Pendergrass · Zoning Ordinance
Pendergrass Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As posted on the city's website, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Part 4 of 5. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
(m)Natural features within the proposed development. These include drainage channels, bodies of water, and other known significant features such as extensive exposed rock. On all water courses the direction of flow shall be indicated. The 100-year floodplain shall be delineated and the source of the depicted floodplain information shall be indicated (i.e., reference to map panel numbers and dates). See article 8 of this land use management code for additional requirements when development is proposed to be located in a floodplain or flood hazard area.
(n) Man-made features. These include those features existing within and adjacent to the proposed development including existing right-of-way width and pavement widths of adjoining streets, street names, the location and dimensions of existing bridges, easements (all purposes), culverts and other drainage facilities, water, sewer, and other existing utility lines and structures, the names of jurisdiction lines; existing structures on the site and their disposition, and other appropriate built-environment information.
(o) Trees, buffers, landscaping. If buffers or other landscaping or screening treatments are required, show the location, size, and type (natural or planted) on the plans conforming to the requirements of this code, as applicable.
(p) Utilities and other easements. Easements for water and sanitary sewer, as may be required by the utility provider.
(q) Standard drawings. The zoning administrator may require that the development plans include standard drawings adopted by the city or the county, or a standard drawing of any utility provider with jurisdiction over the development project. Where no standard drawing is available but is needed as determined by the zoning administrator, the applicant’s engineer or designer shall provide any such standard drawing requested.
(r) Signature blocks. The zoning administrator may require signature blocks with pertinent information to be signed by the owner/developer, the plan preparer, a utility provider, an external agency, and approval block for signature by the zoning administrator.
(s) Additional information. Other information as may be specified by the zoning administrator, as may be necessary to review the development plan and ensure compliance with this land use management code.
Sec. 1421. Administrative procedures.
The zoning administrator may supplement the requirements of this division and accordingly is authorized to establish and modify administrative procedures regarding the development plan review administrative process to provide for expeditious decision making and to ensure fairness in the process.
Sec. 1422. Completeness check.
(a) The application once received shall be stamped with the date of receipt and shall be checked for completeness within ten business days of submission. Incomplete applications will not be processed.
(b) If all required documents and plans are not submitted, the development plan application will not be reviewed.
(c) The zoning administrator will notify the applicant of any deficiencies and will advise the applicant on what is needed to complete the application and initiate review.
Sec. 1423. Distribution of plans by city for review.
Upon receipt of a completed application, the zoning administrator shall submit a plan set to the following and retain one set in the office of the zoning administrator:
(a) The city’s public works and/or roads department;
(b) The city’s consulting engineer assigned development review functions on behalf of the city;
(c) In cases where a land disturbance permit is required, the city will submit one copy of the plan set and if required hydrology report for the project to the soil and water conservation commission acting on behalf of the soil and water conservation district with jurisdiction.
Sec. 1424. Distribution of plan sets by applicant to external agencies.
Upon determination by the zoning administrator that a development permit application is complete, the zoning administrator shall notify the applicant of the need to submit plan sets to all review agencies with jurisdiction. It shall be the applicant’s responsibility, not the city’s, to send plan sets to external agencies. These may include but are not necessarily limited to the following:
(a) Environmental health department. If the site is to be served an on-site sewage management system or community water system, review and approval or permit from the Jackson County Environmental Health Department shall be required to be obtained prior to issuance of a development permit.
(b) Jackson County Public Development/Road Department. If the site proposes access to a road that is owned or maintained by Jackson County, review and approval or permit from the Jackson County Department of Public Development shall be required to be obtained prior to issuance of a development permit.
(c) Jackson County Water and Sewerage Authority. If the site is to be served by public water and/or sanitary sewer, review and approval or permit from the Jackson County Water and Sewerage Authority (JCWSA) shall be required to be obtained prior to issuance of a development permit.
(d) Georgia Department of Transportation. If the site involves access to a state highway or involves improvements or encroachments in a state highway right of way, review and approval or permit from the Georgia Department of Transportation shall be required to be obtained prior to issuance of a development permit.
The applicant shall be responsible for ensuring that reviews by external agencies, once completed, are submitted to the zoning administrator. In the case an external agency does not approve the development plans, the review comments shall be submitted to the zoning administrator and the applicant shall be responsible for resubmitting the proposed plan sets until approval by that agency is received.
Sec. 1425. Review time frame.
(a) Development permits should be issued or denied as soon as practicable, but in any event decisions on development permits should be issued by the zoning administrator within 30 calendar days of the notice of plan application completeness, unless other agency reviews are required and are not yet completed.
(b) The city is not responsible for delays in approval of development plans when a development permit applicant is required to be approved by an external agency but the applicant has not obtained approval from that external agency with jurisdiction over the development proposal.
Sec. 1426. Action on development permit application.
The zoning administrator shall review the application for compliance with the following criteria, which shall not be limiting:
(a) Development code and zoning conditions. Development plans must be consistent with all applicable articles and sections of this code, and any conditions of zoning, conditional use, or variance approval, if applicable.
(b) Previously approved plats and plans. When property to be developed is included on an approved final plat, master plan, or other plan approved by the city, development plans shall be in substantial accordance with said plat or plan as determined by the zoning administrator. Significant departures from any such requirements may require the resubmission of plat, master plan, or other plan previously approved, as determined by the zoning administrator.
(c) Usability or variance. The zoning administrator shall not approve any development permit application or plan that shows a lot or situation that would require a variance to this code in order to be reasonably usable, whether due to the presence of flood plain, unusual configuration, zoning compliance, lack of public utilities, or for any other reason.
(d) Noncompliance. If the development permit application and plans are found to not comply with the requirements of this code, the zoning administrator shall indicate on the drawing or in writing all comments related to lack of compliance with applicable regulations. The zoning administrator shall deny or withhold approval of the development permit application in cases where the proposed development does not meet the requirements of this code or does not meet the requirements or is nonresponsive to any other internal or external agency.
(e) Revisions. Development plan applications shall be revised and resubmitted to accommodate the comments by review agencies and those issued to the applicant by the zoning administrator. Plan drawings that are submitted for revision must specifically identify those areas that are to be considered for review and approval. The revisions shall be noted in tabular form in a revision block on the plan drawings. When revisions to plan sets are required, the applicant shall provide a written annotated narrative responding to review comments, indicating what and where in the plans that changes have been made.
Revised plan sets may be required to show with a “cloud” annotation those parts of the plan set that have been revised, or where additions have been made. Revisions shall continue to follow this process until the application is approved.
(f) Compliance and approval. When the zoning administrator has determined that the development permit application complies with the requirements of applicable regulations, and has obtained all required internal and external agency approvals, it shall be approved.
Sec. 1427. Permit issuance, pre-construction requirements, and permit posting.
(a) To receive a development permit, the applicant shall submit four printed plan sets as approved, and the zoning administrator shall sign all four sets, retain two, and return two to the applicant; provided, however, the zoning administrator may at any time elect to accept only an electronic copy of said approved plans. The zoning administrator may but shall not be required to have other review agencies sign the plan sets, provided there is assurance that the plan sets submitted for permitting have received all agency approvals.
(b) The applicant may be required to attend a pre-construction meeting and may be required to sign a pre-construction memorandum acknowledging receipt of approved development plans and responsibilities of the property owner and applicant, including but not limited to calls for development inspections.
(c) The applicant shall be supplied a development permit card or placard, which must be posted on the development site prior to commencement of any development or land disturbing activity. The development permit card or placard shall be posted in a conspicuous place so that it will be visible from the roadway providingfrontage.
Sec. 1428. Duration of development permit.
(a) Expiration. A development permit properly issued shall remain in effect for a period of two years, after which time the permit and plans will become null and void and a new permit will be required if no development activity has begun and has been diligently pursued.
(b) Suspension or revocation. A development permit may be suspended, revoked or modified, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in title is not in compliance with the approved plans or that the holder or his successor in title is in violation of this code or any other city code section.
Sec. 1429. Development inspections.
City personnel, including but not limited to the zoning administrator, shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this code, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing and development activities during the time a permit is active. No person shall refuse entry or access to any authorized representative or agent of the city or the state environmental protection division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties, during the time a permit is active.
The following inspections are required for each of the following phases, as applicable to the actual work to be performed under the development permit, unless otherwise determined by the zoning administrator.
(a) Erosion and sedimentation control. Required erosion and sedimentation control measures must be installed in accordance with the approved soil erosion and sedimentation control plan prior to any development activity and as development progresses. Prior to clearing of the property or any portion included under the development permit, inspection of erosion and sedimentation control measures and protective devices for undisturbed areas shall be required. Inspection of erosion and sedimentation control measures will be conducted on a continuing basis.
(b) Stormwater facilities. Construction of the stormwater system shall be initiated as part of the grading of the site. Storm water detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches, shall be coordinated with the construction of streets and other site improvements, as appropriate. Upon installation of storm drainage pipe, detention, or other storm water facilities, inspection and approval shall be required prior to continuation with subgrade preparation.
(c) Grading. Upon completion of street grading, if applicable, inspection and approval shall be required prior to trenching or continuation with subgrade compacting and preparation.
(d) Street curbing and gutter (if provided). After grading is completed and approved, the curb lines shall be staked by the developer’s registered land surveyor. Inspection shall be requested after the subgrade is compacted and forms or string line have been set. Street width and vertical and horizontal alignment may be spot checked.
(e) Sub-grade of streets. After the earth work has been completed, all storm drainage and other underground utilities have been installed under the roadbed, and the backfill in all such ditches is thoroughly compacted, the subgrade shall be brought to the lines, grades and cross section shown on the plans. If any sections of the subgrade are composed of unsuitable or unstable material, such material shall be removed to the depth directed by the inspector and replaced with suitable, thoroughly compacted material. Prior to placement of the street base, the subgrade shall be compacted to 95% density. Testing for sub-grade compaction will be required, including a test at each sanitary sewer manhole.
(f) Utilities. Before any street base is applied, all of the underground utilities—water mains, sewer mains, gas mains, or any other underground utilities, and all service connections related thereto, that will be located under the street base shall be installed completely and provided throughout the length of the street. If a public water system is to be installed, the improvements are required to be reviewed, approved and inspected by the water provider.
(g) Street base. The base shall be string-lined for depth and crown. The street base shall be roll-tested with a fully loaded 18-ton tandem dump truck and shall pass to the satisfaction of the inspector. When testing is required by the inspector, it is the responsibility of the developer to ensure that all required tests are made and reported to the inspector. The cost of all testing and quality control shall be performed at the expense of the developer by qualified testing laboratories. If deemed necessary by the inspector, additional tests will be required.
(h) Paving. The inspector shall be on site during the paving process to check consistency, depth, and workmanship, as applicable. For asphalt paving, the temperature of the material will be monitored and the street may be required to be cored after completion to check thickness and density. Satisfactory test results of the cores shall, if required, be delivered to the zoning administrator and utility provider (where utilities are involved) prior to approval of a final subdivision plat if applicable.
(i) Tree protection and landscaping. Inspections for tree protection measures and the installation of landscaping, if required by this code, shall be as determined appropriate by the zoning administrator.
(j) Final. A final inspection of the development, once complete, shall be required. In the case of a land disturbance permit, once the site is completely stabilized, the zoning administrator will release any land disturbance bond required to be submitted with the land disturbance application.
Sec. 1430. Field changes.
(a) After issuance of a development permit, if changes are desired or made necessary as a result of field conditions, the design engineer must contact the zoning administrator to coordinate the review and approval of the requested revision(s).
(b) All field changes shall be documented as revisions to the approved development plans and correctly shown on as-built surveys if required.
(c) Discrepancies between as-built surveys (if required) and approved development plans may result in delays in approving final plats, building permits or certificates of occupancy.
Sec. 1431. Development permit modifications.
(a) If modifications are requested to an approved development permit, the zoning administrator shall determine whether the modification is a major change or a minor change. Minor changes shall be limited to those that are under the direct authority of the zoning administrator and do not involve the approval or re-approval of an agency external to the city or the city’s consulting engineer or city engineer. The requested modification shall be classified as major if it will involve the review and approval or re-approval of an agency external to the city or the city’s consulting engineer or city engineer.
(b) For major changes, the applicant shall be required to submit plans and follow the procedures of this article to obtain a new (modified) development permit, including the payment of any fee applicable to a major revision of a an approved development permit as specified in a fee schedule adopted by the city council.
(c) For changes deemed to be minor, the zoning administrator may charge a fee for minor development permit revisions specified in a fee schedule adopted by the City Council and is authorized to review and approve such minor changes.
(d) Reviews of applications for modified development plan approval shall proceed generally in conformance with this article, as determined applicable by the zoning administrator.
The zoning administrator may exercise discretion in an effort to expedite the process.
Sec. 1432. Disclaimers.
(a) No transfer of responsibility. Approval of development plans by the city shall not imply or transfer of acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture or any other profession, from the professional, corporation or individual under whose hand or supervision the development plans were prepared. The completion of inspections and authorization for work continuation shall not transfer responsibility for the quality of the work performed or materials used from the owner, nor imply or transfer of acceptance of responsibility for project design or engineering from the professional, corporation or individual under whose hand or supervision the development plans were prepared.
(b) No waiver of compliance. No development permit issued by the zoning administrator shall be interpreted to relieve any owner of the responsibility of maintaining full compliance with all applicable codes, ordinances and other regulations. Any development permit issued in error or in contradiction to the provisions of this code or any other ordinance of the city shall be considered to have been null and void upon its issuance.
(c) No liability for damage. The approval of plans under the provisions of this article and the issuance of a development permit shall not relieve any person from the responsibility for damage to any person or property otherwise imposed by law, nor shall such plan approval or development permit issuance impose any liability upon the city for damage to any person or property.
ARTICLE 15
SUBDIVISION OF LAND
DIVISION 15-1 PURPOSES, AUTHORITY, AND DEFINITIONS
DIVISION 15-2 GENERAL PROVISIONS
DIVISION 15-3 PRELIMINARY PLAT
DIVISION 15-4 STANDARDS FOR BLOCKS AND LOTS
DIVISION 15-5 FINAL PLAT SPECIFICATIONS
DIVISION 15-6 FINAL PLAT PROCEDURES
DIVISION 15-7 IMPROVEMENT GUARANTEES AND ACCEPTANCE OF PUBLIC
IMPROVEMENTS
Sec. 1501. Purposes.
This article is adopted for the following purposes, among others:
(a) To assure equitable handling of all subdivision plats by providing uniform procedures and standards for the subdivider;
(b) To assure, in general, the wise development of new land areas, in harmony with the comprehensive plan of the city;
(c) To assure the accurate description of property, the identification of property boundaries with monuments, and the proper recording of property descriptions in public records;
(d) To help eliminate the costly maintenance problems which occur when streets and lots are laid out without proper consideration given to various public purposes;
(e) To protect lot purchasers who generally lack the specialized knowledge to evaluate subdivision improvements and design; and
(f) To implement the Georgia Plat and Condominium Plan Recording Act of 2017 and other applicable state laws.
Sec. 1502. Authority of zoning administrator.
(a) In accordance with the provisions of this article, the zoning administrator shall have final authority with regard to the review and approval, conditional approval, or disapproval of final plats for minor subdivisions, lot combination plats, boundary line adjustments, and condominium plans; provided, however, the zoning administrator does not have authority to accept any public improvements on behalf of the city council. Public streets and any other public improvement to be dedicated to the city shall only be accepted by the city council, following procedures for public dedications specified in this article.
(b) The zoning administrator shall not sign and approve any final or other plat required by this article, nor shall any plat be authorized for recording, unless the plat meets the minimum requirements of this article and any other applicable provision of this code.
Sec. 1503. Definitions.
Block: An area of land that is entirely surrounded by streets, public lands, railroad rights-of-way, watercourses, or other well defined and fixed boundaries.
Condominium plan: A drawing that is required to be recorded prior to the first conveyance of a condominium unit pursuant to subsection (b) of Georgia Code Section 44-3-83, including, but not limited to, a condominium floor plan, condominium plot plan, or condominium site plan.
Cul-de-sac: A dead-end street of limited length having a primary function of serving adjoining land, and constructed with a turnaround at its end.
Dedication plat: A plat drawn specifically for the purpose of dedicating public right-of-way or land for public use, drawn to meet final plat specifications and following procedures for final plat approval of this article.
Easement: A grant of one or more of the property rights by the property owner to and/or for use by the public, a corporation, or another person or entity.
Final plat: The final drawing of a subdivision and, as applicable, dedication, prepared for filing for record with the Clerk of Superior Court of Jackson County, and containing all elements and requirements set forth in this article.
Source: Brewer, William E. and Charles P. Alter. 1988. The Complete Manual of Land Planning & Development. Englewood Cliffs, NJ: Prentice Hall.
Illustrative Final Plat Homeowners association: An organization formed for the maintenance and operation of the common areas of a subdivision or development, where membership in the association is automatic with the purchase of a dwelling unit or lot within the development, with the ability to legally assess each owner of a dwelling unit or lot and which has authority to place a lien against all dwelling units and lots within the subdivision or development.
Lot: A parcel or tract of land held in single ownership.
Lot, corner: A lot abutting upon two or more streets at their intersection.
Lot depth: The average horizontal distance between the front and rear lot lines.
Lot, double frontage: A lot other than a corner lot that has frontage upon two or more streets that do not intersect at a point abutting the property.
Lot, flag: A tract or lot of land of uneven dimensions in which the portion fronting on a street is less than the required minimum width required for construction of a building or structure on that lot.
Major subdivision: The division of a tract of land into any number of lots, which requires the construction of a new street or the widening of an existing roadway or the construction and dedication of a public improvement, as defined; or the division of land into more than five lots, regardless of whether construction of a new street or the widening of an existing roadway or the construction and dedication of a public improvement, as defined, is involved.
