Skip to content
Georgia Commons
Menu

Pine Mountain · Zoning Ordinance

Article VI

3.6. C-2 - Commercial District

About this text

  • As posted on the city's website, retrieved 2026-11-14

A. MINIMUM LOT REQUIREMENTS

Area 15,000 sq. ft.

Width at building line 75 feet

B. MAXIMUM LOT COVERAGE 25% of the total lot area

C. MINIMUM SETBACK REQUIREMENTS Compatible with existing neighboring setbacks for front, side, and rear yards

D. MAXIMUM BUILDING HEIGHT 45 feet or 3 stories

E. OFF-STREET PARKING As required in Section 2 of this Article an Article V. Section 3

F. OFF-STREET LOADING AND UNLOADING As required in Article V, Section 4

G. OTHER REQUIREMENTS

1. A side yard buffer strip of 50 feet shall be required when a side yard abuts a residential district and five feet of the buffer strip shall be planted with shrubs and trees to provide an aesthetic appearance.

2. A rear yard buffer strip of 50 feet shall be required where a rear yard abuts a residential district and five feet of the buffer strip shall be planted with shrubs and trees to provide an aesthetic appearance.

3. A 20-foot fire lane shall be required on one side of the major structure or single freestanding structure.

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pine-mountain/zoning/3.6@2026-11-14-cf6514aff4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pine Mountain Zoning Ordinance, 3.6. C-2 - Commercial District | Georgia Commons