6.12.3. Installation of storm drainage facilities.

About this text

  • As published by Municode, current through 2026-01-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Construction of the storm drainage facilities shall be initiated as part of the grading of the site and in accordance with the approved stormwater management plan. Stormwater detention facilities shall be constructed prior to the installation of

any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches,

shall be coordinated with the construction of streets and other site improvements, as appropriate.

6.12.4. Earthen embankments. Earthen embankments shall be placed in uniform layers not to exceed a compacted thickness of six inches per

layer and shall be compacted to a density of 95 percent of the maximum laboratory dry weight per cubic foot as determined by AASHTO Method T-99 in all areas where structures, parking lots and drives, streets, and utilities are to be placed.

All other embankments are to be compacted to at least 90 percent. Proofrolling shall be accomplished prior to placement of embankments to detect soft spots.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rome/zoning/6.12.3@2026-01-26-b4aa38dd21

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Rome Zoning Ordinance, 6.12.3. Installation of storm drainage facilities | Georgia Commons