Metes and bounds: A system of describing and identifying land by a series of lines around the perimeter of an area; “metes” means bearings and distances and “bounds” refers to physical monuments.
Minor subdivision: The division of a tract of land into five or less lots which does not involve construction of a new street or the widening of an existing roadway, or the construction and dedication of a public improvement, as defined.
Preliminary plat: A professional drawing which shows the proposed layout of a subdivision in sufficient detail to indicate its general design. A preliminary plat is prepared by a professional engineer, a registered land surveyor, a landscape architect, a land planner, or any other person professionally familiar with land development and project construction activities. A preliminary plat is not a construction document.
Professional engineer: An engineer duly registered or otherwise authorized by the State of Georgia to practice in the field of civil engineering.
Protective covenants: Contracts made between private parties as to the manner in which land may be used, with the view toward protecting and preserving the physical and economic integrity of any given area.
Public improvement: The construction, enlargement, extension or other construction of a facility intended for dedication to the city or a public utility provider or to a facility already owned by the city, including but not limited to a street, curb and gutter, sidewalk, cross drain, catch basin, other roadway appurtenance, domestic water supply system main, fire hydrant, valve or other water system appurtenance, or sanitary sewerage main or outfall, lift station, force main, manhole or other appurtenance. Utility supply lines to a building are not considered public improvements. Construction of a driveway apron connection shall not be considered a public improvement for purposes of triggering preliminary plat approval.
Registered Land Surveyor: A land surveyor licensed and registered to perform the duties of a registered land surveyor (R.L.S.) by the State of Georgia.
Retracement: A survey, not required to be reviewed and approved by the local jurisdiction prior to filing or recording in the clerk’s office, but drawn to specifications required by this article.
Septic tank: An approved watertight tank designed or used to receive sewage from a building sewer and to affect separation and organic decomposition of sewerage solids, and discharging sewage effluent to an absorption field or other management system.
Subdivider: Any person who undertakes the subdivision of land, and any person having such a proprietary interest in land to be subdivided as will authorize the maintenance of proceedings to subdivide such land under this code, or the authorized agent of such person.
Subdivision: The division of a property or tract of land into two or more tracts or lots; or a land development project in which two or more lots are created, along with the streets and utilities needed to support construction of buildings on the lots. The word “subdivision” includes resubdivision and, when appropriate to the context, relates either to the process of
subdividing or to the actual land or area which is subdivided.
Sec. 1504. Exemptions from plat approval.
The following types of land subdivisions, transfers, and sales are specifically exempted from the plat approval requirements of this article; provided, however, that such exemptions shall not apply to land development requirements and improvement requirements of this article or compliance with other applicable requirements of this code:
(a) Retracement surveys and easement surveys, as specifically authorized in this article;
(b) The creation and sale of cemetery plots;
(c) The sale of lots consistent with previously approved and recorded plats or deeds;
(d) The creation of leaseholds for space within a multiple-occupancy building or the division of property into leaseholds (but not for sale) for commercial, industrial, or institutional use;
(e) The creation of leaseholds (but not for sale) for the agricultural use of property where the use does not involve the construction of a building to be used as a residence or for other purposes not directly related to agricultural use of the land or crops or livestock raised thereon.
(f) Any division of land to heirs through a judicial estate proceeding, or any division of land pursuant to a judicial partition, or any division of land occurring from the foreclosure of a deed of trust; provided, however, that such exemption shall not require the zoning administrator to issue permits if the resulting lots or parcels fail to meet any applicable zoning provisions regarding lot size, lot width, or other dimensional requirements.
Sec. 1511. Land is one lot until subdivided.
Until property proposed for subdivision has received final plat approval and been properly recorded, the land involving the subdivision shall be considered as one lot, or as otherwise legally recorded.
Sec. 1512. Subdivision of land.
(a) No person shall subdivide land except in accordance with this article and this code.
(b) It shall be unlawful to sell or transfer title to another person any lot or tract or portion thereof of land that has not been established as a lot of record, except in compliance with this article. Unless the lot to be sold or transferred is a lot of record, final plat approval by the city in accordance with this article shall be required. This section shall not be interpreted as limiting the sale or transfer of lots consistent with previously lawfully approved recorded plats or deeds.
(c) It shall be unlawful for any person, firm, corporation, owner, agent or subdivider, by deed or plat, to sell, transfer, agree to sell, offer at public auction, negotiate to sell or subdivide any land until a preliminary plat, if required, and final plat have been approved by the zoning administrator and final plat recorded in accordance with this article. Said restriction applies to lands subdivided for non-residential as well as residential uses. The description by metes and bounds in the instrument of transfer or other document used in the process of selling or transfer shall not exempt the transaction from compliance with this article or from the penalties established for violations of this code.
(d) The city through its attorney or other designated official may enjoin such transfer of, sale, or agreement by appropriate action.
Sec. 1513. Review of subdivisions along state routes.
(a) No subdivision plat containing land which abuts a state route shall be approved until such plat has been submitted for review and comment by the Georgia Department of Transportation, in accordance with the provisions of O.C.G.A. 32-6-151.
(b) When the city receives such a plat, it shall submit two copies of the proposed subdivision plat to the Georgia Department of Transportation if such proposed subdivision includes or abuts on any part of the state highway system. The Georgia Department of Transportation, within 30 days of receipt of the plat, shall recommend approval and note its recommendation on the copy to be returned to the zoning administrator or recommend rejection. Failure of the Georgia Department of Transportation to act within this 30-day period shall constitute approval. If the plat is recommended for rejection, the reasons for rejection and requirements for approval shall be given to the zoning administrator in writing; but such recommendation shall be advisory only and shall not be binding.
Sec. 1514. Lots must comply with code requirements.
No person shall subdivide land, and the zoning administrator shall not approve any subdivision of land, unless the lots created pursuant to said subdivision meet or exceed all applicable requirements of the zoning district in which it is located, overlay district if applicable, environmental overlay district if applicable and any other applicable requirements of this code, and as may be amended from time to time. For minimum lot frontage, minimum lot width and minimum lot size requirements by zoning district, see article 2 of this code.
Sec. 1515. Improvements required for final platting.
No final subdivision plat involving a public dedication of land or public improvement of streets or public utilities shall be approved by the zoning administrator or accepted for recordation by the Clerk of Superior Court of Jackson County until all improvements, if required by this article or code generally, have been constructed or installed in a satisfactory manner and approved by the zoning administrator and public utility provider as applicable.
Sec. 1516. Creation of homeowner’s association.
(a) Required. For any major subdivision including townhome development involving common areas, open spaces, and/or a stormwater detention facility on a separate tract within the subdivision, a homeowner’s or property owner’s association shall be required to be created which shall be responsible for the ownership and maintenance of common areas, open spaces and/or stormwater detention facilities within the subdivision. The homeowner’s or property owner’s association must be maintained as the responsible owner of such facilities and lands and shall not be dissolved unless another ownership entity is accepted by the city council.
(b) Mandatory membership. Membership in the homeowner’s association must be mandatory for each property in the development.
(c) Bylaws and covenants. Such association must also include homeowner’s or property owner’s declaration and bylaws, including covenants, conditions and regulations applicable to each property in the development. The covenants will run for 20 years and automatically renew every 20 years unless 67% of the persons owning lots in the subdivision vote to terminate the covenants as governed by O.C.G.A. 44-5-60. Subject to applicable city, local, and federal rules, laws, regulations, and rulings of courts having competent jurisdiction over the subject property, said covenants shall include a restriction that no more than 10% of the single-family units (with an additional 5% hardship) may be leased to third parties by individual owners.
(d) Approval and recording. The instruments of such creation and financial endowment shall be submitted to the zoning administrator for review and approval; covenants are also subject to approval by the city attorney, and such approval shall be obtained prior to recording. said instruments shall also be recorded at the time of final plat recording with
(e) Reserve account. At the time control of the association is passed from the declarant to the property owners, the association shall have a reserve account of not less than $125.00 per occupied residence for residential associations or for nonresidential subdivisions an amount approved by the zoning administrator. There shall be no debt incurred to the association.
(f) Enforcement. The declaration and bylaws shall be enforced by an association management company, which shall have the power to compel the payment of membership dues and assessments.
(g) Condominium association. For condominium projects, incorporation of a condominium association consistent with state law and the provisions of this section will serve in lieu of a homeowners association.
Sec. 1517. Easements.
(a) Easements for drainage or public utilities may be required in connection with any major or minor subdivision as determined by the zoning administrator in conjunction with utility providers. A drainage easement is required and shall be provided along any manmade drainage channel or drainage pipe located outside a street right-of-way. When required, easements shall be shown on the final plat.
(b) The minimum width of any drainage, water, or sanitary sewer easement shall be twenty feet. Easements for water, sanitary sewers and/or drainage purposes may be combined, but must be a minimum of 30 feet if in combination.
Pedestrian easements, if required by the zoning administrator, shall be at least ten feet wide.
Sec. 1518. Retracement surveys.
Pursuant to O.C.G.A. 44-2-26, the owner of real property, or of any interest therein or any holder of a lien thereon may file a plat of the property in the office of the clerk of superior court of the city in which the property or any part thereof is located. Said plat shall be considered a retracement survey, provided that it contains the surveyor certification box for retracement surveys as required by this article. Such retracement survey shall not require local approval and shall be entitled to be filed and recorded.
Sec. 1519. Surveyor certification box for retracement surveys.
(a) Each plat of a retracement survey shall have depicted thereon a box which contains the following applicable certifications of the land surveyor:
“This plat is a retracement of an existing parcel or parcels of land and does not subdivide or create a new parcel or make any changes to any real property boundaries. The recording information of the documents, maps, plats, or other instruments which created the parcel or parcels are stated hereon. Recordation of this plat does not imply approval of any local jurisdiction, availability of permits, compliance with local regulations or requirements, or suitability for any use or purpose of the land. furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67.”
(b) The land surveyor shall sign on a line immediately beneath the certification on the plat.
At the discretion of the land surveyor and in conformity with local regulations, the surveyor may electronically sign the certification using a facsimile signature. The facsimile signature may be a reproduction of an original signature or an electronically created signature. If the land surveyor elects to use a facsimile signature, the surveyor must maintain full control over the application and use of such signature.
(c) In the case of a plat that is a retracement survey, the land surveyor shall state clearly the recording information of any document, map, plat, or other instrument which created any of the parcels depicted. The depiction of gores, overlaps, or other parcel delineation as may be necessary to remedy or address title issues or deficiencies shall be allowed as part of the retracement function.
(d) Plats bearing the certification required for retracement surveys shall be entitled to recordation without further review or local approval.
Sec. 1520. Easement surveys.
Plats that depict existing or proposed easements, including for any purpose including utilities, access, no access, or for conservation purposes, may be recorded using the certification for retracement surveys, provided that there are no changes to any real property boundaries, and provided that the plat includes information required by this article. Plats bearing the certification required for retracement surveys shall be entitled to recordation without further review or local approval.
DIVISION I5-3
PRELIMINARY PLAT
Sec. 1531. Preliminary plat – when required.
Any major subdivision as defined shall require the submission and approval by the city council of a preliminary plat.
Sec. 1532. Relationship of preliminary plat to development permit.
(a) Preliminary plat approval requests may be processed in conjunction with an application for development permit. However, the preliminary plat if required must be approved prior to issuance of a development permit for the project.
(b) A development permit and a land disturbance permit per the requirements of this code shall be required prior to initiation of any land disturbing or construction activities on the lands proposed for subdivision.
(c) Preliminary plat approval shall be valid for a period of two years, after which preliminary plat approval shall expire if there have been no improvements installed on the land subject to subdivision.
Sec. 1533. Preliminary plat specifications.
The following specifications are required for a preliminary plat:
(a) Proposed name of subdivision. The proposed name of the subdivision shall not duplicate or too closely approximate, phonetically, the name of any other subdivision in the city or county. If shown to the contrary, the zoning administrator may refuse to accept such subdivision name.
(b) Plat scale and sheet size. The preliminary plat shall be clearly and legibly drawn at a scale of 100 feet or less to 1 inch. The recommended maximum dimensions of the sheet size is 36 inches by 48 inches and the minimum dimensions of 17 inches by 22 inches;
however, the zoning administrator may approve other sheet sizes and scales as appropriate.
(c) Owner and professional contact information. Name, mailing address, telephone and fax numbers and e-mail address of the property owner and the professional preparing the preliminary plat.
(d) Miscellaneous. Date of boundary survey, north point and graphic scale, source of data, date of plan drawing, and, if any, revision dates.
Source: Brewer, William E. and Charles P. Alter. 1988. The Complete Manual of Land Planning & Development. Englewood Cliffs, NJ: Prentice Hall.
Illustrative Boundary Survey
(e) Location and tract boundaries. Location (including Militia District) and size of the property in acres (or in square feet if less than an acre), and the external boundaries of the tract to be subdivided or developed shown by bearings and distances. The preliminary plat must reference and be based on a boundary survey of the exterior boundaries of the proposed subdivision, prepared by a registered land surveyor.
(f) Vicinity map. A location map of the property in relation to the surrounding area with regard to well-known landmarks such as arterial streets, railroads, and major water courses.
(g) Abutting property information. Names of adjoining property owners per recorded deeds, zoning district of all adjoining properties, and if applicable overlay district designations of all adjoining properties.
(h) Prior subdivision. Name of former approved subdivision, if any, for all of the land in the preliminary plat that has been previously subdivided, showing boundaries of same.
(i) Zoning. Zoning district boundaries and zoning designation(s) of the subject property and, if applicable, overlay district.
(j) Application number and conditions. Rezoning, conditional use, and variance application number, date of approval, and conditions of approval, if applicable.
(k) Natural features and flood plains. Natural features within the property, including topographic contours at no less than five-foot intervals, drainage channels, bodies of water, wetlands, streams with required buffer designated, wooded areas and other significant natural features such as groundwater recharge areas and rock outcroppings.
On all water courses entering or leaving the property, the direction of flow shall be indicated. The 100-year flood plain, if any, shall be delineated.
Source: Brewer, William E. and Charles P. Alter. 1988. The Complete Manual of Land Planning & Development. Englewood Cliffs, NJ: Prentice Hall.
Illustrative Topography and Existing Conditions
(l) Streets, easements, political boundaries and built features. Man-made features within and adjacent to the property, including street right-of-way and pavement widths, names of existing streets, all easements, city and county political boundary lines, and other significant information such as location and dimensions of bridges, existing buildings to remain, and other features.
(m)Subdivision block and lot layout. The proposed subdivision layout including lot lines and street right-of-way lines, with proposed street names or letter designations and rightof-way widths, along with the front building setback line and the approximate dimensions of the length and width of each lot. The total number of lots in the subdivision and the total acreage in the tract to be subdivided shall be indicated. Lots shall be numbered consecutively in a clockwise fashion, and the approximate land area of each lot shall be indicated for each lot. The proposed phasing of the subdivision shall be indicated, if it is proposed to be platted in phases.
(n) Water and sewage disposal. A statement as to the source of the domestic water supply and provisions for sanitary sewage disposal. For those properties that will not be served by a public sanitary sewerage system, location and results of soil tests or percolation tests as required and approved by the Jackson County Environmental Health Department.
(o) Stormwater management. The approximate location of proposed storm water detention facilities. Compliance with stormwater management requirements of this code will be required for the issuance of a land disturbance permit.
(p) Public land reservations. In addition to public streets, the preliminary plat shall indicate land if any to be dedicated for public use.
(q) Additional information. Additional information as may be required by the zoning administrator to ensure compliance with this Article and this code.
(r) Approval. Approval of a development permit for the proposed subdivision shall constitute approval of the preliminary plat.
Sec. 1534. Procedures.
(a) Upon receipt of a completed preliminary plat application, the zoning administrator shall schedule the application for the next public meeting before the city council and forward all pertinent materials in the application to the city council for review.
(b) An application for preliminary plat approval must be submitted at least 21 days before the regular meeting date of the city council to be considered on that agenda. The city council shall approve, conditionally approve, or deny the preliminary plat application, or it may postpone to a later meeting not to exceed 65 days from the date of its first scheduled consideration of the preliminary plat.
(c) The basis of the city council’s review of and action on a preliminary plat shall be whether the preliminary plat meets the purposes and requirements of this article and the code generally, whether the public dedications proposed in the subdivision are adequate, and whether the preliminary plat conforms to the policies of the comprehensive plan.
Sec. 1535. Amendments to approved preliminary plats.
The zoning administrator is authorized to approve minor amendments to preliminary plats. Any proposed amendment to a preliminary plat that is determined by the zoning administrator to constitute a public interest shall be deemed a major amendment. For all amendments to preliminary plats determined to be major amendments, approval by the city council shall be required. The city council shall approve, conditionally approve, or deny the proposed major amendment to a preliminary plat. Procedures for considering a major amendment to a preliminary plat shall be the same as required for an initial application for preliminary plat approval as specified in this division.
Sec. 1541. Suitability of land.
Land physically unsuitable for subdivision because of flooding, poor drainage, steep slopes, rock formations or other such features that may endanger health, life or property, aggravate erosion, increase flood hazard, or necessitate excessive expenditures of public funds for supply and maintenance of services shall not be approved for subdivision or development unless adequate methods are formulated by the subdivider for solving the problems.
Sec. 1542. Conformance with comprehensive plan and other plans.
(a) All proposed subdivisions shall conform to the comprehensive plan and development policies in effect at the time of submission to the zoning administrator. All highways, streets and other improvements recommended in the countywide transportation plan (if adopted by city council) shall be platted by the developer in the location and to the dimension indicated in the countywide transportation plan.
