Oglethorpe County · Zoning Ordinance
Article XI - Project Design and Construction Standards
Section 1118.02. Slopes.
About this text
- As posted on the county's website, retrieved 2026-11-23
a) Cut or fill slopes in the public right‐of‐way and/or slope easements shall not exceed one (1) vertical unit to three (3) horizontal units, unless otherwise approved by the County Engineer based on topographic conditions. This is the maximum allowable slope and should not be considered the norm.
If grading plans indicate cut or fill slopes outside of the right‐of‐way then the construction plans and final plat shall indicate slope easements for the required grading.
b) No cut or fill slopes or existing unadjusted slope shall encroach closer than 8 feet from the curb back in curbed sections or 15 feet to the edge of pavement for un‐ curbed sections on any street right‐of‐ way within the subdivision. A cut or fill slope between lots should be confined to the lower lot whenever possible so as to avoid erosion from the higher lot to the lower lot.
c) All fill slopes created for the purpose of street or home construction shall have a compaction of not less than 95 percent as determined by the established engineering practices.
d) All slopes created or existing within the subdivision or as a result of the subdivision development shall be planted or otherwise protected from erosion and failure.
Read this code where it is posted (county website (oglethorpecountyga.gov)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.