Pierce County · Zoning Ordinance
Appendix B - LAND SUBDIVISION ORDINANCE / 5 - MINIMUM DESIGN STANDARDS
5-2. Easements.
About this text
- As published by Municode, current through 2025-01-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
5-2.1 Utility: Utility locations, wherever feasible, shall be located within the platted right-ofway. If easements are required, they shall be a minimum width of twenty (20) feet. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase,
they shall be platted within said subdivision or phase thereof.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.