Pendergrass · Zoning Ordinance
Pendergrass Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As posted on the city's website, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Part 2 of 5. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
(c) Family day care home. Family day care homes, as defined (3 to 6 children), are permitted as home occupations, subject to compliance with Rules and Regulations for Family Day Care Homes, Chapter 290-2-3, Georgia Department of Early Care and Learning, updated March 26, 2014, as may be amended from time to time. For purposes of this paragraph only, children who are related by blood, marriage or adoption to the care provider shall not be included in the calculation of the six-children limitation.
(d) Adult day services. Adult day services, as defined, herein, shall meet any applicable rules of the Georgia Department of Human Resources Division of Aging Services.
(e) Indoor and outdoor area. Child care learning centers, group day care homes, and adult day services shall have at least 150 square feet of outdoor play area and at least 35 square feet of indoor space provided for each child or other person served. The outdoor play area shall be enclosed by a fence with a minimum height of four feet.
Sec. 311. Church or place of worship.
(a) Parsonage. A church or place of worship that constitutes the only principal use on the lot shall be permitted one residence as an accessory use, with its customary accessory uses, for the housing of the pastor, priest, minister, rabbi, etc.; provided that if the residence is a stand-alone unit it shall be separated by a minimum of 15 feet from other buildings on the lot.
(b) School or day care. A church or place of worship shall be permitted a school or day care center as an accessory use.
(c) Cemetery. A church or place of worship that constitutes the only principal use on the lot shall be permitted to have a cemetery as an accessory use.
(d) Community food or housing shelter. In zoning districts where permitted, one community food or housing shelter is an authorized accessory use to a church or place of worship, subject to the requirements for such use in this article.
(e) Community donation center. A church or place of worship may operate a community donation center, subject to compliance with the requirements for such use in this article.
(f) Recreational fields. A church or place of worship that constitutes the only principal use on the lot shall be permitted to have unlighted recreational fields; lighted recreational fields accessory to a church or place of worship shall require conditional use approval.
Sec. 312. Commercial recreation facility, outdoor.
Outdoor commercial recreational facilities, as defined, are typically accompanied by substantial off-site impacts. Accordingly, the following regulations are imposed and shall be met:
(a) Minimum area. Such uses require a minimum lot area of five acres.
(b) Hours of operation. Unless otherwise specifically provided for in conditional use approval, the hours of operation of an outdoor commercial recreation facility shall be limited to time between 8:00 a.m. and 10:00 p.m.
(c) Setback and buffer. A minimum building setback of 100 feet, and a natural undisturbed buffer replanted where sparsely vegetated of at least 50 feet adjacent to side and rear property lines, shall be provided. Greater setbacks and larger buffers may be imposed during conditional use approval.
(d) Outdoor lighting. Uses that propose night lighting other than incidental security lighting shall be required to submit a photometric plan to enable the evaluation of impacts from illumination.
(e) Noise and air pollution abatement. Noise abatement and air pollution abatement plans may be required as part of an application for conditional use and shall be subject to the approval of the city during the conditional use application process. Such projects may be required to construct noise attenuation walls or otherwise address off-site noise or air pollution impacts.
Sec. 313. Community donation center.
Community donation centers shall meet the following requirements:
(a) Indoor storage. All collected items shall be stored inside an enclosed building.
(b) Loading and unloading. Loading/ unloading space shall be provided on the site approved by the zoning administrator.
(c) Limits on materials collected. The center shall not accept hazardous materials, motor vehicles or motor vehicle parts, bathroom or kitchen fixtures, guns, ammunition, weapons, carpet, or construction materials.
(d) Duration of operation. Hours of operation, and any associated loading or unloading operations, shall occur only between the hours of 7:00 a.m. and 9:00 p.m.
Sec. 314. Community food or housing shelter or crisis center.
In zoning districts where permitted, community food and housing shelters or crisis centers as defined shall comply with the following:
(a) Required facilities. Housing shelters shall have adequate beds, showers, and restroom facilities provided at the location to meet the needs of the overnight guests, all maintained a clean, safe, and sanitary fashion.
(b) Duration of stay. Guests of the shelter shall be required to leave the shelter premises no later than 8:00 a.m.
(c) Accessory to church. In zoning districts where permitted, a community food or housing shelter may be operated as a use accessory to a church or other place of worship, provided it meets the requirements of this section.
Sec. 315. Construction field office.
(a) Temporary buildings or structures shall not be occupied as a permanent office or for any other use in any district; provided, however that an industrialized building or other temporary building or structure may be used for a temporary office or other permitted nonresidential use, subject to the following:
(b) Approval by the zoning administrator and issuance of a permit by the building inspector;
(c) Said permit shall be temporary but renewable once after a period of six months;
(d) Said permit shall only be issued if plans and permit(s) have been approved for one or more permanent buildings on the subject property;
(e) Adequate water and sewage disposal for the structure(s) is approved by the city (or in the case of a septic tank, by the county health department); and
(f) Said industrialized building or temporary building or structure(s) shall be removed from the site no later than upon the occupancy of the appropriate permanent building(s) or structure(s) intended for such use.
Sec. 316. Crematory.
(a) Reference to state law. A crematory shall meet the requirements of O.C.G.A. Section 43-18-72, including but not limited to a prohibition within 1,000 feet of a residential subdivision platted and recorded in the office of the superior court of Jackson County.
(b) License. A copy of the license required by O.C.G.A. Section 43-18-72 issued by the Georgia Board of Funeral Service shall be submitted to the zoning administrator prior to commencing operation.
Sec. 317. Dam.
(a) Reference to state law. Dams shall comply as applicable with the Georgia Safe Dams Act of 1978 (O.C.G.A. 12-5-370 et seq.), including inspection and permitting to reduce the risk of dam failure. (Reference: O.C.G.A. 12-5-371).
(b) Reference to state rules. No dam shall be established unless it meets applicable Rules of the Georgia Board of Natural Resources governing the construction and maintenance of dams or artificial barriers. (Reference: O.C.G.A. 12-5-374; Additional Reference: Rules of Georgia Department of Natural Resources, Environmental Protection Division, Chapter 391-3-8 Rules for Dam Safety).
(c) Permit. No dam shall be constructed in the city unless a copy of the state permit required per O.C.G.A. 12-5-376 to construct a dam is submitted to the zoning administrator prior to construction.
(d) Removal of dam. No dam shall be removed in the city unless a copy of the permission to remove a dam granted by the state per O.C.G.A. 12-5-377 is submitted to the zoning administrator prior to removal.
Sec. 318. Dumpster pad and enclosure.
All institutional, commercial and industrial uses in the city that stores trash, waste, or garbage on the premises, shall provide a dumpster and dumpster pad enclosure for the garbage containment device(s), compliant with the following standards:
(a) Pad. There shall be a concrete pad for the placement of the dumpster or garbage containment device.
(b) Enclosure. Pads for dumpsters and trash, waster or garbage storage areas shall be enclosed by a wall with a minimum height of eight feet or equal to the height of the garbage containment device if taller than eight feet. Walls and fences forming trash enclosures shall be constructed of sturdy, durable, opaque materials. The enclosure shall be constructed of wood, concrete masonry units, brick, or other impenetrable material approved by the zoning administrator as being compatible with the design and color of the principal building. No advertising on an enclosure or enclosure gate is permitted.
(c) Gate. The enclosure shall be gated. Gates shall be constructed with commercial grade hinges, poles and hasps, shall have a closing latch, and must remain closed at all times except during service. Gates may be constructed of wood, metal, or, other materials compatible with the architecture of the enclosure and principal building. Metal gates must be coated with vinyl, powder, or similar process. Chain-link fencing is not permitted for gates.
(d) Yard location. The dumpster pad and enclosure shall be located behind the front building line in a side or rear yard, unless otherwise approved by the zoning administrator.
(e) Setback. The dumpster pad and enclosure shall be setback a minimum of five feet from any property line.
(f) Service time restrictions. A garbage containment device shall not be serviced between the hours of 7:00 p.m. and 7:00 a.m. on weekdays, or between the hours of 9:00 p.m. and 9:00 a.m. on weekend days and federal holidays.
(g) Maintenance. Dumpster pad enclosures shall be maintained in good repair at all times.
Structures that become dilapidated or derelict shall be repaired within 30 days notice of disrepair from the city zoning administrator or code enforcement officer.
Sec. 319. Fallout shelter or underground bunker.
Fallout shelters or underground bunkers shall be subject to the following requirements:
(a) Location. A fallout shelter shall only be placed in or under a side or rear yard of the lot.
(b) Setback for above-ground portion. If any portion of the structure extends above the ground, then the portion above the ground must comply with side and rear setbacks applicable to principal buildings for the zoning district in which the shelter or bunker structure is located.
(c) Obstructions. A fallout shelter or underground bunker shall not be placed under any septic tank drain field, any buried utilities, or within or under any utility easement.
(d) Permit. A permit shall be required to be issued by the building official.
Sec. 320. Fee simple townhouse.
The fee-simple townhouse dwelling requirements contained in this section shall apply to all feesimple townhouse dwellings in the city, including all fee-simple townhouse dwellings within planned unit development districts. Fee simple townhouses shall meet the following requirements,:
(a) Minimum lot frontage. Each platted lot for a fee-simple townhouse shall have a minimum of twenty-four feet of frontage on a public street or private road that meets public street standards of the city.
(b) Minimum lot size. The minimum lot size for a fee-simple townhouse lot shall be 2,400 square feet.
(c) Maximum density. The maximum density of a fee-simple townhouse subdivision shall be 8 units per acre.
(d) Minimum unit size. The minimum heated floor area per dwelling unit shall be 1,400 square feet.
(e) Setback. Zero lot line between fee-simple units within the same building shall be permitted, subject to applicable fire and building codes.
(f) Units in building. To avoid a monotonous appearance, for any given building, no more than six units shall be included in one building.
(g) Differentiation. No more than three adjacent townhouse dwelling units may have the same front façade designs. Differentiation between adjacent townhouse dwelling units or groups of adjacent townhouse dwelling units may be accomplished by a change in materials, building height, color, roof form, or front yard setbacks.
(h) Building separation. Buildings in townhouse developments shall be separated by a distance of at least 20 feet.
(i) Front yard. No entrance to a townhouse dwelling garage may face a street not contained within the townhouse development. When the garage doors of an attached garage of a townhouse dwelling face a street, a minimum front yard setback of at least 20 feet from the sidewalk on the same side of the street shall be provided. When garage doors of an attached garage of a townhouse dwelling do not face a street, a minimum front yard setback of ten feet from the sidewalk on the same side of the street shall be provided.
(j) Utilities and metering. Public water and public sewer system connections are required for all fee-simple townhouse dwelling units. Each fee-simple dwelling unit of a townhouse building shall be metered separately. Each electricity meter, natural gas meter, and water meter shall measure the delivery of utility service to no more than one dwelling unit within a fee-simple townhouse building.
(k) Garage. Each fee-simple townhouse dwelling unit shall have its own garage containing at least one parking space.
(l) Front porch. A front porch or stoop is required in the front yard area of each fee-simple townhouse dwelling unit and must be connected to the front sidewalk by a walkway at least three feet wide.
(m)External building material finishes. At least 30 percent of the front façade of each feesimple townhouse dwelling unit shall be finished with brick, brick veneer (excludes “thin” brick), stone, or stone veneer (excludes “thin” stone).
(n) Pedestrian access. A continuous paved pathway or sidewalk system must be provided to connect amenity spaces, the townhouse dwellings, and sidewalks external to the development.
(o) Plat approval. Each fee simple townhouse development or phase thereof shall require subdivision plat approval in accordance with the city’s subdivision regulations. Areas for visitor parking spaces may be required by the city at the time of preliminary plat approval.
Sec. 321. Fence or wall.
(a) Permit. Any fence or wall that requires an engineered foundation shall require a permit be issued by the building inspector. Permits for fences are not normally required, but plans for any walls taller than four feet shall require a permit.
(b) Types prohibited. Razor wire shall be prohibited, unless a conditional use permit is applied for and granted.
(c) Height. Fences or freestanding walls constructed in a front yard of a residential lot shall not exceed five feet in height unless required for engineering reasons; provided, however, that this shall not apply to subdivision or project identification monuments at the entrance to a subdivision or development and wall or fence extensions thereof, where permitted, which shall not exceed eight feet in height and columns shall not exceed ten feet in height.
(d) Composition and finish.
1. Walls and fences shall not be permitted if composed or constructed in whole or in part of exposed concrete block, tires, palettes, garage doors, plywood, particle board, paper, plastic, plastic tarp or junk, or other discarded, cast-off, secondhand, or other items or materials not originally intended to be used for constructing or maintaining a fence or wall.
2. In all residential zoning districts, fences or walls erected within the required front yard shall be constructed of brick, stone, wood, stucco, wrought iron, finished aluminum, split rail or vinyl-coated chain link.
3. All new chain-link fences, regardless of height, shall be vinyl coated.
4. Fences in landscape strips or required buffers or abutting rights of ways (where permitted) shall have the finished portion facing the exterior of the development.
5. Walls may be comprised of brick, stone, wooden landscape timbers, concrete masonry units, or other material(s) approved by the zoning administrator. Walls may be composed of unfinished concrete block but shall be finished on all sides with brick, stone, stucco, exterior insulating and finish system (EIFS) or other material approved by the zoning administrator.
(e) Gates. When gates for vehicular access are required or proposed, said gates shall not be located closer 20 feet of a public street or road right of way, to ensure safe ingress and egress.
(f) Location. Fences and walls are not subject to minimum setback requirements for buildings or accessory structures. However, fences and walls shall not be permitted to obstruct vision and must preserve sight visibility at the intersections of streets and driveways. No fence or wall shall be constructed in a public right-of-way, except that retaining walls and subdivision entrance monuments may be placed partially within the right-of-way of a local street if approved by the during a final platting process or dedication procedure and will not pose a visibility problem or other public hazard.
(g) Maintenance, repair, extension, and replacement. Fences and walls shall be maintained, repaired if damaged, and replaced if severely damaged or destroyed. Any fence or wall that is repaired or extended may be repaired or extended using existing materials. Any fence or wall that does not meet the requirements of this section but is replaced shall be required to comply with all applicable provisions of this section.
(h) Temporary fencing. These requirements shall not apply to temporary fencing erected around a lot during construction of a building for security or safety or code compliance reasons. All such temporary fencing shall be approved by the building inspector upon issuance of a building permit and shall be removed upon completion of construction.
