Oglethorpe County · Zoning Ordinance
Article XI - Project Design and Construction Standards / 1119 - Installation of streets and utilities.
Section 1119.03. Installation of utilities; general.
About this text
- As posted on the county's website, retrieved 2026-11-23
All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed plus 2 feet on each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at 50 foot intervals to insure proper utility locations as specified in Section 1117. The developer shall coordinate the location of all utilities and provide a copy of all as‐built and proposed locations upon submission of the final plat.
Read this code where it is posted (county website (oglethorpecountyga.gov)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.