Skip to content
Georgia Commons
Menu

Oglethorpe County · Zoning Ordinance

Article VI - Environmental Protection Provisions / 605 - Storm Drainage and Stormwater Management

Section 605.08. Construction inspections of post ‐ development stormwater management systems.

About this text

  • As posted on the county's website, retrieved 2026-11-23

a) Inspections to ensure plan compliance during construction. Periodic inspections of the stormwater management system construction shall be conducted by the staff of the Department or conducted and certified by a professional engineer who has been approved by the Department. Construction inspections shall utilize the approved stormwater management plan for establishing compliance.

All inspections shall be documented with written reports that contain the following information:

1) The date and location of the inspection;

2) Whether construction is in compliance with the approved stormwater management plan;

3) Variations from the approved construction specifications; and

4) Any other variations or violations of the conditions of the approved stormwater management plan.

b) If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions.

c) Final inspection and as‐built plans. Upon completion of a project and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan and paying all related as built review fees. All applicants are required to submit actual "as built" plans for any stormwater management facilities or practices after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a design professional licensed to perform hydrologic analysis in the State of Georgia. As‐built drawings shall be drawn to scale and be submitted in a paper and approved digital format .

A final inspection by the Department is required before the release of any performance securities can occur.

d) As‐built plans include at minimum:

1) Must be drawn in Georgia State Plane Coordinate System, East Zone, North American Vertical Datum of 1988 (NAVD 88).

2) The location and rim elevation of all inlets, manholes, outlet control structures, or other stormwater structures within the limits of the proposed improvements.

3) The invert elevations of all drain pipe, culverts, and outfalls within the limits of the proposed improvements.

4) The delineation of all impervious areas within the limits of the improvements.

5) A topographic survey of all on‐site drainage areas contributing to the proposed stormwater management facility.

6) The location and cross‐sectional area of all channels or berms used in the conveyance of surface drainage to the proposed stormwater management facility.

7) A topographic survey of the stormwater management facility.

8) A stage storage table of the stormwater management facility.

9) A detailed drawing of all outlet control structures indicating the elevations and geometry of all weirs, orifices and risers.

10) The following statement must be affixed to each sheet of the as‐built drawings with the original seal and signature of the licensed professional certifying the as‐built drawings.

“I hereby certify that this plan is a true representation of the as built conditions and that all stormwater best management practices, stormwater infrastructure, and land covers have been built substantially in accordance with the approved plans and specifications and that any deviations noted on these drawings will not prevent the system from functioning in compliance with the Oglethorpe County Stormwater Ordinance when properly maintained and operated. These determinations have been based upon on‐site observations of

construction as of Month/Day/Year and conducted by me or by persons under my direct supervision.”

Read this code where it is posted (county website (oglethorpecountyga.gov)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oglethorpe-county/zoning/605.08@2026-11-23-2d181a0f59

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oglethorpe County Zoning Ordinance, Section 605.08. Construction inspections of post ‐ development stormwater management systems | Georgia Commons