Sec. 322. Flea market.
A flea market shall comply with applicable state law regarding flea market vendors record keeping (O.C.G.A. 10-1-360 et seq.).
Sec. 323. Food truck or mobile food vendor.
(a) Motor vehicle tag. A food truck must have a valid tag from the state’s division of motor vehicles.
(b) Food service rules. Food trucks, and mobile food vendors as may be applicable, shall operate in accordance with the State of Georgia’s Rules and Regulations for Food Service.
(c) Health department license, permit or approval. The operator of a food truck or mobile food vendor shall have approval of a county health department in the state, and the applicant shall submit evidence of health department approval prior to authorization by the zoning administrator.
(d) Owner authorization. Food truck operators and mobile food vendors shall obtain the signed approval of the property owner for each location at which the food truck or mobile food vendor operates. Such approval must be made available for inspection upon request.
Food trucks are not permitted to operate (except in transit) on a public right of way except by permit issued by the zoning administrator for special events sponsored or approved by the city.
(e) Hours of operation. Food trucks and mobile food vendors shall not operate between the hours of 10:00 p.m. and 7:00 a.m. Food trucks shall be parked in an approved operating location overnight off the service premises.
(f) Additional operational constraints. No food truck or mobile food vendor shall be permitted to have a vehicular drive-through facility or drive-up window. No amplified microphones or bullhorns shall be permitted as part of the food truck or mobile food vendor operation.
(g) Sanitation. Food truck operators and mobile food vendors shall be responsible for the proper disposal of waste and trash associated with the operation. Public trash receptacles shall not be used for this purpose. Operators shall remove all waste and trash prior to leaving each location or as needed to maintain the health and safety of the public.
Sec. 324. Golf course.
In zoning districts where permitted, the following accessory uses are permitted in association with a golf course:
(a) Buildings used to house equipment for the maintenance and operation of the golf course.
(b) Cart rental and staging area.
(c) Food service and restaurant, whether open to members only or to the general public.
(d) Country club or clubhouse, which may include tennis courts and other recreational courts and swimming pool, as well as food service and restaurant.
(e) Putting green.
(f) Pro shop.
(g) Driving range.
Sec. 325. Group home, or rooming or boarding house.
(a) Occupancy limitations. No basement, attic, or accessory building shall be used for rooming house, boarding house or group home purposes. No registration required by this section shall be issued to any person proposing to use a basement, attic, or accessory building or any part thereof as habitable rooms for rooming house purposes.
(b) Bedroom requirements and limitations. No room in any rooming house, boarding house, or group home shall be occupied as a sleeping room by any person unless there is at least 120 square feet of bedroom space, exclusive of wardrobe and closet space, for each and every adult person occupying any such room. All sleeping quarters shall be served by working heating and cooling facilities and a bed with a mattress for each registered occupant. Bedrooms shall not contain cooking facilities, and no food preparation or cooking for guests shall be conducted within any bedrooms.
(c) Minimum basic facilities. At least one flush water closet, lavatory basin, and bathtub or shower, connected to a water and sewerage system and in good working condition, shall be supplied for each 8 persons or fraction thereof residing within a rooming house, boarding house, or group home. All such facilities shall be located within the dwelling so as to be accessible from a common hall or passageway to all persons sharing such facilities. Every lavatory basin and bathtub or shower shall be supplied with hot and cold water at all times.
(d) Food preparation and meals. Any rooming house, boarding house, or group home where food is served shall comply with all requirements of the county health department.
Sec. 326. Guest house.
All guest houses, as defined, shall comply with the following requirements.
(a) Water and sewer. The water supply and sanitary sewage disposal system for the lot must be certified by the county health department as adequate to support the guest house in combination with the principal dwelling.
(b) Number. No more than one guest house shall be permitted on any lot.
(c) Location. The guest house shall be erected only in the rear yard of the lot.
(d) Maximum floor area. The heated floor area of the guest house shall not exceed 50 percent of the heated floor area of the principal dwelling or 1,200 square feet, whichever is less.
(e) Use and occupancy. A guest house shall be used only by the occupants of the principal dwelling on the lot, their non-paying guests, or live-in domestic employees. A guest house shall not be rented separate from the principal dwelling.
(f) No manufactured home. A manufactured home shall not be permissible as a guest house.
(g) Architectural compatibility and plans. A guest house shall be architecturally compatible with the principal dwelling on the lot. The zoning administrator must approve plans of the guest house prior to issuance of a building permit.
(h) Additional restriction. A guest house shall not be authorized as an accessory use to a manufactured home.
Sec. 327. Home occupation.
In districts where permitted, the following regulations shall apply to home occupations:
(a) Number of occupations. No more than two home occupations shall be permitted per dwelling.
(b) Physical limitations. The gross floor area of a dwelling unit devoted to a home occupation shall not exceed 40 percent of the gross floor area of the dwelling. In residential zoning districts, no accessory building shall be used in connection with a home occupation, except by conditional use permit.
(c) Alterations to the dwelling. The exterior appearance of the dwelling must remain that of a dwelling. No internal or external alterations inconsistent with the residential use of the building may be permitted.
(d) Vehicles and parking. Vehicles kept on site in association with the home occupation shall be used by residents only, except for the parking of employees as may be permitted by this section. Only vehicles used primarily as passenger vehicles shall be permitted in connection with the conduct of the home occupation. Incoming vehicles related to the home occupation, if any, shall at all times be parked off-street within the confines of the residential driveway or other on-site permitted parking. The transporting of goods by truck in connection with a home occupation is prohibited.
(e) Equipment, off-site impacts, and nuisances. No home occupation shall generate traffic, sound, smell, vibration, light, or dust that is offensive or that creates a nuisance. No equipment that interferes with radio and/or television reception shall be allowed. Home occupations must exclude the use of machinery or equipment that emits sound (e.g., saws, drills, musical instruments, etc.) that is detectable beyond the property. Chemical, electrical, or mechanical equipment that is not normally a part of domestic or household equipment and which is used primarily for commercial purposes shall not be permitted.
(f) Visits by patrons prohibited. There shall be no visits by clients or patrons permitted in conjunction with a home occupation; provided, however, that the following exceptions are made for purposes of meeting overriding public goals of education and the care of children: instruction in music, dance, arts and crafts, and similar subjects, limited to two students at one time; and a “family day care home,” as defined by this code.
(g) Signs. There shall be no signs permitted in conjunction with a home occupation, although this shall not preclude the property owner from erecting signs permitted on the lot pursuant which are authorized per the sign regulations in this code.
(h) Employees and licenses. Only occupants of the dwelling and one additional full-time employee or two part-time employees shall be authorized to work on the premises in connection with a home occupation. Any occupational tax certificates required by state or city regulations must be obtained. Proof of state registration, if required for the home occupation, shall be submitted to the zoning administrator prior to the issuance of a business registration.
(i) Display, stock in trade, sales, and storage. There shall be no display, and no stock-intrade nor commodity sold or stored on the premises, in connection with a home occupation, nor shall there be any activity associated with the home occupation visible outside the dwelling.
(j) Uses prohibited. The following uses are specifically prohibited as home occupations:
auto sales or auto repair; tow service; restaurant; animal hospital, veterinary clinic, kennels, animal boarding or breeding, or the keeping of animals; funeral homes; retail or wholesale shops; contractor’s establishments, machine shops; special event facilities; and lodging services.
(k) Approval. All home occupations shall be subject to the zoning administrator’s approval.
The applicant for a business registration shall file for approval from the zoning administrator on forms provided by the zoning administrator. Additional information, including a plot plan of the lot on which a home occupation is proposed, may be required by the zoning administrator, along with information describing the nature of the home occupation.
(l) Modifications by conditional use permit. The provisions of this section may be modified or varied pursuant to application by the property owner for a conditional use, according to procedures specified in this code for conditional uses.
Sec. 328. Institutional residential living and care facility.
(a) Accessory uses. Institutional residential living and care facilities may have one or more of the following accessory uses:
1. Ancillary clinics, personal service, retail (e.g., pharmacy, hair salon, medical offices).
2. Central kitchen and dining facility.
3. Recreation and amenities.
4. Building/clubhouse for classes, meetings, concerts, storytelling, etc.
5. Adult day care.
(b) State permit. Each institutional residential living and care facility must obtain all license(s) and/or permit(s) required by the State of Georgia in order to operate, and which shall be displayed in a prominent place in the facility.
Sec. 329. Intermodal container, temporary.
During the time a household, institution, business, or industrial establishment is moving in or out of a building on a property, one intermodal container, as defined, may be temporarily placed on the premise of a developed lot for purposes of loading or unloading personal property pertaining to the use on the property subject to the following:
(a) The container may be positioned in a front yard or other location on the property that is accessible for pick up or drop off.
(b) The container shall not remain longer than a period of 32 calendar days.
(c) One or more additional intermodal containers may be authorized by the zoning administrator for residential, institutional, business, or industrial establishments, upon demonstration of evidence of need by the establishment.
Sec. 330. Junk vehicle, junk or recovered material.
Except for junk/salvage yards, materials recovery facilities, and wrecked motor vehicle compounds as may be permitted by this code in certain zoning districts, it shall be unlawful to park or continuously store abandoned, wrecked, junked or inoperable vehicles, power-driven construction equipment, used lumber or metal, used appliances, or any other miscellaneous scrap material in quantity that is visible from a public street or adjacent or abutting property.
Sec. 331. Landfill.
(a) General siting restriction. No sanitary landfill shall be sited in a manner inconsistent with the location provisions of the local or regional comprehensive solid waste management plan adopted by the city.
(b) Minimum site area. The minimum site area shall be 50 acres.
(c) Buffer. A natural, undisturbed buffer meeting screening requirements of these zoning regulations and replanted where sparsely vegetated, shall be maintained for a minimum width of 150 feet along all side and rear property lines.
(d) Access. Access must be provided from a paved road or highway. Access shall not be allowed through any residential subdivision or residential development.
(e) Traffic impact study. As a part of the conditional use application or if a conditional use is not required then prior to issuance of a development permit, a traffic study shall be submitted to the zoning administrator. The applicant shall address recommendations of the traffic study to mitigate traffic impacts of the proposed facility. Specifically, the study shall identify any state or county maintained road within or adjacent to the property, and shall state any repaving, alterations, turning lanes, signalization, or other road additions or improvements necessary to accommodate the potential increase of traffic volume or weight occasioned by the proposed operations.
(f) Road surfacing and dust control. Permanent roads within the landfill site shall be surfaced with a dust-free material. Roads other than permanent roads shall be treated with dust inhibitors which will reduce the generation of dust from the road surfaces as a result of wind or vehicular action.
(g) Lighting. As a part of the conditional use application, the applicant shall submit information regarding proposed night lighting, which may be limited by the city council via conditions of conditional use approval.
(h) Fencing. Landfills shall be enclosed by a minimum six-foot-high fence along the entire perimeter boundary, for screening and security purposes, as approved during the conditional use application process or as approved by the zoning administrator if not subject to the conditional use application process. Gates must be provided at all points of vehicular ingress and egress and shall be closed and locked when not in regular use.
Along such perimeter fence, notice signs shall be posed at regular intervals which shall warn against trespassing.
(i) Operational setback. Landfilling activities shall not occur within 100 feet of any perimeter property line.
(j) On-site operator. All landfills regulated by this section shall have an operator in attendance at all times when the landfill is in use.
(k) Covered loads. Vehicles shall be allowed into a landfill site only if waste is covered, to prevent blowing of material from the vehicle.
(l) State permit. The owner shall provide the zoning administrator with a current copy of a Georgia solid waste handling permit, or pending application thereof, prior to applying for a development permit.
Sec. 332. Manufactured home.
(a) Construction. Manufactured homes shall be constructed in accordance with standards established pursuant to the National Manufactured Housing Construction and Safety Standards Act of 1974 (42 USC 5401 et sq.) for manufactured homes and O.C.G.A. 8-2- 160, et seq.
(b) Permit required. A permit shall be required to be issued by the building official for the movement of a new or preowned manufactured home into or within the city. No permit shall be issued unless a complete application is received as required by this section. Prior to issuance, the zoning administrator or building official shall confirm with the appropriate county tax officer that all state and county taxes theretofore accruing with respect to the manufactured home have been paid, and that the manufactured home is properly titled in the name of the applicant, or else the permit application will be denied and the permit shall not be issued.
(c) Permit application requirements. The permit required for installation of a manufactured home shall include the following:
1. A permit application form as required by the zoning administrator, and a permit application fee as specified by resolution of the city council.
2. Inspection report for preowned homes. If the manufactured home is previously owned, and the home is to be moved into the city from a location outside of the city, a relocation permit from the zoning administrator is required, and the home must be inspected to show it meets applicable standards prior to obtaining a permit. An inspection report from a qualified inspector as defined in O.C.G.A. 8-2-26 stating that the home meets the minimum health and safety standards of Georgia Rule 120-3-7 shall be required. The applicant shall be solely responsible for the payment of any charges for the services of the qualified inspector, and any such fees shall be in addition to the permit application fee required to be paid to the city.
3. Recorded plat, deed, and physical/911 address for the property.
4. Septic tank permit or confirmation from the county health department showing an existing septic tank meets requirements for installing the manufactured home.
5. A copy of the manufactured home installer’s license issued by manufactured housing section of the safety fire division of the state of Georgia and local business registration.
6. Completed subcontractor trade permit applications and subcontractor trade licenses issued by the state of Georgia or a state Georgia has a reciprocity agreement, for electrical, plumbing, and HVAC as applicable. If the applicant is the owner and wishes to complete the electrical work or any other trade work needed themselves, the applicant shall complete and submit a homeowner’s affidavit. In such cases the homeowner’s affidavit shall be accepted in lieu of one or more subcontractor affidavits, as applicable.
7. If the site for the manufactured home requires grading of more than one acre, a copy of a notice of intent from the Georgia environmental protection division is required.
Further, a copy of the Georgia soil and water conservation commission level 1A certification (blue card) of the grading contractor shall be submitted. If the applicant is grading less than one acre and completing the grading themselves and doing so for their own primary residence, the owner/applicant may check “other” on the city’s homeowner affidavit form.
(d) Lot requirements and setbacks. Manufactured homes shall be established in accordance with the applicable dimensional requirements for the zoning district in which the use is located, including minimum lot size, minimum lot width, and principal building setbacks.