(b) When features of other plans adopted by city (such as schools or other public-building sites, parks or other land for public uses) are located in whole or in part in a subdivision, such features shall be either dedicated or reserved by the subdivider for acquisition within a reasonable time by the appropriate public agency.
Sec. 1543. Block length.
Intersecting streets shall be provided at such intervals so as to provide adequate cross traffic and connectivity. Blocks in residential subdivisions should not exceed 1800 feet nor be less than 600 feet in length, except where topography or other conditions justify a departure from these standards. In blocks longer than 800 feet, pedestrian ways and/or easements through the block shall be required near the center of blocks.
Sec. 1544. Block width.
(a) The width of a block shall be sufficient to allow two tiers of lots of appropriate depth, except where reverse frontage lots on arterial streets are provided, or when prevented by topographic conditions or size of the property, or for lots along the periphery of the subdivision, in which case the zoning administrator may approve a single row of lots.
(b) Blocks intended for business or industrial use shall be of such width as to be considered most suitable for their respective use, including adequate space for off-street parking, deliveries, and service.
Sec. 1545. Lot depth.
The depth of lots intended for detached, single-family residential shall not be greater than four times the width of the lot at the regulatory building line, unless unusual circumstances make these limitations not practicable. Lots intended for other uses should observe this maximum lot depths standard where practicable.
Sec. 1546. Adequate building site.
Each lot shall contain an adequate building site not subject to flooding and outside the limits of any existing easements, required building setback lines, and required stream buffers.
Sec. 1547. Lot lines.
All side lot lines shall be perpendicular to street lines, and all rear lot lines shall be parallel or radial to street lines, unless not practicable because of topographic or other features.
Sec. 1548. Double frontage lots.
Double frontage lots shall be avoided except where essential to provide separation of residential development from traffic arteries or overcome specific disadvantages of topography or orientation. The zoning administrator may require a no-access, planting screen easement of at least 10 feet in width, across which there shall be no right of access, along the line of lots abutting such a traffic artery or other disadvantageous use.
Sec. 1549. Flag lots.
(a) Flag lots, which meet minimum lot area requirements and meet the minimum lot width at the front building setback line where the building is placed, may be allowed where conditions of hardship make standard design or frontage impossible, impractical, or inefficient with regard to land use.
(b) Where such lots are allowed, the street frontage of each panhandle portion of the lot shall not be less than 30 feet wide, and the panhandle portion of the lot shall be no less than 30 feet wide and not more than 300 feet long.
(c) Not more than two such panhandle access points shall abut each other. The zoning administrator may require shared driveways for abutting flag lots.
Sec. 1550. Lot remnant not permitted.
All remnants of lots less than the required minimum lot size which may be left over after subdividing a larger tract, must be added to adjacent lots, rather than allowed to remain as unusable or noncompliant parcels. The zoning administrator may permit a lot remnant for a specific purpose such as a detention pond or buffering, provided that access and design is appropriate and the lot remnant is restricted to specific public, utility, or conservation use.
Sec. 1551. Format for plats and condominium plans.
All images of a plat or condominium plan submitted for filing in the office of the clerk of superior court shall:
(a) Be at full size of the drawing scale stated thereon;
(b) Be an electronic image of a plat or condominium plan presented to the clerk electronically in conformance with all specifications set forth in any rules and regulations promulgated by the Georgia Superior Court Clerks’ Cooperative Authority;
(c) Comply with the minimum standards and specifications adopted in the rules and regulations of the State Board of Registration for Professional Engineers and Land Surveyors; and
(d) Provide a box of not less than three inches square, if at full size, in the upper left-hand corner which shall be reserved for the clerk to append filing information.
Sec. 1552. Data for plats required per state law.
This section enumerates data required to be shown on plats per the Georgia Plat and Condominium Plan Recording Act of 2017.
(a) County. The county where the property lies.
(b) City. Any municipality wherein the property lies.
(c) Owner. The name of the property owner or owners of the subject property as stated on the most current or applicable title instrument.
(d) Plat type. The type of plat (final subdivision, boundary line adjustment, lot combination, retracement survey, easement survey, dedication plat, etc.).
(e) Name. The name of any subdivision if the property lies within a named subdivision or if the plat is creating a new subdivision; or the name of any condominium if the property is within a condominium development.
(f) Division designations. The applicable units, pods, blocks, lots, or other subdesignations of any named subdivision or condominium.
(g) Developer. The name or names of the developer or developers of any named new subdivision or condominium.
(h) Land lots and districts. All applicable land lots, land districts, sections, reserves, or militia districts wherein the platted property lies.
(i) Date and revision dates. The date of initial preparation and issuance and any revision dates, including a brief explanation of each revision.
(j) Surveyor. The name, address, and telephone number of the land surveyor who prepared and sealed the plat and, if working for or through a firm, corporation, partnership, association, limited liability company, or other entity, then also the certificate of authorization number of that entity, in which case the address and telephone number of such entity are acceptable in lieu of the individual surveyor's address and telephone number.
(k) Surveyor registration. The registration number of the land surveyor or a statement that he or she is the county surveyor and is not required by law to be a registered surveyor.
(l) Surveyor seal. The seal of the land surveyor who has prepared the plat and is signing the surveyor certification, which shall be placed within or next to the surveyor certification box.
(m)Page numbers. If the plat has multiple pages the page number for each applicable page and the total number of sheets in the set shall be placed on each sheet in the same or similar location. The information required by this paragraph may be placed on all sheets or on different sheets within the set submitted for filing.
(n) Scale. The scale of the plat stated and shown graphically.
(o) Surveyor certification box for subdivision plats. Each plat involving a subdivision shall have depicted thereon a box which contains the following applicable certifications of the land surveyor:
“As required by subsection (d) of O.C.G.A. Section 15-6-67, this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67.”
The land surveyor shall sign on a line immediately beneath the certification on the plat.
At the discretion of the land surveyor and in conformity with local regulations, the surveyor may electronically sign the certification using a facsimile signature. The facsimile signature may be a reproduction of an original signature or an electronically created signature. If the land surveyor elects to use a facsimile signature, the surveyor must maintain full control over the application and use of such signature.
(p) Additional certifications. Additional dates, certifications, and signatures, which may be electronically created signatures, may be placed on plats. Such certifications may include, but are not limited to, those that may be required by local jurisdictions or agencies, the United States Small Business Administration, the United States Department of Housing and Urban Development, and the American Land Title Association.
Sec. 1553. Data required for plats per state rules and regulations.
This section enumerates selected data required to be on plats per Rules and Regulations of the State of Georgia, Department 180, “State Board of Registration for Professional Engineers and Land Surveyors,” Chapter 180-7, “Technical Standards for Property Surveys, and local requirements. It is the land surveyor’s responsibility to provide all data required by said rules, and the lack of inclusion of said rule requirements in this section shall not relieve a land surveyor from complying with said requirements:
(a) Point of beginning and point of reference. There shall be a point of commencement and/or a point of beginning that can be readily re-established. The direction and distance from a point of reference to a point on the boundary of the individual survey, and such additional data as may be required to relocate the boundary point from the point of reference with the same degree of accuracy required of the parcel surveyed. The point of reference shall be an established, monumented position which can be identified or relocated from maps, plats or other documents on public record, including state plane coordinates when applicable. The point of reference may lie on or within the boundary of the survey.
(b) Names of adjoining subdivisions and property owners and documents reviewed. The names of adjoining subdivision and/or property owners on all lines, as can be determined at the time of commencement of the survey through public records such as the county tax assessor and/or clerk of court records, along with a notation as to what documents were reviewed for each adjacent property.
(c) Roads. Adjacent streets, roads, or other rights-of-way, and the width and the former widths, if pertinent, of rights-of-way adjacent to or crossing the property.
(d) Water. All water boundaries.
(e) Easements. The width and the former widths, if pertinent, of easements adjacent to or crossing the property. Where water and sewer utilities are located within rights of ways to be dedicated to the city, temporary easements shall be required for such utilities in favor of the service provider until the rights of ways are officially accepted by resolution of the city council.
(f) Encroachments and cemeteries. Apparent encroachments and observed evidence of human burials or cemeteries.
(g) North arrow. An arrow to indicate the principal meridian and a notation as to the reference of bearings to magnetic north, astronomic north, record or grid north. A grid north reference shall indicate the zone. Record north shall reference the document or survey to which the meridian is oriented and the line of the survey to which the "record bearing" was applied to.
(h) Metes and bounds bearings and distances and areas. Bearings of all lines of the boundary or lot lines, and distances of all boundary or lot lines, and area of the parcels expressed in acres or square feet. The total acreage of the subdivision shall be shown. All bearings, distances, and areas shown on the survey shall be based upon the measurements of the surveyor, except that both the measured and the record measurements may be shown if the surveyor feels that such comparison is necessary or otherwise required, in which case a clear distinction shall be made as to which are measured and which are record. All angular directions shall be represented in degrees, minutes, and seconds.
Distances that are shown for proximity purposes only and have not been measured shall be clearly labeled as “approximate”; A metes and bounds description shall describe all courses in logical sequence around a lot or tract in a clockwise direction such that the ending point is the beginning point. In the case of curved lines, the curve shall be defined by curve data to include the radius, arc length, chord bearing, and distance of regular curves. Chord distances and directions shall be given for irregular curves.
(i) Equipment reference. A statement to indicate the type of equipment used to obtain the linear and angular measurements used in the preparation of the plat, or the proper notations required by Rule 180-7-.09 when GPS equipment is used in performing the survey.
(j) Closure precision. The closure precision of the data shown on the plat. The closure may be stated as follows: “This map or plat has been calculated for closure and is found to be accurate within one foot in ____ feet.”
(k) Monuments. Monuments shall be set at all boundary corners. All monuments found, placed or replaced shall be described on the survey plat. The land surveyor shall set monuments, unless monuments already exist or cannot be set due to physical obstructions. Those monuments that cannot be set due to physical obstructions shall have a reference monument set. Said reference monument shall be referenced on the plat by bearing and distance from the true position of said monument. Also, said reference monument shall be set far enough away from the true corner so as not to be confused with the position of the true corner. Corner descriptions shall state the size, material and cap identification of the monument as well as whether the monument was set or found. In the case of badly disturbed or deteriorated monuments that are replaced for the purpose of position preservation, the survey shall indicate the size, type, and material of both the found monument and the monument with which it was replaced.
(l) Monument specifications. All monuments set shall be composed of a durable material and shall incorporate a ferrous material to aid in location by magnetic locators. Said monuments shall have a minimum length of 18 inches. Monuments placed at land lot corners, district corners or county corners shall if a rod have a minimum diameter of 5/8 inches, a pipe of 1 inch diameter or a concrete or stone monument of not less than 4 inches square. Every boundary monument set shall be identified with a durable marker or cap bearing the Georgia registration number of the land surveyor in responsible charge or the name of the business entity and/or Certification of Authorization number (COA #).
Sec. 1554. Additional plat data required locally.
In addition to the requirements of state law and state rules and regulations, all plats shall including the following additional information:
(a) Street names. Street names including both the name and the suffix, such as “street,” “avenue,” etc.
(b) Location sketch or vicinity map. A hand-drawn or map reproduction, whether or not to an engineering scale, showing the subject property in context of a larger area. Typical scale when a scale is used, is 1inch equals 2,000 feet.
(c) Road centerlines, pavement widths and radii. The centerline of all roads within or adjacent to the subdivision, and the exact pavement width of the road or roads abutting the subject property and within the subdivision.
For cul-de-sacs, both the right of way radius and the pavement radius shall be shown. In addition, the right of way and pavement radii of all street intersections shall be shown.
(d) Lot and block identifiers. Lots numbered in numerical order and blocks lettered alphabetically.
(e) Addresses. Prior to recording, the street address number shall be shown on each lot as assigned by the Jackson County Department of Geographic Information Systems.
(f) Building setbacks. Front building setback lines with dimensions as to length across each lot and distance from the street right-of-way.
(g) Flood hazard area note. A note indicating whether or not the property is located within a 100-year flood plain, as designated on Federal Emergency Management Agency Flood Insurance Rate Maps, along with the community map panel number and effective date.
(h) Dedications and common areas. Any areas to be reserved, donated, or dedicated to public use and common use shall be shown along with their acreage. If streets are to be dedicated, the total linear distance of streets to be dedicated shall be indicated on the plat.
(i) Private covenants. Statement of and reference to private covenants, conditions and restrictions, if any.
(j) Other data. The zoning administrator may require that additional information be shown on the final plat, including but not limited to the existing zoning district and if applicable zoning conditions, zoning overlay and/or environmental overlay district, if applicable, variances if applicable, required stream buffers and zoning buffers, and wetlands.
(k) The following certifications shall be required for final plats, as applicable:
Owner’s certification. A certificate signed by the owner directly on the final plat, as follows:
The owner of the land shown on this plat and whose name is subscribed hereto, certifies that that he/she is the fee simple absolute owner of the land shown on this plat and that all state, city and county taxes or other assessments now due on this land have been paid.
___________________________________________ Owner Signed, sealed and delivered in the presence of:
___________________________________ Witness ___________________________________ Notary Public
(c) Certificate of approval and signature block.
For final plats for minor subdivisions, the following certification of approval and signature block shall be provided on the plat:
Pursuant to the land use management code of the City of Pendergrass and all requirements of approval having been fulfilled, this minor subdivision final plat was given final approval by the zoning administrator and it is entitled to be recorded in the Clerk’s Office, Jackson County Superior Court.
_____________________________ ____________________ Signature, Zoning Administrator Date For final plats for major subdivisions, the following certification of approval and signature block shall be provided on the plat:
Pursuant to the land use management code of the City of Pendergrass and all requirements of approval having been fulfilled, this major subdivision final plat was given final approval by the zoning administrator and the Pendergrass City Council and it is entitled to be recorded in the Clerk’s Office, Jackson County Superior Court.
_____________________________ ____________________ Signature, Zoning Administrator Date _____________________________ ____________________ Signature, Mayor Date
(l) Certificate of dedication. If the subdivision involves the dedication of land or streets or other improvement to the public, the following certification shall be provided on the plat:
The owner dedicates to the public for use forever the street right of way(s) and/or other public dedications or public improvement shown on this plat, as follows:
Street right of way(s): __ linear feet and ___ acres.
Other: ___ acres.
A dedication is not final until acceptance of the warranty deed by resolution of the Pendergrass City Council.
___________________________________________ Owner Signed, sealed and delivered in the presence of:
___________________________________ Witness ___________________________________ Notary Public (m)Health department certificate. If the subdivision involves an on-site sewage management system or community water system, the following certification shall be provided on the plat:
“This final plat has been approved by the Jackson County Environmental Health Department as being consistent with applicable state and local environmental health requirements.
_____________________________ ____________________ Signature, Director, Jackson County Environmental Health Department Date For a minor subdivision, the zoning administrator may waive the requirement to include a signed health department certificate on a final plat; provided, however, that if the lot(s) included in the final plat of a minor subdivision are to be served by an on-site sewage management system (septic tank), in lieu of said certification the final plat shall contain the following note: “Each lot must be reviewed and approved by the Jackson County Environmental Health Department for on-site sewage management system placement prior to the issuance of a building permit.”
(n) Engineer’s utility certificate. If the subdivision involves water and/or sanitary sewer lines to be dedicated, the following certification shall be provided on the plat:
The civil engineer responsible for the design and oversight of construction of water and/or sewer lines within this subdivision to be dedicated, hereby certifies that said water and sewer lines have been constructed and inspected as being in accordance with the standard specifications of the utility provider(s) and the requirements of the Pendergrass Unified Development Code:
_____________________________ ____________________ Signature, Name of Professional Engineer Date (affix seal)
(o) Utility dedication certificate. If the subdivision involves water and/or sanitary sewer lines to be dedicated, the following certification shall be provided on the plat:
The owner hereby dedicates to the Jackson County Water and Sewerage Authority forever the water and sanitary sewer lines within easements or within street rights of ways shown on this plat, as follows:
Water lines: __ linear feet.
Sanitary sewer lines: __ linear feet.
___________________________________________ Owner Signed, sealed and delivered in the presence of:
___________________________________ Witness ___________________________________ Notary Public
(p) Temporary utility easement dedication:
The subdivider hereby dedicates temporary easements to the Jackson County Water and Sewerage Authority within proposed rights of ways containing water and/or sewer lines to be dedicated, until such rights of ways are accepted by resolution of the Pendergrass City Council.”
___________________________________________ Owner Signed, sealed and delivered in the presence of:
___________________________________ Witness ___________________________________ Notary Public
(q) Utility easement dedication. If easements for water and/or sewer are included in the subdivision but located outside of right of way to be dedicated, the subdivider shall include the following easement dedication statement:
The subdivider hereby dedicates utility easements to the Jackson County Water and Sewerage Authority as shown on this final plat.
___________________________________________ Owner Signed, sealed and delivered in the presence of:
___________________________________ Witness ___________________________________ Notary Public
(r) Utility acceptance of dedication. If the subdivision involves water and/or sanitary sewer lines to be dedicated, the following certification shall be provided on the plat:
“The Jackson County Water and Sewerage Authority accepts the water and/or sanitary sewer lines within easements or within street rights of ways shown on this plat:
_____________________________ ____________________ Signature, Mayor Date” The exact language of the plat certifications specified in this section may be changed to match the requirements of the utility provider or health department, as may be appropriate and as approved by the zoning administrator.
Sec. 1555. Additional requirements for final plats involving private streets.
