Palmetto · Zoning Ordinance

Appendix B - ZONING / Article 15 - SPECIAL USE REQUIREMENTS

Sec. 15-40. Wind energy conversion systems.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Wind energy conversion systems (single accessory WECS). Where a single accessory wind energy conversion system requires a special use, it shall be evaluated subject to the conditional use requirements of Section 14-30.

B. Wind energy conversion systems (commercial WECS):

1. Number. The permitted number of commercial WECS on a lot shall be limited by the setback and spacing requirements of this section.

2. Height. The height of a WECS shall be subject to the placement and required setback provisions of this section; however, the permitted maximum total height of a WECS shall be 250 feet (with the blade in the vertical position). The height shall further be limited by restrictions that may be imposed by the Federal Aeronautics Administration (FAA). The WECS shall not be located and erected to a height that would exceed the height limits imposed by the approach, transitional, horizontal or conical zones of any airport airspace.

3. Setback. All commercial WECS towers shall be set back a distance at least equal to one and one-half times the WECS height from all property lines forming the perimeter boundary of the contiguous project area, measured to the base of the tower. In addition, no commercial WECS shall be closer than 1,000 feet to any principal structure in a residential zoning district.

4. Rotor Clearance. The minimum blade or rotor clearance from the ground shall be 20 feet for a horizontal-axis WECS and ten feet for a vertical-axis WECS. The minimum blade or rotor clearance from a building, tree or utility line shall be 75 feet.

5. Spacing. The minimum distance between two commercial WECS shall be equal to the combined height of both WECS.

6. Tower. All commercial WECS shall be constructed with a tubular tower. Lattice towers and guy wires shall be prohibited.

7. Climbing Devices. All commercial WECS shall be designed to prevent unauthorized access.

8. Color. A commercial WECS shall be painted a non-obtrusive light color such as white, beige or light gray that is non-reflective. No striping or contrasting color shall be visible on the blades or tower.

9. Lighting. There shall be no lighting on or directed to the WECS, unless a beacon is required by the FAA. The site plan and special use application shall include specification of any required lighting.

10. Electrical Distribution Lines. All distribution lines from the commercial WECS to any building and/or the electrical grid connection shall be underground. The generator and all other electrical equipment, and controls shall be enclosed within the nacelle, pole or within a building.

11. Sign. There shall be no signs on the WECS other than the name of the manufacturer and applicable safety information. If the facility is fenced, safety information signs shall be placed on the fence.

12. Braking Systems. An accessory WECS shall have an automatic braking, governing, or feathering system to prevent uncontrolled rotation or over speeding. Emergency shut-off information shall be in a location easily accessible and viewable.

13. Noise. Noise emissions from the operation of a WECS shall not exceed 60 decibels on the dBA scale, as measured at the nearest property line or street; however, at any property line adjoining a residential zoning district, noise emissions shall not exceed 45 dBA. Manufacturer's specifications indicating the operating noise levels of the WECS at full RPM shall be provided with the application. The zoning administrator may require the owner to pay for a sound evaluation by a qualified professional following installation to determine compliance with the requirements of this section.

14. Electromagnetic Interference. WECS shall be designed, constructed and operated so as not to cause electromagnetic interference. In the event that electromagnetic interference is experienced, the applicant must provide alternate service to each individual resident or property owner affected.

15. Applications. All applications for special use approval shall be accompanied by the following information, in addition to the special use application required by Section 15-3.

a. Location and height of all existing and proposed buildings, structures, electrical lines, towers, security fencing, and other above ground structures associated with the WECS.

b. Locations and height of all adjacent buildings, structures, and above ground utilities located within 300 feet of the exterior boundaries of the lot or parcel where the proposed WECS will be located; and any residential dwelling in a residential zoning district within 1,000 feet from the property in question. Specific distances to other on-site buildings, structures, and utilities shall also be provided.

c. The location of all existing and proposed overhead and underground electrical transmission or distribution lines shall be shown.

d. Existing and proposed setbacks and separation distances for the WECS from all structures located on the property where the WECS will be located.

e. The site plan submittal shall contain a written description of the procedures to be used to maintain the WECS. The description shall include maintenance schedules, types of maintenance to be performed, and removal procedures and schedules in the event the WECS becomes obsolete or is abandoned.

f. A copy of the manufacturer's installation instructions and blueprints shall be provided to the city, with sufficient information to show that the requirements of this subsection are met.

g. Drawings and engineering calculations shall be certified by a registered engineer licensed in the State of Georgia.

h. A noise modeling and analysis report showing noise levels at property lines at full RPM.

i. A shadow flicker analysis shall be prepared. The analysis shall identify the locations of shadow flicker that may be caused by the WECS blade rotation and the expected durations of the flicker at these locations from sun-rise to sun-set over the course of a year.

The analysis shall identify problem areas where shadow flicker may affect residents, livestock and traffic. The analysis shall also show measures that shall be taken to eliminate or mitigate the problems.

16. Maintenance. All commercial WECS must be kept and maintained in good repair and condition at all times. If a commercial WECS is not maintained in operational and reasonable condition or poses a potential safety hazard or nuisance, the applicant shall take expeditious action to correct the situation. The applicant shall keep a maintenance log on each WECS, which the City can review on a monthly basis or as needed.

17. Abandonment. Any commercial WECS not used for 12 successive months or longer shall be deemed to be abandoned and shall be promptly dismantled and removed from the property at the applicant's sole cost and expense. All above and below ground materials must be removed.

The ground must be restored to its original condition within 60 days of removal.

18. Transportation. Any public roads that will be used for transporting WECS equipment shall be identified with the application. The Fulton County Department of Public Works and the City of Palmetto Police Department shall approve the proposed routes on any public road. Any road damage caused by the transportation of WECS equipment shall be repaired to the satisfaction of the jurisdiction in which the damaged road is located. A performance guarantee for road repair shall be required in accordance with the provisions of Section 21-5.

19. Performance Guarantee. The applicant shall furnish a performance guarantee to the city in order to ensure full compliance with this subsection and any conditions of approval. At a minimum, the performance guarantee shall be in an amount determined by the city to be sufficient to have the commercial WECS fully removed and the land returned to its original state should the structure or structures become abandoned, dangerous or obsolete, or not in compliance with this ordinance or the special use approval. The performance guarantee shall be kept in full force and effect during the entire time while a commercial WECS exists.

History

The history line the source prints at the end of the section.

(Ord. No. 2013-02, § 6, 4-1-2013)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:palmetto/zoning/15-40@2026-11-11-d4d3bbf923

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Palmetto Zoning Ordinance, Sec. 15-40. Wind energy conversion systems | Georgia Commons