(e) Installation generally. Installation of manufactured homes shall be in accordance with Georgia Rules and Regulations, Subject 120-3-7, “Rules and Regulations for Manufactured Homes,” adopted by the Georgia Safety Fire Commissioner. For purposes of this section and said rules, “installation” means the construction of a foundation system and the placement or erection of a manufactured home on the foundation system.
“Installation” includes, without limitation, supporting, blocking, leveling, securing, or anchoring such home and connecting multiple or expandable sections of such home.
(f) State-licensed installer required. Any new or previously owned manufactured home shall be installed only by an installer who has a license from the manufactured housing section of the safety fire division of the state of Georgia. An individual who transports a manufactured home to a site of installation shall be excluded from state licensure as an installer, provided he or she performs only such temporary blocking as is necessary to stabilize the home pending installation.
(g) Installer permit from state. Any licensed installer performing any installation of any new or used manufactured home shall first purchase an installation permit from the Georgia safety fire commissioner. The installation permit shall be attached by the installer to the panel box of each manufactured home upon completion of the installation.
(h) Stabilizing devices and foundation. Each new or previously owned manufactured home being installed shall have stabilizing devices and shall be installed on a foundation constructed in accordance with the manufacturer's installation instructions for new manufactured homes or standards included within Georgia Rule 120-3-7 for previously occupied manufactured homes.
(i) Installation instructions. Installation instructions provided with manufactured homes must be followed for installation. Installation shall be consistent with the manufacturers installation instruction manual and Georgia Rule 120-3-7-.21. Whenever the manufacturer's instructions do not stipulate certain installation requirements, or when clarification is needed, or when the manufacturer's instructions state that the issue is left to the regulatory authority having jurisdiction, then the installation instructions incorporated in Georgia Rule 120-3-7.21 shall be followed.
(j) Skirting. Skirting of the manufactured home is required. Skirting shall be installed in accordance with the skirting manufacturer's instructions or Georgia Rule 120-3-7- .21(13)(d). Unless inconsistent with these instructions or rules, skirting material may be composed of vinyl or metal sheeting.
(k) Masonry curtain walls. Load bearing masonry curtain walls shall not be required for manufactured homes. Non-load bearing masonry curtain walls are not required but may be provided by contractual agreement between the homeowner, the dealer/retailer, and/or installer and if provided shall be constructed in accordance with drawings and/or instructions provided in the manufacturer's installation manual, or instructions and other drawings or procedures approved by the Board of Commissioners. Non-load bearing walls, if provided, shall have no contact with the manufactured home or any portion thereof for the purpose of structural support.
(l) Stairs and landings. Stairs and landings are required and shall be constructed in accordance with the provisions of the State Minimum Standard Building Codes which are enforced by the city. For any door elevated above the ground, there must be a landing that is a minimum of 36 inches by 36 inches.
(m) Inspections. The building official is authorized to make inspections of manufactured home installations to ensure compliance with O.C.G.A. § 8-2-160 et seq. and Georgia Rules and Regulations, Subject 120-3-7, “Rules and Regulations for Manufactured Homes,” adopted by the Georgia safety fire commissioner.
(n) Final inspection and permanent power. Upon completion of the installation, a final inspection shall be required. The building official shall not approve permanent power for an installed manufactured home until a final inspection by the building official has been completed and installation of the home has been approved. It shall be unlawful for the power company to authorize power, or for an individual to connect a manufactured home to a permanent power supply without prior confirmation from the building official that the home has passed final inspection and is authorized to be connected to permanent power.
Sec. 333. Manufactured home park.
In zoning districts where permitted, manufactured home parks shall comply with the following requirements:
(a) Water and sanitary sewer. Manufactured home parks shall be connected to a public water supply and a public sanitary sewer system, unless adequate provisions for on-site sewage management is approved by the county health department.
(b) Minimum development area. The minimum lot area for the development shall be five acres.
(c) Minimum development frontage. The minimum road frontage for the lot shall be 100 feet.
(d) Access roads. All access roads within the development shall be private with a minimum easement width of 40 feet and paved with a minimum pavement width of 20 feet, and lighted with a minimum spacing of 200 feet each between streetlights.
(e) Parking and driveways. All off-street parking areas or spaces and driveways shall be paved and shall have direct access to an interior access road. Driveways serving individual manufactured home spaces shall be no less than 10 feet in width. No driveway serving an individual manufactured home shall be permitted to access a road exterior to the development, except via an approved internal access road.
(f) Minimum open space. At least 20 percent of the development must be set aside as open space or for recreation purposes.
(g) Occupancy. No manufactured home space or manufactured home shall be rented for a period of less than 30 days.
(h) Accessory building. A manufactured home shall not be used as an accessory building in the manufactured home park.
(i) Rules and regulations. A copy of the park management rules and regulations must be submitted to the zoning administrator for approval. The park operator will be responsible for ensuring that tenants comply with the rules and regulations.
Sec. 334. Manufacturing, fabrication or assembly as accessory use.
Manufacturing or fabrication activities associated with a permitted retail use, such as but not limited to a jewelry store or pottery, shall be permitted, provided that the area devoted to such manufacturing or fabrication shall not exceed 25 percent of the building floor area of the principal building in which such manufacturing or fabrication is conducted or 1,000 square feet, whichever is greater. All products manufactured or fabricated on the premises must be sold on the premises as a retail activity.
Sec. 335. Mining, quarrying or resource extraction.
(a) Minimum site area. The minimum site area shall be 100 acres.
(b) Buffer. A natural, undisturbed buffer meeting screening requirements of these zoning regulations and replanted where sparsely vegetated, shall be maintained for a minimum width of 200 feet along all side and rear property lines.
(c) Fencing. Such facilities shall be enclosed by a minimum six-foot-high fence along the entire perimeter boundary, for screening and security purposes, as approved during the conditional use application process. Gates must be provided at all points of vehicular ingress and egress and shall be closed and locked when not in regular use. Along such perimeter fence, notice signs shall be posed at regular intervals which shall warn against trespassing and shall contain a statement pertaining to the use of explosives, if applicable.
(d) Operational setbacks. Mining, quarrying and excavation operations shall not take place any closer than 300 feet to any perimeter property line.
(e) Operations plan. An operation plan containing the following information shall be submitted as part of the application for special use approval:
1. Date of commencement of the operation and its expected duration.
2. Proposed hours and days of operation, which shall not be inconsistent with this section unless approved otherwise by the city council as a part of conditional use application approval.
3. A description of the method of operation, including the disposition of topsoil, overburden and by-products
4. A description of the equipment to be used in the extraction process.
5. A statement regarding the intended use of explosives, if any, or other hazardous materials, if any, and the methods and procedures proposed for handling, use, storage and disposal of the materials.
6. A plan for reclamation of the land upon completion of mining, quarrying, or other excavation.
(f) Traffic impact study. As a part of the conditional use application, a traffic study shall be submitted to the zoning administrator. The applicant shall address recommendations of the traffic study to mitigate traffic impacts of the proposed facility. Specifically, the study shall identify any state or county maintained road within or adjacent to the property, and shall state any repaving, alterations, turning lanes, signalization, or other road additions or improvements necessary to accommodate the potential increase of traffic volume or weight occasioned by the proposed operations.
(g) Lighting. As a part of the conditional use application, the applicant shall submit information regarding proposed night lighting, which may be limited by the Board of Commissioners via conditions of conditional use approval.
(h) Blasting and vibrations. Blasting operations if permitted are subject to the requirements of this code. Vibration levels at the boundaries of the extraction site shall not exceed a minimum peak velocity of 1.0 inches per second, steady state and 2.0 inches per second impact state.
(i) Reference to state rules and regulations. A state surface mining permit, and all plans and specifications submitted for such state permit, as required by state law and administrative rules, shall be submitted to the zoning administrator prior to commencement of operations.
(j) Days and hours of operation. Hours of operation may be limited by the city council via conditions of special use approval. Unless otherwise approved, the mining and quarrying operations (excluding routine maintenance of equipment) shall be limited to the following: No operation shall be allowed between the hours of 7:00 p.m. and 7:00 a.m.
during the months of November, December, January, February, and March. No operation shall be allowed between the hours of 9:00 p.m. and 6:30 a.m. during the months of April, May, June, July, August, September and October. No operation shall be permitted on Sundays, New Years, Independence Day, Thanksgiving or Christmas Day.
Sec. 336. Model home or temporary sales facility.
A model home is typically constructed before approval of a final plat, and hence the model home is the principal use of the entire unsubdivided parcel until the final plat is approved. A building permit may be issued for one model home on a lot shown on approved development plans for a subdivision prior to final plat approval, subject to the following requirements:
(a) Zoning district compliance. Although the location is not yet its own lot of record, the model home shall be placed on a lot that meets zoning district requirements for lot area, lot width, and principal building setbacks or will meet such requirements at the time of final plat approval.
(b) Water and sewer. The model home shall be connected to sanitary sewer or an approved on-site sewage management system (e.g., septic tank) approved by the county health department.
Sec. 337. Parking lot, accessory uses within.
(a) Parking and loading areas shall not be used for the repair or dismantling of any vehicle, equipment, materials, or supplies.
(b) Buildings or structures shall not be erected or established within a parking lot except as may be authorized by the zoning administrator as a temporary use or other use authorized by this code.
(c) Parking and loading areas shall not be used to store or display vehicles or implements for sale, unless otherwise specifically authorized by this code.
Sec. 338. Recreation facility, private (community recreation).
Community recreation, such as a site with a swimming pool and cabana, courts, clubhouse, etc.
serving a residential subdivision or multi-family development, shall be authorized by the zoning administrator, subject to the following requirements:
(a) Operation. The facility shall be open only to residents of the residential development which it serves, and their guests, and shall not be open to the general public for a fee.
(b) Outside activity duration. Outdoor activity shall cease by 11:00 p.m.
(c) Setback and buffer. Buildings and structures associated with said use shall be located a minimum of 25 feet from any property line, including a minimum 15-foot-wide natural buffer along any side or rear property line. If outdoor patio or decks are provided, they shall be located no closer than 25 feet from a property line.
(d) Swimming pools. See swimming pools in this article.
(e) Plan and permits. A site plan must be approved by the zoning administrator to ensure compliance with all applicable laws and provisions of this code and a development permit and building permit may be required, as appropriate.
Sec. 339. Recreational vehicle and equipment.
(a) Storage. Recreational equipment such as boats, boat trailers, travel trailers, recreational vehicles, pick-up campers or coaches, motorized dwellings, motor coaches, tent trailers and other similar vehicles shall be parked or stored only in side yards, rear yards, carports, or in an enclosed building, provided however, that such equipment may be parked or stored anywhere on premises for a period not to exceed twenty-four (24) hours during loading and unloading. No recreational vehicle or recreational equipment shall be stored or maintained on a vacant lot.
(b) Occupancy. A recreational vehicle shall not be occupied as a permanent residence.
Sec. 340. Recreational vehicle park.
In zoning districts where permitted, recreational vehicle parks shall comply with the following requirements:
(a) Water and sanitary sewer. Recreational vehicle parks shall be connected to a public water supply and a public sanitary sewer system or an on-site sewage management system approved by the county health department.
(b) Minimum development area. The minimum lot area for the development shall be three acres.
(c) Minimum development frontage. The minimum road frontage for the lot shall be 100 feet.
(d) Space setback. No recreational vehicle space shall be located within 50 feet of a city street, county road or state or federal highway right of way.
(e) Access. Direct access to a city, county, state or federal highway shall be required. No entrance shall be through a residential zoning district.
(f) Internal access roads. All access roads within the development shall be private with a minimum easement width of 40 feet and paved with a minimum pavement width of 20 feet, and lighted with a minimum spacing of 200 feet each between street lights.
(g) Parking and driveways. All off-street parking areas or spaces and driveways have direct access to an interior access road. No driveway serving an individual recreational vehicle space shall be permitted to access a road exterior to the development, except via an approved internal access road.
(h) Minimum open space. At least 20 percent of the park must be set aside as open space or for recreation purposes.
(i) Occupancy. No recreational vehicle or space shall be rented or occupied for a period of more than 180 days.
(j) Accessory uses. Management offices, active indoor or passive outdoor recreational facilities, toilets, showers, laundry facilities and other uses and structures customarily incidental to the operation of a recreational vehicle park are permitted as accessory uses, provided use is restricted to the occupants of the park.
(k) Rules and regulations. A copy of the park management rules and regulations must be submitted to the zoning administrator for approval. The park operator will be responsible for ensuring that visitors comply with the rules and regulations.
Sec. 341. Relocated residential structure.
A site-built single-family dwelling may be relocated onto a lot in the city, subject to compliance with the following requirements:
(a) Permit. A building permit shall be required to establish the dwelling in its proposed location. The permit application shall include the address and tax parcel number where the structure is now located and a photograph of the dwelling in its current location.
(b) Water and sewer or septic tank. The lot on which the dwelling is to be located must have adequate water and sanitary sewer or on-site sewage management system (e.g., septic tank) approved by the county health department prior to occupancy.
Sec. 342. Self-service storage facility.
(a) Minimum and maximum development size. The minimum lot size for a self-service storage facility shall be two acres and the maximum lot area shall be four acres..
(b) Minimum building separation. There shall be a minimum separation of ten feet between buildings.
(c) Minimum width of aisle ways. The minimum width of an aisle way shall be 20 feet if one-way traffic and 24 feet for two-way traffic. Traffic flow patterns in the aisle ways shall be clearly marked with directional signage and painted lane markings with arrows as may be approved.
(d) Turning radii. To assure appropriate access and circulation by emergency vehicles and equipment, a minimum turning radius for all aisle ways and access roads within the development may be required.
(e) Fencing. The facility shall be fenced along the entire perimeter boundary. Fencing adjacent to a street frontage and abutting a residential zoning district shall be an architecturally finished wall or solid, opaque wooden fence with a minimum height of six feet, placed interior to any required landscape strip.
(f) Size of storage units. Individual storage units shall not exceed four hundred and fifty
(450) square feet in area.
(g) Use of storage units. Individual storage units shall not be used for living, wholesale or retail sales, or hobbies. Storage bays shall not be used to manufacture, fabricate, or process goods; service or repair vehicles, boats, small engines or electrical equipment, or to conduct similar repair activities; conduct garage sales or retail sales of any kind;
rehearsing or practicing utilizing band instruments; conversion to an apartment or dwelling unit; or to conduct any other commercial or industrial activities. Individual storage bays within a self-service storage facility shall not be considered a premise for the purpose of assigning a legal address in order to obtain mail delivery, an occupational license, or any other governmental permit or licenses to do business.
