Skip to content
Georgia Commons
Menu

Pine Mountain · Zoning Ordinance

Article VI

3.7. M-1- General Manufacturing District

About this text

  • As posted on the city's website, retrieved 2026-11-14

A. MINIMUM LOT REQUIREMENTS

Area 5 acres Width at building line 200 feet

B. MAXIMUM LOT COVERAGE 50 % of the total lot area

C. MINIMUM SETBACK REQUIREMENTS

Front 5O feet Side 30 feet Side Street 50 feet Rear 50 feet

D. MAXIMUM BUILDING HEIGHT 45 feet or three stories

E. OFF-STREET PARKING

As required in Article V, Section 3

F. OFF-STREET LOADING AND UNLOADING

As required in Article V, Section 4

G. OTHER REQUIREMENTS

1. A side yard buffer strip of 75 feet shall be required where a side yard abuts a residential district and five feet of the buffer strip shall be planted with shrubs and trees to provide an aesthetic appearance.

2. A rear yard buffer strip of 75 feet shall be required where a rear yard abuts a residential district and five feet of the buffer strip shall be planted with shrubs and trees to provide an aesthetic appearance.

3. A green belt of five feet shall be required on three sides of the property unless waived by the Town of Pine Mountain Town Council.

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pine-mountain/zoning/3.7@2026-11-14-d9770a461f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pine Mountain Zoning Ordinance, 3.7. M-1- General Manufacturing District | Georgia Commons