No final plat involving a private street shall be approved by the zoning administrator for recording unless and until it shall contain the following on the face of the plat:
(a) The private street shall be located within an exclusive and irrevocable access and utility easement granted to the city. The access and utility easement shall be no less wide than that required for right-of-way for a similar public street. All lot area requirements, setbacks and other requirements of the applicable zoning district shall be measured outside of or from such access and utility easement. As an alternative, the private street may be located within a separate parcel of land, no less wide than that required for rightof-way for a similar public street, owned by a homeowner’s association for the development and granting an exclusive and irrevocable access and utility easement to the county.
(b) Covenants, or reference to the deed book and page of the recorded covenants.
(c) “The City of Pendergrass has no responsibility to build, improve, maintain, or otherwise service the private streets, drainage improvements, and other appurtenances contained within the general public purpose access and utility easement or easements for private streets shown on this plat.”
(d) “Grant of Easement. The general purpose access and utility easement(s) shown on this plat for private street(s) is (are) hereby granted and said grant of rights shall be liberally construed to provide all necessary authority to the City of Pendergrass and the Jackson County Water and Sewerage Authority, serving the subdivision, for the installation and maintenance of utilities, including, but not limited to, electric lines, gas lines, telephone lines, water lines, sewer lines, cable television lines, and fiber optic cables, together with the right to trim interfering trees and brush, together with a perpetual right of ingress and egress for installation, maintenance, and replacement of such lines.
____________________________ Signature of Property Owner At the discretion of the zoning administrator, a subdivision improvement guarantee as required for public streets may be required for a subdivision containing private streets.
Sec. 1556. Purchaser’s acknowledgement for lot served by private street.
Prior to the sale or as a condition of the closing of a real estate transaction involving any lot served by a private street in the city, the subdivider or seller shall ensure that the purchaser of said lot shall execute a notarized purchaser’s acknowledgement of private street construction and drainage maintenance responsibilities as set forth below. A copy of the purchaser’s acknowledgement shall be retained by the purchaser and shall be required to be submitted as a condition of a building permit for a principal building on said lot.
Purchaser’s Acknowledgement of Private Street and Drainage Maintenance Responsibility.
(I) (We) have read the Declaration of Covenant which pertains to the lot that is the subject of this real estate transaction ______________ (insert address or attach legal description).
(I) (We) understand that the Declaration of Covenant applies to the lot that (I am) (we are) purchasing and requires (me) (us) to provide a specified percentage or amount of the financing for the construction and maintenance of any private street and drainage facilities serving the lot which (I am) (we are) purchasing, and that owners of other lots in this plat may sue for and recover those costs which this covenant requires (me) (us) to pay, plus their damages resulting from (my) (our) refusal to contribute, plus reasonable attorney’s fees. (I) (we) further understand that the City has no obligation to assist with the maintenance and improvement of the private street, drainage facilities, and other appurtenances within the general purpose public access and utility easement for the private road serving the lot in question. I (we) understand that a copy of this purchaser’s acknowledgement shall be required as a condition of the issuance of a building permit for a principal building on the lot (I am) (we are) purchasing.
__________________________ Purchaser” A reference to this requirement to execute a purchaser’s acknowledgment prior to the sale of any lot served by a private street shall also appear in the recorded. covenants, conditions, and restrictions for the subdivision.
Sec. 1557. Combination plat.
(a) An existing lot line forming the boundary between two conforming platted lots located within the same subdivision or a lot line between lots or parcels that have merged to form one building lot may be removed or eliminated through a final plat revision process which conforms to the final plat requirements of this article.
(b) Where separate lots of land are proposed to be combined, they shall be submitted to the zoning administrator as a final plat for review and approval. In the case no final plat applies to the subject lots or parcels, a boundary survey and plat depicting all lots involved in the lot combination shall be required to be approved by the zoning administrator as a final plat.
(c) Such combination plat shall be titled with the same name as that of the original subdivision, if applicable, and shall indicate thereon that the replat is for the purpose of removing the lot lines between specific lots.
Sec. 1558. Boundary line adjustment.
(a) One or more existing lot lines forming boundaries between conforming platted lots located within the same subdivision, or one or more lot lines between abutting lots or parcels may be adjusted through a final plat revision process that requires the approval of the zoning administrator and recording of a plat meeting the specifications of a final plat. In the case no final plat applies to the subject lots or parcels, a boundary survey and plat of the entire lots involved in the boundary line adjustment shall be required to be approved by the zoning administrator.
(b) Such plat showing said boundary line adjustment shall be titled with the same name as that of the original subdivision and shall include thereon that the replat is for the purpose of adjusting the lot lines between specific lots.
Sec. 1561. Application for final plat.
Applications for final plat approval shall include the following:
(a) Application form. Completion of an application form with information specified by the zoning administrator, including but not limited to owner information. The owner, or agent if so authorized, shall sign the application attesting to the accuracy of the application and confirming authority and intent to submit the application for consideration.
(b) Copies of plat. Copies of the final subdivision plat in a number as established by the zoning administrator, showing the entire ownership and drawn to the specifications required by this article.
(c) Legal description of lots. A legal description for each lot in the subdivision shall be provided.
(d) Fee. Payment of the applicable application and review fees as established by the city council from time to time for a final plat.
(e) Payment for signs and striping. Payment for materials and installation of traffic signs and street name signs in an amount determined by the city engineer. Payment of the cost of street striping or signalization, if required and not completed by the owner, shall also be included with the application.
(f) Financial guarantee of improvements. For major subdivisions involving public improvements, a subdivision improvement guarantee as specified in this article.
(g) Protective covenants and homeowner’s association documents. If required by provisions of this code, a homeowners’ association shall be created and the instruments of such creation and financial endowment shall be recorded at the time of final plat recording. Similarly, if a property owners association is required by this code or established by the developer, such association shall be created and instruments of creation and financial endowment shall be required at the time of final plat recording.
Two copies of the recorded instruments or instruments to be recorded shall be filed with the zoning administrator.
Sec. 1562. Process for review and approval of a final plat.
Upon completion of all requirements, the subdivider or property owner can file an application for final plat approval. The procedures for final plat review and action shall be as specified in this section.
(a) Review for completeness and application acceptance. The zoning administrator shall review the final plat application for completeness within no more than 7 calendar days from the posted submission deadline. Incomplete applications will not be processed and will be returned to the applicant.
(b) Distribution and agency review of final plat. The zoning administrator may forward a copy of the final plat application to other city departments as may be appropriate, the Georgia Department of Transportation if the proposed subdivision has frontage on or proposes access to a state or federal road. The applicant shall be required to obtain approval from the Jackson County Environmental Health Department if septic tanks are proposed within a major subdivision, and public utility providers in cases where connection to public water and/or sewer is proposed or required.
(c) Time period for completion of review. Except for final plats that have frontage on or propose access to a state or federal road which require review by the Georgia Department of Transportation (which require a 30-day review period), within no more than 25 calendar work days following receipt of a complete final plat application, during which agency review shall be completed, the zoning administrator shall indicate on the final plat or in writing all comments related to compliance with this article and the code. The zoning administrator shall provide all comments to the applicant for resolution, who shall work with each department as necessary to resolve all issues.
(d) Action. When the zoning administrator has determined that a final plat of a minor subdivision is in compliance with the requirements of this code, it shall be approved by the zoning administrator. When the zoning administrator has determined that a final subdivision plat of a major subdivision is in compliance with the approved preliminary plat for the major subdivision and the requirements of this code and consistent with the comprehensive plan, it shall be scheduled for consideration and action by the city council. If the city council determines that the final subdivision plat of a major subdivision is in compliance with the approved preliminary plat for the major subdivision and the requirements of this code and consistent with the comprehensive plan, it shall be approved. In the case of a final plat for a minor subdivision, action must be taken by the zoning administrator to approve, conditionally approve, or disapprove the minor final plat application within no more than 45 days from receipt of a completed application. In the case of a final plat for a major subdivision, action must be taken by the city council to approve, conditionally approve, or disapprove the major final plat application within no more than 65 days from receipt of a completed application.
Sec. 1563. Recording of final plat.
(a) Once the final subdivision plat has received approval as evidenced by the certificate of final plat approval, the applicant shall record the plat electronically with the Jackson County Clerk of Superior Court.
(b) The applicant is responsible for paying any required recording fees.
(c) All plats must be in the Georgia Coordinate System West Zone NAD 83 before the plat is recorded. If the project is within 1,000 feet of a Jackson County geodetic monument the plat must use the monument as a control/tie point. The applicant for final plat approval shall be responsible for forwarding an electronic copy of the final plat as recorded, along with recording information, to the zoning administrator. In addition, the subdivision applicant shall submit electronic (DWG/DXF and PDF) file copies of lot boundaries of subdivisions and related information as specified by the zoning administrator. Building permits may be withheld pending receipt of the electronic files and copy of the recorded final plat.
(d) Recordation of a final plat constitutes approval to begin the sale or transfer of subdivision lots.
Sec. 1564. Distribution of approved final plat.
The final plat is a source of essential information to tax officials, public safety officials, and utility officials, among others. Accordingly, the zoning administrator may forward recorded final plats to appropriate departments and agencies, such as the Jackson County Emergency Services Department; the city building official; the city engineer; and The United States Postal Service (local postmaster). At the discretion of the zoning administrator, additional agencies or persons may be added to the distribution list.
Sec. 1565. Revision of final plat.
The application requirements and procedures for amending final plats shall be the same as for final plat applications.
ACCEPTANCE OF PUBLIC IMPROVEMENTS
Sec. 1571. Subdivision improvement guarantee.
(a) Improvements. All public improvements required for subdivisions shall have been properly installed and completed in accordance with all requirements and standards of this code (other than traffic signs, street name signs, street striping, and signalization) prior to final plat approval.
(b) Submission. Prior to approval of a final subdivision plat, a subdivision improvement guarantee in a form acceptable to the zoning administrator and city attorney is required for all completed improvements shown on the as-built surveys required by this code.
Prior to final plat approval, the owner of a subdivision involving public improvements shall submit a subdivision improvement guarantee.
(c) Maintenance period and duration of guarantee. The subdivider shall maintain any public improvements in the subdivision, for a period of two years or until certificates of occupancy have been issued for 75% or more of the principal buildings on the lots shown on the final subdivision plat, whichever occurs later. The two-year maintenance period shall begin upon recordation of the final subdivision plat. If the two-year term expires before the issuance of certificates of occupancy for 75% or more of the principal buildings on the lots shown on the final subdivision plat, the improvement guarantee shall be renewed or extended, until certificates of occupancy have been issued on 75% of the principal buildings on the lots shown on the final subdivision plat. The subdivider shall not assign this responsibility to another entity without permission of the city attorney and zoning administrator.
(d) Amount of guarantee. The value of the improvement guarantee shall be equal to $25.00 per linear foot of street improvements shown on the as-built surveys or final plat. The cost of construction shall be evidenced by copies of contractor agreements or actual invoices paid, or as otherwise determined or accepted by the zoning administrator.
(e) Inspection. Prior to the end of the maintenance period, the subdivider shall request an inspection of the subdivision’s public improvements. The zoning administrator or city engineer shall perform the inspection. The subdivider shall be notified of the inspection results in writing at least 30 days prior to receipt of a request from the subdivider to the city to initiate an inspection.
(f) Repairs. If repairs are needed for the public improvements to meet city specifications during the two-year maintenance period, the subdivider shall be required to make such repairs within 30 days, after written notification by the zoning administrator. The subdivider must correct all defects or deficiencies in materials or workmanship and make such repairs as necessary to approximate the as-built condition of the improvements.
When the subdivider completes the necessary maintenance repairs, he or she shall request in writing that the zoning administrator inspect the repairs. The zoning administrator or city engineer shall inspect the repairs and notify the developer of the inspection results.
(g) Remedy. If the repairs are not completed, the subdivision improvement guarantee shall be called to pay for the repairs. Should the amount of the subdivision improvement guarantee be inadequate to pay for the repairs, the developer shall pay the remaining amount. The city may withhold building permits if the remaining amount required by this paragraph is not paid.
Sec. 1572. Warranty deed and resolution of acceptance.
Subdivision streets and right of ways and other lands to be dedicated to the public shall be accepted by the city only upon the approval by the city council of a general warranty deed conveying fee simple title of such right of ways and lands. The warranty deed shall be accompanied by a certificate of title and a tax transfer form addressed to the city council, certifying that the grantor in such deed is vested with marketable fee simple title to the property conveyed thereby, free and clear of all liens and encumbrances, and further that the individual executing such deed has full authority to do so. The subdivider shall forward executed deeds for the streets, and dedication of other public properties if applicable, to the zoning administrator who will schedule the matters for the next available meeting of the city council for consideration, and if approved, recording, along with a resolution accepting the public improvements for perpetual maintenance.
Sec. 1573. Release of improvement guarantee.
Upon adoption by the city council of a resolution accepting the public improvements within the subdivision for perpetual maintenance, the improvement guarantee shall be released by the zoning administrator.
ARTICLE 16
IMPROVEMENT REQUIREMENTS
DIVISION 16-1 GENERAL PROVISIONS
DIVISION 16-2 DESIGN REQUIREMENTS FOR STREETS
DIVISION 6-3 DRIVEWAYS
Article 16, Improvement Requirements
DIVISION 16-4 WATER
DIVISION 16-5 SEWER OR ON-SITE SEWAGE MANAGEMENT
DIVISION 16-6 DRAINAGE AND STORMWATER MANAGEMENT
DIVISION 16-7 UTILITY ENCROACHMENT
Sec. 1601. Purpose.
The purpose of this article is to establish minimum design requirements, standards, and specifications for improvements within subdivisions and land developments, including but not limited to roads, water, sewer and septic, drainage and stormwater management.
Sec. 1602. Application and exemption.
(a) The improvement requirements specified in this article shall apply to all developments, except as specifically exempted or provided otherwise in this article.
(b) No person shall commence construction of any improvements on any land prior to the approval of construction plans and engineering plans for said improvements as required by this code (see in particular article 14 regarding development permitting), in accordance with the improvement standards specified in this article.
(c) All improvements required to be constructed as part of a major subdivision, minor subdivision, or land development shall be constructed and improved in accordance with the standards and specifications for construction as required by this article.
(d) No building permit or certificate of occupancy shall be issued for a building, structure, or use, nor shall any excavation, grading, or land disturbance applications be approved on any parcel of land unless it meets the improvement requirements specified in this article and any additional specifications as may be adopted or applied pursuant to this article.
Sec. 1603. Definitions.
AASHTO: The American Association of State Highway and Transportation Officials.
Access: A way or means of approach to provide physical entrance to a property.
Curb cut: Any interruption or break in the line of a street curb for the purpose of connecting a driveway to a street, or otherwise to provide vehicular access to abutting property. The term curb cut may be used to refer to an access point for a driveway to a public street, even in cases where no curbing exists.
Deceleration lane: A speed-change lane, including tapered areas, for the purpose of enabling a vehicle that is making an exit turn from a roadway to slow to a safe turning speed after it has left the mainstream of faster-moving traffic. Also called a “decel lane”; it usually denotes a right turn lane but includes left turn lanes into a development or driveway.
Horizontal alignment: Horizontal geometrics of a road.
Horizontal curve: A curve by means of which a road can change direction to the right or left.
Street: A dedicated and accepted public right-of-way, or a private street approved by the city, which affords the principal means of access for motor vehicles to abutting properties.
Street jog: The incidence where two streets or two portions of a single street are separated by a relatively short distance, usually at their intersection with another street.
Traveled way: The portion of a roadway for the movement of vehicles, exclusive of shoulders and auxiliary lanes.
Sec. 1611. Generally.
(a) Public streets, and private streets when authorized to provide the principal means of access to a lot or tract of land, contained wholly within a subdivision or land development, shall be fully improved to the standards contained in or referenced by this article.
(b) Where this article does not contain a specification or standard, the zoning administrator may require that the materials, methods of construction, and workmanship for the work covered in reference to street construction conform to the latest standard specifications of the Georgia Department of Transportation, or to county road standards and specifications.
Sec. 1612. Street alignment, intersections and jogs.
Streets shall be aligned to join with planned or existing streets. Under normal conditions, streets shall be laid out so as to intersect as nearly as possible at right angles (90 degrees), but in no case shall such a street intersection be less than 75 degrees. Where street offsets or jogs cannot be avoided, offset "T" intersections shall be separated by a minimum centerline offset of 150 feet.
Sec. 1613. Continuation of existing streets and connections.
(a) Existing streets, and their right of ways, shall be continued at the same or greater width, but in no case less than the required width.
(b) When a new street is proposed within a development or subdivision, the development or subdivision shall provide for the continuation or projection of any existing street adjoining the development or subdivision at the same or greater right-of-way and pavement width.
(c) The city council as part of the final plat approval process for a major subdivision may require that the major subdivision provide one or more connections or future connections to adjoining subdivisions or properties.
Sec. 1614. Street plans for future phases of a tract.
Where the plat or site plan of land proposed to be subdivided or developed includes only part of the tract owned by the subdivider or land developer, a tentative plan of a future street system for the portion not slated for subdivision or land development consideration may be required by the zoning administrator and if required shall be prepared and submitted by the subdivider or land developer.
Sec. 1615. Minimum street right-of-way and pavement widths.
Street right-of-way and pavement widths shall at minimum meet the following:
Street Type Minimum Right-Of-Way Width (Feet) Minimum Pavement Width (Feet) (back of curb to back of curb) Arterial 100 Per GDOT Collector street 80 32 Local residential street with curb and gutter 50 26 Local commercial street with curb and gutter 50 28 Local residential street without curb and gutter (where authorized) 60 22 Sec. 1616. Paving specifications.
Roadways shall be constructed and paved with top courses meeting the following standards. The minimum pavement width, measured from edge of pavement to edge of pavement, (or from the inner edge of curb where curbing exists) shall be as required for the street type as follows.