(h) Materials stored. Individual units or the premises more generally shall not be used for the storage of hazardous materials, toxic substances, flammable liquids, or highly combustible or explosive materials.
(i) Open storage. Open storage of recreational vehicles, boats, trailers, recreational equipment and similar vehicles of the type customarily maintained by private individuals for their personal use shall be permitted within a self-service storage facility subject to the following requirements:
1. The total area devoted to open storage shall not exceed 25 percent of the total developed area of the facility.
2. The open storage area shall observe the required minimum front, side, and rear yard setbacks for the zoning district in which it is located.
(j) Office. A leasing, management, and/or security office shall be permitted in conjunction with a self-service storage facility. Within such office, the sale or rental of items related to moving and storage such as moving boxes, packing supplies and hand trucks shall be permitted.
(k) Accessory rental of vehicles. A self-service storage facility may rent or lease moving trucks and trailers, provided that all such trucks or trailers are stored in the open storage area authorized by this section.
(l) Parking. Designated customer parking is not required; however, a minimum of four parking spaces shall be provided adjacent to the facility’s leasing office, if a leasing office is located on site.
(m)Hours of operation. Self-service storage facilities shall not be accessible to the general public (excluding on-site managers or security agents) between the hours of midnight and 5:00 a.m.
Sec. 343. Semi-trailer.
(a) The parking or storage of a semi-trailer, as defined, is prohibited in agriculturalresidential and residential zoning districts.
(b) Such parking shall not be authorized where such use is permitted as a principal or accessory use.
Sec. 344. Solar energy system, building mounted.
A building-mounted solar energy system shall be subject to the following regulations:
(a) Placement.
1. No solar energy system shall be mounted or affixed to any freestanding wall or fence.
2. Panels and building mounts shall be installed per manufacturer's specifications.
3. In residential zoning districts, a solar energy system for aesthetic reasons shall not be located on the front slope of a pitched roof of a principal residential structure unless no other location for the solar energy equipment is feasible. The city may require sun and shadow diagrams specific to the installation to ensure compliance with this provision.
(b) Height. Building-mounted solar panels or systems shall not exceed four feet above the height of any principal building on the site.
(c) Permits and code compliance. A building permit shall be required for installation of all building-mounted solar energy systems, except for flush-mounted panels.
Sec. 345. Solar energy system, ground mounted.
In zoning districts where permitted, a ground mounted solar energy system shall be subject to the following regulations:
(a) Placement.
1. A ground-mounted solar energy system shall not be located within the required front yard of a lot.
2. A ground-mounted system shall not be located over a septic system, leach field area or identified reserve area unless approved by the county health department.
3. If located in a floodplain or an area of known localized flooding, all panels, electrical wiring, automatic transfer switches, inverters, etc. shall be located above the base flood elevation.
4. Panels and ground mounts shall be installed per manufacturer's specifications.
(b) Maximum area coverage. For residential properties, a ground-mounted solar energy system shall not exceed 25 percent of the footprint of the principal building served. For non-residential properties, a solar energy system shall not exceed 50 percent of the footprint of the principal building served.
(c) Height. The maximum height of a ground-mounted solar energy system shall not exceed the maximum building height for accessory buildings in the zoning district in which it is located, or 20 feet, whichever is less.
(d) Permitting. A building permit is required for any ground-mounted solar energy system.
Sec. 346. Swimming pool.
(a) Setback. Swimming pools (water’s edge) must be located 15 feet from any property line.
(b) Fence and gate. Swimming pools must be enclosed by a fence or wall at least four feet in height with a locking gate.
(c) Other requirements. Swimming pools must comply with all applicable ordinances and may require approvals from the county health department and shall require that a permit be obtained from the building official.
(d) Commercial swimming pools. Swimming pools which are operated as an accessory use to hotels, motels, or other permitted commercial uses shall be restricted to use by the patrons/ guests of the principal use on the subject property and shall not be opened to the general public for a fee.
Sec. 347. Temporary classroom.
On sites where educational or religious facilities are permitted, one or more temporary classrooms, which may be industrialized buildings, may be permitted as temporary uses by the zoning administrator, upon application and after the issuance of a building permit, for a public school, private school, or church, or similar facility. The zoning administrator may attach reasonable conditions on the issuance of such permit to ensure compatibility and public safety. The duration of such temporary use and building permit shall not exceed one year, unless an extension is granted by the zoning administrator.
Sec. 348. Timber harvesting.
(a) Bona fide agricultural activity. The following shall be required in order to qualify tree harvesting as a bona fide agricultural activity:
1. The tract must be under an approved forestry management plan.
2. The county tax commission has approved the property for a preferential agricultural assessment or a conservation use assessment.
3. There is a contract for delivery of the trees between the tree harvesting company and an end user, such as to a mill or wood pulp company.
4. Best management practices required by the Georgia Forestry Commission shall be followed. This can be evidenced by a contract between the tree harvesting company and the property owner (the seller) that is consistent with the form and content recommended by the Georgia Forestry Commission.
5. The tree harvester is currently qualified as a master timber harvester by the Georgia Forestry Commission at the time of the tree harvesting.
(b) Permit not required. No permit from the city or county shall be required for timber harvesting.
(c) Notice required. All persons or firms harvesting standing timber in the city for delivery as pulpwood, logs, poles, or wood chips to any woodyard or processing plant located inside or outside the state of Georgia shall provide notice of such harvesting operations to the Board of Commissioners of Jackson County and the zoning administrator prior to cutting any such timber. Prior written notice shall be required of any person or firm harvesting such timber for each separate tract to be harvested thereby, shall be in such form as prescribed by state rule or regulation of the Director of the Georgia Department of Natural Resources and shall consist of the following:
1. A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road;
2. A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under O.C.G.A.
Section 48-5-7.5;
3. The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and
4. The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber.
Such notice may be submitted in person, by transmission of an electronic record via telefacsimile or such other means as approved by the Board of Commissioners of Jackson County, or by mail.
[Reference O.C.G.A. 12-6-24]
(d) Restriction on development approval of recently cleared land. Except for properties with activities consistent with paragraph (a) of this section (bona fide agricultural activity), no development or land disturbance permit will be issued by the city if any portion of the property has been cleared of trees within three years prior to such permit application. This restriction may be waived by the city council upon a finding that: the tree removal occurred as a bona fide agricultural activity; and a minimum basal area of at least 50 square feet per acre, distributed evenly throughout the property, is retained on the property at the time of tree removal, as certified by a qualified arborist or forester.
Sec. 349. Truck stop.
In zoning districts where permitted, establishments that provide refueling of trucks and cater to the needs of truck drivers are subject to the following requirements:
(a) Accessory uses and buildings; floor limit. All uses other than the dispensing of fuel or other accessory vehicle services must be contained within a single principal building.
Such building may contain convenience shopping space, a restaurant, television viewing and recreation lounges, restroom facilities, and showers, not to exceed 30,000 square feet of building floor area.
(b) Parking area setback and buffer. Truck parking areas must be at least 200 feet from any residential zoning district, within which there shall be a 100-foot-wide buffer.
(c) Vehicle repairs. No major repairs such as engine overhaul, transmission and differential repairs, body and fender work and other repairs of a similar nature shall be performed on the site.
(d) Inoperable vehicles and parts. No outside storage of parts or non-operable vehicles is permitted.
Sec. 350. Vehicle or implement for sale.
Any property owner may offer and display for sale in a front yard one operable vehicle or operable implement if the operable vehicle or implement offered for sale is owned by the property owner, for a period not to exceed 90 days in any one-year period.
Sec. 351. Yard or garage sale.
(a) Frequency. No individual lot shall be permitted more than two yard or garage sales annually.
(b) Duration. A yard or garage sale shall not be held for more than 72 hours in any sevenday period.
Sec. 380. Purpose and intent.
The purpose of this division is to establish guidelines for the siting of all wireless telecommunication equipment and facilities, microwave towers, common carrier towers, cellular, television and radio telecommunications towers and antennae. The regulations and requirements of this division are adopted for the following purposes:
(a) To provide for the location of communication towers and communication antennas; and to protect residential areas and land uses from potential adverse impacts of communication towers, poles, and antennas by restricting them in accordance with the restrictions of this division.
(b) To minimize adverse visual impacts of communication towers and antennas through careful design, siting, landscape screening, and innovative camouflaging techniques.
(c) To accommodate the growing need for communication towers and antennas while minimizing the total number of towers within the community necessary to provide adequate personal wireless services to residents.
(d) To promote and encourage shared use/co-location of existing and new communication towers (i.e., the use of multiple antennae operated by different providers on a single tower) as a primary option rather than construction of additional single-use towers or poles.
(e) To promote and encourage placement of antennae on existing towers, where such siting options exist, and on buildings, where such siting options exist.
(f) To consider public health, safety, and welfare in the siting of new towers, and to avoid potential damage to adjacent properties from tower or pole failure through engineering and careful siting of tower structures.
(g) It is also the intent of this code to limit the siting of telecommunications facilities and towers where they will have the least adverse impact on the community and still comply with the requirements of the Telecommunications Act of 1996 (Public Law No. 104-104, 47 U.S. C. Section 332(c)(7)). These intentions are accomplished with restriction of locations and by enacting controls on height, setbacks, screening, color, and materials in order to minimize visibility and promote public safety and welfare. The regulations in this division are reasonably related to the valid public purposes described in this section.
(h) It is not the intent of the city to discriminate among providers of functionally equivalent services or to prohibit or have the effect of prohibiting the provision of wireless services in the city. It is also the intent that applications to place, construct, or modify personal wireless service facilities will be acted upon within a reasonable period of time.
Sec. 381. Applicability.
All new communication towers, poles, and communication antennas shall be subject to this division, except that this division shall not govern the following:
(a) Any tower, or the installation of any antenna, that is seventy (70) feet or less in height and is owned and operated by a federally-licensed amateur radio station operator or ham radio operator from the operator’s residence.
(b) Antennae or towers located on property owned, leased, or otherwise controlled by the city or Jackson County, provided that a license or lease authorizing such antenna or tower has been approved by the government or agency with jurisdiction.
(c) Monopole towers 100 feet or less in height located within electrical substations.
(d) Antennae attached to existing transmission towers.
Sec. 382. Performance and construction standards.
(a) Placement restrictions. Communication towers shall be setback from residential zoning district boundaries a minimum of one foot for each foot of tower height. All towers shall be located at least one-third of their height in feet from any public right-of-way.
(b) Height. Towers shall be the minimum height necessary to provide parity with existing similar tower-supported antenna. No tower, pole, or antenna, whether freestanding or attached to a building or structure, shall exceed 200 feet in height from ground level;
provided, however, that a variance application may be filed concurrently with the conditional use application to exceed this height limitation. To prevail, the applicant must successfully demonstrate why the prescribed maximum height is insufficient to provide adequate service, or that a taller tower will be in the community’s interest by avoiding the construction of one or more additional towers at a new location.
(c) Illumination. Communication towers, poles, or antennae shall not be lighted except to assure human safety or as required by the Federal Aviation Administration, Federal Communications Commission, or other federal or state agency with jurisdiction.
(d) Co-location. Proposed communication antennas are encouraged to co-locate onto existing communication towers. Conditional use approval is not required for the addition of an antenna to an existing approved tower or pole.
Sec. 383. Application requirements.
In addition to and in conjunction with the information required for conditional use applications generally, applicants may be required to submit the following:
(a) A site plan with topographical information.
(b) An elevation view, perspective drawing, or simulated photograph of how the proposed telecommunication tower will look from public rights-of-way and surrounding residential streets from which it will be visible once constructed.
(c) The zoning administrator may require supporting engineering calculations and information which provide evidence of need and document radio frequency range, coverage area, and tower height requirements.
(d) The application should specifically address whether there is a technically suitable space available on an existing tower or other location within the search area (i.e., the grid for the placement of the antenna), and such information should specifically include the location of all existing towers within a one-mile radius of the site proposed.
Sec. 384. Application processing.
Decisions on applications for wireless service facilities shall be made within a reasonable period of time, which shall mean generally that such decisions shall be processed in roughly the same amount of time required for other conditional use applications; provided, however, that the city council shall table an application for conditional use for a wireless service facility no more than once before making a final decision, unless the applicant does not object to additional continuances.
Sec. 385. Criteria to consider in acting upon applications.
In acting on an application for conditional use for a wireless service facility, the city council shall make its decision on the application based on substantial evidence and sufficient to allow a reviewing court to understand the reasoning behind the decision and whether that reason comports with the evidence presented. Generalized community concerns, unaccompanied by supporting documentation, do not constitute substantial evidence.
Sec. 386. Small wireless facility.
Small wireless facilities (small cell sites) and new, modified, or replacement poles to be used for collocation of small wireless facilities may be placed in the right of way as a permitted use in accordance with Georgia Code Section 36-66C-6, subject to applicable codes and the following requirements:
(a) Each such new, modified, or replacement pole installed in the right of way in a historic district and in an area zoned primarily for residential use shall not exceed 50 feet above ground level;
(b) Each such new, modified, or replacement pole installed in the right of way not in historic district or in an area zoned primarily for residential use shall not exceed the greater of:
fifty feet above ground level; or ten feet greater in height above ground level than the tallest existing pole in the same authority right of way in place as of January 1, 2019, and located within 500 feet of the new proposed pole;
(c) New small wireless facilities in the right of way shall not exceed the following:
1. For a collocation on an existing pole or support structure, more than ten feet above the existing pole or support structure; or
2. For a collocation on a new, modified, or replacement pole under paragraph (a) or (b) of this section, the height limit provided in such paragraphs.
(d) An applicant in the right of way shall employ due care during the installation and maintenance process and shall comply with all safety and right of way protection requirements of general applicability set forth in applicable law.
(e) An applicant in the right of way shall not place any small wireless facilities, support structures, poles, or decorative poles where they will interfere with any existing infrastructure or equipment and shall locate its lines and equipment in such a manner as not to interfere unnecessarily with the usual vehicular or pedestrian traffic patterns or with the rights or reasonable convenience of owners of property that abuts any right of way.
