Ir al contenido
Georgia Commons
Menú

Pine Mountain · Ordenanza de zonificación

Article VI

SECTION 7. DRAINAGE

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-14

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

1. Storm Sewers:

Storm sewers and drains shall be provided in each subdivision. They shall be designed to carry not less than the storm water from a rainfall expected to occur once in ten (10) years, with a runoff of 90 percent for pavements and buildings and a variable run off factor depending upon topography of ground for other purposes. Storm drain pipes shall consist of reinforced concrete, bituminous coated corrugated metal or bituminized fiber pipe. The storm sewer system shall be designed and sized to accommodate and provide for future extensions. The entire storm sewer system shall be approved by the Town Engineer or duly appointed agent of the Town Council

prior to its installments.

2. Drainage Swales and Ditches:

All drainage swales and ditches must be a minimum of six feet wide with a six foot to one-foot (6:1) slope on each side. They must be constructed of sod, asphalt, or concrete sufficient to prevent erosion.

3. Driveways, Headwalls, Masonry Mailboxes:

All driveways shall slope away from streets or roads at a rate of one-quarter (1/4) inch to onehalf (1/2) inch per foot for a distance of ten (10) feet. No headwalls or masonry mailboxes may be erected on public right-of-way.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:pine-mountain/zoning/7@2026-11-14-ce35a258f4

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Pine Mountain Zoning Ordinance, SECTION 7. DRAINAGE | Georgia Commons