Rome · Zoning Ordinance
Appendix B - UNIFIED LAND DEVELOPMENT CODE / Article 2 - PROCEDURES
2.5.6. Expiration of development permit.
About this text
- As published by Municode, current through 2026-01-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
a. A development permit shall expire if the development activity described in the permit is not begun within six months from the date of issuance.
b. The Chief Building Inspector may renew any development permit that has expired with the concurrence of the respective Public Works Department, within six months of expiration. If a development permit has expired for more than six months, the applicant shall be required to apply for a new development permitunder the development permit approval process of this Development Code.
(Ord. No. 01-7-2, § I, 7-16-01; Ord. No. 05-2-4, § I, 2-7-05)
2.6. Flood area permit.
2.6.1. Permit required. If development or construction is proposed within or affecting an area of special flood hazard, approval of a flood area
permit application shall be required. An application for a flood area permit may be included with and reviewed as part of a development permit
application.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.