(f) Within a historic district, an applicant may collocate a small wireless facility and may place or replace a pole, only upon satisfaction of the following: The issuance of a permit under subsection (a) of Code Section 36-66C-6; and compliance with any objective, reasonable, and nondiscriminatory aesthetic and structural requirements that have been made publicly available in writing by the authority at least 30 days prior to submission of the application; provided, however, that any such requirements may not have the effect of materially inhibiting any wireless provider's technology or service, and compliance with any such requirements shall not be considered a part of the small wireless facility for purposes of the size restrictions in the definition of small wireless facility. In the absence of any such requirements, a replacement pole shall be substantially similar in height and appearance to the pole being replaced.
(g) For applications for new poles in the right of way in areas zoned for residential use, the authority may propose an alternate location in the right of way within 100 feet of the location set forth in the application, and the wireless provider shall use the authority's proposed alternate location unless the location imposes technical limits or significant additional costs. The wireless provider shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and it shall provide a written summary of the basis for such determination.
(h) An applicant may collocate a small wireless facility on a decorative pole, or may replace a decorative pole with a new decorative pole, in the event the existing decorative pole will not structurally support the attachment, only upon satisfaction of the following: the issuance of a permit under subsection (a) of Code Section 36-66C-6; and compliance with any objective, reasonable, and nondiscriminatory aesthetic and structural requirements that have been made publicly available in writing by the authority at least 30 days prior to submission of the application; provided, however, that any such requirements may not have the effect of materially inhibiting any wireless provider's technology or service, and compliance with any such requirements shall not be considered a part of the small wireless facility for purposes of the size restrictions in the definition of small wireless facility. In the absence of any such requirements, a replacement pole shall be substantially similar in height and appearance to the pole being replaced.
ARTICLE 4
RESERVED
ARTICLE 5
GENERAL DEVELOPMENT REQUIREMENTS
DIVISION 5-1 GENERAL PROVISIONS
DIVISION 5-2 ACCESS
DIVISION 5-3 OUTDOOR LIGHTING
DIVISION 5-4 NOISE
DIVISION 5-5 ARCHITECTURAL DESIGN
Article 5, General Development Requirements
DIVISION 5-1
GENERAL PROVISIONS
Sec. 501. Findings and purposes.
(a) Access. Over time, if not carefully thought through, numerous entryways to a street can contribute to difficult turning situations and lead to unsafe conditions. Abutting properties which do not provide interconnecting access to one another make it difficult and dangerous, if not impossible, for motorists to travel between those properties.
Accordingly, it is appropriate to regulate connections to public streets and also to require inter-parcel access between and among compatible nonresidential properties.
(b) Outdoor lighting. It is in the public interest to provide a quality night time environment.
Careless use of outdoor lighting damages the aesthetics of the night time environment. If not regulated, outdoor lighting can decrease security or safety or create hazards through glare, light trespass, and distraction. Inappropriately shielded lights and overlighting can compromise the public’s visibility. The naturally dark, star-filled sky is an important part of the natural environment that should not be degraded by improper or inappropriate outdoor lighting. Regulating outdoor lighting brings substantial public benefits.
Eliminating glare improves visibility. Elimination of wasted light saves money, energy, and resources.
(c) Noise. According to Noise Violations: Guidance Manual for State and Local Prosecutors (U.S. Environmental Protection Agency, Washington, DC), people increasingly view exposure to excessive noise as a health hazard. A number of close associations have been demonstrated between cardiovascular diseases and noise exposures. Noise may also be a causative agent in other medical problems such as high blood pressure, colitis, ulcers, and migraine headaches. Although many of the health effects of noise may not yet be clearly understood or quantified, there is little doubt that noise can contribute to a range of physical and psychological injuries. Noise acts on the body to produce stress. At approximately the 75—80, or lower, decibel (dB) range, a number of short-term physical reactions take place. Heart rhythm and blood pressure changes occur, blood cholesterol levels rise, pupils of the eye dilate, and stomach acid secretion may change leading to gastrointestinal malfunctions. Some automatic physical reactions such as blood vessel constriction may continue for some period even after the noise stops. Even noise that may cause no direct permanent physical health repercussions may still cause annoyance, sleep loss, and other forms of mental distress. There is some scientific evidence indicating that noise may increase irritability, argumentativeness, anxiety, nervousness, and general aggressive tendencies, and decrease helping behavior. Noise may trigger undesirable social behavior, and this effect may be increased with physical fatigue. Furthermore, noise may have less obvious secondary effects in addition to its more direct effects, for example, impairment of learning or job performance and interference with other activities such as communication and sleep. Sound loud enough to interfere with conversation or mental concentration may have adverse secondary effects in the educational or work environment. These are public concerns sufficient to justify adoption and enforcement of noise performance standards and to prohibit certain noise-inducing practices.
(d) Architectural design including building material finishes. Institutional, commercial and industrial developments can have a major impact on the aesthetics of the community.
It is in the public interest to direct and control the visual appearance and functional design of non-single-family residential developments in the city, to prevent patently offensive harm to the existing visual character of the city, to ensure functionality and longevity, and to safeguard the happiness, comfort, and general well-being of its citizens.
The choice of materials applied to the exterior of buildings has great visual significance and can affect the long-term appearance and maintenance of the built environment.
Exterior building material is directly related to the durability of the building against weathering and damage from natural forces.
Sec. 502. Compliance required.
(a) Before any development permit or building permit is issued for a given development or building, the development or building must be found by the zoning administrator to comply with all applicable requirements of this article and the standards and specifications required by other articles of this code. No such permit shall be issued if the development or building fails to comply with the requirements of this article and all other standards and specifications of this code.
(b) The building official shall not issue a building permit and shall not allow occupancy or use of a building until advised by the zoning administrator that such development or building as applicable meets the requirements of this article and the standards and specifications required by other articles of this code.
Sec. 511. Definitions.
Access: A way or means of approach to provide physical entrance to a property.
Arterial street: A term used in the functional classification of roads. These roads serve statewide, interstate and regional trips. Arterial streets are classified as such by the Georgia Department of Transportation.
Collector street: A term used in the functional classification of roads. A collector street collects traffic from local streets and connects to the arterial street system. Collector streets are classified as such by the local government in any adopted transportation plan or transportation element of a comprehensive plan, or in the absence of such plan, by the zoning administrator.
Driveway: A constructed vehicular access serving one or more properties and connecting to a public or private street.
Functional classification of roads: A system for the classification of roads used by the Federal Highway Administration, the Georgia Department of Transportation, the county and the city.
The system is based on several factors, including: the amount of traffic currently on the road plus if any new major traffic generators (e.g., new schools, new subdivisions, new community level commercial centers, or new major employers) are being built in the near future along that roadway; and the length of the roadway in comparison with the functional classification of other roads in the same area.
Highway: A term applied to streets and roads that are under the jurisdiction of the Georgia Department of Transportation or federal highway agency. Highways are arterial streets and the highest level of the circulation network, carrying significant volumes of traffic for both long and short trips, and are usually designed to allow access to abutting properties but with some degree of control and safe standards of design.
Inter-parcel access: A road, driveway or access way within a property that provide access to interior lot frontage or other properties, not connected to a public road or state route.
Road: A state highway, a county road, a road adopted as a county-owned right of way approved for county maintenance, a street owned and/or maintained by a municipality, or where permitted, a private road. Roads afford the principal means of access to abutting property or properties and are required to meet specifications contained in this code. The term includes “street” but does not include “access easement.”
Sec. 512. Access and driveway approval required.
(a) Every development and every lot within a subdivision shall have access to the public street system via a city street, county road, or state highway that meets the standards and requirements of this article, unless specifically authorized otherwise by this code.
(b) No driveway shall be connected to a city street, county road, or state highway, and no curbs or medians on public streets or rights-of-ways shall be cut or altered for access unless approved by the zoning administrator. The zoning administrator in consultation with the city engineer shall be authorized to promulgate standards and requirements for driveway connections to city streets. Access to a county road is subject to the approval of Jackson County.
(c) No driveway or other improvement constructed on a city street or county road right of way shall be constructed or relocated or have its dimensions altered without the approval of the zoning administrator.
(d) Driveways must be permitted. Approval of driveways shown on approved development plans shall constitute driveway approval unless specified otherwise in such approval.
Approval of driveways shown on a building permit application shall constitute driveway approval unless specified otherwise by such permit approval. A separate driveway permit shall be required, if the driveway proposed has not been shown on approved development plans or approved as part of a building permit.
(e) Driveways shall be a minimum length of 23 feet from the back of curb or, if no curb exists, 20 feet from the right of way, except as may be provided otherwise in this code.
Sec. 513. Access to entire parcel.
(a) The entire parcel, rather than simply a particular project, shall be considered in formulating and approving access plans. To this end, the zoning administrator may require a development project or subdivision on only part of a lot (unsubdivided parcel) to design and provide access through the remainder of the parcel not proposed for land development at the time, or reserve such future access by easement or right of way.
(b) Where land proposed to be subdivided or developed includes only part of the tract owned or intended for subdivision or development by the subdivider or land developer, a tentative plan of a future road system for the portion not slated for immediate subdivision or land development consideration shall be required by the zoning administrator. When such tentative plan is required, it shall be prepared and submitted by the subdivider or land developer no later than the time of submission of lot subdivision or development plan approval, whichever occurs first.
Sec. 514. Access control on state routes.
(a) Access onto a state highway shall meet the Georgia Department of Transportation Regulations for Driveway and Encroachment Control, Revision 4.0, dated March 15, 2016, as may be amended from time to time. For driveways accessing U.S. or State highways, the requirements of the Georgia Department of Transportation shall apply whenever more restrictive than the standards in this code.
(b) A copy of the Georgia Department of Transportation permit, if required, shall be submitted to the zoning administrator before plans for land development are approved or permits can be issued for development or building.
Sec. 515. Access easements.
(a) For any lot of record which existed prior to adoption of this code but which does not have frontage on a public street or private street meeting the requirements of this code, access may be obtained to and from that lot of record solely via any access easement which was lawfully established for access to such lot prior to the adoption of this code.
(b) A new access easement shall not be authorized as the sole means of access to any lot within a subdivision.
Sec. 516. Common access easements for shared driveways.
(a) Shared driveways between two parcels along the common property line of the two parcels may be required by the zoning administrator at the time of lot subdivision, particularly in the case of one or more flag lots.
(b) In such a case as shared driveways are proposed or required to be provided by the zoning administrator, a common access easement no less than 20 feet in width shall be provided along the common property line (10 feet on each side unless otherwise approved by the zoning administrator).
Sec. 517. Inter-parcel access.
(a) Developments abutting an arterial or collector street shall provide vehicular access to abutting commercial, office, or institutional developments, whether existing or planned (i.e., according to either the zoning map and/or the character map), as determined by the zoning administrator, so as to provide a vehicular connection among all adjacent parcels also abutting an arterial or collector street.
(b) This requirement may necessitate driveway aprons, stub-outs, or other design features to provide for cross-connection access to abutting properties as determined by the zoning administrator. If inter-parcel access is required, the property owner shall grant an access easement to facilitate the movement of motor vehicles from site to site.
(c) Where possible, the location of vehicular connections across a property line shall be mutually determined and constructed by both property owners. Connection of parking areas for vehicular access may be provided in the front portion of the site. In cases where it is not possible to provide the connection in front, it may be provided in the rear portion of the site. In the case of coordination problems or any factors preventing construction of an inter-parcel connection, the zoning administrator will determine the location of the inter-parcel connection to be constructed by property owners.
Sec. 518. Pedestrian access.
(a) Except for detached, single-family dwellings, pedestrian access from abutting streets must be provided to individual developments and each building within the development.
Pedestrian ways shall be well defined and take as direct a path as possible.
(b) Where pedestrian access ways cross vehicular routes, a change in grade, materials, textures or colors, or appropriate striping or demarcation, shall be provided to emphasize the point of intersection between pedestrians and vehicles and improve its visibility and safety. For instance, brick pavers and other special paving materials can help to distinguish pedestrian walkway surfaces from vehicular access ways.
Sec. 521. Definitions.
Direct light: Light emitted directly from a lamp, off of the reflector or reflector diffuser, or through the refractor or diffuser lens, of a luminaire.
Fixture: The assembly that houses a lamp or lamps and can include all or some of the following parts: a housing, a mounting bracket or pole socket, a lamp holder, a ballast, a reflector or mirror, and/or a refractor or lens.
Footcandle: A unit of illuminance on a surface that is everywhere one foot from a uniform point source of light of one candle and equal to one lumen per square foot. One footcandle (FC) is the equivalent of 10.76 Lux (1 Lux = 0.0929 FC).
Full cutoff luminaire: An outdoor light fixture shielded or constructed so that no direct light rays are emitted by the installed fixture at angles above the horizontal plane.
Glare: Light emitting from a luminaire with intensity great enough to reduce a viewer's ability to see, and in extreme cases causing momentary blindness, or that causes annoyance or discomfort.
Illuminance: The area density of the luminous flux incident at a point on the surface. It is a measure of light incident on a surface, expressed in lux or footcandles.
Isofootcandle plan: A site plan of a proposed development showing proposed outdoor illuminance with a series of isofootcandle lines that join points on a surface where the illuminance is the same.
Light trespass: The shining of light produced by a luminaire beyond the boundaries of the property on which it is located.
Luminaire: A complete lighting system, including a lamp or lamps and a fixture. This term shall be interpreted broadly as applying to all outdoor electrically powered illuminating devices, outdoor lighting or reflective surfaces, lamps and similar devices, permanently installed or portable, used for illumination or advertisement.
Outdoor lighting: The night-time illumination of an outside area or object by any man-made device located outdoors that produces light by any means.
Safety lighting: Exterior lighting that involves ensuring proper levels of illumination to provide safe working conditions, safe passage, and the identification of outdoor hazards.
Security lighting. Exterior lighting installed solely to enhance the security of people and property.
Sec. 522. Applicability.
(a) All outdoor lighting, unless exempted from compliance, shall be installed in a manner that conforms with the requirements of this division.
(b) It shall be unlawful to maintain any lighting device in a manner inconsistent with the requirements of this division.
Sec. 523. Exemptions.
The following shall be exempt from compliance with the provisions of this division:
(a) All temporary emergency lighting needed by police or fire departments or other emergency services.
(b) All hazard warning luminaires required by federal regulatory agencies.
(c) All vehicular luminaires.
(d) Safety lighting, as defined in this division.
(e) Holiday lights and decorations, provided that they are removed within a reasonable period following the holiday season to which they pertain.
Sec. 524. Full cut-off fixtures required.
All luminaries not exempted from this division hereafter installed for outdoor lighting shall be full cutoff luminaires, as defined by this division, or another luminaire which does not emit any direct light above a horizontal plane through the lowest direct-light-emitting part of the luminaire.
