion joint material shall be provided at all structures and radius points and at intervals not to exceed 250 feet in the remainder of the curb and gutter.

(4) Inferior workmanship or unprofessional construction methods resulting in unacceptable curb and gutter will be cause for rejection of the finished work.

(5) Disturbed areas along all curbing shall be backfilled, stabilized, and grassed.

(Ord. No. 06-2025, § I, 9-2-2025) Sec. 401-46. Sidewalk requirements.

(a) Sidewalks. Sidewalks and curb ramps shall be constructed in all new development or redevelopment along all abutting or internal streets, existing or new, private, or public.

Whenever a discrepancy occurs between the design and construction standards of this UDO and any state or federal regulation, then the most restrictive shall apply.

(b) Sidewalk and curb ramp installation and timing. Sidewalks and curb ramps shall be installed as follows:

(1) Connection. Developers shall connect proposed sidewalks on developed property to the adjacent property's sidewalks.

(2) Residential subdivision projects. Sidewalks and curb ramps, where required, shall be installed on new internal streets (both sides including "eyebrow" turnarounds and cul-de-sacs) and on abutting external streets (abutting side).

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:norcross/zoning/whole@2026-11-11-c7924ef273

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Norcross Zoning Ordinance (the whole text) (Part 2 of 3) | Georgia Commons