Street Base Requirements Street Classification Base Binder Topping Arterial Per GDOT Per GDOT Per GDOT Collector 10 inches GAB 3 inches 19 mm Superpaver 2 inches 9.5 mm Superpaver Local Commercial or Industrial Street 8 inches GAB 4 inches 19 mm Superpaver 2 inches 9.5 mm Superpaver Local Residential Street 6 inches GAB 0 inches 2 inches 9.5 mm Superpaver GDOT = Georgia Department of Transportation GAB = graded aggregate base, compacted to 95% modified proctor density.
Sec. 1617. Subgrade and street base.
(a) Subgrade. After grading of the roadway has been completed, the subdivider shall proofroll the subgrade using a heavy rubber tired vehicle to verify that exposed subgrades are stable and to identify loose or soft areas requiring under cutting or stabilization.
Proofrolling shall be under the observation of an independent testing laboratory or engineer and the subdivider shall provide certification of successful proofrolling testing.
(b) Graded aggregate base course. The base course shall consist of mineral aggregate and may be a combination of natural deposit or a blend of the materials specified. All materials are subject to approval of the zoning administrator or city engineer.
(c) Thickness of material. Street base material shall conform to the thickness as required for the street type specified in this division
(d) Extension. For streets without curbs, the base shall extend at least 1 foot beyond the edge of pavement. For streets with curbs, the base shall extend at least 1 foot beyond the back edge of the curb.
(e) Replacement of unsuitable material. Wherever unsuitable material is found in the subgrade, the unsuitable material shall be replaced with graded aggregate stone.
Sec. 1618. Pavement topping.
(a) Prime. After the base has been placed, mixed, compacted, shaped, inspected and accepted, it shall be primed with suitable asphaltic materials as specified in Georgia Department of Transportation Specifications unless otherwise approved by the city engineer.
(b) Roadway binder. After the prime has been inspected and accepted, the roadway or street shall be surfaced with 19 mm Superpaver binder as required for the street type specified in this division.
(c) Tack coat. Tack coat shall be applied on a prepared road surface according to the requirements of Georgia Department of Transportation Specifications unless otherwise approved by the city engineer
(d) Final topping. Final topping shall consist of a course of 9.5 mm Superpaver asphaltic cement as required for the street type as required by this division.
Sec. 1619. Testing requirements for street base and paving.
Tests of street base and paving may be required to be conducted as follows.
Testing Requirements and Standards Type of Test to be Performed Minimum Number of Tests Testing Standards Sub-grade Compaction Each 500 linear feet of roadway 95% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Base Compaction Each 500 linear feet of roadway 100% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Asphalt Density Each 1,000 linear feet of roadway 92% Laboratory Density Asphalt Thickness Each 500 linear feet of roadway Deficient in thickness not more than ¼” When testing is required, it is the responsibility of the developer to insure that all required tests are made and reported to the zoning administrator for review and approval. The cost of all testing and quality control shall be performed at the expense of the developer by qualified testing laboratories.
Sec. 1620. Dead-end streets and turnarounds.
(a) Cul-de-sac required. Dead-end streets other than those ending in a cul-de-sac are generally discouraged if not prohibited. A dead-end street other than a cul-de-sac shall not be allowed except as a temporary stage of construction of a street that will be extended in a later stage of construction, except as otherwise provided in this section. Streets that dead-end shall terminate in a cul-de-sac meeting the requirements of this article, unless the zoning administrator approved an exception pursuant to this section.
(a) Cul-de-sac required. Dead-end streets other than those ending in a cul-de-sac are generally discouraged if not prohibited. Streets that dead-end shall terminate in a cul-desac meeting the requirements of this article or as approved by the zoning administrator. A dead-end street other than a cul-de-sac shall not be allowed except as a temporary stage of construction of a street that will be extended in a later stage of construction, except as otherwise provided in this section.
(b) Residential street. Cul-de-sacs in residential subdivisions shall terminate in a circular turnaround having a minimum right-of-way radius of 50 feet and a paved turnaround with a minimum 50-foot radius to back of curb.
(c) Commercial and industrial street. Cul-de-sacs in commercial and industrial subdivisions shall terminate in a circular turnaround having a minimum right-of-way radius of 60 feet, and a paved turnaround with a minimum radius of 50 feet to back of curb.
(d) Exceptions. Standards for turnarounds that are specified in the international fire code appendix D, “fire apparatus access roads,” may be authorized by the zoning administrator in leu of a circular cul-de-sac, and to that end if authorized such turnarounds shall be considered as meeting the requirements of this section.
Table D103.3 Requirements for Dead-End Fire Apparatus Access Roads Length (feet) Width (feet) Turnarounds Required 0-150 20 None required 151-500 20 120-foot Hammerhead, 60-foot “Y” or 96-foot diameter cul-de-sac in accordance with Figure D103.1 501-750 26 120-foot Hammerhead, 60-foot “Y” or 96-foot diameter cul-de-sac in accordance with Figure D103.1 Over 750 Special approval required
(e) Maximum length. The maximum length of a cul-de-sac street shall be 1,000 feet, unless necessitated by topographic conditions and approved as a variance.
(b) Temporary cul-de-sac. Streets that are planned to continue at some future date shall provide a temporary cul-de-sac as required by the zoning administrator. The minimum radius for a temporary cul-de-sac shall be 40 feet. Temporary turnarounds shall consist of 6 inches of graded aggregate base. A temporary cul-de-sac shall be made permanent within 12 months if the next phase is not permitted. The zoning administrator may require a performance bond by submitted by the owner/ developer in the amount of the estimated cost of making the cul-de-sac permanent.
Sec. 1621. Alleys.
(a) Alleys may be constructed at the rear of lots, subject to the approval of the zoning administrator. Alleys may be provided to facilitate rear-access to garages on one or more lots in a single-family residential subdivision.
Source: Arendt, Randall. April 2004. Crossroads, Hamlet, Village, Town:
Design Characteristics of Traditional Neighborhoods Old and New. Revised Edition.
Planning Advisory Service Report No. 523/524. Chicago: American Planning Association. Figure 151, p. 87.
Illustrative Alley Access, Single-family Detached
(b) If alleys are provided, they must be paved. The minimum easement shall be 20 feet in width; the travel way shall be a minimum of 16 feet with 2-foot shoulders on each side.
(c) If alleys are provided, they must be private and shall not be publicly dedicated.
(d) Alleys shall only be permitted if provided with a turn-around having a radius of at least 40 feet, or a “T-head” turn-around approved by the zoning administrator.
Sec. 1622. Street intersection curb radii.
Turning radii for street intersections shall be provided as follows, based on the highest street classification involved in the intersection as listed below. Where the angle of street intersection is less than 90 degrees, a longer radius may be required.
(a) Arterial: 50-foot radius.
(b) Collector: 35-foot radius.
(c) Local street: 25-foot radius.
(d) The right-of-way radius at street intersections shall be a minimum of fifteen (15) feet, with larger radii for streets serving nonresidential development, as approved by the zoning administrator or city engineer.
Sec. 1623. Street grades and minimum design speed.
(a) Minimum grades. All streets shall have a minimum grade of 0.5 percent.
(b) Maximum grades and minimum design speeds. Maximum grades and minimum design speeds for proposed streets by street type shall be as required in the table below.
Design exceptions must be justified and approved by the zoning administrator and city engineer. If the maximum grade of a street is varied, the resulting street grade shall not exceed 15 percent, nor shall any grade between 12 and 15 percent exceed a length of 150 feet.
Maximum Grades and Minimum Design Speeds Street Type Maximum Grade Minimum Design Speed Arterial street 6% 45 mph Collector street 8% 35 mph Local street 12% 30 mph Alleys 12% 15 mph Sec. 1624. Horizontal alignment of streets.
Where a deflection angle of more than five degrees in the alignment of a street occurs, the radius of curvature of the center line of said street shall be not less than that minimum required as follows:
Minimum Horizontal Alignment of Streets Street Classification Minimum Radius of Curvature of Center Line Arterial street 800 feet Collector street 200 feet Local street 150 feet Curved streets shall have a minimum tangent of 100 feet at intersections as measured from the centerline of cross streets. A tangent of a least 200 feet in length shall be introduced between reverse curves on collector streets, and 100 feet on local streets.
Sec. 1625. Minimum sight distance.
(a) Sight distance requirements at intersections and driveways shall be as required by this section. The design speed for sight distance requirements at entrance intersections shall be the existing posted speed limit. Distances shall be measured from a point on the centerline of the entering road or driveway 15 feet back from the edge of the nearest traffic way in the abutting street, and extending in both directions along the abutting street. Minimum sight distances shall be measured from the driver’s eyes, which are assumed to be 3.5 feet in height above the pavement surface, to an object 3.5 feet high on the pavement in the center of every on-coming travel lane. The sight distance shall be clear along its entire minimum length and unimpaired by intervening changes in street grade, horizontal alignment or obstructions. Examples of obstructions are vegetation, ground cover, signs, existing topography, etc.
Minimum Sight Distance Requirements Design Speed (miles per hour) Minimum Required Sight Distance (Feet) 2-lane 3 or 4 lane Sight Distance Left to Sight Distance Right Sight Distance Left Sight Distance Right 30 335 335 375 35 390 390 440 40 445 445 500 45 500 500 565 50 555 555 625 55 610 610 690
(b) Minimum sight distance requirements of this section may be designed in accordance with AASHTO’s Geometric Design of Highways and Streets if such standards conflict with the requirements of this section.
Sec. 1626. Curb and gutter required.
(a) Curb and gutter shall be installed along streets when required for the functional classification of street.
(b) Curbs along collectors and local commercial or industrial streets shall be Portland cement concrete, 6-inch x 24-inch x 12-inch vertical type only, with a minimum strength of 3,000 psi at 28 days.
(c) Curbs along residential streets shall be Portland cement concrete, 6-inch x 24-inch x 12- inch vertical type, or if approved by the zoning administrator, 6-inch x 24-inch rolled type, with a minimum strength of 3,000 psi at 28 days..
(d) The cut subgrade under all curbs and gutters for streets shall be a graded aggregate base course of a depth specified by this article for the type of street (eight inch depth for a commercial street and six inch depth for a residential subdivision street), installed simultaneously with the street graded aggregate base course, compacted to 95%, proofrolled and proofroll-tested as required by this article. The city engineer may accept a modified proctor test in lieu of meeting this 95% standard.
(e) All curbing shall be backfilled. The curb and gutter shall be constructed so as to present a smooth, even line both horizontally and vertically. There shall be no areas of ponding.
(f) When property to be divided as a major subdivision or developed for commercial or industrial purposes abuts one side or both sides of road with a functional classification that requires curb and gutter, but no curb and gutter exists on one or both sides, the subdivider or developer may be required at no cost to the city, to improve the road with curbs and gutters along the entire property fronting said road without curb and gutter.
Sec. 1627. Slopes and shoulder improvements.
(a) On streets with curb and gutter, the shoulders shall slope ¼ inch to the foot toward the roadway from back of curb, and no more than ½ inch to the foot for the remainder of the right of way width.
(b) On streets with swale ditch drainage, the shoulders shall slope ¾ inch to the foot away from the roadway for at least five feet to the drainage channel. The maximum slope for the drainage channel shall be two feet of run for each one one foot of fall, with a minimum two-foot wide channel at the bottom of the swale.
(c) Immediately after grading and filling and re-spreading of topsoil, all areas of disturbed soil shall be fertilized and seeded (or in steep areas sodded or otherwise appropriately treated) with suitable vegetative cover to retard erosion.
(d) When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a stand of grass to prevent undue erosion, either by sprigging or seeding.
Sec. 1628. Sidewalks required.
Sidewalks are required to be installed by the developer at the time of development as follows:
(a) On both sides of all new commercial streets.
(b) On both sides of streets serving residential subdivisions, except for those subdivisions with a minimum lot size of one acre and a minimum lot width of 100 feet.
(c) Streets serving industrial development shall not be required to have sidewalks.
(d) The subdivider of a major subdivision or a land development shall be required to install a sidewalk, and associated curb and gutter, along the entire frontage on a public street abutting and accessed by the major subdivision or land development, unless a sidewalk installation waiver is applied for and granted pursuant to this article.
(e) Sidewalks shall be included within the dedicated non-pavement right-of-way of roads and shall parallel the street pavement as much as possible; provided, however, the zoning administrator or city engineer may permit sidewalks to be designed and constructed so that they meander around permanent obstructions or deviate from a linear pattern for design purposes; or authorize a sidewalk to be placed on private property within an access easement rather than a state highway right of way, if the sidewalk construction requirement would be the only improvement otherwise required in the right of way of a state route.
Sec. 1629. Sidewalk construction.
(a) Sidewalks must comply with all requirements of the federal Americans with Disabilities Act and the Georgia Accessibility Code with regard to surface, slope, and lift.
(b) Concrete sidewalks shall be a minimum of five feet wide. Concrete sidewalks, where required for local streets, shall be four inches thick.
(c) Concrete shall be 4,000 psi at 28 days’ strength.
(d) Sidewalks shall be placed on compacted subgrade and shall be backfilled and the strip between curb and sidewalk, if required, planted with grass sod.
Sec. 1630. Sidewalk installation waiver.
Upon application and submission of a waiver review fee as may be established by the city council, the zoning administrator is authorized to waive the requirement for the major subdivider or developer of site abutting an existing street to install sidewalk (and which may include waiver of requirements to install curb and gutter) along the existing street, if three or more of the following conditions exist (this waiver allowance shall not apply to new streets). The zoning administrator shall decide on the waiver application based on the extent to which these criteria for waivers are met:
(a) There is not a public or private school or public park located within one-half mile of the subject development;
(b) Sidewalk does not exist on a portion of the road (considering both sides of the street) in the general vicinity, and if constructed, the sidewalk would not connect to any existing sidewalk;
(c) The size and scale of the land use/improvement is such that it would pose an undue financial burden on the developer if the sidewalk installation requirement is imposed in the specific development instance;
(d) Physical conditions of the road frontage pose substantial practical difficulty in installing sidewalk and associated curb and gutter improvements, or such conditions substantially increase the cost of improvement.
Typical Sidewalk Detail
(e) Sidewalk construction on residential lots within subdivisions may be deferred to the builder of individual lots to construct, provided such requirements is referenced on the final plat. In such instances, no certificate of occupancy for a building on a given lot shall be authorized until said the required sidewalk is constructed on said lot, and connects with adjacent sidewalk fronting on common areas, as applicable.
(f) Where a driveway is provided or planned, the sidewalk shall be designed and constructed with driveway transitions as appropriate.
(g) Sidewalks fronting common areas shall be completed by the subdivider or land developer prior to approval of the final plat.
Sec. 1631. Multi-use path.
When required by the city, or where provided by a subdivider or land developer, multi-use paths shall meet the following requirements:
(a) Width. Unless otherwise approved by the zoning administrator, the standard minimum width of a multi-use path shall be eight feet.
(b) Pavement, base and shoulder. Pavement of the path shall be two-inches of 9.5 mm Superpave asphalt over a minimum four inches of compacted, aggregate base. The aggregate base shall extend a minimum of three feet on both sides of the path. The threefoot shoulders shall be backfilled and grassed after pavement of the path.
(c) Vertical clearance. Vertical clearance for the path shall be a minimum of eight feet.
(d) Drainage. Where existing ground conditions require cross drainage under paths, the pipe size and alignment of the culverts shall be as required and approved by the city engineer.
(e) Right of way or easement. When a multi-use path is constructed outside of a public or private road right of way, the city may require that the path, along with a minimum 20- foot wide right of way, be dedicated to the city. Paths may be authorized to be located within city-imposed stream buffers and impervious surface setbacks but not within stateimposed stream buffers. When not required to be dedicated to the city, the path shall have a minimum 20-foot-wide access easement.
Sec. 1632. Deceleration and turning lanes.
(a) Generally. Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization, etc. shall be installed at all entrance roads into a development or major subdivision, per the requirements of the Georgia Department of Transportation Regulations for Driveway and Encroachment Control, Revision 5.7, dated June 20, 2024, Section 4.9, “Auxiliary Turn Lanes,” as may be amended from time to time, unless otherwise determined appropriate per traffic impact assessment. If the DOT driveway regulations would require an improvement if the road were a state route, the zoning administrator or city engineer shall require the same such improvements for local roads.
(b) Length. Generally, deceleration lanes and turn lanes shall be a minimum length of 150 feet, with an additional 50-foot taper length, and a pavement width of 12 feet (exclusive of curb and gutter). Deceleration lanes and tapers may be required to be of greater length, based on the design speed of the road
(c) Right of way. If needed, additional right-of-way to accommodate the deceleration lane or turn lane and a 10-foot shoulder shall be dedicated by the developer to the city.
(d) Drainage. Associated drainage improvements as deemed necessary by the city by the construction of the deceleration or turn lane shall also be required. The developer will pay the cost of any cross-drain pipe relocations and catch basins that must be constructed along an existing state or city road as a result of installing a required deceleration or turning lane.
(e) Utilities. Utilities shall be relocated at the developer’s expense outside of a deceleration or turning lane.
Sec. 1633. Traffic calming devices.
All traffic calming devices shall be designed by a professional engineer and shall be reviewed and approved by the zoning administrator and city engineer prior to installation.
Sec. 1634. Private streets.
(a) Private streets, if approved by the city, shall meet all requirements and standards that apply to public streets as specified in this article.
(b) Names of private streets are subject to the approval of the zoning administrator, with final road name assigned by the Jackson County Department of Geographic Information Systems.
(c) A sign signifying a private street may be required by the zoning administrator to be a different color than that of street signs (e.g., blue as opposed to green) provided for public streets, in order to distinguish maintenance responsibilities in the field, and/or they may be required to be marked “private.”
