6-7. Storm water drainage.

About this text

  • As published by Municode, current through 2025-01-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The subdivider shall provide adequate storm water drainage in accordance with these regulations and applicable specifications. Where drainage conditions dictate, open ditches shall be paved. The subdivider shall also provide for adequate drainage of springs or other ground water drainage.

The drainage system for a subdivision shall be designed in accordance with sound engineering principles and procedures such that all salable parcels included in the final plat are positively drained.

The drainage system shall be designed to accommodate drainage from adjacent lands which naturally drain to or through the lands being subdivided. The drainage system shall be designed to not significantly affect the natural drainage onto adjacent lands unless appropriate easements are obtained by the developer from the owner of such adjacent lands concurring with the proposed drainage design. Evidence of such concurrence shall be submitted to the Zoning Administrator along with the improvement plans and specifications.

Drainage facilities that are designed to handle flowing water (for example, culverts and weirs) shall be hydraulically designed to function when subjected to the maximum flow rate that can be expected to occur with a 25-year storm event.

Drainage facilities that are designed to handle water accumulations (for example, detention ponds with overflow provisions) shall be designed to accommodate the maximum water level that can be expected to occur with a 25-year storm event. Necessary drainage facilities, including but not limited to culverts, rights-of-way, and easements, may be dedicated to the local government, at no expense to the local government, and at the option of the local government.

All drainage systems discharging into any creek, stream, or natural body of water, including but not limited to wetlands as determined by the U.S. Army Corps of Engineers, shall pass through an approved sedimentation or detention pond prior to such discharge.

A drainage, sedimentation, and soil erosion plan certified by a professional engineer or registered land surveyor shall be submitted to the Zoning Administrator simultaneous with the preliminary plat, at which time technical design criteria will be established. Said plan shall be consistent with the latest version of Best Management Practices as defined by the Georgia Department of Natural Resources.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pierce-county/zoning/6-7@2025-01-07-464383081e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pierce County Zoning Ordinance, 6-7. Storm water drainage | Georgia Commons