SECTION 7. DRAINAGE

About this text

  • As posted on the city's website, retrieved 2026-11-14

1. Storm Sewers:

Storm sewers and drains shall be provided in each subdivision. They shall be designed to carry not less than the storm water from a rainfall expected to occur once in ten (10) years, with a runoff of 90 percent for pavements and buildings and a variable run off factor depending upon topography of ground for other purposes. Storm drain pipes shall consist of reinforced concrete, bituminous coated corrugated metal or bituminized fiber pipe. The storm sewer system shall be designed and sized to accommodate and provide for future extensions. The entire storm sewer system shall be approved by the Town Engineer or duly appointed agent of the Town Council

prior to its installments.

2. Drainage Swales and Ditches:

All drainage swales and ditches must be a minimum of six feet wide with a six foot to one-foot (6:1) slope on each side. They must be constructed of sod, asphalt, or concrete sufficient to prevent erosion.

3. Driveways, Headwalls, Masonry Mailboxes:

All driveways shall slope away from streets or roads at a rate of one-quarter (1/4) inch to onehalf (1/2) inch per foot for a distance of ten (10) feet. No headwalls or masonry mailboxes may be erected on public right-of-way.

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:pine-mountain/zoning/7@2026-11-14-ce35a258f4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Pine Mountain Zoning Ordinance, SECTION 7. DRAINAGE | Georgia Commons