(d) Any gate placed across a private street that limits access to a subdivision or development shall provide for unimpeded access by emergency vehicles, governmental vehicles on official business, and public and private delivery services including the U.S. Postal Service. Accessibility to such gated communities shall comply with all standards and requirements of the city for access activation, and shall be of breakaway or other construction acceptable to the city.
Sec. 1635. Street lighting.
(a) Streetlights shall be required and must be installed in accordance with local utility company standards in all subdivision developments. Installation of the streetlights shall be the responsibility of the developer.
(b) The standard for street lighting shall be one street light at every street intersection and one street light for each 500 linear feet of street.
(c) If street lights are installed along private streets, it shall be the responsibility of the developer and then the homeowner’s association, upon its activation, to maintain the street lights and pay electric bills for street lighting operations.
(d) If street lights are installed along streets to be dedicated to the public, it shall be the responsibility of the developer and then the homeowner’s association, upon its activation, to maintain the street lights and pay electric bills until the first day of the month following the governing body’s acceptance by warranty deed of the streets and street right of ways containing the street lights, at which time the city will assume responsibility for street light maintenance and the payment of electric bills for streets lights in said dedicated right of ways.
Sec. 1636. Street names and street name signs.
(a) Street names are subject to the approval of the zoning administrator, but shall be assigned by the Jackson County Department of Geographic Information Systems.
(b) Proposed public or private streets, which are extensions of, or in alignment with, existing or other proposed streets shall have the same name.
(c) Street names shall not duplicate or be phonetically similar to existing street names.
(d) Street name signs of a type approved by the city are to be placed at all intersections.
Unless otherwise approved by the zoning administrator, street signs shall be constructed of aluminum sheets with reflective backgrounds. Information on the street name signs shall be readable from both sides of the sign. Signs shall be installed on a steel post. The vertical distance from the road elevation to the bottom of the sign face shall be seven feet with a minimum burial depth of three feet.
(e) Street name signs may be required to be installed by the city at the developer’s expense or the city shall direct the applicant to install said signs subject to the approval of the zoning administrator.
Sec. 1637. Traffic signs and striping.
All new streets and land developments shall be provided with traffic control striping (e.g., stop bars, direction of travel, etc.) and signs (e.g., speed limits, stop signs, etc.) if necessary, that meet or exceed the Manual on Uniform Traffic Control Devices for Streets and Highways published by the Federal Highway Administration of the U.S. Department of Transportation, as may be amended from time to time, subject to the approval of the zoning administrator.
Sec. 1641. Access control on state routes.
(a) Access onto a state highway shall meet the Georgia Department of Transportation Regulations for Driveway and Encroachment Control, Revision 4.0, dated March 15, 2016, as may be amended from time to time. For driveways accessing U.S. or State highways, the requirements of the Georgia Department of Transportation shall apply whenever they are more restrictive than the standards in this article.
(b) A copy of the Georgia Department of Transportation permit, if required, shall be submitted to the zoning administrator before plans for land development are approved or permits issued for development or building.
(c) Subdivisions proposed along state routes also require prior review and recommendation by the Georgia Department of Transportation as provided in this code and state law.
Sec. 1642. Driveway compliance.
(a) No driveway shall be connected to a city road, and no curbs or medians on public streets or rights-of-ways shall be cut or altered for access onto a city road unless approved by the public works director.
(b) No driveway shall be connected to a county road, and no curbs or medians on public streets or rights-of-ways shall be cut or altered for access onto a county road unless approved by the county.
(c) Driveway permit. Approval of driveways shown on approved development plans shall constitute driveway approval unless specified otherwise in such approval. Approval of driveways shown on a building permit application shall constitute driveway approval unless specified otherwise by such permit approval. A separate driveway permit shall be required, if the driveway proposed has not been shown on approved development plans or approved as part of a building permit.
Sec. 1643. Residential driveways.
Along city streets, new residential driveways shall be designed and constructed to the following standards:
(a) Width: 8 feet minimum, except for shared driveways which shall be at least 12 feet wide.
A residential driveway shall not exceed a width (measured at the right of way line of the street to which the driveway is connected) of 12 feet, unless the driveway serves a garage or carport designed to park two or more cars located within 40 feet of the right of way, in which case the maximum residential driveway width shall be 20 feet. The maximum driveway widths of this paragraph shall not be construed to prevent additional surfacing for purposes of connecting the driveway to a garage or carport, or for additional uncovered parking, or for additional maneuvering space on the lot.
(b) Spacing from road intersection: Minimum 40 feet; the zoning administrator or city engineer may require greater separation depending on the functional classification of the intersecting street and the street from which access will be gained.
(c) Angle of intersection with street: Right angled (80 degrees to 100 degrees).
(d) Drainage: As approved by the city engineer (18-inch culvert typical where curb and gutter do not exist).
(e) Locations: Driveways will be restricted to locations where movements into and out of them can occur in a safe and orderly manner, as determined by the zoning administrator.
Driveways may be required to align with driveways on the opposite side of the street.
(f) Sidewalk transitions. Where a sidewalk is provided or planned, the driveway shall be designed and constructed with sidewalk transitions as appropriate.
(g) Paving. Unless otherwise approved by the city engineer, installation of a concrete driveway apron shall be required for any driveway connecting to a city street or county road with minimum driveway radius for a residential driveway of 5 feet. Driveway paving may be waived by the zoning administrator for that part of a driveway beyond the required concrete driveway apron.
(h) Number of driveways. The zoning administrator may limit the number of residential driveways for any given lot or parcel of land. Residential lots in any major subdivision shall have no direct driveway access to a collector or arterial street unless approved by the zoning administrator.
(i) Slope and elevation. Any driveway entering on a roadway or street may be required to be sloped down from the street or roadway at a rate of ½ inch per 1 foot for a minimum of 10 feet. In any case, the finished driveway surface within the right-of-way where it abuts the adjacent road must be no higher in elevation than the roadbed.
(j) Length. Residential driveways shall be a minimum length of 23 feet from the back of sidewalk or, if no sidewalk exists, 23 feet from the right of way, except as may be provided otherwise in this code.
Sec. 1644. Nonresidential driveways.
Along city streets, non-residential driveways shall be designed and constructed to the following standards:
(a) Two-way width: 24 feet minimum and 32 feet maximum.
(b) One-way width: 12 feet minimum and 18 feet maximum.
(c) Spacing from street intersection: Minimum 100 feet; the zoning administrator may require greater separation, depending on the functional classification of the intersecting street and the street from which access will be gained.
(d) Angle of intersection with street: Right angled (80 degrees to 100 degrees).
(e) Drainage: As approved by the city engineer.
(f) Paving: Unless otherwise approved by the city engineer, installation of a concrete driveway apron shall be required for any driveway connecting to a city street or county road with minimum driveway radius for a non-residential driveway as specified by the city engineer which should not be less than 25 feet for a driveway apron serving an office, institutional, or commercial use and shall not be less than 40 feet for a driveway serving an industrial use. Driveway paving may be waived by the city engineer for that part of a driveway beyond 50 feet from the front property line.
(g) Locations: Driveways will be restricted to locations where movements into and out of them can occur in a safe and orderly manner as determined by the city engineer.
Driveways may be required to align with driveways on the opposite side of the street.
(h) Sidewalk transitions. Where a sidewalk is provided or planned, the driveway shall be designed and constructed with sidewalk transitions as appropriate.
(i) Number of driveways. Lots with 150 feet of frontage or less shall have no more than one point of access to any one public street. The city engineer may further limit the number of non-residential driveways for any given lot or parcel of land.
(j) Slope and elevation. Any driveway entering on a roadway or street may be required to be sloped down from the street or roadway at a rate of ½ inch per 1 foot for a minimum of 10 feet. In any case, the finished driveway surface within the right-of-way where it abuts the adjacent road must be no higher in elevation than the roadbed.
Sec. 1651. General water requirement.
(a) All habitable buildings shall be connected to a water system capable of providing water for health and emergency purposes, including adequate fire protection.
(b) No building permit shall be issued for any building within a subdivision, or for the development of land, if there is not present throughout the subdivision or to the land development an adequate water supply; provided, however, the zoning administrator may waive the requirement to connect a land development to water if the nature of the development is such that, in the opinion of the zoning administrator, water use will not be necessitated in any way, including fire protection, potable water use, irrigation, and maintenance operations.
Sec. 1652. Water main requirements.
(a) When a public water main is accessible, the subdivider or land developer shall install water supply facilities, including fire hydrants, that meet or exceed the specifications of the Jackson County Water and Sewerage Authority and the Georgia Department of Natural Resources Environmental Protection Division.
(b) In all cases, the size of water mains shall be justified by hydraulic analysis performed by a professional engineer.
(c) Water mains within subdivisions and land developments must be provided with connections to each lot in the subdivision and each land development, except as otherwise specifically provided.
Sec. 1653. Wells.
(a) If a public water supply is not available to the subdivision or land development at the time of constructing improvements for a subdivision or land development, then the subdivider or developer shall provide an adequate alternative water source and an adequate water storage facility. In subdivisions or land developments with a residential density of one unit per acre or less and when a public water system is not available as determined by the zoning administrator, individual wells may be used in a manner so that an adequate supply of potable water will be available to every lot in the subdivision or to the land development.
(b) When individual wells are proposed to be used for water supply, water samples shall be submitted to the County Environmental Health Department for its approval, and individual wells shall be approved by said department.
Sec. 1654. Community water system.
(a) If a public water supply is not available to the subdivision or land development at the time of constructing improvements for a subdivision or land development, then the subdivider or developer shall provide an adequate alternative water source and an adequate water storage facility.
(b) Any community water system, if permitted, shall provide a minimum flow of 400 gallons per day per each lot platted, whether or not each lot is to be immediately developed; shall be sanitary; and shall have a minimum pressure of 20 pounds per square inch at each lot in the subdivision or each land development to be served.
(c) For all common non-public water supply systems, acceptable management, maintenance, and distribution policies and procedures shall be established. These policies and procedures shall be required to guarantee the provision of adequate supplies to each perspective lot owner on a continuing, ongoing basis, and to provide acceptable means for repairs and unforeseen events.
(d) The community water system plan shall be approved by the Jackson County Environmental Health Department and a letter of approval from the Georgia Department of Natural Resources shall accompany the final plat or land development application.
Sec. 1655. Fire hydrants.
(a) Fire hydrants shall be required for all nonresidential land developments and all subdivisions except those permitted to be served by individual on-site wells.
(b) Fire hydrants with appropriate water pressure at appropriate intervals throughout the subdivision or land development shall be provided by the subdivider or land developer as required by the Fire Department serving the participating municipality. Location and construction of fire hydrants shall be in accordance with requirements of the Jackson County Water and Sewerage Authority.
(c) To eliminate future street openings, all underground utilities for fire hydrants, together with the fire hydrants themselves, and all other supply improvements shall be installed before any final paving of a street within the right-of-way shared by such underground utilities.
Sec. 1661. General sewer requirement.
(a) All habitable buildings and buildable lots shall be served by an approved means of wastewater collection and treatment. Each subdivision and land development shall be served by adequate sewage disposal facilities.
(b) No building permit shall be issued for any building within a subdivision or for the development of land, if there is not present throughout the subdivision or to the land development an adequate system of wastewater collection and treatment; provided, however, provided, however, the zoning administrator may waive the requirement to connect a land development to sewer or septic tank if the nature of the development is such that, in the opinion of the zoning administrator, water use will not be necessitated in any way, including fire protection, potable water use, irrigation, and maintenance operations, and permanent employment is not authorized on site.
Sec. 1662. Connection to public sewerage system.
(a) When a public sanitary sewerage system is reasonably accessible, as determined by zoning administrator, the subdivider or land developer shall connect with same and provide sewers accessible to each lot in the subdivision or to each land development.
(b) If a public sanitary sewer is reasonably accessible, it shall be unlawful for any to maintain upon any such property an individual sewage disposal system.
(c) When a public sanitary sewerage system is not immediately accessible but is anticipated to be available within a period of three years, the applicant shall install sanitary sewer lines, laterals, and mains from the street curb to a point in the subdivision or land development boundary so that a future connection with the public sewer main can be made. The zoning administrator may require as a condition of land development approval on the agreement to connect to the public sewerage system upon its availability.
(d) Sanitary sewers shall be located within street or alley rights-of-way unless topography dictates otherwise.
(e) Design and engineering of sanitary sewers shall be in accordance with specifications adopted by the Jackson County Water and Sewerage Authority.
Sec. 1663. Alternative provision.
If sanitary sewer is not available at the time of the development of the subdivision or land development, and if sanitary sewer is not anticipated to be available within a period of three years to serve the subdivision or land development in question, then on-site septic tanks, an oxidation pond, or another approved method of treatment of sanitary sewerage shall be installed by and at the expense of the subdivider, land developer, or lot purchaser, in conformity with the requirements of the County Environmental Health Department.
Sec. 1664. Septic tanks.
(a) Where individual onsite wastewater disposal systems are allowed and proposed, individual lot sizes and shapes must exhibit appropriate regard for the peculiar health, drainage, and maintenance characteristics on the site.
(b) Additionally, detailed soil tests may be required in order to verify the ability of the lots to safely contain and dispose of septic system effluent.
(c) All septic tanks and onsite wastewater disposal systems are subject to the approval of the County Environmental Health Department.
Sec. 1671. Findings.
(a) Land development projects and other land use conversions, and their associated changes to land cover, permanently alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, which in turn increase flooding, stream channel erosion, and sediment transport and deposition.
(b) Land development projects and other land use conversions also contribute to increased nonpoint source pollution and degradation of receiving waters.
(c) The impacts of post-development stormwater runoff quantity and quality can adversely affect public safety, public and private property, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of lands and waters.
(d) These adverse impacts can be controlled and minimized through regulation of stormwater runoff quantity and quality from land development by the use of structural facilities as well as nonstructural measures, such as the conservation of greenspace.
Sec. 1672. Definitions.
Bioretention: A practice to manage and treat stormwater runoff by using a conditioned planting soil bed and planting materials to filter runoff stored within a shallow depression. The method combines physical filtering and adsorption with biological processes.
Channel: A natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
Clean Water Act: The Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent amendments thereto.
Construction activity: Activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES General Construction Permits. These include construction projects resulting in land disturbance. Such activities include but are not limited to clearing and grubbing, grading, excavating, and demolition.
Conveyance: An aboveground or underground natural or man-made drainage feature, that provides for the collection and movement of stormwater, and shall include but not be limited to concrete or metal pipes, ditches, depressions, swales, roads with drainage systems, highways, city streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, drainage channels, reservoirs, rights of way, storm drains, culverts, street gutters, oil/water separators, modular pavements and other similar drainage structures.
Detention: The temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling peak discharge.
Detention facility: A detention basin or structure designed for temporary storage of stormwater runoff and gradual release of stored water at controlled rates.
Drainage: A general term applied to the removal of surface or subsurface water from a given area either by gravity or by pumping; most commonly applied to surface water.
Drainage easement: An easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the terms of the drainage easement.
Drainage structure: A device composed of a virtually non-erodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control or flood control purposes.
Drainage system: The surface and subsurface system for the removal of water from the land, including both the natural elements of streams, marshes, swales and ponds, whether of an intermittent or continuous nature, and the man-made element which includes culverts, ditches, channels, detention facilities and the storm sewer system.
Dry well: A small, excavated pit backfilled with aggregate, usually pea gravel or stone. Dry wells function as infiltration systems used to control runoff from building rooftops. Another special application of dry wells is modified catch basins, where inflow is a form of direct surface runoff.
Dry wells provide the majority of treatment by processes related to soil infiltration, including absorption, trapping, filtering, and bacterial degradation.
Erosion and sedimentation control plan: A plan designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.
Extended detention: The detention of stormwater runoff for an extended period, typically 24 hours or greater.
Filter strip: Typically, a band of close-growing vegetation, usually grass, planted between pollutant source areas and a downstream receiving waterbody. Vegetation can filter sediment from runoff. Thus grass strips can be used to remove sediment from surface runoff. Vegetation also slows the velocity of runoff and helps maintain the infiltration capacity of a soil.
Infiltration: The process by which stormwater runoff percolates into the subsoil.
Infiltration trench: An excavated trench that has been backfilled with stone to form a subsurface basin. Stormwater runoff is diverted into the trench and is stored until it can be infiltrated into the soil, usually over a period of several days. An infiltration trench may include pretreatment such as vegetated filter strips or grassed swales.
Level spreader: Typically, an outlet designed to convert concentrated runoff to sheet flow and disperse it uniformly across a slope to prevent erosion. Level spreaders can be used to convey sheet flow runoff from lawn areas within graded areas to bioretention facilities and transition areas.
Low-impact development: The integration of site ecological and environmental goals and requirements into all phases of urban planning and design from the individual lot level to the entire watershed. In the context of this article, low-impact development is a set of stormwater design practices that are non-structural stormwater controls, specifically stormwater better site design practices.
National Pollutant Discharge Elimination System (NPDES) stormwater discharge permit: A permit issued by the Georgia EPD under authority delegated pursuant to 33 USC § 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis.
Natural, undisturbed conditions: For redevelopment projects or where there are no flooding concerns, this term shall mean the condition of the site immediately prior to the implementation of the proposed project.
Nonpoint source pollution: A form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial plant discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction and subsurface disposal as well as from urban runoff sources.
Nonstructural stormwater management practice or nonstructural practice: Any natural or planted vegetation or other nonstructural component of the stormwater management plan that enhances stormwater quantity and/or quality control or other stormwater management benefits and includes, but is not limited to, riparian buffers, greenspace areas, overland flow filtration areas, natural basins and vegetated channels.
