Skip to content
Georgia Commons
Menu

Pierce County · Zoning Ordinance

Appendix B - LAND SUBDIVISION ORDINANCE / 5 - MINIMUM DESIGN STANDARDS

5-2. Easements.

About this text

  • As published by Municode, current through 2025-01-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

5-2.1 Utility: Utility locations, wherever feasible, shall be located within the platted right-ofway. If easements are required, they shall be a minimum width of twenty (20) feet. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase,

they shall be platted within said subdivision or phase thereof.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pierce-county/zoning/5-2@2025-01-07-2162455bc5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pierce County Zoning Ordinance, 5-2. Easements | Georgia Commons