Section 605.07. Post ‐ development stormwater management performance criteria.

About this text

  • As posted on the county's website, retrieved 2026-11-23

The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article:

a) Channel Protection. Provide for the extended detention of the Channel Protection Volume as outlined in the Georgia Stormwater Management Manual current edition.

b) Overbank flood protection. Downstream overbank flood protection and property protection shall be provided by controlling the post‐development peak discharge rate to the pre‐development rate for the 25‐year, 24‐hour return frequency storm event including peak discharge rate attenuation of the one‐year through the 25‐year return frequency storm events.

c) Extreme flooding protection. Extreme flood and public safety protection shall be provided by controlling and safely conveying the 100‐year, 24‐hour return frequency storm event such that flooding is not exacerbated.

d) Structural stormwater controls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual, the Georgia Department of Transportation Standards and Details, Specifications and any local addenda. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual, the effectiveness must be documented through prior studies, literature reviews, or other means and receive approval from the Department before being included in the design of a stormwater management system.

e) Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control.

f) Drainage system guidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right‐ of‐way, public properties, and private properties adjoining project sites and/or public right‐of‐ways.

Stormwater conveyance facilities that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the following requirements:

1) Methods to calculate stormwater flows shall be in accordance with the stormwater design manual;

2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and

3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual.

4) All construction materials and methods shall conform to the Georgia Department of Transportation Standards and Details, Specifications and any local addenda.

5) All culverts shall be designed to safely convey the 100 year frequency (1 percent chance) design storm so that the headwater causes no damage to upstream properties, rises no greater than 18 inches below the low point of the street, or diverts stormwater around the culvert.

6) All storm drainage systems and laterals be designed to safely convey the 25 year frequency design storm within the crown of the drain pipe with a minimum velocity of 2.5 feet per second and no greater than 15 feet per second.

7) All open channel conveyance systems be designed to safely convey the 25 year frequency design storm. Such conveyance systems shall be lined accordingly to prevent or manage erosive forces.

8) All drainage inlets be designed to safely capture the 25 year design storm frequency and limit the gutter spread to no more than 12 feet in any given section.

9) All stormwater outfalls be designed to accommodate the 25 year design storm frequency and to provide energy dissipation in accordance with the Georgia Stormwater Management Manual and the Manual for Erosion and Sediment Control in Georgia.

g) Dam design guidelines. Any land disturbing activity that involves a site which proposes a dam shall comply with the provisions of O.C.G.A. § 12‐5‐370 et seq. (the "Georgia Safe Dams Act") and the rules for dam safety promulgated thereunder, as applicable.

1) No public or private, permanent or temporary roadways shall serve as an impoundment for stormwater detention facilities.

2) No embankment shall have a slope greater than three (3) feet horizontal to one (1) foot vertical.

Read this code where it is posted (county website (oglethorpecountyga.gov)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oglethorpe-county/zoning/605.07@2026-11-23-8f5c114bef

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.