Off-site facility: A stormwater management facility located outside the boundaries of a development site.
On-site facility. A stormwater management facility located within the boundaries of a development site.
Permeable: Soil or other material that allows the infiltration or passage of water or other liquids.
Pollutant: Anything that causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; non-hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution;
floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; process waste water and wash water; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any kind.
Pollution: The man-made or man-induced alteration of the chemical, physical, biological, thermal and radiological integrity of water.
Regional stormwater management facility or regional facility: Stormwater management facilities designed to control stormwater runoff from multiple properties where the owners or developers of the individual properties may assist in financing the facility and the requirement for on-site stormwater management facilities is either eliminated or reduced.
Stormwater management: The collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, stream bank channel erosion and habitat and water quality degradation, and to enhance and promote public health, safety and general welfare.
Sec. 1673. General requirements.
(a) An adequate drainage system, separate and independent of any sanitary sewer system and including any necessary ditches, pipes, culverts, intersectional drains, drop inlets, bridges, etc., shall be provided for the proper drainage of all surface water for all subdivisions and land developments that are subject to this division.
(b) Sizing and location of all existing and proposed drainage structures shall be the responsibility of a registered professional engineer, landscape architect, or registered land surveyor subject to approval by the city. The 25-year storm event shall be used in designing the storm drains. In cases where a spring, creek, or other watercourse traverses the property, the 100-year storm event will be used for design.
(c) The city shall require the use of on-site control methods such as retention or detention to mitigate the stormwater and drainage impacts of the proposed subdivision or land development. The zoning administrator shall not approve any preliminary plat of a subdivision and shall not approve the construction plans for any land development that does not make adequate provision for storm and floodwater runoff.
(d) No building permit shall be issued for any building within a subdivision or for the development of land, if there is not present throughout the subdivision or land development an adequate system of drainage and stormwater management.
Sec. 1674. Adoption of manual by reference.
The city hereby adopts the Georgia Stormwater Management Manual and shall require adherence to said manual for all subdivisions and land developments, as applicable, as interpreted by the zoning administrator in consultation with the city engineer or consulting engineer.
Sec. 1675. Runoff reduction infeasibility.
(a) The city enforces runoff reduction standards specified in the Georgia Stormwater Management Manual. Designers must demonstrate that they have explored all avenues to meet the runoff reduction standard.
(b) Applications that are not designed to meet runoff reduction requirements shall also prepare and submit a Runoff Reduction Infeasibility (RRI) Form for Determination of Infeasibility. A separate fee, per the adopted fee schedule, shall be required for review of runoff reduction infeasibility requests. If the applicant seeks to request runoff reduction infeasibility prior to submission of the application, a pre-consultation meeting may be scheduled with the city’s consulting engineer for stormwater.
Sec. 1676. Adoption of specific additional standards.
The city engineer may recommend and the zoning administrator may adopt specifications for drainage and stormwater management to supplement specifics of the Georgia Stormwater Management Manual and this division. Any such standards upon adoption by the zoning administrator shall become requirements.
Sec. 1677. Location of stormwater detention facilities.
(a) In residential subdivisions, any detention facility must be located on a separate lot and owned by a homeowners’ association, which shall be responsible for its maintenance and continuing operation after release of responsibilities by the owner/developer as provided in this division. The lot need not meet minimum lot size requirements for the subdivision or the zoning district in which it is located.
(b) In nonresidential subdivisions, any detention facility may be located on a separate lot and owned by a property owners’ association, which shall be responsible for its maintenance and continuing operation; or located on each lot within the subdivision and constructed when the lot is developed.
(c) In multi-family residential and nonresidential development projects, detention facilities shall be provided for each development if necessary, to limit runoff to post-development runoff to less than one cubic feet per second (cfs) increase. The owner of the property shall be responsible for maintenance and continuing operation of the facilities.
(d) Stormwater detention facilities serving two or more developments may be approved by the zoning administrator, provided that private ownership of the facilities and provisions for their perpetual maintenance and continuing operation are clearly established in a written agreement or other manner acceptable to the zoning administrator.
Sec. 1678. Specifications for stormwater detention facilities.
(a) Stormwater detention facilities shall provide adequate capacity to accommodate the stormwater runoff from the subdivision lots or land development(s) it serves, as determined by a registered professional engineer, landscape architect, or registered land surveyor subject to approval by the city engineer. Facilities shall prevent any increase in the pre-development rate of runoff for less frequent storms up to and including the twenty-five year storm.
(b) Unless constructed with 3:1 or lesser slopes and designed as an amenity feature to the subdivision or land development, all stormwater detention facilities shall be surrounded by fencing with a minimum height of five feet with a lockable gate for access. If chain link fencing is utilized, it shall be vinyl coated.
(c) A drainage and access easement with a minimum width of 20 feet shall be required surrounding all stormwater detention ponds.
Sec. 1679. Maintenance.
(a) It shall be the responsibility of the developer to maintain all drainage and stormwater management facilities required by approved preliminary plats or development plans during construction and for a two–year maintenance period following approval of a final subdivision plat or land development project completion, as applicable. The developer shall be responsible for removing temporary structures or facilities at the completion of the construction.
(b) The owner of the property shall be responsible for maintaining the drainage and permanent stormwater management facilities identified by the stormwater management plan to remain after construction is complete, following the two-year maintenance period, until or unless maintenance responsibilities are assigned to a homeowner’s or property owner’s association.
(c) Should an owner or developer, or other responsible party such as a homeowner’s association, fail to maintain drainage or stormwater management facilities in a state of service intended by the stormwater management plan, then the zoning administrator shall notify the responsible party in writing of the deficiencies and specific minimum maintenance requirements to remedy such deficiencies.
(d) If the responsible party fails to perform the required maintenance work or show a program for completion of required maintenance within a reasonable period of time (30 days maximum), then the owner shall be in violation of this division.
Sec. 1691. Utility encroachment permit required.
(a) It shall be unlawful for any utility or person to excavate or to construct, install, maintain, renew, remove or relocate facilities in, on, along, over or under the public rights of way of the city without a utility encroachment permit from the city in accordance with the terms of this division. The zoning administrator may have an administrative role in assisting the city with processing utility encroachment permit applications.
(b) The requirement to obtain a utility encroachment permit may be waived by the city in cases where utility work contemplated within the public rights of way of the city is shown on construction plans for a private development that has been reviewed and approved by the zoning administrator (in conjunction with review as applicable by the consulting city engineer) and a development permit has been issued in accordance with applicable provisions of this code.
(c) This section shall not be construed as requiring a separate utility encroachment permit for a driveway or for installation of a storm drainage culvert if such driveway or storm drainage culvert is authorized by the zoning administrator under a separate permit or authorization pursuant to this code.
Sec. 1692. Utility encroachment permit procedure.
Utility encroachment permits shall be obtained from the zoning administrator upon application made on forms prescribed by the city. The written application shall include the following:
(a) The name and address of the utility;
(b) The nature, extent, and location of any work proposed to be done, along with satisfactory plans as attachments showing in detail the location of the proposed facility or operations as described in the permit application. The plans shall show the size or capacity of facilities to be installed; their relationship to street features such as right-of-way lines, pavement edge, structures, etc., horizontal and vertical clearance to critical elements of the roadway and any other information necessary by the zoning administrator or city engineer to evaluate the impact on the street and its operation;
(c) The name and address of the person or firm who is to do such work;
(d) The name, street address, email address if applicable and telephone and e-mail addresses of one or more facilities representative(s).
(e) The projected starting and finishing dates for the work;
(f) An indemnity bond or other acceptable security in an amount to be set by the city to pay any damages to any part of the city road system or other city property or to any city employee or member of the public caused by activity or work of the utility performed under authority of the permit issued;
(g) A copy, if requested, of the registrant’s certificate of authority (or other acceptable evidence of authority to operate) from the Georgia Public Service Commission and/or the FCC and any other similar approvals, permits, or agreements;
(h) A copy, if requested, of the service agreement, if applicable or other legal instrument that authorizes the utility to use or occupy the right of way for the purpose described in the application;
(i) Unless the applicant can show an exemption from paying utility encroachment fees, the application shall be accompanied by a permit review fee, as established by the master fee schedule of the city.
Sec. 1693. Incomplete application.
If a permit application is incomplete, the zoning administrator shall notify the applicant and shall provide a reasonable period of time in which to revise the application.
Sec. 1694. Permit review and decision.
(a) Unless the permit application is extraordinarily complicated and extensive, in which case more time may be taken, the zoning administrator shall have 30 calendar days from the posted application submission deadline to review the permit application for compliance with the requirements of this article and to evaluate the application in terms of the impact of work proposed in the permit with regard to the following: impacts on safety, visual quality of streets, traffic flow, other users of the right of way; and the difficulty and length of time of the project.
(b) The zoning administrator shall issue the requested permit if there are no concerns with regard to the criteria of this division. The zoning administrator may place conditions of approval on any permit issued. If there are concerns with issuing the requested permit, the zoning administrator shall indicate those concerns or objections in writing to the applicant and deny the requested permit.
(c) Any applicant aggrieved of a decision of the to deny a utility encroachment permit under the provisions of this division may file in writing and sent via certified mail an appeal with the zoning administrator, who shall schedule the appeal in accordance with procedures of this this code for appeal of administrative decisions.
Sec. 1695. Permit commencement, expiration and extension.
(a) Each permit issued by the zoning administrator hall have a set commencement and expiration date based on information provided in the applicant’s permit application.
When the construction under any permit is completed, the utility shall notify the zoning administrator. The permit shall remain in place until construction or activity authorized under the permit is completed or until its expiration date unless the utility is in default.
(b) If work is not begun within six months of the date of permit issuance, the permit will automatically expire.
(c) The zoning administrator is authorized but shall not be obligated to grant an extension to a permit prior to expiration, upon application, and provided that a permit review fee if required for a permit application is paid.
Sec. 1696. Permit default.
The zoning administrator may find a utility in default and give written notice of default to a utility if it is determined that a utility has:
(a) Violated any provision, requirement, or condition of a utility encroachment permit, or any law of the city, county, state, or federal government;
(b) Attempted to evade any provision or requirement of this division
(c) Practiced any fraud or deceit upon the city; or
(d) Made a material misrepresentation or omission of fact in its permit application.
Sec. 1697. Termination of permit.
If a utility fails to cure a default within 20 calendar days after such notice is provided to the utility by the city, then such default shall be a material breach and the city may exercise any remedies or rights it has at law or in equity to terminate the permit. If the zoning administrator decides there is cause or reason to terminate, the following procedure shall be followed:
(a) The zoning administrator shall serve a utility with a written notice of the reason or cause for proposed termination and shall allow a utility a minimum of 20 calendar days to cure its breach; and
(b) If the utility fails to cure within 20 calendar days, the city may declare the permit terminated.
Sec. 1698. Utility accommodation policy and standards.
(a) The document known as “utility accommodation policy and standards,” promulgated and published by the Georgia Department of Transportation Division of Operations, Office of Utilities, dated 2016, and as may be amended from time to time, is hereby adopted in its entirety as if fully set forth in this division, as minimum required standards.
(b) A copy of the “utility accommodation policy and standards” shall be maintained by the zoning administrator and shall be available for public inspection.
(c) References in the “utility accommodation policy and standards” to state personnel, agencies, and fees shall be interpreted, where required, as meaning the city’s equivalents.
(d) Any conflicts between the provisions of this division and the “utility accommodation policy and standards” shall be resolved in favor of the “utility accommodation policy and standards.”
ARTICLE 17
BUILDING REGULATIONS
DIVISION 17-1 GENERAL PROVISIONS
DIVISION 17-2 PERMITS AND PLAN REVIEW
providers.
DIVISION 17-3 INSPECTIONS
Article 17, Building Regulations
DIVISION 17-4 CERTIFICATE OF OCCUPANCY
DIVISION 17-5 EXCEPTIONS, ENFORCEMENT AND PENALTIES
DIVISION 17-I
GENERAL PROVISIONS
Sec. 1701. Minimum standard codes to be enforced.
Except as otherwise specifically provided in this ordinance, it is the intention of the Pendergrass City Council to enforce the latest edition of the following Georgia State Minimum Standard Codes, as adopted and amended by the Georgia Department of Community Affairs:
(a) 2024 International Residential Code (IRC) with Georgia Amendments.
(b) 2024 International Building Code (IBC) with Georgia Amendments.
(c) 2024 International Mechanical Code (IMC) with Georgia Amendments.
(d) 2024 International Fuel Gas Code (IFGC) with Georgia Amendments.
(e) 2024 International Plumbing Code (IPC) with Georgia Amendments.
(f) 2024 International Swimming Pool and Spa Code (ISPSC) with Georgia Amendments.
(g) 2026 Georgia Amendments to the 2023 National Electrical Code (NEC).
Sec. 1702. Appendices.
Any appendices to codes referenced in this chapter are not adopted and are not an integral part of the minimum standard codes, unless specifically indicated otherwise.
Sec. 1703. Existing buildings.
(a) General. Alterations, repairs, or rehabilitation work may be made to any existing structure, building, electrical, gas, mechanical, or plumbing system without requiring the building, structure, plumbing, electrical, mechanical, or gas system to comply with all the requirements of the construction codes, provided that the alteration, repair, or rehabilitation work conforms to the requirements of the construction codes for new construction. The building official shall determine the extent to which the existing system shall be made to conform to the requirements of the construction codes for new construction.
(b) Change of occupancy. If the occupancy classification of any existing building or structure is changed, the building, electrical, gas, mechanical, and plumbing systems shall be made to conform to the intent of the construction codes as required by the building official.
Sec. 1704. Building official.
(a) The city council is authorized to appoint a building official. The city may contract with a third party to provide the duties of the building official. In the absence of an appointed building official the zoning administrator shall assume the functions under the advice of a qualified building official.
(b) The building official is hereby authorized and directed to enforce the provisions of the minimum standard codes and other codes adopted per this article, except as specifically provided otherwise in this article
(c) The building official is further authorized to render interpretations of adopted codes, which are consistent with its intent and purpose.
Sec. 1705. Incorporation clause.
This article is intended to comply with the provisions of Sec. 8-2-26 of Georgia law relative to enforcement of codes and the employment and training of inspectors, which section is incorporated by reference in its entirety into this article. Where any provision of this article is in conflict with any provision of said section of Georgia law, the section of Georgia law shall control. Or where this article is incomplete in having failed to incorporate a provision necessarily required for the implementation of the section of state law, such provision of the state law, so as to meet the mandate of said law, shall be fully complied with.
providers.
Sec. 1711. Permit application.
(a) When a permit is required, any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the construction codes, or to cause any such work to be done, shall first make application to the building official and obtain the applicable permit, if required, for the work.
Sec. 1712. Work authorized.
A building, electrical, gas, mechanical, or plumbing permit shall carry with it the right to construct or install the work, provided the same are shown on the drawings and set forth in the specifications filed with the application for the permit. Where these are not shown on the drawings and covered by the specifications submitted with the application, separate permits shall be required.
Sec. 1713. Minor repairs exempted.
Ordinary minor repairs, with a value of less than $10,000, may be made without a permit, provided that such repairs shall not violate any of the provisions of the minimum standard or other adopted codes.
Sec. 1714. Information required for permit.
(a) Each application for a permit, with the required fee, shall be filed with the building official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location.
(b) The application shall be signed by the owner, or his/her authorized agent.
(c) The permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure, and shall contain such other information as may be required by the building official.
Sec. 1715. Drawings and specifications – requirements.
(a) When required by the building official, two or more copies of specifications and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work, shall accompany the application for a permit.
(b) Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the construction codes.
(c) All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design.
Sec. 1716. Drawings and specifications – design professional.
The design professional shall be an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications, and accompanying data, for the following:
(a) All Group A, E, and I occupancies.
(b) Buildings and structures three stories or more in height.
(c) Buildings and structures 5,000 square feet (465 m2 ) or more in area.
For all other buildings and structures, the submittal shall bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered.
EXCEPTION: Single-family dwellings, regardless of size, shall not require a registered architect nor engineer, and they shall not require a certification that an architect or engineer is not required.
Sec. 1717. Drawings and specifications – additional data.
(a) The building official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and the basis of calculations.
(b) All drawings, specifications, and accompanying data required by the building official to be prepared by an architect or engineer shall be affixed with their official seal.
Sec. 1718. Site drawings.
All permit applications shall include a drawing that shows the location of the proposed building or structure and of every existing building or structure on the site or lot. The building official may require a boundary line survey prepared by a registered land surveyor.
Sec. 1719. Fee required.
(a) Fee required. A permit shall not be issued until the fees prescribed by resolution of the city council have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical, or gas systems, etc. has been paid. On all buildings, structures, electrical, plumbing, mechanical, and gas systems or alterations requiring a permit, a fee for each permit shall be paid as required at the time of filing application, in accordance with the fee schedules as set by the city council.
(b) Additional fee if commencement before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical, or plumbing, etc. system before obtaining the necessary permits, shall be subject to a penalty of 100 percent of the usual permit fee in addition to the required permit fees.
(c) Accounting. The building official or designee shall keep a permanent and accurate accounting of all permit fees and other money collected, the names of all persons upon whose account the same was paid, along with the date and amount thereof.
Sec. 1720. Completeness check; notice of regulatory action.
(a) The building official shall review the permit application for completeness. If incomplete, the building official shall notify the permit applicant of additional information needed to render the application complete.
(b) At the time the building official notifies the applicant that a complete application has been accepted, he shall also notify such applicant as to whether the personnel employed or contracted by the city will be able to provide regulatory action within 30 days for plan review or provide inspection services within two business days of receiving a valid written request for inspection. [Reference: Sec. 8-2-26 O.C.G.A.]
