Pine Mountain · Ordenanza de zonificación
Article VI
3.6. C-2 - Commercial District
Sobre este texto
- As posted on the city's website, retrieved 2026-11-14
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. MINIMUM LOT REQUIREMENTS
Area 15,000 sq. ft.
Width at building line 75 feet
B. MAXIMUM LOT COVERAGE 25% of the total lot area
C. MINIMUM SETBACK REQUIREMENTS Compatible with existing neighboring setbacks for front, side, and rear yards
D. MAXIMUM BUILDING HEIGHT 45 feet or 3 stories
E. OFF-STREET PARKING As required in Section 2 of this Article an Article V. Section 3
F. OFF-STREET LOADING AND UNLOADING As required in Article V, Section 4
G. OTHER REQUIREMENTS
1. A side yard buffer strip of 50 feet shall be required when a side yard abuts a residential district and five feet of the buffer strip shall be planted with shrubs and trees to provide an aesthetic appearance.
2. A rear yard buffer strip of 50 feet shall be required where a rear yard abuts a residential district and five feet of the buffer strip shall be planted with shrubs and trees to provide an aesthetic appearance.
3. A 20-foot fire lane shall be required on one side of the major structure or single freestanding structure.
Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.