Sec. 525. Prohibited lighting practices.
The following outdoor lighting practices are prohibited:
(a) No luminaire shall be aimed, directed, or focused so that the lamp is visible, or in a way that causes direct light from the luminaire to be directed toward residential buildings on adjacent or nearby land, or that creates glare perceptible to persons operating motor vehicles on public ways. Any luminaire that causes glare shall be redirected or its light output controlled as necessary to eliminate such conditions, as directed by the zoning administrator or code enforcement officer.
(b) Strobe lights, and laser lights or searchlight beams projected into the sky.
(c) Outlining of windows, doors, or any other part of a building with neon tubing.
Sec. 526. Intensity limit.
Illuminance levels for outdoor lighting fixtures shall not exceed 1.5 footcandles at the property line, measured at three feet above the ground or finished grade.
Sec. 527. Lighting plan may be required.
The zoning administrator may require a lighting plan as part of a development permit or building permit for any outdoor commercial recreation facility or any automobile sales or service establishment.
Sec. 531. Definitions.
A-weighted sound level: The sound pressure level in decibels as measured on a sound level meter using the A-weighting network as specified in ANSI documents for sound level meters that models human hearing frequency sensitivity by deemphasizing the low frequency components of sound. The A-weighting scale is a frequency-weighted scale which adjusts for the fact that the ear does not respond equally to low, medium, and high range frequencies. The level so read is post scripted "dB A."
Alarm: Any fire, burglary, or civil defense alarm, whistle or similar stationary emergency signaling device.
Noise: Any sound which annoys or disturbs humans or which causes or tends to cause an adverse psychological or physiological effect on humans.
Noise disturbance: Any sound which endangers or injures the safety or health of humans, or annoys or disturbs a reasonable person of normal sensitivities, or endangers or injures personal or real property.
Sound level: The intensity of sound, measured in decibels, produced by an operation or use.
Sound level meter: An instrument designed to measure sound pressure levels Such meters are typically constructed in accordance with the requirements for general purpose sound level meters published by the American National Standards Institute.
Sec. 532. Noise disturbance prohibited.
It shall be unlawful to cause or create any noise disturbance, as defined in this division.
Sec. 533. Sound maximum performance standard.
From 10:00 p.m. until 7:00 a.m., at no point on the boundary of property shall the sound pressure level of any operation exceed 70 decibels measured on the A weighting scale (dB A).
Sec. 534. Exemptions.
The following are exempt from compliance with this division:
(a) Stationary emergency signaling devices, and nonstationary emergency signaling devices (excluding back up vehicle alarms) when used in the cases of an emergency or training exercises and noises or sounds made by law enforcement and other public safety officials performing their official functions.
(b) The unamplified human voice.
(c) Railway locomotives and cars.
(d) Normal sounds of reasonably cared for agricultural or domestic animals, and the sounds of necessary farming equipment for a bona fide agricultural operation. This exemption includes dogs barking as a result of a person trespassing or threatening to trespass upon property in or upon which the dog is situated.
(e) Blasting operations, if done in conformance with the Georgia Blasting Standards Act of 1978, codified as O.C.G.A. Title 25, “Fire Protection and Safety,” Chapter 8, “Regulation of Blasting Operations Generally” and any rules and regulations promulgated thereunder by the Safety Fire Commissioner.
(f) The discharge of firearms by any person in defense of self in accordance with O.C.G.A. § 16-3-21 or in defense of habitation in accordance with O.C.G.A. § 16-3-23.
(g) Aircraft operations, not including model airplanes or drones.
(h) Bells or chimes of churches or other places of worship.
(i) Motor vehicle operations, but not including radios and stereo equipment within a motor vehicle and not including unmuffled engines.
(j) The testing of any alarm for a period of less than 60 seconds, and noise from the activation of an alarm of any building, provided such alarm terminates its operations within five minutes of its activation.
(k) Noises or sounds that result from a sports or athletic event at a public park or school.
(l) The use of fireworks as authorized by state law, O.C.G.A. § 25-10-2.
(m)Domestic power tools and leaf blowers, when operated during the hours of 9:00 a.m. to 9:00 p.m. only.
Sec. 541. Definitions.
Brick veneer: A building construction technique in which an external, non-structural, brick wall conceals a structural wall of another material. Brick veneer is one layer of real brick and differs from solid masonry. With solid masonry, the brick is holding up the structure and is applied in two or more layers. This does not include the material generally referred to as “thin brick” or a prefabricated panel with brick of a depth less than a standard masonry brick.
Dumpster: A container designed to hold refuse that has a hooking connection that permits it to be raised and dumped into a sanitation truck for disposal, or a container (excluding temporary placements) designed to hold refuse that is loaded onto a truck.
Engineered wood siding: A manufactured siding consisting of composite wood, mixed with different fibers and strands of various woods to create the finished product.
Exterior insulating and finish system (EIFS): An exterior wall cladding system consisting primarily of polystyrene foam board with a textured acrylic finish that resembles plaster or stucco; A general class of non-load bearing building cladding systems that provides exterior walls with an insulated, water-resistant, finished surface in an integrated composite material system.
Façade, front: Any façade with a main public entrance which faces one of the primary streets.
Façade, rear: Any façade without a public entry that does not face a public road.
Façade, side: Any façade without a public entry but facing a public street.
Fiber cement siding: A mix of Portland cement reinforced with cellulose wood fibers and used as a siding material. Hardie board is an example.
Hardie board or HardiePlank: A siding material comprised of cement, sand, water and cellulose wood fibers, created by James Hardie. James Hardie's HardiePlank has become synonymous with fiber-cement siding, in much the same way that the brand name Kleenex has come to refer to tissues.
Masonite: A kind of engineered wood which is made of steam-cooked and pressure-molded wood fibers in a process patented by William H. Mason.
Stone veneer (natural): Thinly cut pieces of quarry stone applied to an exterior.
Stone veneer (artificial): Concrete or other materials that emulate the look of natural stone applied to an exterior.
Stucco siding: A type of hand-troweled masonry plaster consisting of cement, water, and sand.
Sec. 542. Building material finishes.
(a) This section shall apply only to office, institutional and commercial developments, including principal and accessory buildings. Residential developments, and development in the light industrial zoning district, are exempt from the requirements of this section.
This section shall also apply to any addition to an office, institutional, or commercial building, whether principal or accessory.
(b) On all building facades subject to the requirements of this section, exterior building materials shall not include smooth-faced concrete block, tilt-up concrete panels, or prefabricated panels. Such materials may be used for construction, but must be veneered or covered with approved exterior building materials, as interpreted by the zoning administrator.
(c) For all facades of a building, the exterior building materials shall be limited to the following materials. The amount of permitted material shall be calculated using the gross square footage of wall area for each elevation (side) of the building.
1. Brick (or brick veneer);
2. Stone (or stone veneer). Natural stone such as, but not limited to, granite, limestone, and marble are allowed building materials. Terra cotta and/or cast stone, which simulate natural stone, are also acceptable.
3. Exterior insulating and finish system (EIFS) or stucco up to 50 percent of the surface area of each side of a principal building;
4. Glass/glass block up to 75 percent of the surface area of each side of a principal building;
5. Split-face block/concrete masonry unit (CMU) up to 50 percent of the surface area of each side of a principal building;
6. Engineered wood siding, such as Masonite, or fiber cement siding such as HardiePlank, up to 75 percent of the surface area of each side of a principal building;
7. Metal up to 25 percent of the surface area of each side of a principal building; and
8. Tile, as an accent material only, up to 10 percent of the surface area of each side of a principal building.
(d) Upon written application, the zoning administrator may administratively waive the requirements of this section for a side or rear building elevation if such side or rear elevation is determined to be not visible from any street.
Sec. 543. Building facades with lengths exceeding 200 feet.
The walls of buildings for office, institutional, commercial, and industrial use shall not extend more than 200 linear feet parallel to a street unless the front façade of the building is designed in a way that breaks up the building face into discrete architectural elements, which can be accomplished through at least one of the following:
(a) Façade modulation: stepping back or extending forward a portion of the façade;
(b) Providing bay windows or repeating window patterns at regular intervals;
(c) Providing a porch, patio, deck, covered entry to portions of the façade at the ground level, or in the case of buildings; or
(d) Changing the roofline by alternating dormers, or using stepped roofs, gables, or other roof elements.
Sec. 544. Drive-under canopies.
The support columns for drive under canopies shall be finished with brick veneer or stone veneer.
Sec. 545. Dumpster enclosures.
Dumpster enclosures shall meet the following requirements:
(a) They shall be screened on three sides of said dumpster area with a minimum eight-foothigh wall constructed of sturdy, durable, opaque materials (with trash receptacles screened from view) substantially similar in appearance to the building on site or as approved by the zoning administrator.
(b) Dumpster areas must be gated on the fourth side with a material that provides opaque screening, such as a solid wooden fence or metal gate matching the height of the surrounding wall and compatible in material and appearance as approved by the zoning administrator.
(c) Dumpster areas and their immediate approach zones shall be constructed of concrete of sufficient size and strength to support the weight of service vehicles.
Sec. 546. Rooftop equipment.
Rooftop mechanical and electrical equipment shall be screened from public view by building elements that are designed as an integral part of the building architecture, or by a parapet wall.
ARTICLE 6
PARKING AND LOADING
DIVISION 6-1 GENERAL PROVISIONS
DIVISION 6-2 PARKING AND LOADING DESIGN AND CONSTRUCTION
REQUIREMENTS
DIVISION 6-1
GENERAL PROVISIONS
Sec. 601. Findings and purposes.
The provisions of this article are intended to serve multiple public purposes as described in this section.
(a) Public safety. Parking lots are connected to public streets, and the city desires to reduce congestion in the streets and ensure that uses and functions of public rights-of-ways are not interrupted by inappropriate or unsafe vehicle operations. Connections to city streets, county roads, and state highways requires regulation in order to apply and enforce critical safety standards.
Article 6, Parking and Loading
(b) Costs. Parking lot construction is a considerable factor in the cost of land development.
To the extent parking requirements are reduced, or when parking areas are reduced, development costs are also reduced.
(c) Overbuilding and underutilization. Off-street parking requirements, if imposed, can be excessive in relation to parking demand, such that some parking spaces remain unutilized for most of the year. The impacts of excess pavement continue every day, regardless of whether or not the parking spaces are utilized. Off-street parking requirements can:
increase construction and housing costs; consume land that could be used for other purposes; encourage dependency on cars; and hinder mixed-use development. Parking reforms have led to some local governments eliminating minimum off-street parking requirements altogether.
(d) Stormwater infiltration. Pavement (concrete, asphalt is impervious surface and reduces infiltration of stormwater. It is in the city’s interest to promote (where authorized, in some cases) alternative pavement materials, such as pervious concrete, porous asphalt, turf block, gravel, wood mulch, and cobbles which provide for some amount of infiltration and can have higher degrees of water quality effectiveness than conventional asphalt and pervious concrete. Stormwater runoff, particularly from impervious surfaces, can introduce toxics, nutrients, and sediment into streams, making water treatment more complicated and expensive and rendering water resources unusable for recreation or to support aquatic resources.
(e) Pervious materials. Porous pavement and grass pavers reduce stormwater runoff by allowing it to pass through the paved surface and infiltrate back into the soil and groundwater. Utilizing porous pavement and grass pavers also potentially reduces the amount of land needed for surface storm water management facilities. Therefore, porous pavement designs and grass pavers can be appropriate in some instances.
(f) Flexibility. The city desires to promote flexible approaches to the provision of off-street parking, including in some cases, as appropriate, use of on-street parking, shared parking arrangements, smaller spaces for compact cars, and unimproved or pervious pavement overflow or spillover parking areas. Designers are permitted flexibility with regard to parking lot designs, subject to the requirements of this article when specific standards or requirements are established.
(g) Modes and circulation. It is in the public interest to ensure on-site circulation patterns within land developments are conducive to safe pedestrian as well as safe and adequate vehicle and truck access.
Sec. 602. Definitions.
Impervious surface: A man-made structure or surface, which prevents the infiltration of water into the ground below the structure or surface. Examples are buildings, roads, driveways, parking lots, decks, swimming pools, or patios.
Pervious surface: A surface containing voids through which water will penetrate or move under hydrostatic pressure.
Sec. 603. Applicability.
(a) This article establishes standards and requirements for the construction of parking spaces and lots and loading areas.
(b) Parking lots which lawfully existed on the effective date of this article shall not be required to comply with the requirements of this article.
(c) The zoning administrator shall ensure parking lots that do not comply with the requirements of this article meet the requirements of this article or substantially comply when a new development permit is required or a building permit is required to add additional building space, additional parking areas or spaces, or additional use(s) on the site.
(d) The construction standards and specifications in this article shall apply to projects that provide five or more parking spaces or that add five or more spaces to an existing development or site, or that adds parking or loading area of 5,000 square feet or more.
(e) If substantial redesign of the parking lot is required to comply with this article in cases of new development or building additions, the zoning administrator may accept substantial rather than complete compliance when the strict application of a requirement of this article would pose substantial practical difficulty as documented in a form acceptable to the zoning administrator.
Sec. 604. Compliance.
No development permit or building permit shall be issued by the zoning administrator for the development land regulated by this article, unless the development conforms to the requirements of this article.
Sec. 605. Off-street parking.
On each lot where a building, structure, or use exists, each lot is expected to have off-street parking space or area commensurate with the needs of the occupying use or building. However, this article does not require minimum parking spaces except for the following:
(a) Detached, single-family dwellings shall provide at least two off-street parking spaces per dwelling unit.
(b) Attached, single-family dwellings (e.g., units in townhouses) shall provide at least one off-street parking space per dwelling unit.
(c) Even though this article does not establish minimum off-street parking requirements for non-single-family residential uses, the following parking ratios (maximums as well as minimums) are offered as a guide to land development (advisory; not required; projects are not required to meet the minimum shown and may exceed the maximum shown):
Minimum and Maximum Parking Space Suggestions Use Minimum number of parking spaces Maximum number of parking spaces Commercial including retail sales or personal service establishment One per 250 square feet of building space One per 200 square feet of building space Office, medical or dental One per 250 square feet One per 150 square feet Office, general or professional One per 300 square feet One per 250 square feet Assembly/ institutional One per four seats in room
with greatest seating capacity or one per 40 square feet in largest assembly area without fixed seating One per three seats in room with greatest seating capacity or one per 30 square feet in largest assembly area without fixed seating Manufacturing, processing, assembling One per 1,300 square feet One per 1,000 square feet Warehouse One per 2,000 square feet One per 1,500 square feet Wholesale One per 1,000 square feet One per 600 square feet
(d) Handicapped parking spaces shall be provided in number and design specifications as required by accessibility codes or standard minimum codes of the state, or federal statute regarding accessibility for disabled persons.