(c) If notified that the city’s personnel (employed or contracted) cannot provide the regulatory action or provide inspection services within two days of request for inspection, the permit applicant may upon notice to the building official proceed with a third-party plan review or inspection as provided by this article.
(d) The applicant for a permit under the terms of this article shall have the option of retaining, at its own expense, a private professional provider (i.e., third party, in the case a private provider is providing inspections and plan reviews under contract with the city) to provide the required inspection or plan review in accordance with the provisions of Sec. 8-2-26 O.C.G.A., irrespective of whether the city determines that the personnel employed or contracted by the city can provide regulatory action or inspection services within the time frames required under Sec. 8-2-26 O.C.G.A. Therefore, even if the permit applicant is notified that city personnel are available to provide the regulatory action or provide inspection services within two days of request for inspection, the permit applicant shall upon notice to the building official have the option to proceed with a third-party plan review or inspection as provided by state law and this article.
(e) If the permit applicant elects to have the city provide the regulatory action, the building official shall examine or cause to be examined each application for a permit and the accompanying documents, consisting of drawings, specifications, computations, and additional data, and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the minimum standard or other codes and all other pertinent laws or ordinances.
Sec. 1721. Requirements for plan reviews and inspections provided by private (third-party) providers.
(a) Any inspection or plan review conducted by a private professional (third-party) provider shall be no less extensive than inspections or plan reviews conducted by city personnel.
(f) The person, firm, or corporation retaining a private professional (third-party) provider to conduct an inspection or a plan review shall be required to pay to the city the regulatory fees and charges which are required by Sec. 8-2-26 O.C.G.A. as applicable. If the applicant elects to utilize the services of a private (third-party) professional provider, the regulatory fees associated with such regulatory action shall be reduced by 50 percent and such reduced amount shall be paid to the city.
(b) A private professional (third-party) provider performing plan reviews under this article shall review plans to determine compliance with all applicable regulatory requirements.
Upon determining that the plans reviewed comply with the applicable regulatory requirements, such private professional provider shall prepare an affidavit or affidavits on a form adopted by the Georgia Department of Community Affairs certifying under oath that the following is true and correct to the best of such private professional provider’s knowledge and belief and in accordance with the applicable professional standard of care:
1. The plans were reviewed by the affiant who is duly authorized to perform plan review pursuant to this section. and who holds the appropriate license or certifications and insurance coverage stipulated in this section.;
2. The plans comply with all applicable regulatory requirements; and
3. The plans submitted for plan review are in conformity with plans previously submitted to obtain governmental approvals required in the plan submittal process and do not make a change to the project reviewed for such approvals.
(c) All private professional (third-party) providers providing inspection or plan review services pursuant to Sec. 8-2-26 O.C.G.A. shall secure and maintain insurance coverage for professional liability (errors and omissions) insurance as required by Sec. 8-2-26
O.C.G.A.
(d) The private professional (third-party) provider shall be empowered to perform any plan review or inspection required by the city, including, but not limited to, inspections for footings, foundations, concrete slabs, framing, electrical, plumbing, heating ventilation and air conditioning (HVAC), or any and all other inspections necessary or required to determine compliance with all regulatory requirements and for the issuance of a building permit or certificate of occupancy by the city, provided that the plan review or inspection is within the scope of such private professional provider’s area of competency; and provided, further, that a qualified inspector acting as a private professional (third-party) provider shall only be empowered to perform a plan review or inspection within an area for which such qualified inspector has been issued a certification, license, or completion of training provided for in Sec. 8-2-26 O.C.G.A.
Sec. 1722. Procedures for private professional (third-party) plan reviews.
(a) A permit applicant utilizing the third-party plan review option as provided per state law and this article shall submit a copy of the private professional (third-party) provider’s plan review report to the city within five days of its completion. Such plan review report shall include: the required affidavit of the private professional provider; the applicable fees; and any documents required by the building official and any other documents necessary to determine that the permit applicant has secured all other governmental approvals required by law.
(b) No more than 30 days after receipt of both a permit application and the affidavit from the private professional (third-party) provider, the building official shall issue the requested permit or provide written notice to the permit applicant identifying the specific plan features that do not comply with the applicable regulatory requirements, as well as the specific code chapters and sections of such regulatory requirements. If the building official does not provide a written notice of the plan deficiencies within the prescribed 30 day period, the permit application shall be deemed approved as a matter of law and the permit shall be issued by the building official on the next business day. [Reference: Sec.
8-2-26 O.C.G.A.]
(c) If the building official provides a written notice of plan deficiencies to the permit applicant within the prescribed 30 day period, the 30 day period shall be tolled pending resolution of the matter. To resolve the plan deficiencies, the permit applicant may elect to dispute the deficiencies pursuant to Sec. 8-2-26 O.C.G.A. or to submit revisions to correct the deficiencies.
(d) If the permit applicant submits revisions to address the plan deficiencies previously identified, the building official shall have the remainder of the tolled 30 day period plus an additional five business days to issue the requested permit or to provide a second written notice to the permit applicant stating which of the previously identified plan features remain in noncompliance with the applicable regulatory requirements, with specific reference to the relevant code chapters and sections of such regulatory requirements. If the building official does not provide the second written notice within the prescribed time period, the permit shall be issued by the building official on the next business day. In the event that the revisions required to address the plan deficiencies or any additional revisions submitted by the applicant require that new governmental approvals be obtained, the applicant shall be required to obtain such approvals before a new plan report can be submitted.
(e) If the building official provides a second written notice of plan deficiencies to the permit applicant within the prescribed time period, the permit applicant may elect to dispute the deficiencies or to submit additional revisions to correct the deficiencies. For all revisions submitted after the first revision, the building official shall have an additional five business days to issue the requested permit or to provide a written notice to the permit applicant stating which of the previously identified plan features remain in noncompliance with the applicable regulatory requirements, with specific reference to the relevant code chapters and sections.
Sec. 1723. Process for pre-qualification of private professional (third-party) providers.
(a) Pursuant to Sec. 8-2-26 O.C.G.A. the city is hereby providing for the prequalification of private professional providers who may perform plan reviews or inspections pursuant to Sec. 8-2-26 O.C.G.A.
(b) The provisions of this section regarding the implementing of prequalification for private professional (third-party) providers shall not become effective until notice of the city’s intent to require prequalification and the specific requirements for prequalification have been advertised in the newspaper in which the sheriff’s advertisements for that locality are published, and by any other methods the city ordinarily utilizes for notification of engineering, architecture, or construction related solicitations.
(c) Private professional (third-party) providers shall be evaluated and approved only on the basis of the private professional (third-party) provider’s expertise with respect to the objectives of Sec. 8-2-26 O.C.G.A., as demonstrated by the private professional (thirdparty) provider’s experience, education, and training.
(d) Individuals or firms wishing to be placed on the city’s list of approved third party inspectors and plans reviewer must submit an initial application along with any application fee prescribed by the city council to the department.
(e) Those providers approved by the city shall be placed on a list of approved private professional (third-party) providers who shall thereafter be authorized to provide private professional (third-party) plan reviews and/or inspections to the extent they have been so locally qualified.
(f) To quality, a private professional (third-party) provider must be independent of, and must not be an employee of or otherwise affiliated with or financially interested in the person, firm or corporation engaged in the construction project to be inspected.
Sec. 1724. Action on permit.
(a) Time frame for action. The building official shall act upon an application for a permit without unreasonable or unnecessary delay.
(b) Issuance if satisfactory. If the building official is satisfied that the work described in an application for a permit and the contract documents filed therewith conform to the requirements of the construction codes and other pertinent laws and ordinances, he shall issue a permit to the applicant.
(c) Stamping of plans. When the building official issues a permit, he/she shall indicate, in writing or by stamp, on both sets of plans “reviewed for code compliance.” One set of drawings so reviewed shall be retained by the building official and the other set shall be returned to the applicant. The permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his/her authorized representative.
(d) Posting of permit. Work requiring a permit shall not commence until the permit holder or his/her agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official.
(e) Refusal to issue permit. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the construction codes or other pertinent laws or ordinances, the building official shall not issue a permit, but shall return the contract documents to the applicant with his refusal to issue such permit. Such refusal shall, when requested, be in writing and shall contain the reason for refusal.
Sec. 1725. Foundation only permit.
When an application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the building official may, at his discretion, issue a special permit for the foundation only. The holder of such a special permit is proceeding at his own risk and without assurance that a permit for the remainder of the work will be granted nor that corrections will not be required in order to meet provisions of the minimum standard or other codes.
Sec. 1726. Conditions of permit – permit intent.
A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the construction codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of the construction codes.
Sec. 1727. Content specified for certain permits.
Any city building permit issued to a general contractor or homebuilder for residential or commercial construction, and any city construction permit, including but not limited to mechanical, plumbing, or electrical permits, issued on existing residential or commercial property, shall have prominently printed thereon at least one inch apart from any other text on such permit and in type size and boldness equal to or greater than any other type size and boldness in the body of the permit the following:
“The issuance of this permit authorizes improvements of the real property designated herein which improvements may subject such property to mechanics’ and materialmen’s liens pursuant to Part 3 of Article 8 of Chapter 14 of Title 44 of the Official Code of Georgia Annotated. In order to protect any interest in such property and to avoid encumbrances thereon, the owner or any person with an interest in such property should consider contacting an attorney or purchasing a consumer’s guide to the lien laws which may be available at building supply home centers.”
[Reference: Sec. 8-2-26 O.C.G.A.]
Sec. 1728. Duration of permit validity.
(a) Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of six months after the time the worked is commenced.
(b) One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension shall be requested in writing and justifiable cause demonstrated. Extensions shall be in writing by the building official.
Sec. 1731. Inspections generally.
(a) Except as provided otherwise by this article, the building official shall inspect all buildings, structures, electrical, gas, mechanical, and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued, unless a third-party provider is arranged per state law and this article, in which case the third-party provider shall conduct such inspections.
(b) The building official, or the third-party provider as the case may be, shall upon notification from the permit holder or his agent make or arrange for the inspections specified in this article and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the minimum standard code.
(c) The building official shall make a record of every such examination and inspection and of all violations of the minimum standard codes.
Sec. 1732. Procedures for private professional (third-party) inspections.
Upon submission by the private professional (third-party) provider of a copy of his or her inspection report to the city, the city shall be required to accept the inspection of the private professional (third-party) provider without the necessity of further inspection or approval by the inspectors or other personnel employed by the city, unless said city has notified the private professional (third-party) provider, within two business days after the submission of the inspection report, that it finds the report incomplete or the inspection inadequate and has provided the private professional (third-party) provider with a written description of the deficiencies and specific regulatory requirements that have not been adequately addressed.
Sec. 1733. Building inspection.
(a) Foundation and foundation wall inspection: To be made after trenches are excavated, the reinforcement is in place, and the forms erected, prior to the placing of concrete.
(b) Slab inspection: To be made prior to the placing of concrete.
(c) Frame inspection: To be made after the roof, all framing, fireblocking, bracing and fasteners are in place, all concealed wiring, all pipes, chimneys, ducts, and vents are complete.
(d) Moisture barrier inspection: To be made prior to the installation of the exterior finishing materials.
(e) Final inspection: To be made after the building is completed and ready for immediate occupancy.
Sec. 1734. Electrical inspection.
(a) Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.
(b) Rough-in inspection: To be made after the roof, framing, fireblocking, and bracing is in place and prior to the installation of wall or ceiling membranes.
(c) Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.
Sec. 1735. Plumbing inspection.
(a) Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place.
(b) Rough-in inspection: To be made after the roof, framing, fireblocking, and bracing is in place and all soil, waste, and vent piping is complete, and prior to this installation of wall or ceiling membranes.
(c) Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.
(d) Note: See Sec. 312 of the International Plumbing Code for required tests.
Sec. 1736. Mechanical inspection.
(a) Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place.
(b) Rough-in inspection: To be made after the roof, framing, fireblocking, and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes.
(c) Final inspection: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy.
Sec. 1737. Gas inspection.
(a) Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected.
(b) Final piping inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test.
(c) Final inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes in order to insure compliance with all the requirements of the construction codes and to assure that the installation and construction of the gas system is in accordance with reviewed plans.
Sec. 1738. Energy inspection.
(a) Foundation inspection: To be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required.
(b) Frame inspection: To be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage.
(c) Final inspection: To be made after the building is completed and ready for occupancy, to verify installation and R-value of ceiling and floor insulation, to verify correct SEER ratings on appliances, and to verify the building envelope tightness has been demonstrated and documented on the Georgia Residential Energy Code Compliance Checklist.
Sec. 1739. Written release.
Work shall not be done on any part of a building, structure, electrical, gas, mechanical, or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing inspections.
Sec. 1740. Inspection exception for licensed master plumbers and utility contractors.
In lieu of inspection by an inspector employed by the city, a licensed master plumber or utility contractor shall have the option of installing a water or sewer line according to the alternative inspection procedure described in Sec. 8-2-26 O.C.G.A, where the installation is on private property outside the building underground, subject to compliance with Sec. 8-2-26 O.C.G.A. The local fee is still required to be submitted to the city.
Sec. 1741. Building certificate of occupancy.
(a) A new building shall not be occupied or a change made in the occupancy, nature, or use of a building or part of a building until after the building official has issued a certificate of occupancy.
(b) Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing, and fire protection systems have been inspected for compliance with the construction codes and other applicable laws and ordinances and released by the building official.
Sec. 1742. Issuance of certificate of occupancy.
Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical, and plumbing systems in accordance with the construction codes, reviewed plans and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of the construction codes.
Sec. 1743. Temporary/partial occupancy.
A temporary/partial certificate of occupancy may be issued for a portion of a commercial building, which in the opinion of the building official, may safely be occupied prior to final completion of the building. The temporary/partial certificate of occupancy shall be forfeited if the certificate of occupancy is not issued within ninety (90) days.
Sec. 1744. Existing building certificate of occupancy.
(a) A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the minimum standard codes for the occupancy intended.
(b) Where necessary, in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required.
(c) When, upon examination and inspection, it is found that the building conforms to the provisions of the minimum standard codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued.
Sec. 1745. Certificate of completion.
(a) Upon satisfactory completion of a building, structure, electrical, gas, mechanical, or plumbing system, a certificate of completion may be issued.
(b) This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system.
(c) This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy.
Sec. 1751. Connection of service utilities.
No person shall make connections from a utility, source of energy, fuel, or power to any building or system which is regulated by the construction codes for which a permit is required, until released by the building official.
Sec. 1752. Temporary connection.
The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel, or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy.
Sec. 1753. Authority to disconnect service utilities.
(a) The building official shall have the power to authorize disconnection of utility service to the building, structure, or system regulated by the construction codes, in case of emergency where necessary to eliminate an immediate hazard to life or property.
(b) The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure, or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure, or service system shall be notified in writing, as soon as practical thereafter.
Sec. 1754. Revocation and other enforcement actions.
(a) Misrepresentation of application. The building official may revoke a permit or approval, issued under the provisions of the construction codes, in case there has been any false statement or misrepresentation as to the material fact in the application or plans on which the permit or approval was based.
(b) Violation of code provisions. The building official may revoke a permit upon determination by the building official that the construction erection, alteration, repair, moving, demolition, installation or replacement of the building, structure, electrical, gas, mechanical, or plumbing systems for which the permit was issued is in violation of, or not in conformity with, the provisions of the minimum standard codes.
(c) Stop work order. The building official may issue a stop-work order for a building project or any portion of such project, which may go into effect immediately as provided by law, after giving notice and opportunity to remedy the violation, if the building official determines that a condition on the building site constitutes an immediate threat to public safety and welfare.
Sec. 1755. Stop work orders.
(a) Upon notice from the building official, work on any building, structure, electrical, gas, mechanical, or plumbing system that is being done contrary to the provisions of the construction codes or in a dangerous or unsafe manner, shall immediately cease.
(b) Such notice shall be in writing and shall be given to the owner of the property, or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed.
(c) Where an emergency exists, the building official shall not be required to give a written notice prior to stopping the work.
(d) Any person who shall continue any work in or about the structure after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe conditions, shall be subject to penalties as prescribed in the city’s Code of Ordinances for violations to code provisions.
(e) A stop-work order issued for reasons of immediate threat to public safety and welfare shall be appealable to the local enforcement agency’s board of appeals, in the manner provided by applicable law. The city council shall serve as the board of appeals.
Sec. 1756. Violations determined during inspections.
A local inspector, including a fire service employee enforcing a state or local fire safety standard, who specifies a code violation noted during an inspection shall, upon the written request of the permit holder, cite in writing the particular code book, section and edition of the code which is the basis of the violation. [Reference: Sec. 8-2-26 O.C.G.A.]
ARTICLE 18
RESERVED
ARTICLE 19
RESERVED
ARTICLE 20
ADMINISTRATION AND ENFORCEMENT
Sec. 2002. Authority of the building official.
Sec. 2003. Enforcement.
Sec. 2001. Authority of zoning administrator.
The zoning administrator is responsible for the supervision and execution of all administrative functions of this code. The zoning administrator shall have the functions, powers, and duties described in this section, which shall not be limiting and which shall be liberally construed in favor of the zoning administrator, subject to appeal of final decisions as provided in division 13- 3 of this code. The zoning administrator may delegate any administrative functions, powers, and duties assigned by this section or ordinance generally to other staff as may be appropriate, without the need to separately authorize such delegation by formal action.
(a) Rezoning requests. Review and make recommendations on applications for amendment to the official zoning map to change the zoning district.
(b) Conditional use applications. Review and make recommendations on applications for conditional use applications.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.