Rossville · Zoning Ordinance
Appendix A - RESERVED / Article VII - REQUIRED IMPROVEMENTS
Section 74. Water supply system.
About this text
- As published by Municode, current through 2024-06-12
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Each lot or other site in a subdivision shall be connected to a public water supply system by lines of sufficient size to accommodate the anticipated water demand. Lot service connections shall be stubbed in so that there will be no necessity for cutting into any pavement in order to make any future connections.
Three copies of the plan of the water supply system of the subdivision, showing the seal of a registered professional engineer, shall be submitted to, checked and approved by the planning commission prior to installation. Said system shall be designed in accordance with standard engineering practice.
Arrangements for the installation of the water system are the responsibility of the subdivider.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.