Sec. 606. Off-site parking.
Off-site parking may be used to meet off-street parking space needs, provided that safe and convenient pedestrian access, such as a sidewalk or path, exists or is provided from the structure or use to the off-site parking lot.
Sec. 607. Off-street loading.
On the same lot with every building, structure or part thereof, erected or occupied for manufacturing, storage, warehouse, truck freight terminal, department store, wholesale store, grocery supermarket, hotel, hospital, mortuary, dry cleaning plant, retail business, or other uses similarly involving the receipt or distribution of vehicles, materials or merchandise, it is expected that there will be provided and maintained adequate space for the standing, loading, and unloading of such materials to avoid undue interference with public use of streets, alleys, and private or public parking areas. However, this article does not establish or require minimum numbers of loading spaces.
CONSTRUCTION REQUIREMENTS
Sec. 611. General circulation.
(a) All parking shall be provided with vehicular access to a city street, county road, or state highway, or if authorized, to an alley.
(b) Except for single-family dwellings (attached and detached) and two-family dwellings in the case of local city streets, off-street parking and loading spaces shall have access so that their use will not require backing movements or other maneuvering within a street right-of-way.
(c) Loading areas if provided shall have access to a street or, if authorized and available, an alley.
(d) Efficient and easily recognized vehicular circulation routes within a development are vital and shall be provided. Internal vehicle circulation shall avoid conflicts between throughtraffic (i.e., traffic flowing into and out of the site) and local traffic (i.e., traffic through parking areas), where possible and feasible.
(e) Dead-end parking areas shall be prohibited unless design conditions prevent a connected design and an alternative is approved by the zoning administrator that provides adequate provision for turnaround of vehicles.
Sec. 612. Pedestrian facilities.
(a) Non-single-family residential developments shall provide safe routes of pedestrian access between occupied buildings and parking and public areas including streets.
(b) Pedestrians shall have the right-of-way over automobile travel.
(c) The internal sidewalk system shall connect to the public sidewalk system along streets and highways, where it exists or is planned.
Sec. 613. Parking space dimensions.
(a) Off-street parking spaces shall be a minimum of nine (9) feet in width and twenty (20) feet in length, with wider (10 foot) spaces encouraged in high-turnover areas.
(b) Compact parking spaces may be proposed by a designer and may be approved by the zoning administrator provided such spaces are clearly marked with signage limiting their use to compact vehicles.
Sec. 614. Parking lot aisle widths.
(a) Parking driveway maneuvering aisle width requirements vary according to the width and length of parking spaces and the angle of parking.
(b) For a single row of 90-degree head-in parking, the minimum depth for a parking space plus the width of the aisle shall be 42 feet.
(c) For two rows of 90-degree head-in parking using the same aisle, the minimum depth for parking spaces plus the width of the aisle shall be 62 feet (i.e., curb to curb) for 9-footwide spaces and 60 feet (i.e., curb to curb) for 10-foot-wide spaces.
Sec. 615. Parking space angles.
(a) The zoning administrator may authorize parking lot designs that utilize 75, 60, and 45 degree-angled parking spaces with one-way or two-way aisles.
(b) If such angled parking is used, parking lots shall comply with acceptable parking dimensional standards for aisle widths as specified by the Institute of Transportation Engineers or other reputable source approved by the zoning administrator.
Sec. 616. Drainage.
Parking and loading areas shall be properly graded if necessary but in all cases drained so as to prevent damage to abutting properties or public streets.
Sec. 617. Curbing.
Curbing shall be installed as required by the zoning administrator when considered necessary for drainage, although water quality effectiveness and character of the zoning district shall be considerations in determining curbing requirements.
Sec. 618. Surfacing.
(a) Parking and loading areas shall be surfaced with concrete, asphaltic concrete, asphalt or other dust-free surface; provided, however, that alternative surfacing materials including porous asphalt, pervious concrete, and grass pavers may be substituted for standard dust free pavements subject to the approval of the zoning administrator.
(b) The zoning administrator may authorize use of gravel for parking lots in lieu of standard pavement methods, except that handicapped parking spaces are required to be surfaced with concrete. Areas considered generally unsuitable for gravel include approach driveways within 50 feet of a city street, county road, or state highway, parking areas with pedestrian traffic between a building and parking area, and high-turnover customer parking areas.
(c) No more than four parking spaces (whether paved or unpaved) shall be authorized outdoors (i.e., excluding carports and garages) in the front yard of a lot developed with a detached single-family dwelling unit.
ARTICLE 7
SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL
DIVISION 7-1 GENERAL PROVISIONS
DIVISION 7-2 MINIMUM REQUIREMENTS/BEST MANAGEMENT PRACTICES
DIVISION 7-3 APPLICATION AND PERMIT PROCESS
DIVISION 7-4 INSPECTION AND ENFORCEMENT
DIVISION 7-5 EDUCATION AND CERTIFICATION
DIVISION 7-6 LEGAL STATUS PROVISIONS
DIVISION 7-1
GENERAL PROVISIONS
Sec. 701. Title.
This article shall be known as “The City of Pendergrass Soil Erosion, Sedimentation and Pollution Control Ordinance.”
Sec. 702. Definitions.
The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:
Best Management Practices (BMPs): These practices include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation which are consistent with, and no less stringent than, those practices contained in the “Manual for Erosion and Sediment Control in Georgia” published by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
Board: The State of Georgia Board of Natural Resources.
Buffer: The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified personnel: A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Commission: The Georgia Soil and Water Conservation Commission (GSWCC).
CPESC: Certified Professional in Erosion and Sediment Control with current certification by Certified Professional in Erosion and Sediment Control Inc., which is also referred to as CPESC or CPESC, Inc.
Cut: A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface; also known as excavation.
Department: The State of Georgia Department of Natural Resources (DNR).
Design professional: A professional licensed by the State of Georgia in the field of: engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by EnviroCert, Inc. Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.
Director: The Director of the State of Georgia Environmental Protection Division of the Department of Natural Resources, or an authorized representative.
District: The Soil and Water Conservation District with jurisdiction.
Division: The Environmental Protection Division (EPD) of the State of Georgia Department of Natural Resources.
Drainage structure: A device composed of a virtually non-erodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for storm water management, drainage control, or flood control purposes.
Erosion: The process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, sedimentation and pollution control plan: A plan required by the Erosion and Sedimentation Act, O.C.G.A. Chapter 12-7, that includes, as a minimum protections at least as stringent as the State General Permit, best management practices, and requirements of this article.
Fill: A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation.
Final stabilization: All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the Plan (uniformly covered with landscaping materials in planned landscaped areas) or equivalent permanent stabilization measures as defined in the Manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.
Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Grading: Altering the shape of ground surfaces to a predetermined condition, including stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.
Ground elevation: The original elevation of the ground surface prior to cutting or filling.
Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in this article.
Larger common plan of development or sale: A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, “plan” means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
Local issuing authority: The governing authority of any county or municipality which is certified pursuant to subsection (a) O.C.G.A. 12-7-8.
Natural ground surface: The ground surface in its original state before any grading, excavation or filling.
Nephelometric Turbidity Units (NTU): Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
NOI: A notice of intent form provided by the Environmental Protection Division for coverage under the state general permit.
NOT: A notice of termination form provided by the Environmental Protection Division to terminate coverage under the State General Permit.
Operator: The party or parties that have: (A) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications;
or (B) day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
Outfall: The location where storm water in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water.
Permit: The authorization necessary to conduct a land-disturbing activity under the provisions of this article or UDC.
Person: Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State of Georgia, any interstate body or any other legal entity.
Phase or phased: Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site.
Project: The entire proposed development project, regardless of the size of the area of land to be disturbed.
Properly designed: Designed in accordance with the design requirements and specifications contained in the “Manual for Erosion and Sediment Control in Georgia” (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the Manual as approved by the Commission up until the date of Notice of Intent (NOI) submittal.
Roadway drainage structure: A device such as a bridge, culvert, or ditch, composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Sediment: Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by wind, water, ice, or gravity as a product of erosion.
Sedimentation: The process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.
Soil and Water Conservation District approved plan: An erosion, sedimentation and pollution control plan approved in writing by the Soil and Water Conservation District with jurisdiction.
Stabilization: The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.
State General Permit: The National Pollution Discharge Elimination System (NPDES) general permit or permits for storm water runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state’s authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C.
Section 1251, et seq., and subsection (f) of Code Section 12-5-30.
State waters: Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
Structural erosion, sedimentation and pollution control practices: Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc. Such practices can be found in the publication, Manual for Erosion and Sediment Control in Georgia.
Vegetative erosion and sedimentation control measures: Measures for stabilization of erodible or sediment-producing areas by covering the soil using one of the following approaches: (a) Permanent seeding, sprigging or planting, producing long-term vegetative cover, or (b) Temporary seeding, producing short-term vegetative cover; or (c) Sodding, covering areas with a turf of perennial sod-forming grass. Such measures may be found in the publication, Manual for Erosion and Sediment Control in Georgia.
Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
Wetlands: Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
Sec. 703. Applicability.
This article shall apply to all property within the corporate limits of the City of Pendergrass.
Sec. 704. Exemptions.
This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:
(a) Surface mining, as the same is defined in O.C.G.A. 12-4-72, “The Georgia Surface Mining Act of 1968;”
(b) Granite quarrying and land clearing for such quarrying;
(c) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;
(d) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A. 12-7-6 and this article;
(e) Agricultural operations as defined in O.C.G.A. 1-3-3, “definitions”, to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys;
producing plants, trees, fowl, or animals; the production of aquaculture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;
(f) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in this article, no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
(g) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture;
(h) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, “state waters” excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by this article;
(i) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the Department of Transportation or the State Road and Tollway Authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. 12-7-7.1; except where the Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the Local Issuing Authority, the Local Issuing Authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
(j) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. 36- 18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. 36- 18-1, or any agency or instrumentality of the United states engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the Local Issuing Authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
(k) Any public water system reservoir.
Sec. 711. General Requirements.
(a) Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES General Permit are not met.
Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans.
(b) Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of this article. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this ordinance and the NPDES General Permit.
(c) Best management practices as set forth in this article shall be required for all landdisturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with this article or any substantially similar terms contained in a permit for the discharge of storm water issued pursuant to subsection (f) of O.C.G.A.
12-5-30, the “Georgia Water Quality Control Act.” As used in this article, the terms “proper design” and “properly designed” mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. 12-7-6 subsection (b).
(d) A discharge of storm water runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the Division pursuant to subsection (f) of O.C.G.A. 12-5-30, the “Georgia Water Quality Control Act”, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than 5 acres.
(e) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the Division pursuant to subsection (f) of Code Section 12- 5-30, the “Georgia Water Quality Control Act”, for each day on which such failure occurs.
(f) The director may require, in accordance with regulations adopted by the Board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.
Sec. 712. Adherence to erosion control manual and additional requirements.
The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A.12-7-1 et. seq.
for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:
(a) Stripping of vegetation, re-grading and other development activities shall be conducted in a manner so as to minimize erosion;
(b) Cut-fill operations must be kept to a minimum;
(c) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;
(d) Whenever feasible, natural vegetation shall be retained, protected and supplemented;
(e) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
(f) Disturbed soil shall be stabilized as quickly as practicable;
(g) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
(h) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
(i) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. 12-7-1 et. seq.;
(j) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
(k) Cuts and fills may not endanger adjoining property;
(l) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
(m)Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
(n) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in this article.
(o) There is established a 25 foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the Director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the Director pursuant to O.C.G.A. 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream:
that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow, Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the “Georgia Water Quality Control Act”, shall remain in force unless a variance is granted by the Director as provided in this paragraph. The following requirements shall apply to any such buffer:
1. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
2. The buffer shall not apply to stream crossings for water lines or sewer lines, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented.
Sec. 713. Injury not proof of violation.
The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of, nor create a presumption of, a violation of the standards provided for in this article or the terms of the permit.
Sec. 721. General.
The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.
Sec. 722. Permit application requirements.
No person shall conduct any land-disturbing activity within the jurisdictional boundaries of the City of Pendergrass without first obtaining a permit from the City of Pendergrass to perform such activity and providing a copy of Notice of Intent (NOI) submitted to EPD, if applicable.
The following permit applications procedures are hereby established and shall control processing and issuance of permits under this article:
(a) Plan and data. The application for a permit shall be submitted to the City of Pendergrass and must include the applicant’s erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in this article. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land disturbing activity proposed will be carried out in such a manner that the provisions of this article will be met.
Applications for a permit will not be accepted unless accompanied by four copies of the applicant’s erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7 .10.
(b) Fees. In addition to the local permitting fees, fees will also be assessed pursuant to paragraph (5) subsection (a) of O.C.G.A. 12-5-23, provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of landdisturbing activity included in the planned development or each phase of development.
All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to subsection (a) of O.C.G.A. 12-7-8 half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to paragraph (9) or (10) of O.C.G.A. 12- 7-17 shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
(c) District review of plans. Following receipt of an application and plan for a permit and following completion of local review for compliance, the local issuing authority shall refer the application and plan to the District for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or deny a plan within 35 calendar days of receipt. Failure of the district to act within 35 calendar days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority.
No permit will be issued unless the plan has been approved by the district, and any variances required by this article have been obtained, all fees have been paid, and bonding, if required per this article, have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 calendar days of receipt. Failure of the local issuing authority with plan review authority to act within 35 calendar days shall be considered an approval of the revised plan submittal.
(d) Denial for violations. If a permit applicant has had two or more violations of previous permits, this article, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application.
(e) Bond. The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed landdisturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
Sec. 723. Plan requirements.
All erosion, sedimentation and pollution control plans shall comply with the following requirements:
(a) Plans must be prepared to meet the minimum requirements of this article, or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article.
(b) The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and storm water management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional.
(c) Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the Stakeholder Advisory Board created pursuant to O.C.G.A. 12-7-20.
(d) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the land-disturbing activity was permitted.
Sec. 724. Permits.
Permits shall be issued or denied as soon as practicable but in any event not later than 45 calendar days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.
(a) Permit requires plan approval. No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required are obtained, bonding requirements, if necessary, are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
(b) Land disturbance consistent with this article. Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applied to private persons, and the division shall enforce such requirements upon the local issuing authority.
(c) Phasing. If the tract is to be developed in phases, then a separate permit shall be required for each phase.
(d) Suspension, revocation, or modification of permit. The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
(e) Rejection for prior violations. The local issuing authority may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. 12-7-7 (f) (1).
Sec. 731. Inspections.
(a) Inspections and regulation of permittees. The city will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit.
(b) Permitee responsibilities. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities.
(c) Notice to comply for non-compliance. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.
Sec. 732. Required amendment to this article.
The local issuing authority shall amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.
Sec. 733. Investigations.
The city shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
Sec. 734. No refusal of access.
No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
Sec. 735. Review of actions.
(a) Review by district or commission. The district or the commission or both shall semiannually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. 12-7-8 (a). The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county’s or municipality’s erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
(b) Review of local issuing authority actions. The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to Code Section 12-7-8 (a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority’s ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. 12-7-8 (a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. 12-7-7 (e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any municipality so notified shall have 90 calendar days within which to take the necessary corrective action to retain certification as a local issuing authority. If the municipality does not take necessary corrective action within 90 calendar days after notification by the division, the division shall revoke the certification of the municipality as a local issuing authority.
Sec. 736. Failure to obtain a permit for land-disturbing activity.
If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
Sec. 737. Stop work orders.
For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five business days to correct the violation. If the violation is not corrected within five business days, the director or the local issuing authority shall issue a stop-work order requiring that landdisturbing activities be stopped until necessary corrective action or mitigation has occurred;
provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning.
(a) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order; and
(b) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
(c) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
Sec. 738. Bond forfeiture.
If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of this article. The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
Sec. 739. Monetary penalties.
Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Each day during which a violation, or failure or refusal to comply continues, shall be a separate violation.
Sec. 751. Education and training certification requirements.
Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. 12-7-20.
Sec. 752. On-site responsibility.
(a) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
(b) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article.
(c) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of paragraph (1) of subsection (b) of O.C.G.A.
12-7-19, then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in paragraph (4) of subsection (b) of O.C.G.A 12-7-19 and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
Sec. 761. Administrative remedies.
The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance; shall entitle the person submitting the plan or holding the permit to a hearing before the Pendergrass City Council within 30 calendar days after receipt by the local issuing authority of written notice of appeal.
Sec. 762. Judicial review.
Any person, aggrieved by a decision or order of the local issuing authority, after exhausting his administrative remedies, shall have the right to appeal de novo to the Superior Court of Barrow County.
Sec. 763 Validity.
Should any section, paragraph, clause, phrase, or provision of this article be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article or development code.
Sec. 764. Liability.
(a) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or District for damage to any person or property.
(b) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(c) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any Waters of the State as defined thereby.
ARTICLE 8
FLOOD DAMAGE PREVENTION
DIVISION 8-1 GENERAL PROVISIONS
DIVISION 8-2 PERMITTING REQUIREMENTS
DIVISION 8-3 PROVISIONS FOR FLOOD HAZARD REDUCTION
floodway (A-zones).
Sec. 839. Standards for areas of special flood hazard (Zones AE) with established base flood elevations without designated floodways.
DIVISION 8-4 VARIANCES AND APPEALS
DIVISION 8-5 ADMINISTRATION AND LEGAL STATUS PROVISIONS
DIVISION 8-1
GENERAL PROVISIONS
Sec. 801. Authority.
Article IX, Section II of the Constitution of the State of Georgia and Section 36-1-20(a) of the Official Code of Georgia Annotated have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry.
Sec. 802. Findings.
(a) The flood hazard areas of Pendergrass, Georgia are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, flood-proofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities.
(c) The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by man-made or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of the City of Pendergrass, or by any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made hereunder.
Sec. 803. Purposes.
It is the purpose of this article to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions applicable in the City of Pendergrass designed to:
(a) Require that uses vulnerable to floods, including facilities, which serve such uses, be protected against flood damage at the time of initial construction;
(b) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;
(c) Control filling, grading, dredging and other development which may increase flood damage or erosion;
(d) Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands; and
(e) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.
Sec. 804. Objectives.
The objectives of this article are to:
(a) Protect human life and health;
(b) Minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains
(c) Help maintain a stable tax base by providing for the sound use and development of flood prone areas in such a manner as to minimize flood blight areas,
(d) Minimize expenditure of public money for costly flood control projects;
(e) Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(f) Minimize prolonged business interruptions, and;
(g) Insure that potential homebuyers are notified that property is in a flood area.
Sec. 805. Applicability.
This ordinance shall apply to all areas of special flood hazard within the city limits of Pendergrass, Georgia.
Sec. 806. Definitions.
Unless specifically defined below, words or phrases used in this section shall be interpreted so as to give them the meaning they have in common usage and to give this section its most reasonable application.
Accessory structure: A structure having minimal value and used for parking, storage and other non-habitable uses, such as garages, carports, storage sheds, pole barns, hay sheds and the like.
Addition (to an existing building):Any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall.
Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered “new construction.”
Administrator: The zoning administrator of the City of Pendergrass, Georgia.
Appeal: A request for a review of the zoning administrator’s interpretation of any provision of this article.
Area of shallow flooding: A designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.
Area of special flood hazard: The land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. In the absence of official designation by the Federal Emergency Management Agency, Areas of Special Flood Hazard shall be those designated by the local community and referenced in this article.
Base flood: The flood having a one percent chance of being equaled or exceeded in any given year.
Base Flood Elevation (BFE): The elevation shown on the Flood Insurance Rate Map for Zones AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO, V1-V30, and VE that indicates the water surface elevation resulting from a flood that has a one percent chance of equaling or exceeding that level in any given year.
Basement: That portion of a building having its floor sub grade (below ground level) on all sides.
Building: Any structure built for support, shelter, or enclosure for any occupancy or storage.
Critical facility: Any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the hazard to life and health. Critical facilities include: structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials; hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events; emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and generating plants, and other principal points of utility lines.
Development: Any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, drilling operations, and storage of materials or equipment.
Elevated building: A non-basement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event.
Existing construction: For the purposes of determining rates, structures for which the "start of construction" commenced before the effective date of the initial Flood Insurance Rate Maps for that community.
Existing manufactured home park or subdivision: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of concrete pads) is completed before the effective date of the first floodplain management regulations adopted by the City of Pendergrass.
Expansion to an existing manufactured home park or subdivision: The preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.
Flood or flooding: A general and temporary condition of partial or complete inundation of normally dry land areas from: the overflow of inland or tidal waters; or the unusual and rapid accumulation or runoff of surface waters from any source.
Flood Hazard Boundary Map (FHBM): An official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as Zone A.
Flood Insurance Rate Map (FIRM): An official map of a community, issued by the Federal Insurance Administration, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.
Flood Insurance Study: The official report by the Federal Insurance Administration evaluating flood hazards and containing flood profiles and water surface elevations of the base flood.
Floodplain: Any land area susceptible to flooding.
Flood proofing: Any combination of structural and non-structural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
Floodway: The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Freeboard: A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. “Freeboard” tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.
Highest adjacent grade: The highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation of a building.
Historic structure: Any structure that is: listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either (1) by an approved state program as determined by the Secretary of the Interior, or (2) directly by the Secretary of the Interior in states without approved programs.
Lowest floor: The lowest floor of the lowest enclosed area, including basement. An unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this section.
Manufactured home: A building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.
Manufactured home park or subdivision: A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
Mean sea level: The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a community’s Flood Insurance Rate Map are referenced.
National Geodetic Vertical Datum (NGVD): As corrected in 1929 is a vertical control used as a reference for establishing varying elevations within the floodplain.
New construction: For the purposes of determining insurance rates, structures for which the “start of construction” commenced after the effective date of the initial Flood Insurance Rate Map and includes any subsequent improvements to such structures. For floodplain management purposes, “new construction” means structures for which the “start of construction” commenced after the effective date of the first floodplain management ordinance adopted by the City of Pendergrass and includes any subsequent improvements to such structures.
New manufactured home park or subdivision: A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed after the effective date of the first floodplain management ordinance adopted by the City of Pendergrass.
North American Vertical Datum (NAVD): Has replaced the National Geodetic Vertical Datum of 1929 in existing and future FEMA Flood Modernization Maps.
Recreational vehicle: A vehicle, which is built on a single chassis; 400 square feet or less when measured at the largest horizontal projection; designed to be self-propelled or permanently towable by a light duty truck; and designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Start of construction: The date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation.
(Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE:
accessory structures are NOT exempt from any ordinance requirements). For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure: A walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank.
Subdivision: The division of a single lot into two or more lots for the purpose of sale or development.
Substantial damage: Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred.
Substantial improvement: Any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a 5-year period, in which the cumulative cost equals or exceeds fifty (50) percent of the market value of the structure prior to the “start of construction” of the improvement. Note: The market value of the structure should be (1) the appraised value of the structure prior to the start of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to the damage occurring. This term includes structures, which have incurred “substantial damage,” regardless of the actual amount of repair work performed.
For the purposes of this definition, “substantial improvement” is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building. The term does not, however, include (1) those improvements of a structure required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions and which have been identified by the Administrator or his or her designee, and not solely triggered by an improvement or repair project, or (2) any alteration of a “historic structure” provided that the alteration will not preclude the structure’s continued designation as a ”historic structure.”
Substantially improved existing manufactured home parks or subdivisions: Where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
Variance: A grant of relief from the requirements of this article, which permits construction in a manner otherwise prohibited by this section.
Violation: The failure of a structure or other development to be fully compliant with the community’s floodplain management regulations. A structure or other development without the elevation certificate, or other certifications, or other evidence of compliance required by this ordinance is presumed to be in violation until such time as that documentation is provided.
Sec. 807. Basis for area of special flood hazard.
(a) Flood insurance study. The areas of special flood hazard identified by the Federal Emergency Management Agency in its Flood Insurance Study (FIS), for Jackson County, Georgia and incorporated areas effective December 17, 2010, with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this article.
(b) Flood insurance rate maps. The flood insurance rate maps for Jackson County, Georgia and incorporated areas effective December 17, 2010, are adopted as if fully contained within this article and shall be the basis for determining areas of special flood hazard.
(c) Additional areas of special flood hazard. Areas of special flood hazard may also include those areas known to have flooded historically or defined through standard engineering analysis by governmental agencies or private parties but not yet incorporated in a Flood Insurance Study.
(d) Repository. The repository for public inspection of the Flood Insurance Study (FIS), accompanying maps and other supporting data and the Flood Insurance Rate Maps is the office of the city clerk, City of Pendergrass.
Sec. 821. Permit required.
No development activity shall commence within an area regulated by this article until and unless a flood area permit shall have been approved by the zoning administrator. No development activity shall be approved unless it conforms with the provisions of this article prior to the commencement of any development activities. No building or structure shall be constructed within an area regulated by this article until and unless a flood area permit or building permit, or both if required shall have been approved by the zoning administrator. No building or structure shall be approved unless it conforms with the provisions of this article prior to the construction of said building or structure.
Sec. 822. Permit procedures.
Application for a flood area permit shall be made to the zoning administrator on forms furnished by the department prior to any development activities, and may include, but not be limited to the following: plans in sufficient number as specified by the department, drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities.
Sec. 823. Specific information required – application stage.
The following information is required at the application stage:
(a) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
(b) Elevation in relation to mean sea level to which any non-residential structure will be flood-proofed;
(c) Design certification from a registered professional engineer or architect that any proposed non-residential flood-proofed structure will meet the flood-proofing criteria of this Article; and
(d) Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development.
Sec. 824. Specific information required – construction stage.
The following information is required at the construction stage:
(a) For all new construction and substantial improvements, the permit holder shall provide to the zoning administrator an as-built certification of the regulatory floor elevation or flood-proofing level immediately after the lowest floor or flood proofing is completed.
Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.
(b) Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The zoning administrator shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed.
Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project.
floodway (A-zones).
Sec. 839. Standards for areas of special flood hazard (Zones AE) with established base flood elevations without designated floodways.
Sec. 831. General standards.
In all areas of special flood hazard the following provisions are required:
(a) Anchoring. New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure.
(b) Flood-resistant materials. New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage.
(c) Construction methods and practices. New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage.
(d) Heating and air conditioning. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(e) Manufactured homes. Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable State requirements for resisting wind forces.
(f) Water supply. New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system.
(g) Sewage systems. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.
(h) On-site sewage disposal systems. On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding.
(i) Nonconformities. Any alteration, repair, reconstruction or improvement to a structure, which is not compliant with the provisions of this ordinance, shall be undertaken only if the non- conformity is not furthered, extended or replaced.
Sec. 832. Elevated buildings.
(a) In all areas of special flood hazard, all new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.
(b) Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
2. The bottom of all openings shall be no higher than one foot above grade; and,
3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both direction.
(c) So as not to violate the “lowest floor” criteria of this article, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area, and
(d) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
Sec. 833. New construction and/or substantial improvements.
In all areas of special flood hazard the following provisions are required for new construction and/or substantial improvements:
(a) Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation.
Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of this article for “elevated buildings.”
(b) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above three feet above the base flood elevation.
Sec. 834. Non-residential construction.
(a) New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones, may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to three (3) feet above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy.
(b) A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the zoning administrator as set forth in this article.
Sec. 835. Manufactured homes.
Where base flood elevation data are available:
(a) All manufactured homes placed and/or substantially improved on: (1) individual lots or parcels, (2) in new and/or substantially improved manufactured home parks or subdivisions, (3) in expansions to existing manufactured home parks or subdivisions, or
(4) on a site in an existing manufactured home park or subdivision where a manufactured home has incurred “substantial damage” as the result of a flood, must have the lowest floor including basement, elevated no lower than three feet above the base flood elevation.
(b) Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that either: the lowest floor of the manufactured home is elevated no lower than three feet above the level of the base flood elevation; or the manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
(c) All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement.
Sec. 836. Recreational vehicles.
All recreational vehicles placed on sites must either:
(a) Be on the site for fewer than 180 consecutive days;
(b) Be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or
(c) The recreational vehicle must meet all the requirements for “new construction,” including the anchoring and elevation requirements of this article.
Sec. 837. Floodway.
Located within areas of special flood hazard established in this Article are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
Sec. 838. Building standards for streams without established base flood elevations and/or floodway (A-zones).
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.